MIRZA MASOOD BAIG
Civil / Infrastructure Engineer
Email: masoodbaig4@gmail.com Mob: +966599419195 / 00923005181369 Page 1 of 4
EDUCATION
B-Tech Graduate in civil
Technology.
From Preston University
Islamabad. (Pakistan)
Degree no: 1407-1013
Registration no:
14C2-306020
---------------
03 year Diploma of
Associate Engineer (Civil)
REGISTRATIONS /
CERTIFICATIONS
Saudi Arabia Ministry of
Housing- Approved as
infrastructure inspector.
2014.
ADDITIONAL
COURSEWORK AND
TRAINING
Construction supervision &
bridge construction courses
offered by Parsons.
HSE training
132 hours OSHA safety
training certificate. From
(Doha Qatar)
HSE Safety training,
technical training online
course from Parsons
university.
COMPUTER / SOFTWARE
SKILLS
MS Word, Excel Basic computer
information, Auto CAD, MS
Office,
Windows installation &
Internet Communications.
LANGUAGE
English
Urdu
Arabic
EXPERIENCE PROFILE
Over all 10 years experience in Civil Engineering, including working for
the past 06years in Qatar & 02 year in Saudi Arabia. Have experience
worked with both the consultant and the contractor firms. Supervised high
profile infrastructure projects including the construction ofroads, Drainage
and sewer networks, underground utilities and water net work pipelines.
PROJECT EXPERIENCE
Saudi Arabian ParsonsLimited
Dec, 2014 to till date.
Project: Ministry of Housing project, (infrastructure works) Madinah
Client: Ministry of Housing, KSA
Project Role: Infra structure engineer.
Duties and responsibilities include the following:
ď‚· To ensure that the projectongoing in accordance with all the approved
construction drawings, contract documents, specifications and all
applicable standards.
ď‚· Supervision ofinfra structural networks such as Drainage, sewer, storm
water, portable water and irrigation.
ď‚· Supervision ofGRP pipeline Drainage, Clay pipes,ductile iron pipe
lines laying, bedding, testing & backfilling.
ď‚· Supervision ofconcrete works ofmanholes, inspection chambers, catch
basin and irrigation tanks.
ď‚· Monitor contractor QA/QC activities and maintain records.
ď‚· Supervision ofcurb stone land escape and related concrete works.
ď‚· Conduct weekly meetings with inspectors and ProjectEngineer.
ď‚· Taking samples ofmaterials delivered to site and responsible for the
entire laboratory testing, including concrete temperature and slump,
compressive testing on concrete cubes, field density tests using nuclear
gauge.
ď‚· Plans the execution ofall civil related works and coordinates the works
to electrical and mechanical groups.
ď‚· Responsible to prepare site observation reports.
ď‚· Ensure that site image is in compliance with Projectstandards and
policies.
ď‚· Ensuring that all construction works are completed in accordance with
the health and safety requirements and conducting weekly safety
toolbox and safety meetings with site staff.
MIRZA MASOOD BAIG
Civil / Infrastructure Engineer
Email: masoodbaig4@gmail.com Mob: +966599419195 / 00923005181369 Page 2 of 4
DATE OF BIRTH
June 08, 1986
Driving License
(QATAR)
Validity 2018-01-21
Driving License
(Saudi Arabia)
Validity 2018-01-21
(A)
Redco International WLL. (Doha Qatar)
Mar 2012 to Oct 2013
Project: - Qatar air ways crew accommodation project.
Role: QC Engineer infrastructure
(B)
Redco International WLL. (Doha Qatar)
Feb 2011 to Mar 2012
Project: - Barwa al khor Project. (Infrastructure work).
Project Role: QC Engineer infrastructure
Duties and responsibilities include the following:
 Coordinates with Client / Consultant’s representatives for any site
instructions and inspection ofworks.
ď‚· Submits site progress reports, inspection requests, estimates and all
applicable monitoring reports on regular basis or as required.
ď‚· Responsible to submit material submittals sample for approval from
consultant.
ď‚· Supervision ofinfra structural networks such as Drainage, sewer, storm
water, portable water and irrigation.
