1. PERSONAL INFORMATION
First Name: Ahmed
Middle Name: Mahmoud
Surname: Ahmed
Gender: Male
Date of Birth: 14/12/1980
Place ofBirth: Egypt- Sharqia - Zigzag
Nationality: Egyptian
Marital Status: Married has three child
Military Status: Finished
Address: Elmasaken El taawenya- Zigzag –El Sharkeya
Driving license: Valid Egyptian, U.A.E, K.S.A license.
Tel No. : 009661 54 864 7711(Mobile K.S.A current)
E-mail: aboyassin2007.l@gmial.com
QUALIFICATION
B.Sc. in civil Engineering , Zigzag University , Faculty of Engineering, 2003
Project : Reinforced concrete
Projectgrade :Very good
EXPERIENCE
From aug. 2013up to now
Job title: PROJECT MANAGER
Company: ADVANCED CONSTRUCTIONCO.
Project: INTERSECTIONAIRPORT ROAD WITH KING KHALID STREET (ALTAIF)
Consultant: DAR ALKHALEJ
Valueof the project: 49 Million S.R
Brief of the project:
2. one tunnel, with in length 642 m.r consistof raft foundation and retaining wall
with upper slabs.
Responsibility:
1- studying all project document(contract-B O Q-specification-tender drawing)
2- surveying all site of project to specify all obstruction clearly.
3- Studying all this obstruction &its reflection on project.
4- Make full picture for direct costfor all activity in project and controlit.
5- Sharing technical office for work plan &base line.
6- Sharing technical office in shop drawing submittal.
7- Sharing projects manager in choosing material suppliers &subcontractors.
8- Preparing site.
9- planning and determine the responsibilities of manpower in the project.
10- Following monthly bill with owner till paying.
11- Safety plan for project.
ACTIVITY:
1- Making soil investigation to check bearing capacity of soil & G.W.T .
2- Making all diversion for underground service(electrical-sewerage-water-
phone-etc….)
3- Excavation till construction level .
4- All reinforced concrete work(foundation- retaining wall- pump station- top
slab- etc……)
5- All finishing work(asphalt-electrical-mechanics-etc…..)
From April2013 up to aug. 2013
Job title: BRIDGES CONSTRUCTIONMANAGER
Company: ADVANCED CONSTRUCTIONCO.
Project: INTERSECTIONHalimma alsaadia with Madina Road at Jeddah
Consultant: Parsons
Valueof the project: 47 Million S.R
Brief of the project:
3. one bridges, three spans with posttension precast girders cast in situ with
approachramps supported by soil walls ,length of bridge 580m, width of
bridges 26.5m.with all service road around.
Activities:
1. Making soil investigation to check bearing capacity of soil and
sharing in getting engineering solution for constructionon shall soil
(eng. Fill ,foam …..Etc).
2. Execution of different structure element such as (excavation, eng.
Fill, pier ,cross head ,precast girder ….etc)
3. Taking all technical action for all activity which relative to the
bridge.
4. Leading the all team in positive direction to finalize all activity on time
under supervision of quality control.
5. Preparing all time schedule &man power and equipments requirement
for all activity of bridge
Making all negations with consultant and subcontractor.
From june2012 up to April 2013
Job title: BRIDGES CONSTRUCTIONMANAGER
Company: ADVANCED CONSTRUCTIONCO.
Project: INTERSECTIONPIRNCE METAAB STR. & ASMAN EBN AFAN STR. AND
PRINCE NAYEF STR.(DAMMAM – EASTREN ZONE)
Consultant: ZOHEER FAYEZ
Valueof the project: 238 Million S.R
Brief of the project:
one bridges intersect with tunnel
posttension box section castin situ with approachramps supported by
retaining walls ,length of bridge 1450m, width of bridges 26.5m.(cost of
bridge more than 140million)
One tunnel with a rotary
4. Activities:
1. Making soil investigation to check bearing capacity of soil and
sharing in getting engineering solution for constructionon shall soil
(eng. Fill ,foam …..Etc).
2. Execution of different structure element such as (excavation, eng.
Fill, pier ,cross head ,box section ….etc)
3. Taking all technical action for all activity which relative to the
bridge.
4. Leading the all team in positive direction to finalize all activity on time
under supervision of quality control.
5. Preparing all time schedule &man power and equipments requirement
for all activity of bridge
6. Making all negations with consultant and subcontractor.
From February 2011up to june2012 (Bridges Depr. Manger)
Company: NAHDAT AL-EMAAR CONTRACTING CO.LED.
Project: CONTIUETION OF SOME ROADS AT ASEER AREA (GROUP 6)
Consultant: V3 ALAYSAI CONSALTANTS
Valueof the project: 211 Million S.R
Brief of the project: 4 bridges length (160,250,350,380),2 interchange with post
tension girders span 27.4 with slabs cast in situ with approachramps, width varies
from 16.35m to 32m& more than 70 culverts with different no. of cells.
