SlideShare a Scribd company logo
1 of 9
Download to read offline
Last Update : Mar 16, 2016
Curriculum Vitae – Arief Kaprawira 1
CURRICULUM VITAE
NAME : ARIEF KAPRAWIRA
DATE, PLACE OF BIRTH : Cirebon, 11 Juni 1974
ADDRESS : Perumahan Taman Nuansa Majasem, Jl. Surabaya
Blok B5 No. 8 Majasem Cirebon RT/RW 05/15
MOBILE : 0821-21073637
RELIGION : Moslem
SEX : Male
STATUS : Married
EMAIL : wira_1106@yahoo.com
REFERENCE
1. Hanapi Sidhojoyo ( Director of PT. Rayakonsult ) / 0816602995
2. Samsul Hadi ( General Manager PT. Senopati Sellularindo ) /
081399236919
3. Yose Rizal ( Manager PT. Indosat ) / 0816100262
4. Estepanus Tasin ( Project Manager / HSE Manager at DSLNG Project ) /
081379603012
LAST EDUCATION
1998 : Civil Engineering ( S1 ) Institut Teknologi Nasional – Bandung
IPK 2,89 ( Scale 4.0 )
COURSE & TRAINING EXPERIENCE
1993 : Wood Courses – ITENAS
1994 : Stone Courses – ITENAS
1996 : Steel Construction & Concrete Grand Aquila Hotel Project Practical Work
- Bandung
1997 : MS Project Course – Bandung
1997 : English Course – AECS Bandung
1997 : Rubber Dam Practical Work – Dinas Pengairan Indramayu Jawa Barat
1999 : SAP 90 Course – LPAK Bandung
1999 : Windows 98 & Autocad R14 Course – LPK Padjadjaran Mandiri
Bandung
2002 : Training & Introduction about Cellular Telecommunication System –
PT Rayakonsult – Bandung ( In office Training )
2010 : Fire Suppression System – Fenwal
2013 : MS Project Trainer at PT. Danusari Mitra Sejahtera
2014 : HSE Site Induction, Environmental Induction, Working at High Elevation,
Simops Training, Safety Defensive Driving – Donggi Senoro LNG
2015 : MS Project Trainer at PT. Karunia Berca Indonesia.
Last Update : Mar 16, 2016
Curriculum Vitae – Arief Kaprawira 2
ADDITIONAL KNOWLEDGE
- ISO 9001
- OHSAS 18001
Language Reading Writing Talking Listening
Bahasa Indonesia Excellent Excellent Excellent Excellent
English Good Good Average Average
COMPUTER SKILLS
Ms Project, Ms Office, Ms Visio, Autocad & Internet
WORK EXPERIENCE
2015 – Present
Position : Project Coordinator
Company : PT. Karunia Berca Indonesia ( Fabrication & Galvanizing ) – Cilegon
Banten
Reporting Line : General Manager Project and Plan
Project / Owner :
- Supply Fabricated Steel Structure and Galvanizing of 3 x A 50 Bridges –
Ambon, East Indonesia / PT. Nindya Karya / Dinas Pekerjaan Umum.
- Supply Fabricated Steel Structure and Galvanizing of 3 x A 60 Bridges –
Sulawesi, East Indonesia / PT. Naviri Konstruksi / Dinas Pekerjaan
Umum.
- Supply Fabricated Steel Structure and Galvanizing of 1 x A 60 Bridge –
West Sulawesi, East Indonesia / PT. Graha Perkasa Mandiri / Dinas
Pekerjaan Umum.
- Supply Fabricated Steel Structure and Galvanizing of 1 x B 45 Bridge –
Ambon, East Indonesia / PT. Hoka Pratama / Dinas Pekerjaan Umum.
- Supply Fabricated Steel Structure and Galvanizing of 2 x A 60 Bridges –
Maluku, East Indonesia / PT. Tarawesi Artha Megah / Dinas Pekerjaan
Umum.
- Supply Fabricated Steel Structure and Galvanizing of 1 x B 45 Bridge –
Sumatera, Indonesia / PT. Lian Suasa / Dinas Pekerjaan Umum.
- Supply Fabricated Steel Structure and Galvanizing of 1 x B 45 Bridge –
Sumatera, Indonesia / PT. Surya Alnusa mandiri / Dinas Pekerjaan
Umum.
- Supply Fabricated Steel Structure and Galvanizing of Bridge Panel 2 x L 24
& 2 x L 30 – Maluku, East Indonesia / CV. Damas Jaya / Dinas
Pekerjaan Umum.
- Supply Fabricated Steel Structure and Galvanizing of Tower Pole &
Acessories for WIGO 4G TD LTE – Sulawesi, Kalimantan, and Sumatera
Area, Indonesia / PT. Berca Hardayaperkasa.
- Supply Fabricated Steel Structure and Galvanizing of 1 x A 40 Bridge –
Maluku, East Indonesia / PT. Wira Karsa Konstruksi / Dinas Pekerjaan
Umum.
- Supply Fabricated Steel Structure and Galvanizing of 1 x A 40 Bridge –
Maluku, East Indonesia / PT. Multi Widya Pratama / Dinas Pekerjaan
Umum.
