SlideShare a Scribd company logo
Paul D. Ferrata
634 Santa Elena Canyon Phone: 512-844-3555
Spring, Texas 77388 Pferrata61@gmail.com
PROFILE
Accomplished Supply Chain Leader with a diverse background that provides a well-rounded perspective of all
aspects of Supply Chain Design and Management. Excellent skillset in data analytics, predictive data
modeling and dashboard development. Leading the industry on data visibility driving process
standardization. Possess strong communication and team building skills with a history of design and
implementation of large scale projects. Solid interpersonal skills with a history of building cohesive groups from
diverse individuals, providing the leadership and direction to achieve goals. Technology expert that finds
innovative solutions to complex problems. Over 28 years in a management capacity. Experienced in negotiating of
complex supply chain agreements, contract logistics and freight management contracts. Expert in inbound to
manufacturing, VMI, plant design, operations management, business model planning, program development and
implementation, labor relations union and non-union, financial planning, profit and loss analysis, operational
process improvement, and experience managing over 800+ employees.
Expertise highlights: Contract Logistics
 Operations & P&L Management  Business Modeling & Design (MOST) Quality Assurance (ISO)
 Network and 4-walls Analyses  Process Improvements, (BPI) Supply Logistics (APICS)
 Port Development & Marine Support  Operations Performance (LEAN) Budgets and Finance
 Supply Chain Design & Management  In-Bound to MFG. Procurement and (VMI)
PROFESSIONAL EXPERIENCE
Consultant to Maritime clients for Logistics, Port design, and operational efficiencies. 2015 – Current
 Currently engaged in 3 unique projects in the Gulf of Mexico region supporting supply chain designs and
synergies identification for a new Port facility (Port Cameron Development), G2 LNG plant in Cameron
Parish, La., and LIGTT (Louisiana Gulf International Transfer Terminal).
CEVA Global Operations Director for Energy Sector 2015 – Feb. 2018
 Director of Global Operations in the energy sector responsible for managing solutions for Up-stream &
Mid-stream energy clients. Built maintained and improved Complex Supply Chain Strategies for high-
velocity critical exploration and drilling operations in US, Latin America, Europe, Middle East and Asia.
and Freight Management global solutions and standardization.
 Developing industry leading data visibility tools and dashboards unique to the client’s needs utilizing SVG,
Qlik-View and Tableau and self-designed solution for supply chain needs of our energy clients. Deployed
creative data dashboard views tailored to the client’s specific needs driving efficiencies into the operations
and managing cost avoidance solutions through predictive analysis.
 Global Process Standardization for all energy clients assuring the process is identified, trained and
maintained across all regions.
Crane Worldwide Logistics Director of Global Solutions March 2013 – March 2015
 Held the position of Director for Global Solutions in Contract Logistics and the Energy Sector. The
position encompassed the development and implementation of solutions for CL and Energy clients such
as Baker Hughes, Wholesome Sweeteners, Nabors, Halliburton, NOV, Anadarko, as well as other 4-walls
opportunities.
 Design engineer for Contract Logistics developing procedures and CAD designs for manufacturing facility
layouts for contract logistics opportunities. Responsibility included both design and implementation of
major CL opportunities.
 Started at Crane Worldwide Logistics opening the Baker Hughes distribution center, Domestic and
International consolidation center, and overflow facilities.
CEVA Sr. Director Engineering and System Solutions Dell Computers & Microsoft May 2001 – Jan. 2013
 Oversaw and owned the engineering department responsible for improving and sustaining operational
excellence for Dell, Microsoft, and Masco.
 Assisted in the designed and support for the engineering solutions for Microsoft finished goods
distribution in Memphis, TN. and Mira Loma, Ca. On-Line Store support, Full network transportation
analysis. Brick and Mortar replenishment strategy, Value Custom Services efficiencies created…
 Design architect and implementation owner for numerous in-bound to manufacturing JIT Supply Logistics
Centers for Dell Computer Corporations. SLC locations across the US and Latin America. Responsible