Activities:
1. Making soil investigation to check bearing capacity of soil.
2. Supervision of all prepared shop drawing for all element of bridges
works.
3. Supervision & execution of different structure element such as
(excavation, footing, pier with height more than17m, posttension
girder, top slab , newjerrsy barrier …)
5. 4. Navigation with different company to get best price offer for different
material(bearing, formwork ,waterproof, expansions joint, etc) 1
5. All road works for bridges works according to typical sections
(engineering fill, sub base, abc …)
6. All finishing works (curbstone, interlock, high mast lighting …)
7. Repair of concrete element (honey cum, air bubbles, surface cracks
,misalignment )
From march 2010 up to January 2011 (structural project
engineer)
Company:MOHAMED ALI AL-SWILEM CO. Company
Project: RIYADH SECONDARY ROADS – GROUP 1 PROJECT
Consultant: V3 ALAYSAI CONSALTANTS
Valueof the project: 350 Million S.R
Brief of the project:1underpass&5 bridges, posttension & pretension girders with
slabs cast in situ with approach ramps supported by retaining walls, width varies
from 32 to 40m.
Activities:
1. Piling work including supervision, service diversion, execution of
100 mm piles.
2. Integrity test & load test piles using concrete blocks loading.
3. Execution of different structure element such as (pile cap, pier,
pretension, post tension girder, top slab, …)
4. Erection of retaining walls parapet & n4120ewjerssy of center median
including alignment verticality check0251748` 1
5. All road works for bridges works according to typical
sections(engineering fill , sub base,abc,……)
6. All finishing works (curbstone,interlock ,high mast lighting,……)
7. Repair of concrete element (honey cum, air bubbles, surface cracks
,misalignment )
6. From sep.2008 up to feb.2010 (structural engineer)
Company:Emirates Roads Contracting Company
Project: Access Arrangement to Rashidia Park & Ride Station
Consultant: PARSONS
Valueof the project: 700 Million Dhrs
Brief of the project: 17 bridges, posttension cast in situ with approachramps
supported by soil walls, width of bridges varies from 10.9 to 24.20m and depth from
2.5 to 1.80m.
Activities:
1. Piling work including supervision , service diversion , execution of
1500, 1000 & 600 mm piles
2. Integrity test & load test piles using both of tension anchors and
concrete blocks loading
3. Execution of different structure element such as (pile cap, pier,
bottom slab & web, top slab, posttension…)
4. Stressing of bridge using Middle East system
5. Erection of soil wall panels using “Fryssinet system” (including belts
tensioning , backfilling, verticality check, …)
6. Soil wall precastbarrier erection & casting of counter weight portion
7. Bridge cast in situ barrier
8. Repair of concrete element (honey cum, air bubbles, surface cracks)
using O-Basf Products.
From 04/2007up to 08/2008 (Project engineer)
Company:Nile Public Co. of Roads & Bridges
Project: New Banha bridge over Zagazig-Banha Railway (Egypt)
Valueof the project: 27 Million L.E.
Duration of project : 10 months
Brief of the project: consists of 09 bays box girder section & 2 bays steel beams
with composed slab deck.
Consultant: Al Behire Consultant
Activities:1- Coordination between site and design office
7. 2- Detailer of steel reinforcement for different structure element
3- Execution of all bridge activites (180 piles, 12 pile caps, 2 abutments, 10
piers, asphalt work, installation of light poles)
4- Details of steel reinforcement and concrete dimensions for different R.C
elements.
5- Quantity surveying for project items (Steel structure, Concrete, Reinforcement…)
From 05/2004 up to 03/2007 (Site Engineer)
Company:Nile Public Co. of Roads & Bridges
Projects: El Wasfia Bridge over El Ismailia Canal
Valueof the project: 57 Million L.E.
Brief of the project: consists of 17 bays boxgirder section & 1 steel bay ( steel
beams with composed slab deck).
Consultant: Authority of Roads & Bridges.
Activities:1- Coordination between site and design office
2- Detailer of steel reinforcement for different structure element
3- Execution of all bridge stages (580 piles, 19 pile caps, 2 abutments,17 piers )
4- Details of steel reinforcement and concrete dimensions for different R.C
elements.
5- Quantity surveying for project items (Steel structure, Concrete,
Reinforcement…)
General Skills
Ability to work under pressure – Excellent learning capabilities
Excellent communication skills – great negotiation skills
Excellent leadership skills – great analytic skills
Greet coordination skills – excellent interpersonal skills
COMPUTER Skills
Auto Cad
Excel – word