SlideShare a Scribd company logo
1 of 8
PERSONAL INFORMATION
 First Name: Ahmed
 Middle Name: Mahmoud
 Surname: Ahmed
 Gender: Male
 Date of Birth: 14/12/1980
 Place ofBirth: Egypt- Sharqia - Zigzag
 Nationality: Egyptian
 Marital Status: Married has three child
 Military Status: Finished
 Address: Elmasaken El taawenya- Zigzag –El Sharkeya
 Driving license: Valid Egyptian, U.A.E, K.S.A license.
 Tel No. : 009661 54 864 7711(Mobile K.S.A current)
 E-mail: aboyassin2007.l@gmial.com
QUALIFICATION
 B.Sc. in civil Engineering , Zigzag University , Faculty of Engineering, 2003
 Project : Reinforced concrete
 Projectgrade :Very good
EXPERIENCE
From aug. 2013up to now
Job title: PROJECT MANAGER
Company: ADVANCED CONSTRUCTIONCO.
Project: INTERSECTIONAIRPORT ROAD WITH KING KHALID STREET (ALTAIF)
Consultant: DAR ALKHALEJ
Valueof the project: 49 Million S.R
Brief of the project:
 one tunnel, with in length 642 m.r consistof raft foundation and retaining wall
with upper slabs.
Responsibility:
1- studying all project document(contract-B O Q-specification-tender drawing)
2- surveying all site of project to specify all obstruction clearly.
3- Studying all this obstruction &its reflection on project.
4- Make full picture for direct costfor all activity in project and controlit.
5- Sharing technical office for work plan &base line.
6- Sharing technical office in shop drawing submittal.
7- Sharing projects manager in choosing material suppliers &subcontractors.
8- Preparing site.
9- planning and determine the responsibilities of manpower in the project.
10- Following monthly bill with owner till paying.
11- Safety plan for project.
ACTIVITY:
1- Making soil investigation to check bearing capacity of soil & G.W.T .
2- Making all diversion for underground service(electrical-sewerage-water-
phone-etc….)
3- Excavation till construction level .
4- All reinforced concrete work(foundation- retaining wall- pump station- top
slab- etc……)
5- All finishing work(asphalt-electrical-mechanics-etc…..)
From April2013 up to aug. 2013
Job title: BRIDGES CONSTRUCTIONMANAGER
Company: ADVANCED CONSTRUCTIONCO.
Project: INTERSECTIONHalimma alsaadia with Madina Road at Jeddah
Consultant: Parsons
Valueof the project: 47 Million S.R
Brief of the project:
 one bridges, three spans with posttension precast girders cast in situ with
approachramps supported by soil walls ,length of bridge 580m, width of
bridges 26.5m.with all service road around.
Activities:
1. Making soil investigation to check bearing capacity of soil and
sharing in getting engineering solution for constructionon shall soil
(eng. Fill ,foam …..Etc).
2. Execution of different structure element such as (excavation, eng.
Fill, pier ,cross head ,precast girder ….etc)
3. Taking all technical action for all activity which relative to the
bridge.
4. Leading the all team in positive direction to finalize all activity on time
under supervision of quality control.
5. Preparing all time schedule &man power and equipments requirement
for all activity of bridge
Making all negations with consultant and subcontractor.
From june2012 up to April 2013
Job title: BRIDGES CONSTRUCTIONMANAGER
Company: ADVANCED CONSTRUCTIONCO.
Project: INTERSECTIONPIRNCE METAAB STR. & ASMAN EBN AFAN STR. AND
PRINCE NAYEF STR.(DAMMAM – EASTREN ZONE)
Consultant: ZOHEER FAYEZ
Valueof the project: 238 Million S.R
Brief of the project:
 one bridges intersect with tunnel
 posttension box section castin situ with approachramps supported by
retaining walls ,length of bridge 1450m, width of bridges 26.5m.(cost of
bridge more than 140million)
 One tunnel with a rotary
Activities:
1. Making soil investigation to check bearing capacity of soil and
sharing in getting engineering solution for constructionon shall soil
(eng. Fill ,foam …..Etc).
2. Execution of different structure element such as (excavation, eng.
Fill, pier ,cross head ,box section ….etc)
3. Taking all technical action for all activity which relative to the
bridge.
4. Leading the all team in positive direction to finalize all activity on time
under supervision of quality control.
5. Preparing all time schedule &man power and equipments requirement
for all activity of bridge
6. Making all negations with consultant and subcontractor.
From February 2011up to june2012 (Bridges Depr. Manger)
Company: NAHDAT AL-EMAAR CONTRACTING CO.LED.
Project: CONTIUETION OF SOME ROADS AT ASEER AREA (GROUP 6)
Consultant: V3 ALAYSAI CONSALTANTS
Valueof the project: 211 Million S.R
Brief of the project: 4 bridges length (160,250,350,380),2 interchange with post
tension girders span 27.4 with slabs cast in situ with approachramps, width varies
from 16.35m to 32m& more than 70 culverts with different no. of cells.
Activities:
