1Abdul Saeed
CURRICULUM VITAE
Name of Applicant : ENGR: ABDUL SAEED
Nationality : Pakistani
Profession : B.Sc. Civil Engineering (Graduated in 1996)
Working in Sultanate of Oman : since 2005
Overall work Experience : over 20 years of rich multi-dimensional experience
Valid Omani Driving Licence : Since Feb, 12 2006 (Sultanate of Oman)
Telephone & GSM Nos. : (Oman: +968-92674651) & (Pak: +92-3009154484)
Email : abdulsaeed123@hotmail.com
Date of Birth : 2nd
November 1971
PROFILE:
Postgraduate Professional Civil Engineering discipline with over 20 years of Civil Engineering experience
having good hand in Contracts Codes / specifications in Roads / Highway / Infra-structure & Buildings &
Ports Construction and Design, Traffic Signal Design, Bridge/Structure Designs, Tunnels,
Vehicular/Pedestrian Underpasses, retaining wall, Multi-storey car parks etc. by engaging in challenging
projects with well reputed consultants (NESPAK & currently with Khatib & Alami and Partners).
Worked as RE / ARE / Civil Engineer, had successful working relationship with respectable Client.
Performed inter-discipline coordination pertaining Project Planning and Management of Site & Office matters.
Provided guidance to CAD draftsman, electrical / mechanical and utilities sections in designing and analysis
of various road pavement by using several British and American codes of practice like ASTM, AASHTO LRFD
etc. Having good hand in correspondence as per standard conditions of contact.
2Abdul Saeed
EDUCATION
 Bachelor of Science in Civil Engineering from Saint Louis University in 1996.
PROFESSIONAL AFFILIATIONS:
 Member of Pakistan Engineering Council
 Member American Association of Civil Engineering
COMPUTER SKILLS:
 AUTO-CAD
 ROAD-CALC
 MS OFFICE
1
EXPERIENCE:
Name of Employing Agency : Khatib & Alami and Partners
Title of Position : ARE (CIVIL)
Location of Assignment : DUQM - Sultanate of Oman
Period of assignment : October 2016 till to date
ACTIVITIES:
Working as Assistant Resident Engineer / Civil Engineer at "Construction of Roads, Infrastructure
and Building works at Government Berth Area PORT OF DUQM (IP4") Project Cost = 55 Million Rial
Omani. My responsibilities are Planning and management of building works and related office works all site
activities comprising of Preparation of Draft correspondence in the light of Project Contracts & specifications
and Conditions of Contract, checking drawings. Project comprises of high-tech Five Zones with buildings full
of facilities for Royal Oman Yacht, Royal Oman Navy, ROP, Sultan Special Force and Fast Ferry Terminal,
3 No. Helipads, Dual carriageway and complete Infrastructure services.
2
Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
Title of Position : ASSISTANT RESIDENT ENGINEER / CIVIL Engineer
Location of Assignment : Duqm-Sultanate of Oman
Period of assignment : March 2015 to August 2016
3Abdul Saeed
ACTIVITIES:
Working as Assistant Resident Engineer / Civil Engineer at “Construction of Main Road
Improvement at Duqm Centre,Duqm” with Project Cost = 13.865 Million Rial Omani. My responsibilities
are management of all the site activities including Landscaping design / office work i.e. checking drawings
and responsible for drafting all correspondence following contract documents. Project comprises of Dual
carriageway and service road at both sides and concrete structure.
3
Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
Title of Position : RESIDENT ENGINEER
Location of Assignment : Islamabad-Pakistan
Period of assignment : September 2014 to March 2015
ACTIVITIES:
“Metro Bus Project, Islamabad (Package-III” with Project Cost = 3.50 Billion rupees. One of the
most prestigious public sector projects in Pakistan. My responsibilities are management of site activities /
office work. Responsible for replying all the correspondence as per standard contract documents. Project
comprising of Concrete structure, road works as well as steel structure i.e. Construction of Bridges, Culverts,
Underground Trench Section for Metro Bus System, Underpasses, Pedestrian Under passes, rigid pavement,
flexible pavement and pedestrian overhead Bridges (Steel Structures).
4
Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
Title of Position : A. RESIDENT ENGINEER
Location of Assignment : Sultanate of Oman
Period of assignment : January 2012 to August 2014
ACTIVITIES:
“UPGRADATION OF SOHAR ROUNDABOUT” with Project Cost = 21.00 Million Omani Rials.
Project is located on existing Batinah Highway in Wilayat of Sohar consist of Construction of an Interchange
in place of existing roundabout comprising of a bridge/flyover, pedestrian under passes, multi cell drainage
structure, construction of Mechanically stabilized Earth Retaining Wall and six lane highway and also
4Abdul Saeed
responsible for relocation of Utility Lines e.g. Electric lines, water lines, telephones lines etc. Responsible for
replying all the correspondence as per Oman standard contract documents & conditions of contract.
Responsibilities included analysis and design of Road and Pavement, Traffic Signals, Post-tensioned Box
Girder Bridges, Piers, Mechanically stabilized Earth Retaining Walls, Underpasses and drainage structures.
I supervised the production of scheme drawing which were approved by Ministry of Transport &
Communication for Construction.
5
Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
Title of Position : A. RESIDENT ENGINEER / CIVIL Engineer
Location of Assignment : Sultanate of Oman
Period of assignment : April 2007 to June 2012
ACTIVITIES:
Worked as “Assistant Resident Engineer” at “DUALIZATION OF SALALAH-THUMRAIT ROAD
PROJECT” .management of all roads & structural activities including 6 Underpasses (15mx24m) &
construction of Tensar Reinforced Soil Retaining Wall with Modular Block Facing System, it was largest
project & main artery connecting a tourism hub city of Salalah with Muscat and all the Gulf Countries. The
existing road alignment & grade has been improved from 14% to 7.85% and removing all the hairs pin mends
of Mountains Stretches of Yassemin Phase-I & II. Total duel carriageway length of the project road is 77.180
Km comprising of Eight Service roads, Six large sized vehicular Underpasses(size 15mx24m).12 No Animal
Crossing(4mx4m) and 72 No of drainage Culverts. Total revised cost of project of OMR 55.70 million.
Responsibilities included analysis and design of Road and Pedestrian Pavement, Traffic Signals, Tensar
Reinforced Walls, Underpasses, and Drainage Structure, I supervised the production of scheme drawing
which were approved by the Client for construction.
6
Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
Title of Position : RESIDENT ENGINEER
Location of Assignment : Sultanate of Oman
Period of assignment : October 2006 to April 2007
ACTIVITIES:
Worked as “Resident Engineer” at “DESIGN & CONSTRUCTION OF ROAD BETWEEN
BUTHAILAH TO NIZWA-THUMRAIT ROAD PROJECT” .located in the Governorate of Dakhiliya, it
generally follows an existing track connecting Nizwa-Thumrait Road with Buthailiah Village. The end point of
5Abdul Saeed
the Project is located in the town of Buthailah. Total length of project is 17 Km including two access roads
with asphalted shoulders, Type-A junction and massive Wadi protection works. The project has been
executed as per highway Standards and specification in Sultanate of Oman. Responsibilities included
analysis and design of Road and pedestrian pavement, Traffic Signals and drainage structure. I supervised
the production of scheme drawing which were approved by the Client.
7
Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
Title of Position : RESIDENT ENGINEER
Location of Assignment : Sultanate of Oman
Period of assignment : December 2005 to September 2006
ACTIVITIES:
Worked as “Resident Engineer” at “LAKBI-SAQRA COASTAL ROAD PROJECT” located in Al-
Wusta Region, Sultanate of Oman. The project envisages Design and Construction of 5.66 Km coastal
road out of which 2.00 Km constructed inside the sea and protected with Rock Armour. Fabric permeable
membrane and R.C.C wave wall. The scope of the work has been added with another 5.00 Km mountainous
road along with road side facilities like car park, walkways and beautification works of Housing area.
Responsibilities included analysis and design of Road and pedestrian pavement, Traffic Signals and drainage