included building requirements, preparing models, crafting statements of work, implementation and
operational support.
 Oversaw material planning, resource scheduling, and reporting to meet Microsoft, Dell and CEVA’s
objectives and goals for in bound to manufacturing for (4) major Dell factories in the US.
 Managed numerous large scale operations ranging from work forces of over 100 employees to 800 plus.
 Owned and responsible for budgets and P&L's for $68 MM in revenue operating at acceptable levels of
profitability.
 Provided in-depth experience with the development of new system functionality to meet the needs of our
customers material flow and sourcing needs.
Accomplishments
 Developed and established application software titled; Knowledge Harvest, a front end authoring tool that
allows for innovation in reporting structure.
 Created advanced dashboards from the ground up, that display real time tracking of key indicators using
scalable vector graphics. These dashboards have been adopted by numerous JIT and fleet operations
across the country.
 Selected to help create and organize the look forward planning on supply chain strategies for Dell
Computer Corporation.
 Implemented seven SLC’s, two bypass yards, and two order fulfillment centers in five cities in seven
months. This was over 2.3 million square feet of warehouse space.
 Increased the Dell business from 1.5 million annual revenue, to the current model of 68 million, with
projections to grow to over 400 million over the next five years.
 Saved $1.1 million per year by developing a cost reduction plan that reduced MHE and FTE’s by
converting the facility through a complete foot print redesign.
United Parcel Service, Houston, Texas 1985 – 2000
Division Manager-Center Manager-Strategic Systems Manager-Time Study Coordinator…
 Managed large scale UPS hubs and distribution facilities at a division manager’s level. The last facility
employed over 800 people and processed over one hundred thousand parcels daily.
 Managed seven independent UPS center operations across Houston.
 Held the position for Strategic Systems Coordinator over South East District. Responsible for design
efforts, establishing scope requirements, testing, and implementation of new systems and technology.
 Managed in an industrial engineering capacity with building and facilities, time study coordination,
computer assisted dispatch control, and implementation of a system titled DIAD, Delivery Information
Access Device.
 Served and chaired on the Greater Houston Partnership association as a UPS representative.
Accomplishments
 Best operations for the year. Best safety for the year. Best revenue growth for the year for Next Day Air
Service. Peoples award for demonstrating sound people and management skills.
 Team lead for new facility start up for air operations at Ellington field.
 Project manager for a new facility start up at the Stafford hub, over three hundred thousand square foot
hub and multi center facility.
 Increased production within the hub network by 22% by developing sound process improvements for
material flow and the reduction of touches in the over process. This was accomplished by developing a
strong Team Concept in the facility.
EDUCATION
 Coursework, Engineering, Texas A&M, College Station, Texas
 Coursework, General Studies, Blinn College, Brenham, Texas
 Coursework, Petroleum Engineering, Tyler Junior College, Tyler, Texas
 Coursework, General Studies, University of Houston, Houston, Texas
COMPUTER SKILLS
Certifications: Green Belt APICS
Data Base Development and Data Visualization through SVG, QlikView, Tableau, Dundas, SVG…
Operating Systems: Microsoft, SQL Server, MMP, MacOS
Software: Microsoft Office Suite, Microsoft FrontPage, Net Objects, Macromedia Flash, Dreamweaver, WMS,
Auto CAD, and Visual Studio, Projects
Programming Languages: Visual Basic and VB.NET
Internet Protocols/Networking Skills: TCP/IP, FTP, HTTP, SMTP, and Wireless
Manufacturing:
 Materials/inventory management
 JIT (Just In Time) inventory to MFG.
 Materials warehousing
 Lean concepts – 6 Sigma
 Business process improvements (Green Belt Certification)
Key Strengths:
 Strategic Systems Development
 Supply Chain Development
 Operations Management
 AUTO CAD
 Business Modeling
 Labor Modeling (MOST)
 Financial Planning
 Operations Management
 Logistics and Warehouse Design
 Facility Startup and Project Management
 TeamBuilding
 P&L Management
 EXCELL
 POWERPOINT
 WORD
 Data Visualization
 Dashboard Design and Development