Last Update : Mar 16, 2016
Curriculum Vitae – Arief Kaprawira 3
- Supply Fabricated Steel Structure and Galvanizing of 1 x B 40 Bridge –
East Timor, Timor Leste / Green Dragon, Lda / Public Work Department
Government of Timor Leste.
- Supply Fabricated Steel Structure and Galvanizing of 1 x A 50 Bridge –
Maluku, East Indonesia / PT. Tiga Ikan Jaya Utama / Dinas Pekerjaan
Umum.
- Supply Fabricated Steel Structure and Galvanizing of Bridge 1 x B 50, 1 x B
40 include Link Set type B – Lampung, Sumatera - Indonesia / PT. AA
Bersaudara / Dinas Pekerjaan Umum.
- Supply Fabricated Steel Structure, Painting / Coating and installation of
Building Canopy Structure – Jakarta, Indonesia / PT. Balfour Beatty
Sakti
- Supply Fabricated Steel Structure, Painting / Coating and Erection of
Mezzanine Structure at JI EXPO Building – Jakarta, Indonesia / PT.
Jakarta International EXPO
- Supply Fabricated Steel Structure, Painting / Coating and Erection of Parit
Baru Coal Fired Steam Power Plant Project 2 x 50 MW (Site Bengkayang)
at West Kalimantan, Indonesia / PT. Praba Indo Persada (Consortium
with CGGC).
- Supply Fabricated Steel Structure, Painting / Coating and Erection of
Canopy, Slab Structure, Trellis, and Roof Crown at WTC 3 – Jakarta,
Indonesia / PT. Balfour Beatty Sakty
- Supply Fabricated Steel Structure, Painting / Coating and Erection of
Canopy, Guard House, Sky Light, and Upper Roof at Amarta Unilever
Head Quarter – BSD City, Tangerang, Indonesia / PT. BAM Decorient
- Supply Fabricated Steel Structure, Painting / Coating and Erection of
Building Steel Structure at Project Convention & Theater JI EXPO –
Kemayoran, Jakarta, Indonesia / PT. Total Bangun Persada & PT.
Balfour Beatty Sakti
Job Description : - Scheduling, monitoring of projects running (with S-Curve & Microsoft
Project) from PO received until the invoice paid / Closed.
- Provide Method Statement Erection Work
- Making detailed progress report accurately and report to General Manager.
- Support coordinating & arranging the project team ( Engineering,
Procurement, QC, Production, & Document Control ) to execute the target
based on the agreed time
- Coordinating, monitoring, supervising and ensure all activities of the
department provide the progress of the realization according with the Job
Order target and Schedule
- Integrating all department activity resulting a productive and efficient output
- To ensure the company's operations generate progress according to plan
and schedule
- Processing & analyze project data for support invoicing document for client
approval according to agreed time
- Processing & analyze project data for payment/invoicing subcontractor
2014 – 2015
Position : Deputy Project Manager
Company : PT. Artha Teknik Abadi ( Engineering& Construction ) – Cilegon Banten
Reporting Line : Project Manager & Director
Project / Owner :
- Furniture Fixtures and Equipment for DSLNG Permanent Office Buildings –
Luwuk, Center of Sulawesi / PT. Donggi Senoro LNG.
Last Update : Mar 16, 2016
Curriculum Vitae – Arief Kaprawira 4
Job Description : - Making a schedule and project completion schedule with S-Curve for
Project Control and Client Approval
- Support coordinating & arranging the project team ( Engineering,
Procurement, QC, Production, & Document Control ) to execute the target
based on the agreed time
- Monitoring of projects running from the PO received until the invoice
process with weekly & monthly progress report accurately to Management
- Coordinating, monitoring, supervising and ensure all activities of the
departement provide the progress of the realization according with the
RPO target and Schedule
- Integrating all department activity resulting a productive and efficient output
- To ensure the company's operations generate progress according to plan
and schedule