structure. I supervised the production of scheme drawing which were approved by the Client.
8
Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
Title of Position : ARE/Civil Engineer
Location of Assignment : Lahore-Pakistan
Period of assignment : November 2004 to November 2005
ACTIVITIES:
Worked as “Resident Engineer” at “Design & construction supervision of Niazi Chowk
Interchange, Ring road-Lahore Pakistan “comprising of Roads. A 30 m span duel carriageway Bridge
with Pre-stressed girder and Underpass, Loops, Ramps, drainage culverts structure and road street
lighting. Beside above activities partially I was also given responsibility to look after the material testing
Laboratory temporarily. The project was completed successfully.
Responsibilities included analysis and design of Road and pedestrian pavement, Traffic Signals and drainage
structure. I supervised the production of scheme drawing which were approved by the Client.
9
Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
6Abdul Saeed
Title of Position : RESIDENT ENGINEER
Location of Assignment : Khanewal-Pakistan
Period of assignment : April 2003 to November 2004
ACTIVITIES:
Worked as “Civil Engineer” for the “Rehabilitation of Sahiwal-Multan Section (N-5 Highway)
Road Project responsible to look after all the activities i.e. embankment, sub base, aggregate base course.
Asphaltic base course and Asphaltic Wearing Course. Supervised all the quality testing performed for the
above mentioned construction activities as per as per AASHTO and ASTM specification standards.
.Responsibilities included analysis and design of Road and pedestrian pavement, Traffic Signals and
drainage structure. I supervised the production of scheme drawing which were approved by the Client.
10
Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
Title of Position : RESIDENT ENGINEER
Location of Assignment : Kohat-Pakistan
Period of assignment : October 1999 to March 2003
ACTIVITIES:
(From Feb 2001 to March 203) Tunnel Construction Activities:
Worked as “Tunnel Civil Engineer” at “kohat Tunnel Project” in Tunnel Engineering Section my duty
covers management & supervision of Tunnel Excavation, Shotcrete, Rock Bolts fixing, and water proofing
system installation. Lining concrete, installation of centre and side drain pipe, concrete pavement and road
slab inside tunnel and all civil works related tunnel facilities i.e. installation of EXHAUST JET FANS *
embedded conduits in concrete for jet fans 11 KV high tension cables, installation of FIRE HYDRANTS /
FIRE EXTINGUISHERS with all relevant conduits works.
Responsibilities included analysis and design of Tunnel, Traffic Signals and Reinforced Retaining Wall, Slabs
and Drainage structures.
(From Feb 2001 to March 203) Bridge Construction Activities:
Worked at the same as “JUNIOR BRIDGE STRUCTURE ENGINEER” at “Kohat Tunnel Project” upon
successful of completion of tunnel works used to manage and supervise right from start till completion of 11
No of Bridges i.e. sub soil investigation, witnessed pile testing, working pile works(200 piles) all sub structure,
super structure works and fixing of elastomeric bearing pad.
Responsibilities included analysis and design of Tunnel, Traffic Signals and Reinforced Retaining Wall, Slabs
and Drainage structures.
7Abdul Saeed
11
Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
Title of Position : ASSISTANT ENGINEER
Location of Assignment : Peshawar-Pakistan
Period of assignment : May 1996 to September 1999
ACTIVITIES:
Worked as “Assistant Engineer” on “Primary Education Programme funded by Kfw / World Bank” to
manage to manage and supervise construction School building single and multi-storey buildings.
I raised and also resolved Early Warming. Issued Engineer’s instruction to the Contractor .attend commercial
and Risk Reduction meeting; made on site measurements and records, preparation of measurement book
for payment purposes to the Contractor and prepared cost estimate for Client’s consideration.
LANGUAGES KNOWN:
English & Urdu : Excellent in speaking, reading and writing.
Hindko & Punjabi : Excellent in speaking, reading.
Pushto : Excellent in speaking, reading.
Arabic : Fair in speaking and reading