More Related Content

What's hot

Keith Chadwick's Resume
Keith Chadwick's ResumeKeith Chadwick's Resume
Keith Chadwick's Resume
Keith Chadwick
 
Karla Vohra Resume_v16
Karla Vohra Resume_v16Karla Vohra Resume_v16
Karla Vohra Resume_v16
Kruti Vohra
 
Ray Yelle Profile 2016-01
Ray Yelle Profile 2016-01Ray Yelle Profile 2016-01
Ray Yelle Profile 2016-01
Raymond Yelle
 
Rajesh parashar-cv
Rajesh parashar-cvRajesh parashar-cv
Rajesh parashar-cv
RAJESH PARASHAR
 
john-rowan-resume2
john-rowan-resume2john-rowan-resume2
john-rowan-resume2
J.C. Rowan
 
Patricia Wurm BAPM II
Patricia Wurm BAPM IIPatricia Wurm BAPM II
Patricia Wurm BAPM II
Patricia Wurm
 
Bruce Shaver Senior Project Manager 2011
Bruce Shaver   Senior Project Manager 2011Bruce Shaver   Senior Project Manager 2011
Bruce Shaver Senior Project Manager 2011
tbshaver
 
Warrier mohandas s__general_14 jul 2016
Warrier mohandas s__general_14 jul 2016Warrier mohandas s__general_14 jul 2016
Warrier mohandas s__general_14 jul 2016
Mohandas Warrier
 
Lokesh_Nagrale_Resume
Lokesh_Nagrale_ResumeLokesh_Nagrale_Resume
Lokesh_Nagrale_Resume
Lokesh Nagrale
 
Jon Cohn Exton PA - Resume
Jon Cohn Exton PA - ResumeJon Cohn Exton PA - Resume
Jon Cohn Exton PA - Resume
Jon Cohn
 
Resume_David_Colbourn September 2016
Resume_David_Colbourn September 2016Resume_David_Colbourn September 2016
Resume_David_Colbourn September 2016
David Colbourn
 
MAnish Kumar-G
MAnish Kumar-GMAnish Kumar-G
Roy Resume April 2015
Roy Resume April 2015Roy Resume April 2015
Roy Resume April 2015
roy elgar
 
George kerestes resume (4.2)
George kerestes resume (4.2)George kerestes resume (4.2)
George kerestes resume (4.2)
George Kerestes
 
Sami patel full_resume
Sami patel full_resumeSami patel full_resume
Sami patel full_resume
Jignesh Shah
 
tlightfoot resume 2017 v3 sd
tlightfoot resume 2017 v3 sdtlightfoot resume 2017 v3 sd
tlightfoot resume 2017 v3 sd
Terry Lightfoot
 
Gal-Or Resume
Gal-Or ResumeGal-Or Resume
Gal-Or Resume
mgalor
 
JKoch res v2 - generic
JKoch res v2 - genericJKoch res v2 - generic
JKoch res v2 - generic
Jeffrey Koch
 
James Blance Resume_2016
James Blance Resume_2016James Blance Resume_2016
James Blance Resume_2016
James Blance
 
LSims Resume 2016
LSims Resume 2016LSims Resume 2016
LSims Resume 2016
Levell Sims, MBA, PMP, CSM
 

What's hot (20)

Keith Chadwick's Resume
Keith Chadwick's ResumeKeith Chadwick's Resume
Keith Chadwick's Resume
 
Karla Vohra Resume_v16
Karla Vohra Resume_v16Karla Vohra Resume_v16
Karla Vohra Resume_v16
 
Ray Yelle Profile 2016-01
Ray Yelle Profile 2016-01Ray Yelle Profile 2016-01
Ray Yelle Profile 2016-01
 
Rajesh parashar-cv
Rajesh parashar-cvRajesh parashar-cv
Rajesh parashar-cv
 
john-rowan-resume2
john-rowan-resume2john-rowan-resume2
john-rowan-resume2
 
Patricia Wurm BAPM II
Patricia Wurm BAPM IIPatricia Wurm BAPM II
Patricia Wurm BAPM II
 