1. Making soil investigation to check bearing capacity of soil.
2. Supervision of all prepared shop drawing for all element of bridges
works.
3. Supervision & execution of different structure element such as
(excavation, footing, pier with height more than17m, posttension
girder, top slab , newjerrsy barrier …)
4. Navigation with different company to get best price offer for different
material(bearing, formwork ,waterproof, expansions joint, etc) 1
5. All road works for bridges works according to typical sections
(engineering fill, sub base, abc …)
6. All finishing works (curbstone, interlock, high mast lighting …)
7. Repair of concrete element (honey cum, air bubbles, surface cracks
,misalignment )
From march 2010 up to January 2011 (structural project
engineer)
Company:MOHAMED ALI AL-SWILEM CO. Company
Project: RIYADH SECONDARY ROADS – GROUP 1 PROJECT
Consultant: V3 ALAYSAI CONSALTANTS
Valueof the project: 350 Million S.R
Brief of the project:1underpass&5 bridges, posttension & pretension girders with
slabs cast in situ with approach ramps supported by retaining walls, width varies
from 32 to 40m.
Activities:
1. Piling work including supervision, service diversion, execution of
100 mm piles.
2. Integrity test & load test piles using concrete blocks loading.
3. Execution of different structure element such as (pile cap, pier,
pretension, post tension girder, top slab, …)
4. Erection of retaining walls parapet & n4120ewjerssy of center median
including alignment verticality check0251748` 1
5. All road works for bridges works according to typical
sections(engineering fill , sub base,abc,……)
6. All finishing works (curbstone,interlock ,high mast lighting,……)
7. Repair of concrete element (honey cum, air bubbles, surface cracks
,misalignment )
From sep.2008 up to feb.2010 (structural engineer)
Company:Emirates Roads Contracting Company
Project: Access Arrangement to Rashidia Park & Ride Station
Consultant: PARSONS
Valueof the project: 700 Million Dhrs
Brief of the project: 17 bridges, posttension cast in situ with approachramps
supported by soil walls, width of bridges varies from 10.9 to 24.20m and depth from
2.5 to 1.80m.
Activities:
1. Piling work including supervision , service diversion , execution of
1500, 1000 & 600 mm piles
2. Integrity test & load test piles using both of tension anchors and
concrete blocks loading
3. Execution of different structure element such as (pile cap, pier,
bottom slab & web, top slab, posttension…)
4. Stressing of bridge using Middle East system
5. Erection of soil wall panels using “Fryssinet system” (including belts
tensioning , backfilling, verticality check, …)
6. Soil wall precastbarrier erection & casting of counter weight portion
7. Bridge cast in situ barrier
8. Repair of concrete element (honey cum, air bubbles, surface cracks)
using O-Basf Products.
From 04/2007up to 08/2008 (Project engineer)
Company:Nile Public Co. of Roads & Bridges
Project: New Banha bridge over Zagazig-Banha Railway (Egypt)
Valueof the project: 27 Million L.E.
Duration of project : 10 months
Brief of the project: consists of 09 bays box girder section & 2 bays steel beams
with composed slab deck.
Consultant: Al Behire Consultant
Activities:1- Coordination between site and design office
2- Detailer of steel reinforcement for different structure element
3- Execution of all bridge activites (180 piles, 12 pile caps, 2 abutments, 10
piers, asphalt work, installation of light poles)
4- Details of steel reinforcement and concrete dimensions for different R.C
elements.
5- Quantity surveying for project items (Steel structure, Concrete, Reinforcement…)
From 05/2004 up to 03/2007 (Site Engineer)
Company:Nile Public Co. of Roads & Bridges
Projects: El Wasfia Bridge over El Ismailia Canal
Valueof the project: 57 Million L.E.
Brief of the project: consists of 17 bays boxgirder section & 1 steel bay ( steel
beams with composed slab deck).
Consultant: Authority of Roads & Bridges.
Activities:1- Coordination between site and design office
2- Detailer of steel reinforcement for different structure element
3- Execution of all bridge stages (580 piles, 19 pile caps, 2 abutments,17 piers )
4- Details of steel reinforcement and concrete dimensions for different R.C
elements.
5- Quantity surveying for project items (Steel structure, Concrete,
Reinforcement…)
General Skills
 Ability to work under pressure – Excellent learning capabilities
 Excellent communication skills – great negotiation skills
 Excellent leadership skills – great analytic skills
 Greet coordination skills – excellent interpersonal skills
COMPUTER Skills
 Auto Cad
 Excel – word
LANGUAGES
Language Speaking Understanding Reading Writing
Arabic Native Native Native Native
English Very good Very good Very good Very good