ď‚· Supervision of pipes laying,bedding,backfilling and testing.
ď‚· Supervision of precasterection & casting works.
ď‚· Supervision ofconcrete works ofmanholes, inspection chambers and
Under Ground Water Tanks.
ď‚· Plans the execution ofall civil related works and coordinates the works
to electrical and mechanical groups.
ď‚· To ensure that construction activities should be as project stander and
specification.
ď‚· Follow up with vendors / consultants about whether the emailed file has
been received and notify them of any delay in response time.
ď‚· Participating in weekly review meeting with the client and the
consultant.
ď‚· Ensure that site image is in compliance with Project standards and
policies.
ď‚· Responsible for implementing the overall safety on site.
MIRZA MASOOD BAIG
Civil / Infrastructure Engineer
Email: masoodbaig4@gmail.com Mob: +966599419195 / 00923005181369 Page 3 of 4
(C)
Redco International WLL. (Doha Qatar)
Jun 2009 to Feb 2011
Project: - Al khor residence Development project.
Project Role: Site Engineer infrastructure
(B)
Redco International WLL. (Doha Qatar)
Nov 2007 to Jun 2009.
Project: Lusail Development Project (Infrastructure work).
Project Role: Site Engineer infrastructure.
Duties and responsibilities include the following:
ď‚· Supervision ofinfra structural networks such as Drainage, sewer, storm
water, portable water and irrigation.
ď‚· Supervision of pipes laying, bedding, backfilling and testing.
ď‚· Supervision ofconcrete works ofmanholes, inspection chambers and
Under Ground Water Tanks.
ď‚· Supervision and controlling ofsite inspection and survey works.
ď‚· Plansand analyses allpossibleconstructionmethodologiesandrecommends
the best optionsto the ProjectManagerforapprovalprior to executionatsite.
ď‚· Preparingthe measurementsheetaccordingtotheitemsin the billof
quantitiesandsubmittingsameto the quantitysurveying team.
ď‚· Plansand analyses allpossibleconstructionmethodologiesandrecommends
the best optionsto the ProjectManagerforapprovalprior to executionatsite.
ď‚· Managesdirectlyandprovide engineeringandtechnicalsupportstoallthe civil
work groupsat site.
ď‚· Plansthe executionofallcivil relatedworksand coordinatestheworksto
electrical andmechanicalgroups.
ď‚· Monitoring the site activities of the site foreman and providing technical
guidance to constructthe work in accordance with the project
specification and contract.
ď‚· Supervise the construction ofunderground services tunnel. Steel work,
formwork, concrete work & water proofing.
ď‚· Supervision of underground all kind Utilities & service related with civil
works.
ď‚· Participating in weekly review meeting with the client and the
consultant.
ď‚· Submits site daily reports, inspection requests, estimates and all
applicable monitoring reports on regular basis or as required.
ď‚· Ensuring that the implementing the overall safety on site construction
MIRZA MASOOD BAIG
Civil / Infrastructure Engineer
Email: masoodbaig4@gmail.com Mob: +966599419195 / 00923005181369 Page 4 of 4
activities.
Bahria Town development authority ,
Islamabad Pakistan.
Oct 2007 to May 2005
Project: Bahria housing,
(Largestprivate housing society in Asia)
Client: Bahria Town
Project Role: infrastructure inspector.
Duties and responsibilities include the following:
ď‚· Inspection ofsite structure activities including construction of huge
retaining and drainage structures like bridges,
ď‚· Culverts, cause ways, drains, RCC retaining walls and breastwalls.
ď‚· Supervision ofsite highway activates including earth work inspection of
sub grade, sub base & base layers.
ď‚· Attending site meetings with the residentengineer and the clientto
discuss ongoing works, design issues, claims, health and safety etc.
ď‚· Preparationof MonthlyProgress Report
ď‚· Setting outthe works, including drainage manholes and pipelines, road
works vertical and horizontal alignments, earthworks excavations, etc.
ď‚· Supervision and controlling ofsite inspection and survey works.
ď‚· Preparing as-built drawings ofdrainage and infrastructure works and
submitting to the residentengineer for approval.
ď‚· Responsible for implementing the overall safety on site.