Bruce Shaver Senior Project Manager 2011
Bruce Shaver   Senior Project Manager 2011Bruce Shaver   Senior Project Manager 2011
Bruce Shaver Senior Project Manager 2011
 
Warrier mohandas s__general_14 jul 2016
Warrier mohandas s__general_14 jul 2016Warrier mohandas s__general_14 jul 2016
Warrier mohandas s__general_14 jul 2016
 
Lokesh_Nagrale_Resume
Lokesh_Nagrale_ResumeLokesh_Nagrale_Resume
Lokesh_Nagrale_Resume
 
Jon Cohn Exton PA - Resume
Jon Cohn Exton PA - ResumeJon Cohn Exton PA - Resume
Jon Cohn Exton PA - Resume
 
Resume_David_Colbourn September 2016
Resume_David_Colbourn September 2016Resume_David_Colbourn September 2016
Resume_David_Colbourn September 2016
 
MAnish Kumar-G
MAnish Kumar-GMAnish Kumar-G
MAnish Kumar-G
 
Roy Resume April 2015
Roy Resume April 2015Roy Resume April 2015
Roy Resume April 2015
 
George kerestes resume (4.2)
George kerestes resume (4.2)George kerestes resume (4.2)
George kerestes resume (4.2)
 
Sami patel full_resume
Sami patel full_resumeSami patel full_resume
Sami patel full_resume
 
tlightfoot resume 2017 v3 sd
tlightfoot resume 2017 v3 sdtlightfoot resume 2017 v3 sd
tlightfoot resume 2017 v3 sd
 
Gal-Or Resume
Gal-Or ResumeGal-Or Resume
Gal-Or Resume
 
JKoch res v2 - generic
JKoch res v2 - genericJKoch res v2 - generic
JKoch res v2 - generic
 
James Blance Resume_2016
James Blance Resume_2016James Blance Resume_2016
James Blance Resume_2016
 
LSims Resume 2016
LSims Resume 2016LSims Resume 2016
LSims Resume 2016
 

Similar to Resume Paul Ferrata 2018

Resume Complete 112416
Resume Complete 112416Resume Complete 112416
Resume Complete 112416
Denise Deutchman
 
Michael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15New
Michael Jones
 
William G Hull resume
William G Hull resumeWilliam G Hull resume
William G Hull resume
Bill Hull
 
Keith_McGaha_CV_Sept012015
Keith_McGaha_CV_Sept012015Keith_McGaha_CV_Sept012015
Keith_McGaha_CV_Sept012015
Keith McGaha
 
R.L. Michael Montgomery II_AWS_vC
R.L. Michael Montgomery II_AWS_vCR.L. Michael Montgomery II_AWS_vC
R.L. Michael Montgomery II_AWS_vC
R.L. Michael Montgomery II
 
Andrew Chard
Andrew ChardAndrew Chard
Andrew Chard
Andrew Chard
 
Resume_RajeshParyachery_2015_M
Resume_RajeshParyachery_2015_MResume_RajeshParyachery_2015_M
Resume_RajeshParyachery_2015_M
Rajesh Paryachery
 
Resume - James Simmons
Resume  - James SimmonsResume  - James Simmons
Resume - James Simmons
simmoja3
 
Resume G Bisanz Presentation Format
Resume G Bisanz Presentation FormatResume G Bisanz Presentation Format
Resume G Bisanz Presentation Format
Gregory Bisanz
 
Vadivelan_Resume
Vadivelan_ResumeVadivelan_Resume
Vadivelan_Resume
vadivelan MP
 
JD Taylor - Resume w dates
JD Taylor - Resume w datesJD Taylor - Resume w dates
JD Taylor - Resume w dates
JD Taylor
 
Sheldon cousino resume
Sheldon cousino resumeSheldon cousino resume
Sheldon cousino resume
Sheldon Cousino
 
Resume Of Ken Flint
Resume Of Ken FlintResume Of Ken Flint
Resume Of Ken Flint
Kenneth Flint
 