- Processing & analyze project data for support invoicing document for client
approval according to agreed time
2013 – 2014
Position : Project / Workshop Manager
Company : PT. Artha Teknik Abadi ( Engineering& Construction ) – Cilegon Banten
Reporting Line : Director
Project / Owner :
- Supply Fabricated Steel Structure of Ichthys On Shore LNG Precast –
Cilegon / PT. BAM Decorient Indonesia.
- Supply Fabricated Steel Structure of Wheatstone PLF and Tug Berth
Project - Cilegon / PT. BAM Decorient Indonesia
- Supply Fabricated Steel Structure of D2TA Staircase Tower & Piperack
Support - Cilegon / PT. BAM Decorient Indonesia
- Supply Fabricated Steel Structure of Loading Platform & Prestress Bed
- Cilegon / PT. BAM Decorient Indonesia
- Supply Fabricated Steel Structure of Ichthys Support Frame for Precast
Element - Cilegon / PT. BAM Decorient Indonesia
- Supply Fabricated Steel Structure of Precast Stairs South Quarter - / PT.
Tata Mulia Nusantara Indah
- Supply Fabricated Steel Structure of Precast Stairs Bahana Tower -
Jakarta / PT. Tata Mulia Nusantara Indah
- Supply & Installation ‘Furniture Fixtures and Equipment for DSLNG
Permanent Buildings’ / PT. Donggi Senoro LNG
- TAR Project ‘Vessel & Tower Lining Job Package’ / PT. Amoco Mitsui
( BPPI )
- Repair & Repainting Wall Fumira APU-1 / PT. Lotte Chemical Titan
Nusantara
- Dismantling & Mobilization Batching Plan Cidaun / PT. Holcim Indonesia
Job Description : - Making a Project Completion Schedule with S-Curve for Project Control
and Client Approval
- Coordinating & arranging the project team (Engineering, Procurement, QC,
Production, & Document Control) to execute the target based on the
agreed time
- Monitoring of projects running from the PO received until the invoice
process with weekly & monthly progress report accurately to Management
- Coordinating, monitoring, supervising and ensure all activities of the
Department provide the progress of the realization according with the RPO
target and Schedule
Last Update : Mar 16, 2016
Curriculum Vitae – Arief Kaprawira 5
- Integrating all department activity resulting in a productive and efficient
output
- To ensure the company's operations generate progress according
to plan and schedule
- Processing of data to analyze project data supporting invoicing document
approval by the client according to agreed time.
2012 – 2013
Position : Project Coordinator
Company : PT. Danusari Mitra Sejahtera ( Steel Fabricator ) – Cileungsi Bogor
Reporting Line : Director
Project / Owner :
- Supply Fabricated Steel Structure of Blast Furnace(Belt Conveyor) at
Krakatau - Cilegon/ PT. Krakatau Engineering – PT POSCO Enc.
- Supply Fabricated Steel Structure of Cook Oven Plant at Krakatau -
Cilegon/ PT. Krakatau Engineering – PT POSCO Enc.
- Supply Fabricated Steel Structure of Hot Gas Duct & Belt Conveyor at
Indocement – Citeureup, Bogor / PT. Truba Jaya Engineering – PT.
Supply Fabricated Steel Structure of Mill Feed Building at Indocement –
Citeureup, Bogor / PT. Truba Jaya Engineering – PT. Heidelberg
Technology Center
Job Description : - Making a Project Completion Schedule with S-Curve for Project Control
and Client Approval
- Monitoring of projects running from the PO received until the invoice
process with Weekly & Monthly Progress Report accurately to
Management
- Coordinating, monitoring, supervising and ensure all activities of the
Departement provide the progress of the realization according with the
RPO target and Schedule
- Integrating all Department activity resulting in a productive and efficient
output
- To ensure the company's operations generate progress according to plan
and schedule
- Processing of data to analyze project data supporting invoicing document
approval by the client according to agreed time.
2012
Position : Project Manager
Company : PT. Delapan Delapan Teknik
