Page 1 of 8 Curriculum Vitae of Aniruddha Hati
Name : ANIRUDDHA HATI
Permanent
Address
: 209/1 V.I.P Nagar,
P.O- V.I.P Nagar
Kolkata – 700 100, India.
Contact Phone No. : +91-9903248762 (India)
+974-31542347 (Qatar)
Passport No. : H5097691
Email address : aniruddhahati@gmail.com
hati_ani@rediffmail.com
Skype Id : aniruddhahati
Date of Birth : 11th
May 1982
Nationality : Indian
Education : Bachelor of Civil Engineering (1st
Class) from Bengal Engineering and
Science University, Shibpur in 2006.
M.E. (Structural Engineering) (1st
Class) from Bengal Engineering and
Science University, Shibpur in 2012.
Countries of work
experience
: India, Singapore, Qatar.
Employment Record:
From Feb 2016 : Till Date
Employer : KEO International Consultants
Position Held : Project Engineer
Description of Duties : Detail Structural Design.
A) UNDER GROUND METRO, BRIDGES, FLYOVERS & URBAN INFRASTRUCTURE:
• Dubai Metro Route 2020 (EXPOLINK2020)
Owner Client: Roads & Transport Authority (RTA), Govt. of Dubai
Consortium: EXPOLINK 2020 ALSTOM-acciona-GULEMARK
Independent Design Verification (IDV) check for the proposed cut & cover tunnels and
annex structures. The IDV check has been performed considering submitted drawings
based on the proposed construction sequence submitted by the contractor consortium.
The scope of IDV check to address any value-engineering proposal including capability
of the structural adequacy of the submitted structures.
CV-Aniruddha.DOC 1
Page 2 of 8 Curriculum Vitae of Aniruddha Hati
The IDV structures are mainly below grade ramp and shafts structures on Route 2020. It
comprises of Northern and Southern below grade ramps, including the U-section, R72-A1
Annex structure and R73-A1 Annex structure.
The annex structures are multilevel structures. Design consideration of these structures
are bottom-up construction with diaphragm wall including temporary and permanent
props.
• Lusail Stadium and Precinct for Football World Cup 2022
Owner Client: Supreme Committee for Delivery & Legacy
Contractor: HBK-CRCC JV
Detail structural design of Staircases, Ramps, VVIP Ramp structure, VVIP Parking
structures, Stromwater Attenuation Tank and all other drainage structure related to foul
swear, surface water, fire water, TSE and portable water required for the stadium and
precinct area.
Schematic & detail design of eight numbers of staircases for the public entry/ exit during
the opening ceremony & final match for the football world cup 2022. Schematic & detail
design of two numbers of ramps for the entry/ exit of spectators and for the movement of
the fire engine during and the match. Detail structural design of VVIP Ramp for the VVIP
entry/ exit into the main stadium at podium level considering entry/ exit of the players’
buses movement underneath the ramp structure. Detail structural design of underground
stromwater attenuation tanks, precast and cast-in-situ manhole structures.
• New Orbital Highway & Truck Route- Project 23 C2- Orbital Highway: Salwa Road
to North Relief Road
Owner Client: Infrastructure Affairs, ASHGHAL, Qatar
Contractor: NOH2-QDVC JV
Detail structural design of Valve Chambers, Thrust Blocks & other structural components
for Treated Sewage Effluent (TSE) and Portable Water (PW) network for the project
Package A, B, C & D. The valve chambers are designed based on 13.5 bar force along
the pipe network for TSE and 9 bar force for PW.
• Construction and Update of Al Rayyan Road Project 7 – C1, West of New Rayyan
R/A to East of Bani Hajer R/A, Project No. P007-C1
Owner Client: Infrastructure Affairs, ASHGHAL, Qatar
Contractor: Six Construct- Boom JV
Detail structural design of temporary and permanent access shafts for micro tunneling
works. The shafts are 1.8m diameter and 20-meter depth.
Review of design and drawings for precast segmental manhole shafts of 6m & 7m
diameter and 23 meter deep.
CV-Aniruddha.DOC 2
Page 3 of 8 Curriculum Vitae of Aniruddha Hati
• Sabah Al Hamad Sea City Phase A-A3 Sewage Treatment Plant Extension
Owner Client: LA’ALA AL-KUWAIT REAL ESTATE CO.K.S.C
The project is an expansion of existing sewage treatment plant at Sabah AL AHMAD