More Related Content

What's hot (20)

CV_Nurul_Huda Latest CV_LeMeridien
CV_Nurul_Huda  Latest CV_LeMeridienCV_Nurul_Huda  Latest CV_LeMeridien
CV_Nurul_Huda Latest CV_LeMeridien
 
CV AKPuri July 2015
CV AKPuri July 2015CV AKPuri July 2015
CV AKPuri July 2015
 
CV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design EngineerCV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design Engineer
 
Arshad Jan CV
Arshad Jan CVArshad Jan CV
Arshad Jan CV
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16
 
Chetan Arora CV
Chetan Arora CVChetan Arora CV
Chetan Arora CV
 
Rajesh Resume
Rajesh ResumeRajesh Resume
Rajesh Resume
 
Resume
ResumeResume
Resume
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
Baba Lalin.B -Bridge Structural Engineer
Baba Lalin.B -Bridge Structural EngineerBaba Lalin.B -Bridge Structural Engineer
Baba Lalin.B -Bridge Structural Engineer
 
Shibendra_Kumar_Patel.
Shibendra_Kumar_Patel.Shibendra_Kumar_Patel.
Shibendra_Kumar_Patel.
 
Col SP Tomar_CV
Col SP Tomar_CVCol SP Tomar_CV
Col SP Tomar_CV
 
satih cv
satih cvsatih cv
satih cv
 
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERINGCV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
Md._Habibur_Rahman_CV
Md._Habibur_Rahman_CVMd._Habibur_Rahman_CV
Md._Habibur_Rahman_CV
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1
 
New C.V Shanu
New C.V ShanuNew C.V Shanu
New C.V Shanu
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 

Similar to CV Abdul Saeed (20)

A. Nasir CV(1)
A. Nasir CV(1)A. Nasir CV(1)
A. Nasir CV(1)
 
MCV
MCVMCV
MCV
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Revised Resume
Revised ResumeRevised Resume
Revised Resume
 
AR - CV (1)
AR - CV (1)AR - CV (1)
AR - CV (1)
 
Cv 01
Cv 01Cv 01
Cv 01
 
CV OF GHAZANFAR KHAN
CV OF GHAZANFAR KHANCV OF GHAZANFAR KHAN
CV OF GHAZANFAR KHAN
 
SENIOR LAND SURVEYOR
SENIOR LAND SURVEYORSENIOR LAND SURVEYOR
SENIOR LAND SURVEYOR
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
mathy 2015
mathy 2015mathy 2015
mathy 2015
 
CV
CVCV
CV
 
Cv zaki 17.11.2014 dhaka
Cv zaki 17.11.2014 dhakaCv zaki 17.11.2014 dhaka
Cv zaki 17.11.2014 dhaka
 
CV PM-KJH
CV PM-KJHCV PM-KJH
CV PM-KJH
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
shoukat buildings and Roads -
shoukat buildings and Roads -shoukat buildings and Roads -
shoukat buildings and Roads -
 
cv inayat ali bhan
cv inayat ali bhancv inayat ali bhan
cv inayat ali bhan
 
HAmmad Resume
HAmmad ResumeHAmmad Resume
HAmmad Resume
 
Resume for Sr.Land Surveyor
Resume for Sr.Land SurveyorResume for Sr.Land Surveyor
Resume for Sr.Land Surveyor
 
Cv Ir. Ainul Jamal bin Musa - 2020
Cv   Ir. Ainul Jamal bin Musa -  2020Cv   Ir. Ainul Jamal bin Musa -  2020
Cv Ir. Ainul Jamal bin Musa - 2020
 

