Mohammad Naushad Alam is applying for the position of Instrumentation QA/QC Inspector with over 10 years of experience in instrumentation projects in the Middle East and India. He has experience in instrumentation construction, startup and commissioning for oil and gas projects. His responsibilities have included inspection of instrumentation installation and testing to ensure compliance with quality standards and specifications. He is seeking a growth opportunity with an organization where he can utilize his qualifications and proven track record.
Responsibilities: E&I QA/QC
Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I)
Jobs.QA/QC with the help of specification, drawings.
Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery
Note.
Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional
drawings.
Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing.
Responsible for all Red Marks/As Built drawing as per site modification.
Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer
installation.
Inspection for Heating Tracing cables and Testing.
Having Good Knowledge of (NEC) National Electrical Code.
American Petroleum Institute (API ) Standards
IEC- international ELECTROTECHNICAL Commission Standards.
Inspection for the Installation of MCT’s.
Inspection for Lightning Protection (Lightning Arresters).
Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints,
Earth Bus Bar, EARTHING Test.
Inspection for Motor Installation, Resistance/IR test & Motor torque test.
Inspection for Cable Continuity/IR, Cable termination, EARTHING test.
Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S.
Complete QA/QC Documentation as per Project specification.
Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT.
Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT.
Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing)
Inspection for Impulse Line Leak test.
Inspection for JB’S Installation, Panels, Cabinets Installation.
Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre-
Commissioning with the attachments of Instrument loop package index, Functional loop test CR,
Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop
Diagram & P& ID’S.
Responsible for clear the Punch Points.
Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion
Department (MC)
Final Walk Down of Hand over System (HOS) with Client.
Responsibilities: E&I QA/QC
Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I)
Jobs.QA/QC with the help of specification, drawings.
Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery
Note.
Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional
drawings.
Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing.
Responsible for all Red Marks/As Built drawing as per site modification.
Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer
installation.
Inspection for Heating Tracing cables and Testing.
Having Good Knowledge of (NEC) National Electrical Code.
American Petroleum Institute (API ) Standards
IEC- international ELECTROTECHNICAL Commission Standards.
Inspection for the Installation of MCT’s.
Inspection for Lightning Protection (Lightning Arresters).
Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints,
Earth Bus Bar, EARTHING Test.
Inspection for Motor Installation, Resistance/IR test & Motor torque test.
Inspection for Cable Continuity/IR, Cable termination, EARTHING test.
Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S.
Complete QA/QC Documentation as per Project specification.
Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT.
Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT.
Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing)
Inspection for Impulse Line Leak test.
Inspection for JB’S Installation, Panels, Cabinets Installation.
Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre-
Commissioning with the attachments of Instrument loop package index, Functional loop test CR,
Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop
Diagram & P& ID’S.
Responsible for clear the Punch Points.
Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion
Department (MC)
Final Walk Down of Hand over System (HOS) with Client.
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
COVER LETTER
I am writing to outline my extensive experience and successful track record as an Electrical and Instrument Construction/Maintenance Supervisor. I believe I possess the skills, qualifications and vital experience necessary to make a very significant contribution to your operation.
My extensive experience in chemical, petrochemical, thermal power plant, nuclear power plant, fertilizer plant and cement industries, and construction industry I have been involved with installation, maintenance, testing, troubleshooting, in E & I and repairing and maintenance of electronics system, worked on power electronics, worked on electrical control system, worked on frequency drive, soft starter,PLC,DCS,foundation field bus system, security system, structured cabling networking, surveillance system, fire and gas system, hazardous area instrumentation I am looking forward to have a great time with your company
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
COVER LETTER
I am writing to outline my extensive experience and successful track record as an Electrical and Instrument Construction/Maintenance Supervisor. I believe I possess the skills, qualifications and vital experience necessary to make a very significant contribution to your operation.
My extensive experience in chemical, petrochemical, thermal power plant, nuclear power plant, fertilizer plant and cement industries, and construction industry I have been involved with installation, maintenance, testing, troubleshooting, in E & I and repairing and maintenance of electronics system, worked on power electronics, worked on electrical control system, worked on frequency drive, soft starter,PLC,DCS,foundation field bus system, security system, structured cabling networking, surveillance system, fire and gas system, hazardous area instrumentation I am looking forward to have a great time with your company
Prot. 986 17 pl destina percentual de moradias populares às mulheres vítima...Claudio Figueiredo
Projeto de Lei nº 986/17, de autoria do vereador Arnaldinho Borgo, que destina 5% do total de moradias populares de programas habitacionais públicos em Vila Velha às vítimas de violência doméstica da cidade.
APOSTILA TERRACAP 2017 ENGENHEIRO CIVIL COM 2 VOLUMES + ACESSO AO NOSSO BANCO DE DADOS DE VÍDEO AULAS GRÁTIS.