SEA CITY (PHASE A1-A3). The expansion consists of construction of new design of
Balancing Tank, Sequencing Batch Reactor (SBR), Sludge Digesters, Tertiary Filters,
Sludge Pump Station, Irrigation Storage Tanks, Sludge Thickener, Power and control
building, Lagoon, Lagoon Pump Station, Typical Boundary Wall.
Duty involves the detail structural design of underground tanks viz. Sludge Digesters,
Tertiary Sand Filters, Sludge Pump Station, Irrigation Storage Tanks, Lagoon, Lagoon
Pump Station as per BS standard & Kuwait Phase VIII- Design Criteria Manual.
• Saraya Bandar Jissah Sewage Treatment Plant
Owner Client: Saraya Bandar Jissah.
Contractor Client: Drake & Scull, Oman
Review of Structural Design for the entire sewage treatment plant foundation. The plant
includes design component of foundation of Pumping station, Distribution Chamber, Anoxic
and Aeration Tank, Equalization tank, Membrane tank, Sludge tank and Platform design for
Screen chambers etc.
From Jan 2015 : Feb 2016
Employer : AECOM India Private Ltd.
Position Held : Senior Engineer
Description of Duties : Detail Structural Design.
B) UNDER GROUND METRO, BRIDGES, FLYOVERS & URBAN INFRASTRUCTURE:
• Contract 8803: Engineering Consultancy for Proposed Circle Line Stage 6 (CCL6)
Mainline in Singapore
Owner Client: LTA.
The Circle Line Stage 6 project (CCL6) will close the ‘missing link’ between Harbour
Front and Marina Bay stations and enhance the efficiency and functionality of the existing
Circle Line.
This package comprises provision for approximately 4km of tunnels and 3 underground
station viz. CC30, CC31 & CC32.
Duties involve complete structural design of CC32 station. The design includes
diaphragm wall, roof slab, concourse slab, upper under platform slab & base slab and
other internal structures like columns and walls, platform structure. Top down
construction methodology adopted for the design of this station.
CV-Aniruddha.DOC 3
Page 4 of 8 Curriculum Vitae of Aniruddha Hati
• Construction of Jakarta Mass Rapid Transit Project Surface Section CP101 &
CP102
Owner Client: PT MRT JAKARTA.
Third Party Verifier: CECI Engineering Consultants Inc.
Contractor Client: TOKYU-WIKA JOINT OPERATION
Duties involved detail structural design of steel escape staircase and featured wall panels
for Fatmawati Station, Cipete Raya Station and Lebak Bulus Station as per BS standard.
Peer Review of Superstructure design and drawings for Lebakbulus Station Fatmawati
Station and long span bridge.
From July 2012 : Feb 2016
Employer : AECOM India Private Ltd.
Position Held : Project Engineer
Description of Duties : Detail Structural Design.
C) UNDER GROUND METRO, BRIDGES, FLYOVERS & URBAN INFRASTRUCTURE:
• DMRC CC20: Design and construction of underground station and cut & cover
tunnel, Ramps at Mayapuri and Delhi on Mukundpur-Yamuna Vihar Corridor (Line-
7) of Phase-III Delhi MRTS
Owner Client: Delhi Metro Rail Corporation Limited.
General Consultants: Systra India Pvt. Ltd.
Contractor Client: J. Kumar-CRTG JV.
Duties involved detail structural design of roof slab, concourse slab for Naraina Vihar
station. Design of temporary and permanent columns for station building. Design of thrust
frame and temporary base slab for launching shaft for TBM operation. Design of cut &
cover tunnel towards Mayapuri side. Design of ramp (resting over pile foundation) and
temporary strut and waler for construction of cut & cover tunnel and ramp.
• DMRC CC23: Design and construction of underground stations & tunnel between
Hauz Khas Station and Kalkaji Mandir Station of Delhi MRTS Project of Phase-III.
Owner Client: Delhi Metro Rail Corporation Limited.
General Consultants: ayesa.
Contractor Client: FEMC-Pratibha JV.
Duties involved detail structural design of Diaphragm Wall and Slabs viz. Roof Slab,
Concourse Slab of Chirag Delhi Station & Nehru Enclave Station.
Detail Design of Cut & Cover Tunnel and Ramp Section after Kalkaji Mandir Station to
end of Contract i.e. towards Okhla. Design of Plunge column for temporary supporting of
slab in construction stage.
• Design and Construction of Interceptor Sewers along Najafgarh, Supplementary &
