This resume is for Babu Kuniyamkottil, who has over 25 years of experience in construction, installation, testing, commissioning, and maintenance of instrumentation, electrical, telecommunications, and other systems for oil, gas, and infrastructure projects. His most recent role since 2007 has been as a Construction Supervisor and Commissioning Coordinator for Qatar Petroleum, where he oversees instrumentation, telecommunications, fire alarm, and other systems. He holds various qualifications and certifications and is seeking a position as a Construction or Commissioning Manager.
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
Resume gede andi- construction piping supervisorandi dipayadnya
A senior construction supervisor (piping mechanical and structural) with more than 10 years experience in supervisory role, with a good knowledge of piping, structural, welding, rigging-lifting, scaffolding, HSE, etc.
Resume gede andi- construction piping supervisorandi dipayadnya
A senior construction supervisor (piping mechanical and structural) with more than 10 years experience in supervisory role, with a good knowledge of piping, structural, welding, rigging-lifting, scaffolding, HSE, etc.
1. Resume
BABU KUNIYAMKOTTIL
C/O K S BYJU
ENERGY INTERNATIONAL
DOHA, 13491 Qatar
nbabu175@hotmail.com
babuk2222015@gmail.com
+97455990992
https://qa.linkedin.com/pub/babu-k/ba/aa1/486
babuk175
babuk175
Profile Summary
More than 25 years of experience in the Oil & Gas, Infrastructure Projects (including multistory
Buildings), Petrochemical, Power station & Desalination plants during Construction, Installation, Testing,
Commissioning ,SAT(Site Acceptance Test),SPT (Sustained Performance Test),Integration of the Fire alarm
system, Security system, PA/GA ,BMS system etc. until hand over the Project, Quality control and
Maintenance.
Career Objective
Seeking a suitable position for Construction Manager or Commissioning, Manager Testing &
Commissioning.
Employment History
Nov 2007 – present: Construction Supervisor
Electrical & Instrumentation , Telecom Commissioning coordinator at
onshore Engineering department Rasalffan
Raslaffan, Qatar
Qatar Petroleum
Construction Supervisor Electrical & Instrumentation , Commissioning Coordinator, Qatar Petroleum
Presently working as a Construction Supervisor and Commissioning coordinator with Qatar Petroleum
onshore engineering department RasLaffan for Instrumentation, Telecom, Fire Alarm System, Loss
Prevention, Building Management System and Construction activities of Electrical and IT.
Job responsibilities:
• Ensure and Comply all Construction, Installation, Testing and Commissioning activities in line with
Project Specification, QP standards, QCS, applicable International standards AFC (Approved for
Construction) Drawings and as per Contract SOW (Scope of Work)
• Review EPIC/EPC tender documents and provide input.
• Assist the Project Team during FEED/Engineering Definition/Data gathering/MTM (Mid Tender
Meeting) site visits.
• Assist during EPIC/EPC engineering phase for site visits and data gathering.
• Review Construction schedule and provide input.
• Assist Contractor for mobilization and installation of temporary facilities.
• Review Project HSE Plan and provide input.
• Review Project Quality Plan and ITP and provide input
• Review construction procedures and provide input.
• Review Construction method statements and provide input.
• Review Tie-in/shutdown procedures/schedule and provide input.
• Review Construction elements of Project execution plan and provide input.
• Supervise all construction works to achieve completion in line with Project requirements.
• Ensure Construction activities adhere to “QP Safety Regulations for Contractors” and QP Corporate
Standard for Quality Requirements for Projects”.
2. • Monitor progress and provide input to progress measurement.
• Identify and coordinate construction punch listing and close out.
• Review and accept check-sheets, test-packs, inspection/test records tec., as applicable.
• Ensure timely submission of red line markup drawings for verification.
• Verify and endorse red line mark-up drawings.
• Co-ordinate and Monitor Construction Safety.
• Provides job specific safety requirements, procedures, and drawings for all Work Permits to enable
timely approval from Asset Holder.
• Ensure and comply the site conditions covering local and statutory regulations.
• Training/certification requirements in coordination with HSE.
• Coordinate with HSE and carry out periodic safety audit of site visits to the work areas/camp to
identify potential hazards, house-keeping requirements and shall advise required corrective measure
to ensure all works are executed in a safe manner.
