Planning, Scheduling & monitoring of activities on daily, weekly and monthly basis and preparation of the reports.
Developed and implemented Quality Plan (QP), Inspection Test Plan (ITP) |
|and Checklist to ensure work flow compliance is met accordingly.
Familiar with ISO-9001/14001,Quality management systems,quality management tools,quality objective and mission.
Planning & coordinating with the contractor, consultants and client for timely completion of all activities.
Monitored and conducted in-process and final inspection, examination, testing procedure to the product inspected and demonstrate capabilities in the following function like planning inspection, evaluating the validity and acceptance, reporting and documentations.
Responsibilities: E&I QA/QC
Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I)
Jobs.QA/QC with the help of specification, drawings.
Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery
Note.
Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional
drawings.
Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing.
Responsible for all Red Marks/As Built drawing as per site modification.
Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer
installation.
Inspection for Heating Tracing cables and Testing.
Having Good Knowledge of (NEC) National Electrical Code.
American Petroleum Institute (API ) Standards
IEC- international ELECTROTECHNICAL Commission Standards.
Inspection for the Installation of MCT’s.
Inspection for Lightning Protection (Lightning Arresters).
Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints,
Earth Bus Bar, EARTHING Test.
Inspection for Motor Installation, Resistance/IR test & Motor torque test.
Inspection for Cable Continuity/IR, Cable termination, EARTHING test.
Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S.
Complete QA/QC Documentation as per Project specification.
Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT.
Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT.
Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing)
Inspection for Impulse Line Leak test.
Inspection for JB’S Installation, Panels, Cabinets Installation.
Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre-
Commissioning with the attachments of Instrument loop package index, Functional loop test CR,
Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop
Diagram & P& ID’S.
Responsible for clear the Punch Points.
Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion
Department (MC)
Final Walk Down of Hand over System (HOS) with Client.
Responsibilities: E&I QA/QC
Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I)
Jobs.QA/QC with the help of specification, drawings.
Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery
Note.
Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional
drawings.
Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing.
Responsible for all Red Marks/As Built drawing as per site modification.
Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer
installation.
Inspection for Heating Tracing cables and Testing.
Having Good Knowledge of (NEC) National Electrical Code.
American Petroleum Institute (API ) Standards
IEC- international ELECTROTECHNICAL Commission Standards.
Inspection for the Installation of MCT’s.
Inspection for Lightning Protection (Lightning Arresters).
Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints,
Earth Bus Bar, EARTHING Test.
Inspection for Motor Installation, Resistance/IR test & Motor torque test.
Inspection for Cable Continuity/IR, Cable termination, EARTHING test.
Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S.
Complete QA/QC Documentation as per Project specification.
Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT.
Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT.
Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing)
Inspection for Impulse Line Leak test.
Inspection for JB’S Installation, Panels, Cabinets Installation.
Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre-
Commissioning with the attachments of Instrument loop package index, Functional loop test CR,
Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop
Diagram & P& ID’S.
Responsible for clear the Punch Points.
Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion
Department (MC)
Final Walk Down of Hand over System (HOS) with Client.
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
E&I QC INSPECTOR RESUM AND documents.pdfIrfan786pak
I have good working experience more then 17 years in Oil and Gas ,Fertilizer, Chemical, Petrochemical, in Saudi Arabia & Pakistan , Having a good Experience in Maintenance, Pre Commissioning ,& Commissioning, Start-up and erection Activities, Good knowledge & working skills in plant Control Automation and different control systems such as DCS & ESD systems, Burner Management System, Condition Monitoring System, Turbine & Compressor Integrated Control Systems, F&G System, Production Wellheads, Water & Gas Injection Wellheads Hydraulic Control Panels etc. Ability to work alone as a shifter and fault finding & rectify. i am a Safety conscious & sound knowledge about work permits like cold, hot and entry work permits.in Maintenance and Commissioning 4 LTE2.48 % C4G + During my job I'm Responsible for the PM , CM & breakdown maintenance of various field Instrumentation like flow , pressure , temperature level transmitters , vibration probes , control / on - off valves which installed on Process piping , Skids . Self motivated Maintenance Professional with a demonstrated history of working in the Oil & Gas and Petrochemicals industry in instrument & Control system department securing16 years of Practical experience I am expertly capable in fault diagnosis , troubleshooting and process controls systems in process plant to ensure safety guidelines . I am experienced in modern process control instrumentation in chemicals , petrochemical , fertilizer , oil & gas and cryogenic plants in field of instrumentation . Highly skilled in electrical operations & maintenance . Has working proficiency in SAP system utilization and MS office My skills include but are not limited to : PLC , DCS & Vibration Monitoring System | Control Valve Operation & Maintenance | Loop Checking & SAT / FAT Activities | P & ID & Instruments Calibration | Transducers , SIS / SIL Concept , Positioners | Single Loop Controllers , I / P , ESD System | Turbine & Compressor Control Systems | Workshop / Field Test Equipment | Control Valves , Online Gas Analyzers | Burner Management System | Custody Transfer Metering | Commissioning Activities | Interpersonal Skills | Presentation Skills
I am available on
Email: irfanpak181@gmail.com
Mobile 📱: 00966533012366
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
1. MD. ASHIQUEZAFAR
QA/QCMANAGER
(E&I)
Mobile #+91-9122836942(India)
+ 971-562170023(UAE)
Email : ashique_zafar@yahoo.com
Zafarashique.q@gmail.com
Skype id: ashique.zafar1
Objective:
To be associated with companies where my interest and aptitude can be used to
further enhance my qualification and advance in the demand of the engineering
profession in the field of Instrumentation.