CV Abdul Saeed

  • 1. 1Abdul Saeed CURRICULUM VITAE Name of Applicant : ENGR: ABDUL SAEED Nationality : Pakistani Profession : B.Sc. Civil Engineering (Graduated in 1996) Working in Sultanate of Oman : since 2005 Overall work Experience : over 20 years of rich multi-dimensional experience Valid Omani Driving Licence : Since Feb, 12 2006 (Sultanate of Oman) Telephone & GSM Nos. : (Oman: +968-92674651) & (Pak: +92-3009154484) Email : abdulsaeed123@hotmail.com Date of Birth : 2nd November 1971 PROFILE: Postgraduate Professional Civil Engineering discipline with over 20 years of Civil Engineering experience having good hand in Contracts Codes / specifications in Roads / Highway / Infra-structure & Buildings & Ports Construction and Design, Traffic Signal Design, Bridge/Structure Designs, Tunnels, Vehicular/Pedestrian Underpasses, retaining wall, Multi-storey car parks etc. by engaging in challenging projects with well reputed consultants (NESPAK & currently with Khatib & Alami and Partners). Worked as RE / ARE / Civil Engineer, had successful working relationship with respectable Client. Performed inter-discipline coordination pertaining Project Planning and Management of Site & Office matters. Provided guidance to CAD draftsman, electrical / mechanical and utilities sections in designing and analysis of various road pavement by using several British and American codes of practice like ASTM, AASHTO LRFD etc. Having good hand in correspondence as per standard conditions of contact.
  • 2. 2Abdul Saeed EDUCATION  Bachelor of Science in Civil Engineering from Saint Louis University in 1996. PROFESSIONAL AFFILIATIONS:  Member of Pakistan Engineering Council  Member American Association of Civil Engineering COMPUTER SKILLS:  AUTO-CAD  ROAD-CALC  MS OFFICE 1 EXPERIENCE: Name of Employing Agency : Khatib & Alami and Partners Title of Position : ARE (CIVIL) Location of Assignment : DUQM - Sultanate of Oman Period of assignment : October 2016 till to date ACTIVITIES: Working as Assistant Resident Engineer / Civil Engineer at "Construction of Roads, Infrastructure and Building works at Government Berth Area PORT OF DUQM (IP4") Project Cost = 55 Million Rial Omani. My responsibilities are Planning and management of building works and related office works all site activities comprising of Preparation of Draft correspondence in the light of Project Contracts & specifications and Conditions of Contract, checking drawings. Project comprises of high-tech Five Zones with buildings full of facilities for Royal Oman Yacht, Royal Oman Navy, ROP, Sultan Special Force and Fast Ferry Terminal, 3 No. Helipads, Dual carriageway and complete Infrastructure services. 2 Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd Title of Position : ASSISTANT RESIDENT ENGINEER / CIVIL Engineer Location of Assignment : Duqm-Sultanate of Oman Period of assignment : March 2015 to August 2016
  • 3. 3Abdul Saeed ACTIVITIES: Working as Assistant Resident Engineer / Civil Engineer at “Construction of Main Road Improvement at Duqm Centre,Duqm” with Project Cost = 13.865 Million Rial Omani. My responsibilities are management of all the site activities including Landscaping design / office work i.e. checking drawings and responsible for drafting all correspondence following contract documents. Project comprises of Dual carriageway and service road at both sides and concrete structure. 3 Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd Title of Position : RESIDENT ENGINEER Location of Assignment : Islamabad-Pakistan Period of assignment : September 2014 to March 2015 ACTIVITIES: “Metro Bus Project, Islamabad (Package-III” with Project Cost = 3.50 Billion rupees. One of the most prestigious public sector projects in Pakistan. My responsibilities are management of site activities / office work. Responsible for replying all the correspondence as per standard contract documents. Project comprising of Concrete structure, road works as well as steel structure i.e. Construction of Bridges, Culverts, Underground Trench Section for Metro Bus System, Underpasses, Pedestrian Under passes, rigid pavement, flexible pavement and pedestrian overhead Bridges (Steel Structures). 4 Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd Title of Position : A. RESIDENT ENGINEER Location of Assignment : Sultanate of Oman Period of assignment : January 2012 to August 2014 ACTIVITIES: “UPGRADATION OF SOHAR ROUNDABOUT” with Project Cost = 21.00 Million Omani Rials. Project is located on existing Batinah Highway in Wilayat of Sohar consist of Construction of an Interchange in place of existing roundabout comprising of a bridge/flyover, pedestrian under passes, multi cell drainage structure, construction of Mechanically stabilized Earth Retaining Wall and six lane highway and also