• Co-ordinate and Monitor Construction Quality.
• Inspection & testing the works during construction for compliance to relevant specification,
standards & AFC documents and to ensure timely corrective action measures are undertaken.
• Carrying out material inspections to verify compliance to Project Specifications.
• Review of Material Acceptance Requests (MARs) and verification of compliance at site.
• Carrying out periodic audits/checks to ensure quality records (as identified in ITP) are updated in
accordance with work progress.
• Reviewing, check sheets/records and test packs.
• Verify and ensure the systems and sub-systems are ready for MCC (Mechanical Completion).
• Check and verify the system is ready for Pre-commissioning and testing as per the approved test
procedures.
• Check and verify by calibration and loop check.
• Check and verify the pre-commissioning testing.
• Check and verify the SAT (Site Acceptance Test) as per approved SAT procedure with
commissioning team.
• Test and witness for performance test with commissioning team.
• Check and verify Sustained Performance Test (SPT) with commissioning team.
• Check and verify the Construction Punch list and Commissioning Punch list and close out the items
on behalf of Project construction team.
Jun 2007 – Oct 2007: Construction Supervisor Al -Ahmadi, Kuwait
M/S Worley Parsons
Construction Supervisor (Instrumentation), M/S Worley Parsons
Worked with M/S Worley Parsons as a Construction Supervisor (Instrumentation) for their KOC
Strategic Pipe line Project from KNPC Mina-Al-Ahmadi Refinery to Doha Power Station and Sabiya Power
Station (from June 16, 2007 to Oct 31, 2007).
Job description:
• Worked as Construction Supervisor Instrumentation for the Gas oil pipeline projects for Kuwait Oil
Company (KOC)
Nov 2001 – Jun 2007: Instrument Supervisor Al Ahmadi, Kuwait
Ministry of energy at Sabiya Power station
Instrument Supervisor (Maintenance), Ministry of energy at Sabiya Power station
Employed by Ministry of energy at Sabiya Powerstation(2400 MW)& Distillation plants with
3. recarbonation systems as an Instrument Supervisor.(from 2001 November 26th to June 5th 2007)
Job responsibilities:
• I was involved (last one year) in site installation & commissioning for Sabiya water distillation with
recarbonation systems with Doosan Heavy Industries & Construction using Siemens Teleperm XP
DCS. Inspection of installation of various field instruments, calibration, loop test, function test,
sequence test (for pump, motor &shut- off valves), pre-commissioning and commissioning. Working
on different types of field instruments such as Siemens, Rosemount, Yamatake honey well, Fischer,
Foxboro, Masoneilan, Acculoadetc flow, level, pressure Xmrs, conductivity analyzers, ultrasonic
level Xmrs, and Temperature monitoring systems.
• Worked in power station instrument maintenance dept2400MW oil and gas fired Boiler & Turbine
in field and control room using Mitsubishi DIASYS-UP and MACS 3000 DCS and Allan Bradley
PLC S/05. Responsible for fault finding and rectifying during plant running and supervision &
inspection of contractor during preventive maintenance and shut down maintenance.
• Review of installation inspection, Pre-commissioning and commissioning documentation to ensure
compliance with the specification and current working practices.
• Partaking in witnessing activities for pre-commissioning of plant sequence control protection system
and modulating control systems. Quality control, conducting inspections, execution of project work
and its supervision on site.
• Execution of work from client’s side giving instructions to the contractor and inspection their work.
Inspection of incoming materials & spare parts.
Feb 2001 – Nov 2001: Instrument supervisor Al Ahmadi, Kuwait
M/S.L.G.Engineering& construction Co at Kuwait National Petroleum
Instrument supervisor, M/S.L.G.Engineering& construction Co at Kuwait National Petroleum
Employed by M/S.L.G.Engineering& construction Co as an Instrument supervisor at Kuwait National
Petroleum Co (K.N.P.C) for the new Gas oil desulphurization project.(From 27th February 2001 to
November 2001).
Job responsibilities:
• Installation of various process control instruments erection of cable trays and conduits, calibration
,cable pulling, loop checking and commissioning using FOXBORO I/A. It was a hot cut over project
and system integration from TDC-2000 to TDC-3000 at FUP (Further up gradation project).