Shahdara Drain for Abatement of Population in River Yamuna (Package-2 & 3)
Owner Client: Delhi Jal Board.
Client’s Design Consultants: Engineers India Limited.
Contractor Client: Pratibha- Mosinzhstroi Consortium.
CV-Aniruddha.DOC 4
Page 5 of 8 Curriculum Vitae of Aniruddha Hati
The project scope includes Detail Structural Design of 4 nos. of Underground Pumping
Station viz. Nilothi Pumping Station, Coronation Pillar Pumping Station, Keshopur
Pumping Station and Bharat Nagar Pumping station.
Duties involve detail design of all the underground pumping station considering the stage
construction as per approved top down method statement including design of temporary
structure.
From March 2011 : To July 2012
Employer : AFCONS Infrastructure Limited.
Position Held : Design Engineer
Description of Duties :
D) UNDER GROUND METRO, BRIDGES, FLYOVERS & URBAN INFRASTRUCTURE:
• Design and Construction of Underground Section from Howrah Maidan Station to
West End of Central Station. (Contract No. UG-1)
Owner Client: Kolkata Metro Rail Corporation Limited.
Design Consultants: ATKINS, Dubai.
General Consultants: MAUNSELL/AECOM-YEC-CES-EGISRAIL-LHPA
The project scope includes 3 nos. of Underground Metro Station including underground
4.3 Km. tunneling works by TBM method.
Involved in reviewing the permanent work design done by design consultant and liaison
for the approval from general consultants. Preliminary design of permanent structures.
Design of temporary structures. Checking of working drawings after getting the
Construction Reference Drawings from design consultant. Coordinate between design
consultant and construction team for ensuring the proposed and good qualitative works.
From 2007 : March 2011
Employer : STUP Consultants P Ltd.
Position Held : Design Engineer
Description of Duties :
E) UNDER GROUND METRO, BRIDGES, FLYOVERS & URBAN INFRASTRUCTURE:
• Design of Three-Lane Road Bridges Between Forbesganj – Jogbani Section of NH-
57A in Bihar under NHDP Phase-III
Owner Client: National Highways Authority of India (Ministry of Road Transport and
Highways)
EPC Contractor Client: GPT Infraprojects Limited.
The project scope includes 2 nos. of Major Bridges of span 38.4m x 4 (total 153.6m) over
Sitadhar River on straight alignment and 38.4m x 4 (total 153.6m) over Parman River on
carved alignment and 1 no of ROB of span 34.8mx1+46.2mx2+34.8mx1 (total 162m) on
skew. Another 2 nos. of Minor Bridges and 10 nos. of Culverts.
Duties involve Detail design of 38.4m, 46.2m and 34.8m span PSC Box girder super
structure as well as the substructure and foundation.
CV-Aniruddha.DOC 5
Page 6 of 8 Curriculum Vitae of Aniruddha Hati
• Detail Engineering for the proposed Oil Jetty at Paradip Port
Owner Client: Paradip Port Trust.
End User: Indian oil Corporation Limited.
IOCL’s Consultants: Engineers India Limited.
Paradeep Port Trust (PPT) wants to develop the oil jetty so developed would also cater
to the needs of product handling and crude unloading for Indian Oil Corporation Limited
(IOCL) which is setting up a 15 MMTPA refinery with petrochemical unit at aradeep port.
Duties involved detail structural design of Berthing dolphin (40m x 16.5m) for berthing of
1,50,000 DWT larger and 3000 DWT smaller size vessels, Mooring Dolphin (11m x 11m)
over 1200 diameter bored cast-in-situ pile and walkway between Mooring Dolphin and
Berthing Dolphin.
• Designing of Foundation & Substructure of Bridge No. 497, 505, 514, 515 & 518
Between Section Diitockceera-Damcherra in Connection with Lumding-Silchar
Gauge Conversion Project
Owner Client: North East Frontier Railway
Approving Authority: IIT, Guwahati
Duties involved Finalization of scheme of bridges and detail structural design of
substructure and open foundation of all the bridges.
• Detailed Engineering Design of Major and Minor Bridges in connection with
Construction of New BG line between Haridaspur – Paradeep in East Coast
Railway
Owner Client: East Central Railway.
Approving Authority: RDSO, Lucknow
The bridges consist of 2 nos. of 2x10m span solid slab superstructure supported on