  • 4. 4Abdul Saeed responsible for relocation of Utility Lines e.g. Electric lines, water lines, telephones lines etc. Responsible for replying all the correspondence as per Oman standard contract documents & conditions of contract. Responsibilities included analysis and design of Road and Pavement, Traffic Signals, Post-tensioned Box Girder Bridges, Piers, Mechanically stabilized Earth Retaining Walls, Underpasses and drainage structures. I supervised the production of scheme drawing which were approved by Ministry of Transport & Communication for Construction. 5 Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd Title of Position : A. RESIDENT ENGINEER / CIVIL Engineer Location of Assignment : Sultanate of Oman Period of assignment : April 2007 to June 2012 ACTIVITIES: Worked as “Assistant Resident Engineer” at “DUALIZATION OF SALALAH-THUMRAIT ROAD PROJECT” .management of all roads & structural activities including 6 Underpasses (15mx24m) & construction of Tensar Reinforced Soil Retaining Wall with Modular Block Facing System, it was largest project & main artery connecting a tourism hub city of Salalah with Muscat and all the Gulf Countries. The existing road alignment & grade has been improved from 14% to 7.85% and removing all the hairs pin mends of Mountains Stretches of Yassemin Phase-I & II. Total duel carriageway length of the project road is 77.180 Km comprising of Eight Service roads, Six large sized vehicular Underpasses(size 15mx24m).12 No Animal Crossing(4mx4m) and 72 No of drainage Culverts. Total revised cost of project of OMR 55.70 million. Responsibilities included analysis and design of Road and Pedestrian Pavement, Traffic Signals, Tensar Reinforced Walls, Underpasses, and Drainage Structure, I supervised the production of scheme drawing which were approved by the Client for construction. 6 Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd Title of Position : RESIDENT ENGINEER Location of Assignment : Sultanate of Oman Period of assignment : October 2006 to April 2007 ACTIVITIES: Worked as “Resident Engineer” at “DESIGN & CONSTRUCTION OF ROAD BETWEEN BUTHAILAH TO NIZWA-THUMRAIT ROAD PROJECT” .located in the Governorate of Dakhiliya, it generally follows an existing track connecting Nizwa-Thumrait Road with Buthailiah Village. The end point of
  • 5. 5Abdul Saeed the Project is located in the town of Buthailah. Total length of project is 17 Km including two access roads with asphalted shoulders, Type-A junction and massive Wadi protection works. The project has been executed as per highway Standards and specification in Sultanate of Oman. Responsibilities included analysis and design of Road and pedestrian pavement, Traffic Signals and drainage structure. I supervised the production of scheme drawing which were approved by the Client. 7 Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd Title of Position : RESIDENT ENGINEER Location of Assignment : Sultanate of Oman Period of assignment : December 2005 to September 2006 ACTIVITIES: Worked as “Resident Engineer” at “LAKBI-SAQRA COASTAL ROAD PROJECT” located in Al- Wusta Region, Sultanate of Oman. The project envisages Design and Construction of 5.66 Km coastal road out of which 2.00 Km constructed inside the sea and protected with Rock Armour. Fabric permeable membrane and R.C.C wave wall. The scope of the work has been added with another 5.00 Km mountainous road along with road side facilities like car park, walkways and beautification works of Housing area. Responsibilities included analysis and design of Road and pedestrian pavement, Traffic Signals and drainage structure. I supervised the production of scheme drawing which were approved by the Client. 