Coordinating with client, Applying and receiving permits and executing the job, supervising the job
as per the K.N.P.C standard.
Jun 2000 – Feb 2001: Instrument supervisor Al Ahmadi, Kuwait
M/S.U.B.Engineering at Petrochemical Industries
Instrument supervisor, M/S.U.B.Engineering at Petrochemical Industries
Employed by M/S.U.B.Engineering as an Instrument supervisor at PETROCHEMICAL INDUSTRIES
CO (P.I.C) –SHUAIBA FERTILIZER PLANT- AMMONIA PLANT
Job responsibilities:
• Worked during Plant B shut down maintenance and plant A modernization. During shut down
calibration, repairing, loop checking and commissioning of various field instruments, gas
compressors, and FOXBORO ECKADART micro controllers. Receiving permits coordinating with
the client and implementing the job.
4. Jan 1997 – Jun 2000: I & C Inspector Al Ahmadi, Kuwait
M/S.MERZ &McLELLAN LTD. (CONSULTING ENGRS), NEW CASTLE U.K
I & C Inspector, M/S.MERZ &McLELLAN LTD. (CONSULTING ENGRS), NEW CASTLE
Employed by M/S.MERZ &McLELLAN LTD. (CONSULTING ENGRS), NEW CASTLE U.K. as an
I & C Inspector at Sabiya 2400 MW oil & gas fired power station
Job responsibilities:
• Inspection of Instrument erection, calibration, pre-commissioning, and commissioning as per the
approved drawings and specifications with British standard and Japanese standard. Stage by stage
inspection from material receiving to commissioning.
• Material receiving, erection, installation, calibration, loop checking, function check, sequence test,
power receiving, quality control, pre commissioning and commissioning.
• Execution of work from client side giving instructions to the Contractor and quality control and
inspection of material receiving and Spare parts.
• Liaison with clients/ consultants regarding scope of work, completion targets, field change approval
etc and interact with clients for field modification and alternate work methods for executing the jobs.
Capable of handling P & ID logic diagrams, loop diagrams and ladder logic. Have the capability to
identify the areas of concern and to implement remedial measures to complete the job with in the
scheduled time.
• Worked at different locations of the power plant boiler, turbine, and common areas like seawater
intake, chiller units, fire alarm systems using Siemens PLC, Allan Bradley PLC, and Omron PLC,
Mitsubishi DIASYS UP & MINIMAX F /A systems.
Jul 1993 – Jul 1996: Instrument Maintenance Technician Al Ahmadi, Kuwait
M/S. FINESCO at Kuwait National Petroleum Co
Instrument maintenance technician, M/S. FINESCO at Kuwait National Petroleum Co
Employed by M/S. FINESCO as an Instrument maintenance technician at Kuwait National Petroleum Co
(K.N.P.C)
Job responsibilities:
• Preventive, Running & Break down maintenance, Calibration and repairing of both Pneumatic and
Electronic Instruments. (Field & Control Room).
• Involved in commissioning, loop checking and maintenance of Allan – Bradley PLC (5/02)
troubleshooting, testing, logic checking, calibration of different types of processes instruments such
as transmitters, control valves, analyzers, i/o checking and loop checking of PLC and emergency
S/D system.
• Carried out modifications related to safety interlocks, receptacle wiring and installation of field
instruments such as Ashcroft Pressure switches, Masoneilan Camflex II control valves, etc.
• Experienced in calibration and maintenance of Positive Displacement Meters (smith meters – USA)
Turbine meters (Donald – 6000) set stop valves and MOVS and Enraf tank level gauge system also.
Feb 1991 – Jul 1993: Junior Engineer Instrumentation Assam, India
M/S. Gas Authority of India Ltd LPG Recovery Project, India
Junior Engineer Instrumentation, M/S. Gas Authority of India Ltd LPG Recovery Project, India
Employed by M/S. Gas Authority of India Ltd LPG Recovery Project at Baroda, Bijaipur & Assam in India
as a Junior Engineer Instrumentation from 02-02-1991 to 02-07-1993.