Resume - Sr. Business Analyst
Resume - Sr. Business AnalystResume - Sr. Business Analyst
Resume - Sr. Business Analyst
Mrs. Terry-Lee Hollister
 
Ryan Neal 2011 Resume V2
Ryan Neal 2011 Resume V2Ryan Neal 2011 Resume V2
Ryan Neal 2011 Resume V2
rneal37
 
PMP IT
PMP ITPMP IT
PMP IT
Aaron Hart
 
Sample IT resume from RedRocketResume
Sample IT resume from RedRocketResumeSample IT resume from RedRocketResume
Sample IT resume from RedRocketResume
Angela Ashurst-McGee
 
LCesnick
LCesnickLCesnick
LCesnick
Lisa Cesnick
 
Kumar swaminathan resume -pmp-csm-itil
Kumar swaminathan resume -pmp-csm-itilKumar swaminathan resume -pmp-csm-itil
Kumar swaminathan resume -pmp-csm-itil
Kumar Swaminathan PMP,CSM
 
Kumar swaminathan resume -pmp-csm-itil
Kumar swaminathan resume -pmp-csm-itilKumar swaminathan resume -pmp-csm-itil
Kumar swaminathan resume -pmp-csm-itil
Kumar Swaminathan PMP,CSM
 

Similar to Resume Paul Ferrata 2018 (20)

Resume Complete 112416
Resume Complete 112416Resume Complete 112416
Resume Complete 112416
 
Michael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15New
 
William G Hull resume
William G Hull resumeWilliam G Hull resume
William G Hull resume
 
Keith_McGaha_CV_Sept012015
Keith_McGaha_CV_Sept012015Keith_McGaha_CV_Sept012015
Keith_McGaha_CV_Sept012015
 
R.L. Michael Montgomery II_AWS_vC
R.L. Michael Montgomery II_AWS_vCR.L. Michael Montgomery II_AWS_vC
R.L. Michael Montgomery II_AWS_vC
 
Andrew Chard
Andrew ChardAndrew Chard
Andrew Chard
 
Resume_RajeshParyachery_2015_M
Resume_RajeshParyachery_2015_MResume_RajeshParyachery_2015_M
Resume_RajeshParyachery_2015_M
 
Resume - James Simmons
Resume  - James SimmonsResume  - James Simmons
Resume - James Simmons
 
Resume G Bisanz Presentation Format
Resume G Bisanz Presentation FormatResume G Bisanz Presentation Format
Resume G Bisanz Presentation Format
 
Vadivelan_Resume
Vadivelan_ResumeVadivelan_Resume
Vadivelan_Resume
 
JD Taylor - Resume w dates
JD Taylor - Resume w datesJD Taylor - Resume w dates
JD Taylor - Resume w dates
 
Sheldon cousino resume
Sheldon cousino resumeSheldon cousino resume
Sheldon cousino resume
 
Resume Of Ken Flint
Resume Of Ken FlintResume Of Ken Flint
Resume Of Ken Flint
 
Resume - Sr. Business Analyst
Resume - Sr. Business AnalystResume - Sr. Business Analyst
Resume - Sr. Business Analyst
 
Ryan Neal 2011 Resume V2
Ryan Neal 2011 Resume V2Ryan Neal 2011 Resume V2
Ryan Neal 2011 Resume V2
 
PMP IT
PMP ITPMP IT
PMP IT
 
Sample IT resume from RedRocketResume
Sample IT resume from RedRocketResumeSample IT resume from RedRocketResume
Sample IT resume from RedRocketResume
 
LCesnick
LCesnickLCesnick
LCesnick
 
Kumar swaminathan resume -pmp-csm-itil
Kumar swaminathan resume -pmp-csm-itilKumar swaminathan resume -pmp-csm-itil
Kumar swaminathan resume -pmp-csm-itil
 
Kumar swaminathan resume -pmp-csm-itil
Kumar swaminathan resume -pmp-csm-itilKumar swaminathan resume -pmp-csm-itil
Kumar swaminathan resume -pmp-csm-itil
 