8 Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd Title of Position : ARE/Civil Engineer Location of Assignment : Lahore-Pakistan Period of assignment : November 2004 to November 2005 ACTIVITIES: Worked as “Resident Engineer” at “Design & construction supervision of Niazi Chowk Interchange, Ring road-Lahore Pakistan “comprising of Roads. A 30 m span duel carriageway Bridge with Pre-stressed girder and Underpass, Loops, Ramps, drainage culverts structure and road street lighting. Beside above activities partially I was also given responsibility to look after the material testing Laboratory temporarily. The project was completed successfully. Responsibilities included analysis and design of Road and pedestrian pavement, Traffic Signals and drainage structure. I supervised the production of scheme drawing which were approved by the Client. 9 Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd
  • 6. 6Abdul Saeed Title of Position : RESIDENT ENGINEER Location of Assignment : Khanewal-Pakistan Period of assignment : April 2003 to November 2004 ACTIVITIES: Worked as “Civil Engineer” for the “Rehabilitation of Sahiwal-Multan Section (N-5 Highway) Road Project responsible to look after all the activities i.e. embankment, sub base, aggregate base course. Asphaltic base course and Asphaltic Wearing Course. Supervised all the quality testing performed for the above mentioned construction activities as per as per AASHTO and ASTM specification standards. .Responsibilities included analysis and design of Road and pedestrian pavement, Traffic Signals and drainage structure. I supervised the production of scheme drawing which were approved by the Client. 10 Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd Title of Position : RESIDENT ENGINEER Location of Assignment : Kohat-Pakistan Period of assignment : October 1999 to March 2003 ACTIVITIES: (From Feb 2001 to March 203) Tunnel Construction Activities: Worked as “Tunnel Civil Engineer” at “kohat Tunnel Project” in Tunnel Engineering Section my duty covers management & supervision of Tunnel Excavation, Shotcrete, Rock Bolts fixing, and water proofing system installation. Lining concrete, installation of centre and side drain pipe, concrete pavement and road slab inside tunnel and all civil works related tunnel facilities i.e. installation of EXHAUST JET FANS * embedded conduits in concrete for jet fans 11 KV high tension cables, installation of FIRE HYDRANTS / FIRE EXTINGUISHERS with all relevant conduits works. Responsibilities included analysis and design of Tunnel, Traffic Signals and Reinforced Retaining Wall, Slabs and Drainage structures. (From Feb 2001 to March 203) Bridge Construction Activities: Worked at the same as “JUNIOR BRIDGE STRUCTURE ENGINEER” at “Kohat Tunnel Project” upon successful of completion of tunnel works used to manage and supervise right from start till completion of 11 No of Bridges i.e. sub soil investigation, witnessed pile testing, working pile works(200 piles) all sub structure, super structure works and fixing of elastomeric bearing pad. Responsibilities included analysis and design of Tunnel, Traffic Signals and Reinforced Retaining Wall, Slabs and Drainage structures.
  • 7. 7Abdul Saeed 11 Name of Employing Agency : National Engineering Services Pakistan (Pvt) Ltd Title of Position : ASSISTANT ENGINEER Location of Assignment : Peshawar-Pakistan Period of assignment : May 1996 to September 1999 ACTIVITIES: Worked as “Assistant Engineer” on “Primary Education Programme funded by Kfw / World Bank” to manage to manage and supervise construction School building single and multi-storey buildings. I raised and also resolved Early Warming. Issued Engineer’s instruction to the Contractor .attend commercial and Risk Reduction meeting; made on site measurements and records, preparation of measurement book for payment purposes to the Contractor and prepared cost estimate for Client’s consideration. LANGUAGES KNOWN: English & Urdu : Excellent in speaking, reading and writing. Hindko & Punjabi : Excellent in speaking, reading. Pushto : Excellent in speaking, reading. Arabic : Fair in speaking and reading