circular piers at centre and abutment on either side and pile foundation and 64.6m
through type steel girder bridge supported on abutments on either side and pile
foundation. Duties involved design of substructure and its foundation.
• Design of 42.5m PSC Box Girders and its Substructure Foundation for Two Lane
Road Bridge Over River Damodar At SAIL-ISP, Burnpur, India
Owner: Steel Authority of India Limited, IISCO Steel Plant, India
Duties involved detail design of 42.5m long PSC box girders and its substructure.
• Kolkata Environmental Improvement Project, Kolkata, India
Owner: Kolkata Municipal Corporation.
Funding Agency: Asian Development Bank.
Duties include complete structural design of six numbers pumping stations at different
locations in Kolkata and detail design of two numbers of steel pipe bridges for delivery
main of two pumping station.
• Design of IGI Airport Station and Cut and Cover Tunnel in Airport Area (Contract
No AMEL C4) under Airport Metro Express Line of Delhi Metro Rail
CV-Aniruddha.DOC 6
Page 7 of 8 Curriculum Vitae of Aniruddha Hati
Contractor Client: Senbo Engineering Ltd., Kolkata
Owner: Delhi Metro Rail Corporation Ltd., New Delhi
Owner’s Consultant: Airport Line Consultants (JV of PCI-PBI-JARTS-TONICHI-RITES)
The project scope includes 2.1 km of cut and cover tunnel and an underground station of
244m length. The depth of excavation varies from 9m to 18m. Duties Involved detail
design of underground cut & cover tunnel.
• Floating Jetty on The River Ganga at Allahabad, India
Contractor Client: Central Public Works Department, New Delhi
Owner: Inland Waterways Authority of India.
The project scope includes 8 nos.@31.2m spans (total 256 m) Gangway Bridge, each
span supporting over floating pontoon and final end of the bridge is resting over floating
jetty over river Ganga at Allahabad. The jetty and the pontoons are guided with some
guided arrangement over pile cap.
Duties involved detail structural design of Support Pontoon, Guide system of Support
Pontoon and Main Pontoon, design of pile, Pile Cap and preparation of BoQ.
• Design of underground Central Secretariat station by cut and cover method on
Central Secretariat- Badarpur corridor of Delhi MRTS (Contract no. BC 23)
Contractor Client: Senbo Engineering Ltd., Kolkata
Owner: Delhi Metro Rail Corporation Ltd., New Delhi
General Consultant: JV of PCI-PBI-JARTS-TONICHI-RITES
The project scope includes construction of an underground station in between an existing
metro station and Krishi Bhawan (a Government institutional building). The adjacent
stations shall have connections at various places with the existing station.
Duties involved detail design of underground tunnel and station at different sections with
other ancillary structures.
From 2006 : To 2007
Employer : ITD Cementation India Ltd.
Position Held : Trainee Engineer
Description of Duties :
• Improvement, Operation and Maintenance Including Strengthening and Widening
of Existing 2 Lane Road to 4 Lane Dual Carriageway on NH21 (Ambala -
Chandigarh Section) in the States of Hariyana & Punjab on Build, Operate and
Transfer (BOT) Basis.
Owner Client: GMR.
Funding Agency: GMR.
The BOT project included widening of NH-21& 22 between Ambala-Chandigarh section
and construction of two flyovers- Jiracpur flyover (2400 m), Boldevpur (1800m) and six
minor bridges.
Duties involved site supervision for superstructure, substructure and foundation works for
Zirakpur flyover. Day to day planning and execution of planned schedule at site with the
sub contractors.
CV-Aniruddha.DOC 7
Page 8 of 8 Curriculum Vitae of Aniruddha Hati
Software known
STAAD Pro., WALLAP, SAFE, MIDAS, SAM, Prokon32, Oasys, MS Word, Excel & other Office
utilities.
Publications
Bridges and Structures Sustainability—Seeking Intelligent Solutions
Structural Sustainability, Quality Control, Durability and Robustness of Underground
Metro Structures
IABSE Conference in Guangzhou, China, May 2016.
Languages : Speak Read Write
English Excellent Excellent Excellent
Hindi Good Fair Fair
Bengali Excellent Excellent Excellent
(Mother tongue)
CV-Aniruddha.DOC 8
Dated: 04-12-2017
(ANITUDDHA HATI) Place: Doha, Qatar