Personal Status:
Name: Mirza Masood Baig
Father’s Name: Mirza Jahanagir Iqbal
Date of Birth: 8th June 1986
Passport No: AJ3925072
Marital Status: Married
Nationality: Pakistani
Cellular: +966-599419195
+923005181369 (in case of vocation)
Email ID: masoodbaig4@gmail.com

Infrastructure engineer. CV

  • 1.
    MIRZA MASOOD BAIG Civil/ Infrastructure Engineer Email: masoodbaig4@gmail.com Mob: +966599419195 / 00923005181369 Page 1 of 4 EDUCATION B-Tech Graduate in civil Technology. From Preston University Islamabad. (Pakistan) Degree no: 1407-1013 Registration no: 14C2-306020 --------------- 03 year Diploma of Associate Engineer (Civil) REGISTRATIONS / CERTIFICATIONS Saudi Arabia Ministry of Housing- Approved as infrastructure inspector. 2014. ADDITIONAL COURSEWORK AND TRAINING Construction supervision & bridge construction courses offered by Parsons. HSE training 132 hours OSHA safety training certificate. From (Doha Qatar) HSE Safety training, technical training online course from Parsons university. COMPUTER / SOFTWARE SKILLS MS Word, Excel Basic computer information, Auto CAD, MS Office, Windows installation & Internet Communications. LANGUAGE English Urdu Arabic EXPERIENCE PROFILE Over all 10 years experience in Civil Engineering, including working for the past 06years in Qatar & 02 year in Saudi Arabia. Have experience worked with both the consultant and the contractor firms. Supervised high profile infrastructure projects including the construction ofroads, Drainage and sewer networks, underground utilities and water net work pipelines. PROJECT EXPERIENCE Saudi Arabian ParsonsLimited Dec, 2014 to till date. Project: Ministry of Housing project, (infrastructure works) Madinah Client: Ministry of Housing, KSA Project Role: Infra structure engineer. Duties and responsibilities include the following: ď‚· To ensure that the projectongoing in accordance with all the approved construction drawings, contract documents, specifications and all applicable standards. ď‚· Supervision ofinfra structural networks such as Drainage, sewer, storm water, portable water and irrigation. ď‚· Supervision ofGRP pipeline Drainage, Clay pipes,ductile iron pipe lines laying, bedding, testing & backfilling. ď‚· Supervision ofconcrete works ofmanholes, inspection chambers, catch basin and irrigation tanks. ď‚· Monitor contractor QA/QC activities and maintain records. ď‚· Supervision ofcurb stone land escape and related concrete works. ď‚· Conduct weekly meetings with inspectors and ProjectEngineer. ď‚· Taking samples ofmaterials delivered to site and responsible for the entire laboratory testing, including concrete temperature and slump, compressive testing on concrete cubes, field density tests using nuclear gauge. ď‚· Plans the execution ofall civil related works and coordinates the works to electrical and mechanical groups. ď‚· Responsible to prepare site observation reports. ď‚· Ensure that site image is in compliance with Projectstandards and policies. ď‚· Ensuring that all construction works are completed in accordance with the health and safety requirements and conducting weekly safety toolbox and safety meetings with site staff.
  • 2.
    MIRZA MASOOD BAIG Civil/ Infrastructure Engineer Email: masoodbaig4@gmail.com Mob: +966599419195 / 00923005181369 Page 2 of 4 DATE OF BIRTH June 08, 1986 Driving License (QATAR) Validity 2018-01-21 Driving License (Saudi Arabia) Validity 2018-01-21 (A) Redco International WLL. (Doha Qatar) Mar 2012 to Oct 2013 Project: - Qatar air ways crew accommodation project. Role: QC Engineer infrastructure (B) Redco International WLL. (Doha Qatar) Feb 2011 to Mar 2012 Project: - Barwa al khor Project. (Infrastructure work). Project Role: QC Engineer infrastructure Duties and responsibilities include the following:  Coordinates with Client / Consultant’s representatives for any site instructions and inspection ofworks.  Submits site progress reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.  Responsible to submit material submittals sample for approval from consultant.  Supervision ofinfra structural networks such as Drainage, sewer, storm water, portable water and irrigation.  Supervision of pipes laying,bedding,backfilling and testing.  Supervision of precasterection & casting works.  Supervision ofconcrete works ofmanholes, inspection chambers and Under Ground Water Tanks.  Plans the execution ofall civil related works and coordinates the works to electrical and mechanical groups.  To ensure that construction activities should be as project stander and specification.  Follow up with vendors / consultants about whether the emailed file has been received and notify them of any delay in response time.  Participating in weekly review meeting with the client and the consultant.  Ensure that site image is in compliance with Project standards and policies.  Responsible for implementing the overall safety on site.