Recently uploaded

Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
tolgahangng
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
kumardaparthi1024
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
Claudio Di Ciccio
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
Neo4j
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
Tomaz Bratanic
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
Edge AI and Vision Alliance
 
Programming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup SlidesProgramming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup Slides
Zilliz
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
panagenda
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 

Recently uploaded (20)

Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
 
Programming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup SlidesProgramming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup Slides
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 

Resume Paul Ferrata 2018

  • 1. Paul D. Ferrata 634 Santa Elena Canyon Phone: 512-844-3555 Spring, Texas 77388 Pferrata61@gmail.com PROFILE Accomplished Supply Chain Leader with a diverse background that provides a well-rounded perspective of all aspects of Supply Chain Design and Management. Excellent skillset in data analytics, predictive data modeling and dashboard development. Leading the industry on data visibility driving process standardization. Possess strong communication and team building skills with a history of design and implementation of large scale projects. Solid interpersonal skills with a history of building cohesive groups from diverse individuals, providing the leadership and direction to achieve goals. Technology expert that finds innovative solutions to complex problems. Over 28 years in a management capacity. Experienced in negotiating of complex supply chain agreements, contract logistics and freight management contracts. Expert in inbound to manufacturing, VMI, plant design, operations management, business model planning, program development and implementation, labor relations union and non-union, financial planning, profit and loss analysis, operational process improvement, and experience managing over 800+ employees. Expertise highlights: Contract Logistics  Operations & P&L Management  Business Modeling & Design (MOST) Quality Assurance (ISO)  Network and 4-walls Analyses  Process Improvements, (BPI) Supply Logistics (APICS)  Port Development & Marine Support  Operations Performance (LEAN) Budgets and Finance  Supply Chain Design & Management  In-Bound to MFG. Procurement and (VMI) PROFESSIONAL EXPERIENCE Consultant to Maritime clients for Logistics, Port design, and operational efficiencies. 2015 – Current  Currently engaged in 3 unique projects in the Gulf of Mexico region supporting supply chain designs and synergies identification for a new Port facility (Port Cameron Development), G2 LNG plant in Cameron Parish, La., and LIGTT (Louisiana Gulf International Transfer Terminal). CEVA Global Operations Director for Energy Sector 2015 – Feb. 2018  Director of Global Operations in the energy sector responsible for managing solutions for Up-stream & Mid-stream energy clients. Built maintained and improved Complex Supply Chain Strategies for high- velocity critical exploration and drilling operations in US, Latin America, Europe, Middle East and Asia. and Freight Management global solutions and standardization.  Developing industry leading data visibility tools and dashboards unique to the client’s needs utilizing SVG, Qlik-View and Tableau and self-designed solution for supply chain needs of our energy clients. Deployed creative data dashboard views tailored to the client’s specific needs driving efficiencies into the operations and managing cost avoidance solutions through predictive analysis.  Global Process Standardization for all energy clients assuring the process is identified, trained and maintained across all regions. Crane Worldwide Logistics Director of Global Solutions March 2013 – March 2015  Held the position of Director for Global Solutions in Contract Logistics and the Energy Sector. The position encompassed the development and implementation of solutions for CL and Energy clients such as Baker Hughes, Wholesome Sweeteners, Nabors, Halliburton, NOV, Anadarko, as well as other 4-walls opportunities.  Design engineer for Contract Logistics developing procedures and CAD designs for manufacturing facility layouts for contract logistics opportunities. Responsibility included both design and implementation of major CL opportunities.  Started at Crane Worldwide Logistics opening the Baker Hughes distribution center, Domestic and International consolidation center, and overflow facilities.