More Related Content

What's hot

Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)
Er Mohtisham Ali
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekar ramamurthy
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro project
AkshathaBhandary
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
Ved Jangid
 
Shameera - Work Report - Maga Engineering
Shameera - Work Report - Maga EngineeringShameera - Work Report - Maga Engineering
Shameera - Work Report - Maga EngineeringShameera Wijesooriya
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil EngineerBinu Babu
 

What's hot (20)

Sankar CV
Sankar CVSankar CV
Sankar CV
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Revised Resume
Revised ResumeRevised Resume
Revised Resume
 
Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)
 
_Mohamad Bendary_Jan-2015
_Mohamad Bendary_Jan-2015_Mohamad Bendary_Jan-2015
_Mohamad Bendary_Jan-2015
 
Detailed Experiance - REV01
Detailed Experiance - REV01Detailed Experiance - REV01
Detailed Experiance - REV01
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.Designer
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro project
 
Ramprasad_Resume_SEP-2016
Ramprasad_Resume_SEP-2016Ramprasad_Resume_SEP-2016
Ramprasad_Resume_SEP-2016
 
cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
MCV
MCVMCV
MCV
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
 
Shilpesh CV
Shilpesh CVShilpesh CV
Shilpesh CV
 
Gurunathan resume
Gurunathan resumeGurunathan resume
Gurunathan resume
 
Shameera - Work Report - Maga Engineering
Shameera - Work Report - Maga EngineeringShameera - Work Report - Maga Engineering
Shameera - Work Report - Maga Engineering
 
Asraful Latest_CV
Asraful Latest_CVAsraful Latest_CV
Asraful Latest_CV
 
CV_June15
CV_June15CV_June15
CV_June15
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer
 

Similar to Cv aniruddha

AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjay Sankar
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1naveed ahmed
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L NBasavaraj L N
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
Satyeshwar Sharma
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
Ravi Kumar
 
Abdul Niyas (piping designer-draftsman)
Abdul Niyas (piping designer-draftsman)Abdul Niyas (piping designer-draftsman)
Abdul Niyas (piping designer-draftsman)Niyas Kumble
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
muhammad safdar
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran
 
Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra resume (civil engineer)
Hitendra resume (civil engineer)
Hitendra Parmar
 
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)Sajjad Gilal
 

Similar to Cv aniruddha (20)

Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
Ravi_Shenker2014
Ravi_Shenker2014Ravi_Shenker2014
Ravi_Shenker2014
 
Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)
 
anil resume
anil resumeanil resume
anil resume
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Arshad Jan CV
Arshad Jan CVArshad Jan CV
Arshad Jan CV
 
Abdul Niyas (piping designer-draftsman)
Abdul Niyas (piping designer-draftsman)Abdul Niyas (piping designer-draftsman)
Abdul Niyas (piping designer-draftsman)
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra resume (civil engineer)
Hitendra resume (civil engineer)
 
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
 

Recently uploaded

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 

Recently uploaded (20)