COMPRE JÁ EM:
http://universiaeditora.com.br/apostilas/apostila-terracap-2017/apostila-terracap-2017-engenheiro-civil-video-aulas.html
Strong Authentication Trends in GovernmentFIDO Alliance
The new model for stronger, simpler online authentication has implications beyond businesses and their consumers, including government policy and applications. FIDO authentication was designed with security and privacy at the forefront, making it a natural complement for government initiatives in these areas. Explore FIDO's role in policy, what the Alliance is doing in policy and how governments are working to implement FIDO authentication.
Google Case Study: Strong Authentication for Employees and ConsumersFIDO Alliance
With 50,000 employees and more than a billion users, security and privacy are of critical importance to the Internet giant, Google. Two years ago, they set out with the goal of improving authentication through stronger security, increasing user satisfaction and lowering support costs. In that time, Google deployed FIDO Certified ® security keys. A detailed analysis by this data-driven company has demonstrated clear confirmation of how well FIDO’s approach is suited to making stronger, simpler authentication for employees and consumers.
THIRTEEN (13.4) years of extensive experience as Mechanical ,Piping , Shutdown project, Material Inspection/Material Prevention in Laydown Area or site area/ Structural QA/QC Inspector & QC Supervisor in Mechanical field of construction in various projects like Oil & Gas Industries, Petro chemicals, Chemical Plants, high rise building and infrastructure sector.
I would like to enroll in your esteemed organization as a candidate for an opening in the field of QA/QC Manager . I expect to here from your end in near future.
Excellent planner and strategist with proven abilities in surveying the projects of all kinds of earth works, power plant, chemical plant, water treatment plant, oil & gas plant etc.
Strong analytical and Organizational abilities with skills to plan and implement novel ideas
1. CAREER PROFILE
TO : M/S...................................................................................
SUBJECT : Application for the postof InstrumentationQA/QC Inspector
Dear Sir
I Mr Mohammad Naushad Alam as a Instrumentation QA/QC Inspector backed up with
sound academic record and have gained approx 10 years of experience in field
Instrumentation and Controls. Onsite experience in Instrumentation project Construction
and Management in Middle East and India. Indebted with good communication skills,
aptitude and specialisation in Instrument construction start up and Commissioning specialised
in Oil and Gas project and Maintenance experience in India and Middle East countries. I like
to seek employment with your organisation for a job which offers good growth potentials and
perks commensurable with experience and qualifications with proven track record, Iam sure
to live up to your expectation. I attached brief resume of my career and personal detail for
your reference and consideration.
Hoping to get a favourable reply,
Thanks & withbest regards,
MOHAMMAD NAUSHAD ALAM
Instrumentation QA/QC Inspector
Kentech International Limited,Qatar
Mobile no +919967524130
2. Profile,
Regular surveillance/inspectionof constructionactivitiesas per project specificationand
test plan.
Assignand monitorrespective dutiesof Sr instrumentQA/QC inspector
Store and maintain all qualityrecords.
Coordinate with construction personnel aboutongoing inspectionissues.
Regular reportingto QA/QC manager, on any major issueswhichrequire immediate
action.
Ensure properimplementationofISO 9001.2000
QC inspectionfor instrumentationsystemas per quality control procedure,instrument
test plan and project specification.
Inspectionof primary and secondary cable trays installationconduit, instrument
installation,impulse line installation& pressure test,Air line installationand pressure test.
Secondary and primary cable glandingand terminationMeggering.continutyetc.
Ensuring all instrument were installed& testedasper project qualityprocedure and
project specificationandprepare ITP forms (InstrumentationInstallationInspection).
Pre loopinspection
Prepare RFI (RequestforInspection) to clientfor joint inspectionofcompletedwork
All activitiesduring the construction & commissioningofcontrol cable meggeringand
measuringearth resistance test.
Ensuring all instrumentationwere installedandtestedas per projectquality procedure
and project specification and preparationof ITP formsfor instrument installation
inspection.
Coordinationwith pressure testingteam of impulse linesandpreparation of ITP forms and
Test Reports.
To ensure that all inspectionand testrecords are properly documentedand made
available to the clienton completionin accordance with contract requirements.
Reviewof designand construction relateddocumentconducting material inspections.
Conduct all instrumentinspectionas perApproved ITP.
Prepare non-conformance with the customer’srepresentative toensure good quality.
Mechanical completionacceptance from construction and responsible forrecordingand
clearingall instrumentationpunch listand documentation.
Ensure that inspectionare performedina timelymanner and recorded as per specification
and standard detail drawing ITP’s and QCP’s
Witnessoffire and gas loop checking,processloop check,instrument loopwiring
continuity,instrumentloop folderrelease forms.
Issuingmaterial discrepancyreports for any deficiency.
Issuingnon-conformance report (NCR) for the discrepanciesofworks
Inform clientrepresentative bythe official application ofinspectionand arrange the joint
inspectionaccording to relevantITP.
Receive the construction RFI and determine constructionworks status check installation
conformity to projectspecification.
Witnessoffire and gas loop checking,processloop check,instrument loopwiring
continuity,instrumentloop folderrelease forms.