More Related Content

What's hot

Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015shahmeer memon
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVNANDLAL PRASAD
 
Hee Resume & CV 2016
Hee Resume & CV 2016Hee Resume & CV 2016
Hee Resume & CV 2016hee siek fung
 
Cv Mohamed Gaber eng.
Cv Mohamed Gaber eng.Cv Mohamed Gaber eng.
Cv Mohamed Gaber eng.mohamed gaber
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015Mohd Murtaza
 
Summer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamSummer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamRaju kumar Gautam
 
Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaNarayan Gupta
 
L&t PARKCIRCUS
L&t PARKCIRCUSL&t PARKCIRCUS
L&t PARKCIRCUSRajdip Das
 
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)vishal prakash
 
AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04Ahmed gemeiy
 

What's hot (20)

Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
 
MCV
MCVMCV
MCV
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CV
 
Cv 01
Cv 01Cv 01
Cv 01
 
Hee Resume & CV 2016
Hee Resume & CV 2016Hee Resume & CV 2016
Hee Resume & CV 2016
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
CV
CVCV
CV
 
Cv Mohamed Gaber eng.
Cv Mohamed Gaber eng.Cv Mohamed Gaber eng.
Cv Mohamed Gaber eng.
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
 
Summer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamSummer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman Nigam
 
Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL Patna
 
L&t PARKCIRCUS
L&t PARKCIRCUSL&t PARKCIRCUS
L&t PARKCIRCUS
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
 
AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04
 
k.Ramakkannu cv 06 jan2016
k.Ramakkannu cv 06 jan2016k.Ramakkannu cv 06 jan2016
k.Ramakkannu cv 06 jan2016
 
cv1
cv1cv1
cv1
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 

Viewers also liked

¿Cuál es mi competencia inicial
¿Cuál es mi competencia inicial¿Cuál es mi competencia inicial
¿Cuál es mi competencia inicialMiguel Cime Varguez
 
Informe de la Industria Pesquera a Diciembre de 2015
Informe de la Industria Pesquera a Diciembre de 2015Informe de la Industria Pesquera a Diciembre de 2015
Informe de la Industria Pesquera a Diciembre de 2015Eduardo Nelson German
 
Zeugnis-Lin Tian
Zeugnis-Lin TianZeugnis-Lin Tian
Zeugnis-Lin TianLin Tian
 
Arizona Student Suspended for Harassing Spanish Speakers Files Lawsuit | The...
Arizona Student Suspended for Harassing Spanish Speakers Files Lawsuit  | The...Arizona Student Suspended for Harassing Spanish Speakers Files Lawsuit  | The...
Arizona Student Suspended for Harassing Spanish Speakers Files Lawsuit | The...Rich Valdés
 