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 

Cv aniruddha

  • 1. Page 1 of 8 Curriculum Vitae of Aniruddha Hati Name : ANIRUDDHA HATI Permanent Address : 209/1 V.I.P Nagar, P.O- V.I.P Nagar Kolkata – 700 100, India. Contact Phone No. : +91-9903248762 (India) +974-31542347 (Qatar) Passport No. : H5097691 Email address : aniruddhahati@gmail.com hati_ani@rediffmail.com Skype Id : aniruddhahati Date of Birth : 11th May 1982 Nationality : Indian Education : Bachelor of Civil Engineering (1st Class) from Bengal Engineering and Science University, Shibpur in 2006. M.E. (Structural Engineering) (1st Class) from Bengal Engineering and Science University, Shibpur in 2012. Countries of work experience : India, Singapore, Qatar. Employment Record: From Feb 2016 : Till Date Employer : KEO International Consultants Position Held : Project Engineer Description of Duties : Detail Structural Design. A) UNDER GROUND METRO, BRIDGES, FLYOVERS & URBAN INFRASTRUCTURE: • Dubai Metro Route 2020 (EXPOLINK2020) Owner Client: Roads & Transport Authority (RTA), Govt. of Dubai Consortium: EXPOLINK 2020 ALSTOM-acciona-GULEMARK Independent Design Verification (IDV) check for the proposed cut & cover tunnels and annex structures. The IDV check has been performed considering submitted drawings based on the proposed construction sequence submitted by the contractor consortium. The scope of IDV check to address any value-engineering proposal including capability of the structural adequacy of the submitted structures. CV-Aniruddha.DOC 1
  • 2. Page 2 of 8 Curriculum Vitae of Aniruddha Hati The IDV structures are mainly below grade ramp and shafts structures on Route 2020. It comprises of Northern and Southern below grade ramps, including the U-section, R72-A1 Annex structure and R73-A1 Annex structure. The annex structures are multilevel structures. Design consideration of these structures are bottom-up construction with diaphragm wall including temporary and permanent props. • Lusail Stadium and Precinct for Football World Cup 2022 Owner Client: Supreme Committee for Delivery & Legacy Contractor: HBK-CRCC JV Detail structural design of Staircases, Ramps, VVIP Ramp structure, VVIP Parking structures, Stromwater Attenuation Tank and all other drainage structure related to foul swear, surface water, fire water, TSE and portable water required for the stadium and precinct area. Schematic & detail design of eight numbers of staircases for the public entry/ exit during the opening ceremony & final match for the football world cup 2022. Schematic & detail design of two numbers of ramps for the entry/ exit of spectators and for the movement of the fire engine during and the match. Detail structural design of VVIP Ramp for the VVIP entry/ exit into the main stadium at podium level considering entry/ exit of the players’ buses movement underneath the ramp structure. Detail structural design of underground stromwater attenuation tanks, precast and cast-in-situ manhole structures. • New Orbital Highway & Truck Route- Project 23 C2- Orbital Highway: Salwa Road to North Relief Road Owner Client: Infrastructure Affairs, ASHGHAL, Qatar Contractor: NOH2-QDVC JV Detail structural design of Valve Chambers, Thrust Blocks & other structural components for Treated Sewage Effluent (TSE) and Portable Water (PW) network for the project Package A, B, C & D. The valve chambers are designed based on 13.5 bar force along the pipe network for TSE and 9 bar force for PW. • Construction and Update of Al Rayyan Road Project 7 – C1, West of New Rayyan R/A to East of Bani Hajer R/A, Project No. P007-C1 Owner Client: Infrastructure Affairs, ASHGHAL, Qatar Contractor: Six Construct- Boom JV Detail structural design of temporary and permanent access shafts for micro tunneling works. The shafts are 1.8m diameter and 20-meter depth. Review of design and drawings for precast segmental manhole shafts of 6m & 7m diameter and 23 meter deep. CV-Aniruddha.DOC 2
  • 3. Page 3 of 8 Curriculum Vitae of Aniruddha Hati • Sabah Al Hamad Sea City Phase A-A3 Sewage Treatment Plant Extension Owner Client: LA’ALA AL-KUWAIT REAL ESTATE CO.K.S.C The project is an expansion of existing sewage treatment plant at Sabah AL AHMAD SEA CITY (PHASE A1-A3). The expansion consists of construction of new design of Balancing Tank, Sequencing Batch Reactor (SBR), Sludge Digesters, Tertiary Filters, Sludge Pump Station, Irrigation Storage Tanks, Sludge Thickener, Power and control building, Lagoon, Lagoon Pump Station, Typical Boundary Wall. Duty involves the detail structural design of underground tanks viz. Sludge Digesters, Tertiary Sand Filters, Sludge Pump Station, Irrigation Storage Tanks, Lagoon, Lagoon Pump Station as per BS standard & Kuwait Phase VIII- Design Criteria Manual. • Saraya Bandar Jissah Sewage Treatment Plant Owner Client: Saraya Bandar Jissah. Contractor Client: Drake & Scull, Oman Review of Structural Design for the entire sewage treatment plant foundation. The plant includes design component of foundation of Pumping station, Distribution Chamber, Anoxic and Aeration Tank, Equalization tank, Membrane tank, Sludge tank and Platform design for Screen chambers etc. From Jan 2015 : Feb 2016 Employer : AECOM India Private Ltd. Position Held : Senior Engineer Description of Duties : Detail Structural Design. B) UNDER GROUND METRO, BRIDGES, FLYOVERS & URBAN INFRASTRUCTURE: • Contract 8803: Engineering Consultancy for Proposed Circle Line Stage 6 (CCL6) Mainline in Singapore Owner Client: LTA. The Circle Line Stage 6 project (CCL6) will close the ‘missing link’ between Harbour Front and Marina Bay stations and enhance the efficiency and functionality of the existing Circle Line. This package comprises provision for approximately 4km of tunnels and 3 underground station viz. CC30, CC31 & CC32. Duties involve complete structural design of CC32 station. The design includes diaphragm wall, roof slab, concourse slab, upper under platform slab & base slab and other internal structures like columns and walls, platform structure. Top down construction methodology adopted for the design of this station. CV-Aniruddha.DOC 3