  • 2. CEVA Sr. Director Engineering and System Solutions Dell Computers & Microsoft May 2001 – Jan. 2013  Oversaw and owned the engineering department responsible for improving and sustaining operational excellence for Dell, Microsoft, and Masco.  Assisted in the designed and support for the engineering solutions for Microsoft finished goods distribution in Memphis, TN. and Mira Loma, Ca. On-Line Store support, Full network transportation analysis. Brick and Mortar replenishment strategy, Value Custom Services efficiencies created…  Design architect and implementation owner for numerous in-bound to manufacturing JIT Supply Logistics Centers for Dell Computer Corporations. SLC locations across the US and Latin America. Responsible included building requirements, preparing models, crafting statements of work, implementation and operational support.  Oversaw material planning, resource scheduling, and reporting to meet Microsoft, Dell and CEVA’s objectives and goals for in bound to manufacturing for (4) major Dell factories in the US.  Managed numerous large scale operations ranging from work forces of over 100 employees to 800 plus.  Owned and responsible for budgets and P&L's for $68 MM in revenue operating at acceptable levels of profitability.  Provided in-depth experience with the development of new system functionality to meet the needs of our customers material flow and sourcing needs. Accomplishments  Developed and established application software titled; Knowledge Harvest, a front end authoring tool that allows for innovation in reporting structure.  Created advanced dashboards from the ground up, that display real time tracking of key indicators using scalable vector graphics. These dashboards have been adopted by numerous JIT and fleet operations across the country.  Selected to help create and organize the look forward planning on supply chain strategies for Dell Computer Corporation.  Implemented seven SLC’s, two bypass yards, and two order fulfillment centers in five cities in seven months. This was over 2.3 million square feet of warehouse space.  Increased the Dell business from 1.5 million annual revenue, to the current model of 68 million, with projections to grow to over 400 million over the next five years.  Saved $1.1 million per year by developing a cost reduction plan that reduced MHE and FTE’s by converting the facility through a complete foot print redesign. United Parcel Service, Houston, Texas 1985 – 2000 Division Manager-Center Manager-Strategic Systems Manager-Time Study Coordinator…  Managed large scale UPS hubs and distribution facilities at a division manager’s level. The last facility employed over 800 people and processed over one hundred thousand parcels daily.  Managed seven independent UPS center operations across Houston.  Held the position for Strategic Systems Coordinator over South East District. Responsible for design efforts, establishing scope requirements, testing, and implementation of new systems and technology.  Managed in an industrial engineering capacity with building and facilities, time study coordination, computer assisted dispatch control, and implementation of a system titled DIAD, Delivery Information Access Device.  Served and chaired on the Greater Houston Partnership association as a UPS representative. Accomplishments  Best operations for the year. Best safety for the year. Best revenue growth for the year for Next Day Air Service. Peoples award for demonstrating sound people and management skills.  Team lead for new facility start up for air operations at Ellington field.  Project manager for a new facility start up at the Stafford hub, over three hundred thousand square foot hub and multi center facility.  Increased production within the hub network by 22% by developing sound process improvements for material flow and the reduction of touches in the over process. This was accomplished by developing a strong Team Concept in the facility. EDUCATION  Coursework, Engineering, Texas A&M, College Station, Texas  Coursework, General Studies, Blinn College, Brenham, Texas  Coursework, Petroleum Engineering, Tyler Junior College, Tyler, Texas
  • 3.  Coursework, General Studies, University of Houston, Houston, Texas COMPUTER SKILLS Certifications: Green Belt APICS Data Base Development and Data Visualization through SVG, QlikView, Tableau, Dundas, SVG… Operating Systems: Microsoft, SQL Server, MMP, MacOS Software: Microsoft Office Suite, Microsoft FrontPage, Net Objects, Macromedia Flash, Dreamweaver, WMS, Auto CAD, and Visual Studio, Projects Programming Languages: Visual Basic and VB.NET Internet Protocols/Networking Skills: TCP/IP, FTP, HTTP, SMTP, and Wireless Manufacturing:  Materials/inventory management  JIT (Just In Time) inventory to MFG.  Materials warehousing  Lean concepts – 6 Sigma  Business process improvements (Green Belt Certification) Key Strengths:  Strategic Systems Development  Supply Chain Development  Operations Management  AUTO CAD  Business Modeling  Labor Modeling (MOST)  Financial Planning  Operations Management  Logistics and Warehouse Design  Facility Startup and Project Management  TeamBuilding  P&L Management  EXCELL  POWERPOINT  WORD  Data Visualization  Dashboard Design and Development