EFOMA TIMOTHY COVER LETTER
EFOMA TIMOTHY COVER LETTEREFOMA TIMOTHY COVER LETTER
EFOMA TIMOTHY COVER LETTERTimothy Efoma
 
MikeG_Chk-Air_Inst-PilotResume_092016
MikeG_Chk-Air_Inst-PilotResume_092016MikeG_Chk-Air_Inst-PilotResume_092016
MikeG_Chk-Air_Inst-PilotResume_092016MICHAEL GROSCHOPF
 
NOVAGOLD 2015 Year-End Financials & Project Update
NOVAGOLD 2015 Year-End Financials & Project UpdateNOVAGOLD 2015 Year-End Financials & Project Update
NOVAGOLD 2015 Year-End Financials & Project UpdateNOVAGOLD
 

Viewers also liked (12)

¿Cuál es mi competencia inicial
¿Cuál es mi competencia inicial¿Cuál es mi competencia inicial
¿Cuál es mi competencia inicial
 
Informe de la Industria Pesquera a Diciembre de 2015
Informe de la Industria Pesquera a Diciembre de 2015Informe de la Industria Pesquera a Diciembre de 2015
Informe de la Industria Pesquera a Diciembre de 2015
 
Zeugnis-Lin Tian
Zeugnis-Lin TianZeugnis-Lin Tian
Zeugnis-Lin Tian
 
Arizona Student Suspended for Harassing Spanish Speakers Files Lawsuit | The...
Arizona Student Suspended for Harassing Spanish Speakers Files Lawsuit  | The...Arizona Student Suspended for Harassing Spanish Speakers Files Lawsuit  | The...
Arizona Student Suspended for Harassing Spanish Speakers Files Lawsuit | The...
 
EFOMA TIMOTHY COVER LETTER
EFOMA TIMOTHY COVER LETTEREFOMA TIMOTHY COVER LETTER
EFOMA TIMOTHY COVER LETTER
 
La Huella Humana
La Huella Humana
La Huella Humana
La Huella Humana
 
MikeG_Chk-Air_Inst-PilotResume_092016
MikeG_Chk-Air_Inst-PilotResume_092016MikeG_Chk-Air_Inst-PilotResume_092016
MikeG_Chk-Air_Inst-PilotResume_092016
 
Student Support Centre - Home Tuition
Student Support Centre - Home Tuition Student Support Centre - Home Tuition
Student Support Centre - Home Tuition
 
evaluacion diagnostica
evaluacion diagnosticaevaluacion diagnostica
evaluacion diagnostica
 
Movilizo mis saberes
Movilizo mis saberesMovilizo mis saberes
Movilizo mis saberes
 
NOVAGOLD 2015 Year-End Financials & Project Update
NOVAGOLD 2015 Year-End Financials & Project UpdateNOVAGOLD 2015 Year-End Financials & Project Update
NOVAGOLD 2015 Year-End Financials & Project Update
 
Ncc case study
Ncc case studyNcc case study
Ncc case study
 

Similar to Ahmd Mahmoud c.v

Similar to Ahmd Mahmoud c.v (20)

amr
amramr
amr
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
 
Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.v
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
CV update
CV updateCV update
CV update
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
CV
CVCV
CV
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
Eng Hisham cv
Eng Hisham cvEng Hisham cv
Eng Hisham cv
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
C.V.
C.V.C.V.
C.V.
 