  • 4. Page 4 of 8 Curriculum Vitae of Aniruddha Hati • Construction of Jakarta Mass Rapid Transit Project Surface Section CP101 & CP102 Owner Client: PT MRT JAKARTA. Third Party Verifier: CECI Engineering Consultants Inc. Contractor Client: TOKYU-WIKA JOINT OPERATION Duties involved detail structural design of steel escape staircase and featured wall panels for Fatmawati Station, Cipete Raya Station and Lebak Bulus Station as per BS standard. Peer Review of Superstructure design and drawings for Lebakbulus Station Fatmawati Station and long span bridge. From July 2012 : Feb 2016 Employer : AECOM India Private Ltd. Position Held : Project Engineer Description of Duties : Detail Structural Design. C) UNDER GROUND METRO, BRIDGES, FLYOVERS & URBAN INFRASTRUCTURE: • DMRC CC20: Design and construction of underground station and cut & cover tunnel, Ramps at Mayapuri and Delhi on Mukundpur-Yamuna Vihar Corridor (Line- 7) of Phase-III Delhi MRTS Owner Client: Delhi Metro Rail Corporation Limited. General Consultants: Systra India Pvt. Ltd. Contractor Client: J. Kumar-CRTG JV. Duties involved detail structural design of roof slab, concourse slab for Naraina Vihar station. Design of temporary and permanent columns for station building. Design of thrust frame and temporary base slab for launching shaft for TBM operation. Design of cut & cover tunnel towards Mayapuri side. Design of ramp (resting over pile foundation) and temporary strut and waler for construction of cut & cover tunnel and ramp. • DMRC CC23: Design and construction of underground stations & tunnel between Hauz Khas Station and Kalkaji Mandir Station of Delhi MRTS Project of Phase-III. Owner Client: Delhi Metro Rail Corporation Limited. General Consultants: ayesa. Contractor Client: FEMC-Pratibha JV. Duties involved detail structural design of Diaphragm Wall and Slabs viz. Roof Slab, Concourse Slab of Chirag Delhi Station & Nehru Enclave Station. Detail Design of Cut & Cover Tunnel and Ramp Section after Kalkaji Mandir Station to end of Contract i.e. towards Okhla. Design of Plunge column for temporary supporting of slab in construction stage. • Design and Construction of Interceptor Sewers along Najafgarh, Supplementary & Shahdara Drain for Abatement of Population in River Yamuna (Package-2 & 3) Owner Client: Delhi Jal Board. Client’s Design Consultants: Engineers India Limited. Contractor Client: Pratibha- Mosinzhstroi Consortium. CV-Aniruddha.DOC 4
  • 5. Page 5 of 8 Curriculum Vitae of Aniruddha Hati The project scope includes Detail Structural Design of 4 nos. of Underground Pumping Station viz. Nilothi Pumping Station, Coronation Pillar Pumping Station, Keshopur Pumping Station and Bharat Nagar Pumping station. Duties involve detail design of all the underground pumping station considering the stage construction as per approved top down method statement including design of temporary structure. From March 2011 : To July 2012 Employer : AFCONS Infrastructure Limited. Position Held : Design Engineer Description of Duties : D) UNDER GROUND METRO, BRIDGES, FLYOVERS & URBAN INFRASTRUCTURE: • Design and Construction of Underground Section from Howrah Maidan Station to West End of Central Station. (Contract No. UG-1) Owner Client: Kolkata Metro Rail Corporation Limited. Design Consultants: ATKINS, Dubai. General Consultants: MAUNSELL/AECOM-YEC-CES-EGISRAIL-LHPA The project scope includes 3 nos. of Underground Metro Station including underground 4.3 Km. tunneling works by TBM method. Involved in reviewing the permanent work design done by design consultant and liaison for the approval from general consultants. Preliminary design of permanent structures. Design of temporary structures. Checking of working drawings after getting the Construction Reference Drawings from design consultant. Coordinate between design consultant and construction team for ensuring the proposed and good qualitative works. From 2007 : March 2011 Employer : STUP Consultants P Ltd. Position Held : Design Engineer Description of Duties : E) UNDER GROUND METRO, BRIDGES, FLYOVERS & URBAN INFRASTRUCTURE: • Design of Three-Lane Road Bridges Between Forbesganj – Jogbani Section of NH- 57A in Bihar under NHDP Phase-III Owner Client: National Highways Authority of India (Ministry of Road Transport and Highways) EPC Contractor Client: GPT Infraprojects Limited. The project scope includes 2 nos. of Major Bridges of span 38.4m x 4 (total 153.6m) over Sitadhar River on straight alignment and 38.4m x 4 (total 153.6m) over Parman River on carved alignment and 1 no of ROB of span 34.8mx1+46.2mx2+34.8mx1 (total 162m) on skew. Another 2 nos. of Minor Bridges and 10 nos. of Culverts. Duties involve Detail design of 38.4m, 46.2m and 34.8m span PSC Box girder super structure as well as the substructure and foundation. CV-Aniruddha.DOC 5