Reporting Line : Director
Project / Owner :
- Site Co Location Implementation & Tower Strengthening / PT. SAP –
Jabodetabek & Banten Area
- Site Co Location Implementation & Tower Strengthening / PT. Ericsson –
Jabodetabek & Banten Area
- Site Co Location Implementation & Tower Strengthening/ PT. Tower
Bersama Group Jabodetabek & Jateng Area
- Site Acquisition Project / PT. STP – Jabodetabek & West Java Area
Last Update : Mar 16, 2016
Curriculum Vitae – Arief Kaprawira 6
Job Description : - Making a Project Completion Schedule with S-Curve for Project Control
and Client Approval
- Survey, Re-calculation, Estimating Volume of Work
- Compiling and Analyzing BoQ (Bill of Quantity) for Project Budgetting
- Coordinating / Monitoring / Reporting Progress Work
- Coordinating / Controlling Job Budget
- Support Document Control for Project Invoicing
- To ensure the company's operations generate progress according to plan
and schedule
- Processing of data to analyze project data supporting invoicing document
approval by the client according to agreed time.
2011 – 2012
Position : Project Manager
Company : PT. Swakarya Sari - Jakarta
Reporting Line : Operational Director
Project / Owner :
- Site Implementation RO 2012 Flores Area / PT. Tower Bersama Group
Job Description : - Making a Project Completion Schedule with S-Curve for Project Control
and Client Approval
- Survey, Re-calculation, Estimating Volume of Work
- Compiling and Analyzing BoQ (Bill of Quantity) for Project Budgetting
- Coordinating / Monitoring / Reporting Progress Work
- Coordinating / Controlling Job Budget
- Support Document Control for Project Invoicing
- To ensure the company's operations generate progress according to plan
and schedule
- Processing of data to analyze project data supporting invoicing document
approval by the client according to agreed time.
2011
Position : Site Manager
Company : PT. Kidang Gesit Perkasa
Reporting Line : President Director
Project / Owner :
- Project Owner Management, Development Resort, Club House 3rd floor,
5th floor villa Flats, Shaolin International School, Cikidang Sukabumi, West
Java / PT. Kidang Gesit Perkasa
Job Description : - Making a schedule and Project Completion Schedule with S-Curve for
Project Control and Client Approval
- Survey, Re-calculation, Estimating Volume of Work
- Compiling and Analyzing BoQ ( Bill of Quantity )
- Making simple fabrication & erection drawing for building steel structure
- Managing Subcontractors for achievement target priority
- Coordinating / Monitoring / Reporting Job Progress
- Controlling Project Budget
Last Update : Mar 16, 2016
Curriculum Vitae – Arief Kaprawira 7
2006 – 2011
Position : Engineering Manager ( West Region Sumatera 90 New BTS sites )
Company : PT. Senopati Sellularindo – Jakarta
Reporting Line : Project Manager
Project / Owner : - Expanding New Battery Room MSC Aceh / PT. Indosat Jakarta
- Indosat Backbone Project Area Sumbagsel & Babel ( Perkuatan Struktur
Tower ) / PT. Indosat – Jakarta
- Project Indosat Fiber Optic Java Sumatera BSS Modernization Segmen
Lubuk Linggau – Bengkulu / PT. Indosat - Jakarta
- Site Renovation DRC Building Jatiluhur 2010 / PT. Indosat – Jakarta
- Site Implementation Renovation MSC Building Cirebon 2009 / PT. Indosat
– Jakarta
- Site Implementation Roll Out 2006 – 2009 / PT. Indosat – Jakarta
- Site Implementation Roll Out 2006 – 2007 / PT. Sampoerna
Telekomunikasi Indonesia
Job Description : - Survey, Re-calculation and cost estimating
- Design & Review Design Works ( Shopdrawing - As Built drawings )
- Prepare BoQ ( Bill of Quantity )
- Coordinating / Scheduling / Controlling / Reporting Progress of Work to
Management & Owner
- Monitoring, Coordination with the Owner, and subcon Area Supervisor,
Quality Control for tower concrete foundation structure, erection tower steel