Ahmd Mahmoud c.v

  • 1. PERSONAL INFORMATION  First Name: Ahmed  Middle Name: Mahmoud  Surname: Ahmed  Gender: Male  Date of Birth: 14/12/1980  Place ofBirth: Egypt- Sharqia - Zigzag  Nationality: Egyptian  Marital Status: Married has three child  Military Status: Finished  Address: Elmasaken El taawenya- Zigzag –El Sharkeya  Driving license: Valid Egyptian, U.A.E, K.S.A license.  Tel No. : 009661 54 864 7711(Mobile K.S.A current)  E-mail: aboyassin2007.l@gmial.com QUALIFICATION  B.Sc. in civil Engineering , Zigzag University , Faculty of Engineering, 2003  Project : Reinforced concrete  Projectgrade :Very good EXPERIENCE From aug. 2013up to now Job title: PROJECT MANAGER Company: ADVANCED CONSTRUCTIONCO. Project: INTERSECTIONAIRPORT ROAD WITH KING KHALID STREET (ALTAIF) Consultant: DAR ALKHALEJ Valueof the project: 49 Million S.R Brief of the project:
  • 2.  one tunnel, with in length 642 m.r consistof raft foundation and retaining wall with upper slabs. Responsibility: 1- studying all project document(contract-B O Q-specification-tender drawing) 2- surveying all site of project to specify all obstruction clearly. 3- Studying all this obstruction &its reflection on project. 4- Make full picture for direct costfor all activity in project and controlit. 5- Sharing technical office for work plan &base line. 6- Sharing technical office in shop drawing submittal. 7- Sharing projects manager in choosing material suppliers &subcontractors. 8- Preparing site. 9- planning and determine the responsibilities of manpower in the project. 10- Following monthly bill with owner till paying. 11- Safety plan for project. ACTIVITY: 1- Making soil investigation to check bearing capacity of soil & G.W.T . 2- Making all diversion for underground service(electrical-sewerage-water- phone-etc….) 3- Excavation till construction level . 4- All reinforced concrete work(foundation- retaining wall- pump station- top slab- etc……) 5- All finishing work(asphalt-electrical-mechanics-etc…..) From April2013 up to aug. 2013 Job title: BRIDGES CONSTRUCTIONMANAGER Company: ADVANCED CONSTRUCTIONCO. Project: INTERSECTIONHalimma alsaadia with Madina Road at Jeddah Consultant: Parsons Valueof the project: 47 Million S.R Brief of the project:
  • 3.  one bridges, three spans with posttension precast girders cast in situ with approachramps supported by soil walls ,length of bridge 580m, width of bridges 26.5m.with all service road around. Activities: 1. Making soil investigation to check bearing capacity of soil and sharing in getting engineering solution for constructionon shall soil (eng. Fill ,foam …..Etc). 2. Execution of different structure element such as (excavation, eng. Fill, pier ,cross head ,precast girder ….etc) 3. Taking all technical action for all activity which relative to the bridge. 4. Leading the all team in positive direction to finalize all activity on time under supervision of quality control. 5. Preparing all time schedule &man power and equipments requirement for all activity of bridge Making all negations with consultant and subcontractor. From june2012 up to April 2013 Job title: BRIDGES CONSTRUCTIONMANAGER Company: ADVANCED CONSTRUCTIONCO. Project: INTERSECTIONPIRNCE METAAB STR. & ASMAN EBN AFAN STR. AND PRINCE NAYEF STR.(DAMMAM – EASTREN ZONE) Consultant: ZOHEER FAYEZ Valueof the project: 238 Million S.R Brief of the project:  one bridges intersect with tunnel  posttension box section castin situ with approachramps supported by retaining walls ,length of bridge 1450m, width of bridges 26.5m.(cost of bridge more than 140million)  One tunnel with a rotary
  • 4. Activities: 1. Making soil investigation to check bearing capacity of soil and sharing in getting engineering solution for constructionon shall soil (eng. Fill ,foam …..Etc). 2. Execution of different structure element such as (excavation, eng. Fill, pier ,cross head ,box section ….etc) 3. Taking all technical action for all activity which relative to the bridge. 4. Leading the all team in positive direction to finalize all activity on time under supervision of quality control. 5. Preparing all time schedule &man power and equipments requirement for all activity of bridge 6. Making all negations with consultant and subcontractor. From February 2011up to june2012 (Bridges Depr. Manger) Company: NAHDAT AL-EMAAR CONTRACTING CO.LED. Project: CONTIUETION OF SOME ROADS AT ASEER AREA (GROUP 6) Consultant: V3 ALAYSAI CONSALTANTS Valueof the project: 211 Million S.R Brief of the project: 4 bridges length (160,250,350,380),2 interchange with post tension girders span 27.4 with slabs cast in situ with approachramps, width varies from 16.35m to 32m& more than 70 culverts with different no. of cells. Activities: 1. Making soil investigation to check bearing capacity of soil. 2. Supervision of all prepared shop drawing for all element of bridges works. 3. Supervision & execution of different structure element such as (excavation, footing, pier with height more than17m, posttension girder, top slab , newjerrsy barrier …)