  • 6. Page 6 of 8 Curriculum Vitae of Aniruddha Hati • Detail Engineering for the proposed Oil Jetty at Paradip Port Owner Client: Paradip Port Trust. End User: Indian oil Corporation Limited. IOCL’s Consultants: Engineers India Limited. Paradeep Port Trust (PPT) wants to develop the oil jetty so developed would also cater to the needs of product handling and crude unloading for Indian Oil Corporation Limited (IOCL) which is setting up a 15 MMTPA refinery with petrochemical unit at aradeep port. Duties involved detail structural design of Berthing dolphin (40m x 16.5m) for berthing of 1,50,000 DWT larger and 3000 DWT smaller size vessels, Mooring Dolphin (11m x 11m) over 1200 diameter bored cast-in-situ pile and walkway between Mooring Dolphin and Berthing Dolphin. • Designing of Foundation & Substructure of Bridge No. 497, 505, 514, 515 & 518 Between Section Diitockceera-Damcherra in Connection with Lumding-Silchar Gauge Conversion Project Owner Client: North East Frontier Railway Approving Authority: IIT, Guwahati Duties involved Finalization of scheme of bridges and detail structural design of substructure and open foundation of all the bridges. • Detailed Engineering Design of Major and Minor Bridges in connection with Construction of New BG line between Haridaspur – Paradeep in East Coast Railway Owner Client: East Central Railway. Approving Authority: RDSO, Lucknow The bridges consist of 2 nos. of 2x10m span solid slab superstructure supported on circular piers at centre and abutment on either side and pile foundation and 64.6m through type steel girder bridge supported on abutments on either side and pile foundation. Duties involved design of substructure and its foundation. • Design of 42.5m PSC Box Girders and its Substructure Foundation for Two Lane Road Bridge Over River Damodar At SAIL-ISP, Burnpur, India Owner: Steel Authority of India Limited, IISCO Steel Plant, India Duties involved detail design of 42.5m long PSC box girders and its substructure. • Kolkata Environmental Improvement Project, Kolkata, India Owner: Kolkata Municipal Corporation. Funding Agency: Asian Development Bank. Duties include complete structural design of six numbers pumping stations at different locations in Kolkata and detail design of two numbers of steel pipe bridges for delivery main of two pumping station. • Design of IGI Airport Station and Cut and Cover Tunnel in Airport Area (Contract No AMEL C4) under Airport Metro Express Line of Delhi Metro Rail CV-Aniruddha.DOC 6
  • 7. Page 7 of 8 Curriculum Vitae of Aniruddha Hati Contractor Client: Senbo Engineering Ltd., Kolkata Owner: Delhi Metro Rail Corporation Ltd., New Delhi Owner’s Consultant: Airport Line Consultants (JV of PCI-PBI-JARTS-TONICHI-RITES) The project scope includes 2.1 km of cut and cover tunnel and an underground station of 244m length. The depth of excavation varies from 9m to 18m. Duties Involved detail design of underground cut & cover tunnel. • Floating Jetty on The River Ganga at Allahabad, India Contractor Client: Central Public Works Department, New Delhi Owner: Inland Waterways Authority of India. The project scope includes 8 nos.@31.2m spans (total 256 m) Gangway Bridge, each span supporting over floating pontoon and final end of the bridge is resting over floating jetty over river Ganga at Allahabad. The jetty and the pontoons are guided with some guided arrangement over pile cap. Duties involved detail structural design of Support Pontoon, Guide system of Support Pontoon and Main Pontoon, design of pile, Pile Cap and preparation of BoQ. • Design of underground Central Secretariat station by cut and cover method on Central Secretariat- Badarpur corridor of Delhi MRTS (Contract no. BC 23) Contractor Client: Senbo Engineering Ltd., Kolkata Owner: Delhi Metro Rail Corporation Ltd., New Delhi General Consultant: JV of PCI-PBI-JARTS-TONICHI-RITES The project scope includes construction of an underground station in between an existing metro station and Krishi Bhawan (a Government institutional building). The adjacent stations shall have connections at various places with the existing station. Duties involved detail design of underground tunnel and station at different sections with other ancillary structures. From 2006 : To 2007 Employer : ITD Cementation India Ltd. Position Held : Trainee Engineer Description of Duties : • Improvement, Operation and Maintenance Including Strengthening and Widening of Existing 2 Lane Road to 4 Lane Dual Carriageway on NH21 (Ambala - Chandigarh Section) in the States of Hariyana & Punjab on Build, Operate and Transfer (BOT) Basis. Owner Client: GMR. Funding Agency: GMR. The BOT project included widening of NH-21& 22 between Ambala-Chandigarh section and construction of two flyovers- Jiracpur flyover (2400 m), Boldevpur (1800m) and six minor bridges. Duties involved site supervision for superstructure, substructure and foundation works for Zirakpur flyover. Day to day planning and execution of planned schedule at site with the sub contractors. CV-Aniruddha.DOC 7
  • 8. Page 8 of 8 Curriculum Vitae of Aniruddha Hati Software known STAAD Pro., WALLAP, SAFE, MIDAS, SAM, Prokon32, Oasys, MS Word, Excel & other Office utilities. Publications Bridges and Structures Sustainability—Seeking Intelligent Solutions Structural Sustainability, Quality Control, Durability and Robustness of Underground Metro Structures IABSE Conference in Guangzhou, China, May 2016. Languages : Speak Read Write English Excellent Excellent Excellent Hindi Good Fair Fair Bengali Excellent Excellent Excellent (Mother tongue) CV-Aniruddha.DOC 8 Dated: 04-12-2017 (ANITUDDHA HATI) Place: Doha, Qatar