Issuingmaterial discrepancyreports for any deficiency.
Issuingnon-conformance report (NCR) for the discrepanciesofworks.
3. Overseas Project Information
1] Name of Company : Kentech International Limited, Qatar
Owner : SHELL GTL MTA-2
Project: - : AirSeparation Unit(ShutdownProject)
Position Held: - : Instrumentation QA/QC Inspector
Period- : 2 Jan 2016 to 28 April
2] Name of Company : Samsung Engineering Saudi Arabia
Owner : SAUDI ARAMCO
Project: - : Increase GasHandlingCapacity(IGHC) Package-04(SHAYBAH)
Position Held: - : Instrumentation QA/QC Inspector
Aramco Status : 1 Approved
Period- : 29 Jun2014 to10 September2015
3] Name of Company : Jal International Co. Ltd.K.S.A
Client : Daelim Engineering Construction Co.Ltd.K.S.A
Project: - : Jubail Export Refinery (SATORP)
Position Held: - : Instrumentation QA/QC Inspector
Period- : 13 Feb. 2011 to 23March-2014
4] Name of Company : Jal International Co. Ltd.K.S.A
Client- : Daelim Engineering Construction Co. Ltd.K.S.A
Position held- : Instrumentation QA/QC Inspector
Period : 12April, 2010 to 12Feb, 2011
Project- : National Chevron Phillips Project (jubail)
5] Name of Company : Asyad International Co.Ltd.K.S.A
Client : Hyundai Heavy Industries Co.Ltd.K.S.A
Position held- : Instrument Supervisor
Period- : 07 Feb, 2008 to 26Feb, 2010
Project : IndependentWater&Power Producer Project (MARAFIQ)
4. 6] Name of Company : Asyad International Co. Ltd.K.S.A
Client- : Hyundai Heavy Industries Co.Ltd.K.S.A
Position held- : Instrument Supervisor
Period- : 10 June, 2007 to 06 Feb, 2008
Project- : Shaybah Power Generation Project
7] Name of Company : Petro Chemical Oil Refinery Barauni (BIHAR)
Position held- : Instrument Foreman
Period- : 26 June, 2005 to25 May, 2007
Project- : Maintenance, India (Bihar)
8] Name of Company : BOC India Limited, Jamshedpur (Jharkhand)
Position held- : Instrument Technician
Period- : 26 Nov, 2003 to 20May, 2005
Project- : Maintenance, India (Jharkhand)
Job Responsible for
Inspection for Installation of primary cable tray and secondary cable trays, conduit
installation instrument installation, glanding and termination of primary &
secondary cable
Continuity & megger Test of secondary & primary cable, pressure test of impulse
line, air line Installation of impulse line and air line, junction box, panel installation
and all type of instrument calibration Loop Folder Inspection.
Ensuring all instruments were installed & tested as per project quality procedure,
project specification and preparation of ITP forms and punch list clearing
Inspection for all activities during the construction and commissioning and hand
Over to client all report during the hand overing time
Performed Surveillance for ongoing construction activities.
Carried out inspection of material to make sure it meets the requirement of project
specification.
Ensuring all instruments were installed and tested as per project quality
procedures and project specification and instrument installation.
Pressure testing of impulse lines and inspection and test plan.
Assign and monitors respective duties of other QA/QC inspector.
Store and maintain all quality records for client.
Coordinate with construction personal about ongoing inspection issues. Ensure
proper implementation of ISO 9001.
Regular reporting toQA/QC supervisor and inspector & manager discussion with
on any major issues which required immediate action
Ensuring all instrument works carried out comply with project quality documents
and standards.
Preparing punch list items, making surveillance of construction activities.
5. Witness of instrument calibration.
Installation of cable tray, conduit, junction boxes, instrument system.
Coordination with client in pressure testing of impulse lines& Air Lines
Prepare and review ITPs for Instrumentation Installation.
Prepare daily surveillance and inspection reports.
Review of design and construction related documents conducting material
inspection
PERSONAL INFORMATION
Permanent Address : At-Mushakipur
Dist-Khagaria,Bihar
Pin-851203
India
Date of Birth : 05 Feb. 1985
Marital Status : Married
Languages : English,Hindi, Urdu & Arabic
Mobile. N : 09967524130
Email.ID : mohammad.naushadalam@yahoo.com
mohammad.naushad43@gmail.com
Old Passport No : G2366387
NewPassport No : M7439211
: Place of Issue:- Patna
: Date of Issue:- 16-03-2015
: Date of Expiry - 17-03-2025
EDUCATION
Diploma - : Electronics & Communication Engineering
Academic- : I.Sc (Mathematics)
Computer literate : Ms Word, Ms Excel, Power Point, Internet Surfing
DECLARATION
I do hereby declare that all the statement as mentioned above are true & correct tothe
best of my knowledge and belief.
Date: 05Sep - 2016 yours faithfully