Professional Qualification:
BE in Electronics &Communication
CQM (Certified Quality MANAGER) from Chicago.
Member of ASQ (American Society for Quality)
HSSE CERTIFICATION
Silver medal in ILM(INTERNATIONALLEADERSHIP MANAGEMENT
In the field of safety security environment.
Computer proficiency:
Conversant with windows, Ms-office, HTML, Power point and internet browsing.
Experience History:
More than 12- year’s experience with power plant and Oil& Gas field.
Gulf Experience
April 2013.to Present
Company : Al-hassan Engineerin Co WLL. Abudhabi
Position : QA/QC manager (E&I)
Project : IRP II Refinery project(Inter Refinery Pipeline),Takreer
Aug 2011.to 27th
February 2013
Company : Tekfen construction and Installation co Abudhabi
Position : Senior QA/QC Incharge (E&I)
Project : ASAB 317 FFD Project,ADCO.
Aug 2010.to July2011
Company : Mohammad Almojil Group (MMG).
Position : Electrical & Instrument (E&I) QA/QC superintendent
Project : JGC/NCP(KSA),Package D.
2. July 2008.to June 2010
Company : CCIC QATAR,SHELL.
Position : Electrical & Instrument (E&I) QA/QC Engineer
Project : GTL (Gas to Liquid) Ras Laffan Industrial city
Qatar.
Aug, 2007 to May, 2008
Company : CCC (Saudi),ARAMCO
Project : KGP (Khursaniah Gas Plant)
Position : Senior QA/QC E&I Inspector
June,2006 to July 2007
Company : Aljablein Construction Company
Project : Hail Jubail(Saudi Arabia)
Position : QA/QC Inspector.E&I
1)
Indian Experience
Nov, 2004 toMay, 2006
Company : DODSAL
Project : NTPC Hazira
2)
Position :
Jan, 2003 to Oct,2004
QC Inspector E&I
Company : BOC Gases
Project : Burmal Mines
Position : QC Inspector E&I
Field ofManagement Activity:
Planning, Scheduling & monitoring of activities on daily, weekly and monthly basis
and preparation of the reports.
Developed and implemented Quality Plan (QP),Inspection Test Plan (ITP) |
|and Checklist to ensure work flow compliance is met accordingly.
Familiar with ISO-9001/14001,Quality management systems,quality management
tools,quality objective and mission.
Planning & coordinating with the contractor, consultants and client for timely
completion of all activities.
Monitored and conducted in-process and final inspection, examination, testing
procedure to the product inspected and demonstrate capabilities in the following
function like planning inspection, evaluating the validity and acceptance,reporting
and documentations.
3. Coordinating with the contractors, consultants and client for any variation as per the
drawing and specifications.
Recruit, trained and developed QC personnel who will contribute to the productivity
and profitability of the organization.
Provided quality matters interpretations, technical and
administrative assistance to project management.
Furnished Key Performance Indicator (KPI) to all majordeficiency to|prevent
reoccurrence,save time and accumulated cost, MDR and Matrix index.
Provided quality matters interpretations, technical and administrativeassistance to
project management.
Inspected supplier’s facility and all operations and materials in it.