structure, installation mechanical electrical shelter for BTS
- Provide site problem-solving if it requires re-calculation which requires the
consent of the owner center / consultant planner.
- Coordinating, Reporting Job Progress to Owner
2004 – 2006
Position : Site Coordinator Area Sumatera Utara dan Barat ( West Region
Sumatera 51 New BTS sites )
Company : PT. Senopati Sellularindo – Jakarta
Reporting Line : Project Manager
Project / Owner : Site Implementation Roll Out 2005 – 2006 / PT. Indosat – Jakarta
Job Description : - Survey, Re-calculation and cost estimating
- Conduct field implementation (Shopdrawing)
- Scheduling / Manpower and Materials Management in the Field / Area
- Prepare BoQ (Bill of Quantity)
- Monitoring, Coordination with subcon and Owner, Quality Control CME
BTS project.
- Provide site problem-solving
- Perform Daily Inspection & Weekly, tower concrete foundation structure,
erection tower steel structure, installation mechanical electrical shelter for
BTS
- Coordinating, Reporting Job Progress to Owner
Last Update : Mar 16, 2016
Curriculum Vitae – Arief Kaprawira 8
2004
Position : Ass. Core Team Manager Sumatera Area / Construction Management
Company : PT. Rayakonsult – Bandung
Reporting Line : Core Team Manager
Project / Owner : Outsourcing Of Site Implementation Roll Out 2003 – 2004 Sumatera Area /
PT. Indosat – Jakarta
Job Description : - Coordination with each - each Field Quality Control Team BTS Job CME
- Survey, Re-calculation, Estimation of the job volume, control scheduling
team member each team area.
- Preparing BoQ ( Bill of Quantity )
- Perform Supervising tower concrete foundation structure, erection tower
steel structure, installation mechanical electrical shelter for BTS
- Monitoring progress per-area for a target accuracy as client schedule
required
- Coordination, Prepare weekly & monthly progress report to Owner
2003 - 2004
Position : Field Team Manager Sumatera Area / Construction Management ( 200
sites )
Company : PT. Rayakonsult – Bandung
Reporting Line : Core Team Manager
Project / Owner : Outsourcing Of Site Implementation Roll Out 2003 – 2004 Sumatera Area /
PT. Indosat – Jakarta
Job Description : - Monitoring, Coordination, Quality Control on site for CME BTS
construction.
- Survey, Re-calculation and Estimation of the job volume
- Preparing weekly progress report to Owner
- Supervising tower concrete foundation structure, erection tower steel
structure, installation mechanical electrical shelter for BTS
- Survey, Re-Calculation and Estimation of the job volume to owner
- Coordination, Reporting Job Progress to Indosat Regional.
2000 - 2001
Position : Inspector
Company : PT. Rayakonsult – Bandung
Reporting Line : Project Coordinator
Project / Owner : SPL - OECF INP - 22 - Fishing Harbour Development Cirebon / Dinas
Perikanan Jawa Barat
Job Description : - Survey, Re-calculation and estimating the job volume
- Design and Review Work Fishery Port
- Supervision of the construction of access roads, dock fenders, swamp
reclamation, bathymetry, dredging of harbor groove depth, drilling artesian
wells and installation of waste water treatment
- Coordination, Reporting Job Progress to Owner
Last Update : Mar 16, 2016
Curriculum Vitae – Arief Kaprawira 9
1999
Position : Civil Engineer Assistant
Company : PT. Rayakonsult – Bandung
Reporting Line : Civil Engineer
Project / Owner : - Technical Design Review PPP / PP-Package III ( Area Ambon & Ternate )
/ Dinas Perikanan Pusat
- Technical Design Review of Fish Storage Terminal ( PPI ) Binuangeun /
Dinas Perikanan Jawa Barat
Job Description : - Design and Review Development Pre Port Facilities
- Estimating job volume
I hereby declare that the above details are true and correct to the best of my knowledge and belief.
Cirebon, March 16, 2016
(Arief Kaprawira )