  • 3.
    MIRZA MASOOD BAIG Civil/ Infrastructure Engineer Email: masoodbaig4@gmail.com Mob: +966599419195 / 00923005181369 Page 3 of 4 (C) Redco International WLL. (Doha Qatar) Jun 2009 to Feb 2011 Project: - Al khor residence Development project. Project Role: Site Engineer infrastructure (B) Redco International WLL. (Doha Qatar) Nov 2007 to Jun 2009. Project: Lusail Development Project (Infrastructure work). Project Role: Site Engineer infrastructure. Duties and responsibilities include the following: ď‚· Supervision ofinfra structural networks such as Drainage, sewer, storm water, portable water and irrigation. ď‚· Supervision of pipes laying, bedding, backfilling and testing. ď‚· Supervision ofconcrete works ofmanholes, inspection chambers and Under Ground Water Tanks. ď‚· Supervision and controlling ofsite inspection and survey works. ď‚· Plansand analyses allpossibleconstructionmethodologiesandrecommends the best optionsto the ProjectManagerforapprovalprior to executionatsite. ď‚· Preparingthe measurementsheetaccordingtotheitemsin the billof quantitiesandsubmittingsameto the quantitysurveying team. ď‚· Plansand analyses allpossibleconstructionmethodologiesandrecommends the best optionsto the ProjectManagerforapprovalprior to executionatsite. ď‚· Managesdirectlyandprovide engineeringandtechnicalsupportstoallthe civil work groupsat site. ď‚· Plansthe executionofallcivil relatedworksand coordinatestheworksto electrical andmechanicalgroups. ď‚· Monitoring the site activities of the site foreman and providing technical guidance to constructthe work in accordance with the project specification and contract. ď‚· Supervise the construction ofunderground services tunnel. Steel work, formwork, concrete work & water proofing. ď‚· Supervision of underground all kind Utilities & service related with civil works. ď‚· Participating in weekly review meeting with the client and the consultant. ď‚· Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required. ď‚· Ensuring that the implementing the overall safety on site construction
  • 4.
    MIRZA MASOOD BAIG Civil/ Infrastructure Engineer Email: masoodbaig4@gmail.com Mob: +966599419195 / 00923005181369 Page 4 of 4 activities. Bahria Town development authority , Islamabad Pakistan. Oct 2007 to May 2005 Project: Bahria housing, (Largestprivate housing society in Asia) Client: Bahria Town Project Role: infrastructure inspector. Duties and responsibilities include the following:  Inspection ofsite structure activities including construction of huge retaining and drainage structures like bridges,  Culverts, cause ways, drains, RCC retaining walls and breastwalls.  Supervision ofsite highway activates including earth work inspection of sub grade, sub base & base layers.  Attending site meetings with the residentengineer and the clientto discuss ongoing works, design issues, claims, health and safety etc.  Preparationof MonthlyProgress Report  Setting outthe works, including drainage manholes and pipelines, road works vertical and horizontal alignments, earthworks excavations, etc.  Supervision and controlling ofsite inspection and survey works.  Preparing as-built drawings ofdrainage and infrastructure works and submitting to the residentengineer for approval.  Responsible for implementing the overall safety on site. Personal Status: Name: Mirza Masood Baig Father’s Name: Mirza Jahanagir Iqbal Date of Birth: 8th June 1986 Passport No: AJ3925072 Marital Status: Married Nationality: Pakistani Cellular: +966-599419195 +923005181369 (in case of vocation) Email ID: masoodbaig4@gmail.com