Developed quality assurance plans, scheduled audits and evaluated all acceptance test
programs.
Provided technical support to systems and resolved all quality problems and
conducted necessary investigations.
Ensured that all actions were implemented in required timeframe. Analyzed audit
results and identified any deficiencies in quality system
Ensured that all quality standards were followed in manufacturing process. Provided
technical support to various teams for project improvement.
Monitored all products that were shipped and ensured its accordance with
standards. Maintained process and implemented all corrective measures.
.
Jobs Responsibilities
Perform field inspection to verify conformance to project specification, standard and
IFC drawing prior to final acceptance, issue site memo, site instruction, Discrepancy
Report(DR) and Non-Conformance Report (NCR).etc. and follow-up for rectification
and Corrective action.
Material inspection, Traceability and reviewing Test certificate for delivered material
from vendor.
Review the project specification and implement of ITP, and QCP according to SAES
Saudi Aramco Engineering Standards. Planning about the job and distribution
responsibilities
Routine Area Surveillance of Instrumentation erection activities as per Aramco
Standard
.
Inspection & Witnessing according to Project Specification and QCP & ITP,
Established field inspection & Testing Procedures for E & I works with the assistance
of site project Engineers.
Inspection for the Installation of Field mounted Instruments, Junction Boxes,
Local Panels, Pneumatic Leak Test of Air Line Tubing /Impulse line tubing,
Insulation Resistance test and Continuity Check for instrument Cables.
4. Inspection for the Installation of DCS Panel, ESD Panel, Fire & Gas AlarmSystem .
Inspection for the Installation of Fire & Gas System in the Field such as Push
Button, Horn & Beacon and Fire Detection System . Installation Inspection of
CCTV,PAGA system
Familiar with Daily basis Activities like AFI &RFI.
Overseas the Documents Control management and ensures the availability of Current
Aramco Engineering Standards Procedure and industrial codes and Standard.
Familiar with International standards ASTM, IEC, ANSI, NEC, NEMA.
Inspecting and witnessing of plant earthling systems and testing . Inspecting and
witnessing the testing of LV and HV cable that is continuity test hi pot test and
termination and torque.
Inspecting and witnessing of plant lighting system and testing that is functional and
illumination test as per project specification.
Inspecting and witnessing of all electrical equipment installations like switchgears
transformer, motor earthling lighting and etc LV, HV. Witnessing of motor solo
run test and monitoring the line current bearing temperature vibration rotation
and functional test of control from MCC local and remote .Execution of Heat
Tracing System,HVAC System,HVAC panel and ducting system.retubing of
heat exchanger.
Preparation of Quality related documents as per client’s requirement such as Quality
control plan, ITP, Method statement and related work instructions and liaison with
the client for the approvals.- Responsible for incoming materials Inspection with
respect to approved Specification, Data sheets, Material Approval and quality plan.
- Monitoring the installation and testing of various panels, such as 415V Switchgear
Panels, 3.3KV Breaker Panels & LV Switchboards and HVAC as per the approved
procedures- Monitoring the installation and testing of LV Transformers (145MVA),
Diesel power generators as per the Qualityplan
Carrying out inspection for electrical installation and testing of Motors,
5. Personal Profile
Father’s Name : Md.Imam Zafar
Present Address : At/Po:Kako(Malick Tola)
Dist: jehanabad
Pin : 804418
Cell no : +91-9122836942
Nationality : Indian
Date of Birth : 12th,
December,1975
Gender : Male
Marital Status : Married
Passport Details:
Old Passport Number : E-4047415
Place of issue : Patna
Date of issue : 02-04-2004
Date of Expiry : 01-04-2014
Newpassport No : L-6695863
Place of issue : Abudhabi(UAE)
Date of issue : 02-03-2014
Date of Expiry : 01-03-2024
Date:
Place:
Ashique Zafar
6.
7.
8.
9.
10. Personal Profile
Father’s Name : Md.Imam Zafar
Present Address : At/Po:Kako(Malick Tola)
Dist: jehanabad
Pin:804418
Cell no : +91-9122836942
Nationality : Indian
Date of Birth : 12th,
December,1975
Gender : Male
Marital Status : Married
Passport Details:
Passport Number : E-4047415
Place of issue : Patna
Date of issue : 02-04-2004
Date of Expiry : 01-04-2014
Telephone Number : 06114-255050