More Related Content

What's hot (17)

Kasimin CV
Kasimin CVKasimin CV
Kasimin CV
 
CURRICULUM VITAE 2015 no.sign
CURRICULUM VITAE 2015 no.signCURRICULUM VITAE 2015 no.sign
CURRICULUM VITAE 2015 no.sign
 
CV Ibnu Sodik.xlsx
CV  Ibnu Sodik.xlsxCV  Ibnu Sodik.xlsx
CV Ibnu Sodik.xlsx
 
Makhate CV - Jun 2015
Makhate CV - Jun 2015Makhate CV - Jun 2015
Makhate CV - Jun 2015
 
CV new Bambang
CV new BambangCV new Bambang
CV new Bambang
 
RICHARD_JOK_NEW_CV
RICHARD_JOK_NEW_CVRICHARD_JOK_NEW_CV
RICHARD_JOK_NEW_CV
 
Marlon CV Updated
Marlon CV UpdatedMarlon CV Updated
Marlon CV Updated
 
RESUME
RESUMERESUME
RESUME
 
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
 
Mark Resume 2013
Mark Resume 2013Mark Resume 2013
Mark Resume 2013
 
CV . Tri Yulianto
CV . Tri YuliantoCV . Tri Yulianto
CV . Tri Yulianto
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
 
MICHAEL CHILESHE CV 1
MICHAEL CHILESHE CV 1MICHAEL CHILESHE CV 1
MICHAEL CHILESHE CV 1
 
CV_SYAZANA NADZIR_0194972552
CV_SYAZANA NADZIR_0194972552CV_SYAZANA NADZIR_0194972552
CV_SYAZANA NADZIR_0194972552
 
CV EDDY CHANDRA
CV  EDDY CHANDRACV  EDDY CHANDRA
CV EDDY CHANDRA
 
CV Suhail Sharma - II
CV Suhail Sharma - IICV Suhail Sharma - II
CV Suhail Sharma - II
 
cv andriyansysh
cv andriyansyshcv andriyansysh
cv andriyansysh
 

Viewers also liked

helpaholic - Get Hired Presentation
helpaholic - Get Hired Presentationhelpaholic - Get Hired Presentation
helpaholic - Get Hired Presentation
Jessica Karnes
 
FOURTH YEAR PROJECT PROPOSAL
FOURTH YEAR PROJECT PROPOSALFOURTH YEAR PROJECT PROPOSAL
FOURTH YEAR PROJECT PROPOSAL
JONATHAN MULOSA
 
Dubai-Seizes-Halal-Initiative-Oct-15_2mb
Dubai-Seizes-Halal-Initiative-Oct-15_2mbDubai-Seizes-Halal-Initiative-Oct-15_2mb
Dubai-Seizes-Halal-Initiative-Oct-15_2mb
Mohammed Hajjar
 
Dr. Chao top contributor - Risk Transfer is often used in place of Risk Sharing
Dr. Chao top contributor - Risk Transfer is often used in place of Risk SharingDr. Chao top contributor - Risk Transfer is often used in place of Risk Sharing
Dr. Chao top contributor - Risk Transfer is often used in place of Risk Sharing
Edward Chao
 
Open Payments-Compliance Exec Summary-Final July 16
Open Payments-Compliance Exec Summary-Final July 16Open Payments-Compliance Exec Summary-Final July 16
Open Payments-Compliance Exec Summary-Final July 16
Andrew Wiles
 
Спортивные сборы в Красной Поляне
Спортивные сборы в Красной ПолянеСпортивные сборы в Красной Поляне
Спортивные сборы в Красной Поляне
Kupola
 

Viewers also liked (14)

helpaholic - Get Hired Presentation
helpaholic - Get Hired Presentationhelpaholic - Get Hired Presentation
helpaholic - Get Hired Presentation
 