  • 5. 4. Navigation with different company to get best price offer for different material(bearing, formwork ,waterproof, expansions joint, etc) 1 5. All road works for bridges works according to typical sections (engineering fill, sub base, abc …) 6. All finishing works (curbstone, interlock, high mast lighting …) 7. Repair of concrete element (honey cum, air bubbles, surface cracks ,misalignment ) From march 2010 up to January 2011 (structural project engineer) Company:MOHAMED ALI AL-SWILEM CO. Company Project: RIYADH SECONDARY ROADS – GROUP 1 PROJECT Consultant: V3 ALAYSAI CONSALTANTS Valueof the project: 350 Million S.R Brief of the project:1underpass&5 bridges, posttension & pretension girders with slabs cast in situ with approach ramps supported by retaining walls, width varies from 32 to 40m. Activities: 1. Piling work including supervision, service diversion, execution of 100 mm piles. 2. Integrity test & load test piles using concrete blocks loading. 3. Execution of different structure element such as (pile cap, pier, pretension, post tension girder, top slab, …) 4. Erection of retaining walls parapet & n4120ewjerssy of center median including alignment verticality check0251748` 1 5. All road works for bridges works according to typical sections(engineering fill , sub base,abc,……) 6. All finishing works (curbstone,interlock ,high mast lighting,……) 7. Repair of concrete element (honey cum, air bubbles, surface cracks ,misalignment )
  • 6. From sep.2008 up to feb.2010 (structural engineer) Company:Emirates Roads Contracting Company Project: Access Arrangement to Rashidia Park & Ride Station Consultant: PARSONS Valueof the project: 700 Million Dhrs Brief of the project: 17 bridges, posttension cast in situ with approachramps supported by soil walls, width of bridges varies from 10.9 to 24.20m and depth from 2.5 to 1.80m. Activities: 1. Piling work including supervision , service diversion , execution of 1500, 1000 & 600 mm piles 2. Integrity test & load test piles using both of tension anchors and concrete blocks loading 3. Execution of different structure element such as (pile cap, pier, bottom slab & web, top slab, posttension…) 4. Stressing of bridge using Middle East system 5. Erection of soil wall panels using “Fryssinet system” (including belts tensioning , backfilling, verticality check, …) 6. Soil wall precastbarrier erection & casting of counter weight portion 7. Bridge cast in situ barrier 8. Repair of concrete element (honey cum, air bubbles, surface cracks) using O-Basf Products. From 04/2007up to 08/2008 (Project engineer) Company:Nile Public Co. of Roads & Bridges Project: New Banha bridge over Zagazig-Banha Railway (Egypt) Valueof the project: 27 Million L.E. Duration of project : 10 months Brief of the project: consists of 09 bays box girder section & 2 bays steel beams with composed slab deck. Consultant: Al Behire Consultant Activities:1- Coordination between site and design office
  • 7. 2- Detailer of steel reinforcement for different structure element 3- Execution of all bridge activites (180 piles, 12 pile caps, 2 abutments, 10 piers, asphalt work, installation of light poles) 4- Details of steel reinforcement and concrete dimensions for different R.C elements. 5- Quantity surveying for project items (Steel structure, Concrete, Reinforcement…) From 05/2004 up to 03/2007 (Site Engineer) Company:Nile Public Co. of Roads & Bridges Projects: El Wasfia Bridge over El Ismailia Canal Valueof the project: 57 Million L.E. Brief of the project: consists of 17 bays boxgirder section & 1 steel bay ( steel beams with composed slab deck). Consultant: Authority of Roads & Bridges. Activities:1- Coordination between site and design office 2- Detailer of steel reinforcement for different structure element 3- Execution of all bridge stages (580 piles, 19 pile caps, 2 abutments,17 piers ) 4- Details of steel reinforcement and concrete dimensions for different R.C elements. 5- Quantity surveying for project items (Steel structure, Concrete, Reinforcement…) General Skills  Ability to work under pressure – Excellent learning capabilities  Excellent communication skills – great negotiation skills  Excellent leadership skills – great analytic skills  Greet coordination skills – excellent interpersonal skills COMPUTER Skills  Auto Cad  Excel – word
  • 8. LANGUAGES Language Speaking Understanding Reading Writing Arabic Native Native Native Native English Very good Very good Very good Very good