5. Job responsibilities:
• Installation, Calibration, Commissioning & maintenance of different types of process control
Instruments of both Electronic & Pneumatic. In this period worked at Assam GAIL-ONGC joint
venture operation in Gas Gathering Centers. Experienced in calibration and maintenance of all kinds
of (flow, pressure, level & temperature) pneumatic and electronic instruments and other process
control instruments of different companies including Rosemount, Taylor, Bells, Fisher, Foxboro,
Masonelan, Rotork, and smith meters. Involved with Gas Turbines and compressors (Rotoflow
Corporation USA). Having good knowledge of vibration monitoring using Bentley Niveda 7200
series, speed and Anti-Surge controllers. Experience also included in Instrumentation control room,
Taylor Mod300DCS &Yokogawa Centrum-XL.
May 1989 – Jan 1991: Technician Supervisor for Instrumentation Pune, India
M/S.S.M.Zschimmer and Schwarz chemicals Ltd Sulfonation Plant
Technician Supervisor for Instrumentation
Employed by M/S.S.M.Zschimmer and Schwarz chemicals Ltd Sulfonation Plant –Pune & Gas
Authority of India Ltd- Bijaipur in India as Technician Supervisor for Instrumentation
Job responsibilities:
• Erection, Installation and the commissioning requirements of various process Instruments and
Control loops.
• Hands on experience on Taylor1400 series controllers, Yokogawa YEW series controllers, and
Honeywell multi point recorders, and Rosemount 1151 transmitters. Actively involved in
construction activities then commissioning of Caustic soda and chlorine plants such as installation of
cable laying, conduits, ferruling, tubing and Instruments testing, calibration, loop checks etc.
Involved in construction, testing, and commissioning activities then day to day Maintenance of
instruments in chlorine and caustic soda plants.
Education / Qualifications
Three years engineering Diploma in Instrument Technology Palakkad, Kerala, India
Gov. Polytechnic-Palakkad, Dept of technical education, Govt of Kerala.
Graduated: March 1988
Grade: 70
Skills Summary
• Excellent team player and good leadership qualities.
• Good communication skills, Team work
• Strong analytical skills
• Agility and adaptability; hardworking, dedicated and goal-oriented.
Technical Skills
Name Proficiency
Operating Systems: MS Windows
9X/2000/ME/XP/VISTA, Windows 7/ 8
Expert
Application Software?s: Micro Office Package Expert
Training courses attended
• Attended SIEMENS TELEPERM XP/ SPPA T2000 DCS training course.
• Attended the K.N.P.C. safety training course, Qatar Petroleum Safety training course.
6. • Operation and maintenance training course given by Doosan Heavy Industries &Co Ltd .
• ISO-9000 Basic awareness course with Aptech center for business transformation.
• IOSH Managing Safety training.
• Allan-Bradley PLC 5/20, 5/40,SLC 5/02, 5/03
• SCADA WonderwareIntouch 10.1
Languages
Name Proficiency
English Fluent
Hindi Fluent
Malayalam Fluent
Tamil Fluent
Hobbies / Interests
Political history, Music, professional networking, international travel, Asian cooking, architectural history,
digital technology
References
Steven Richard Hutchinson – Lead Construction
Supervisor
Qatar Petroleum
Request referee contact details
Jhon Samuel – Lead Project Engineer
Qatar Petroleum
Request referee contact details
John Morrison – Senior Project Engineer
Qatar Petroleum
Request referee contact details
Imad Al Kout – Instrument section head
Ministry of Energy
Request referee contact details
7. • Operation and maintenance training course given by Doosan Heavy Industries &Co Ltd .
• ISO-9000 Basic awareness course with Aptech center for business transformation.
• IOSH Managing Safety training.
• Allan-Bradley PLC 5/20, 5/40,SLC 5/02, 5/03
• SCADA WonderwareIntouch 10.1
Languages
Name Proficiency
English Fluent
Hindi Fluent
Malayalam Fluent
Tamil Fluent
Hobbies / Interests
Political history, Music, professional networking, international travel, Asian cooking, architectural history,
digital technology
References
Steven Richard Hutchinson – Lead Construction
Supervisor
Qatar Petroleum
Request referee contact details
Jhon Samuel – Lead Project Engineer
Qatar Petroleum
Request referee contact details
John Morrison – Senior Project Engineer
Qatar Petroleum
Request referee contact details
Imad Al Kout – Instrument section head
Ministry of Energy
Request referee contact details