Open source prez
Open source prezOpen source prez
Open source prez
 
resume
resumeresume
resume
 
FOURTH YEAR PROJECT PROPOSAL
FOURTH YEAR PROJECT PROPOSALFOURTH YEAR PROJECT PROPOSAL
FOURTH YEAR PROJECT PROPOSAL
 
Dubai-Seizes-Halal-Initiative-Oct-15_2mb
Dubai-Seizes-Halal-Initiative-Oct-15_2mbDubai-Seizes-Halal-Initiative-Oct-15_2mb
Dubai-Seizes-Halal-Initiative-Oct-15_2mb
 
Inspiration and moodboard
Inspiration and moodboardInspiration and moodboard
Inspiration and moodboard
 
Клуб бухгалтеров НКО: Командировки — вебинар П.Ю. Гамольского 02.06.2015
Клуб бухгалтеров НКО: Командировки — вебинар П.Ю. Гамольского 02.06.2015Клуб бухгалтеров НКО: Командировки — вебинар П.Ю. Гамольского 02.06.2015
Клуб бухгалтеров НКО: Командировки — вебинар П.Ю. Гамольского 02.06.2015
 
Dr. Chao top contributor - Risk Transfer is often used in place of Risk Sharing
Dr. Chao top contributor - Risk Transfer is often used in place of Risk SharingDr. Chao top contributor - Risk Transfer is often used in place of Risk Sharing
Dr. Chao top contributor - Risk Transfer is often used in place of Risk Sharing
 
Edward via college of osteopathic medicine
Edward via college of osteopathic medicineEdward via college of osteopathic medicine
Edward via college of osteopathic medicine
 
Sara Stinson
Sara StinsonSara Stinson
Sara Stinson
 
Клуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХ
Клуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХКлуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХ
Клуб бухгалтеров НКО: Обзорный семинар 28.01.2015 на ВДНХ
 
Sin título 1
Sin título 1Sin título 1
Sin título 1
 
Open Payments-Compliance Exec Summary-Final July 16
Open Payments-Compliance Exec Summary-Final July 16Open Payments-Compliance Exec Summary-Final July 16
Open Payments-Compliance Exec Summary-Final July 16
 
Спортивные сборы в Красной Поляне
Спортивные сборы в Красной ПолянеСпортивные сборы в Красной Поляне
Спортивные сборы в Красной Поляне
 

Similar to CV - 16032016 (20)

CV_DPComplete151014
CV_DPComplete151014CV_DPComplete151014
CV_DPComplete151014
 
Resume_Jan 2017
Resume_Jan 2017Resume_Jan 2017
Resume_Jan 2017
 
Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015
 
CV-Gusryan Zari Khamsya
CV-Gusryan Zari KhamsyaCV-Gusryan Zari Khamsya
CV-Gusryan Zari Khamsya
 
CV_REZA_2016
CV_REZA_2016CV_REZA_2016
CV_REZA_2016
 
CV_REZA-English_-_2 (1)
CV_REZA-English_-_2 (1)CV_REZA-English_-_2 (1)
CV_REZA-English_-_2 (1)
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
CV_Arijanto EP_2016
CV_Arijanto EP_2016CV_Arijanto EP_2016
CV_Arijanto EP_2016
 
Aditia Wardana-CV
Aditia Wardana-CVAditia Wardana-CV
Aditia Wardana-CV
 
CV
CVCV
CV
 
RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015
 
CV.FAHRUDIN ASMAN
CV.FAHRUDIN ASMANCV.FAHRUDIN ASMAN
CV.FAHRUDIN ASMAN
 
CV Eko Agus Tavala
CV Eko Agus TavalaCV Eko Agus Tavala
CV Eko Agus Tavala
 
CV QUANPH - FEB 2019
CV QUANPH - FEB 2019CV QUANPH - FEB 2019
CV QUANPH - FEB 2019
 
CV - Pebrida Nessya Arlis
CV - Pebrida Nessya ArlisCV - Pebrida Nessya Arlis
CV - Pebrida Nessya Arlis
 
Haemsuda Alynthara
Haemsuda AlyntharaHaemsuda Alynthara
Haemsuda Alynthara
 
CV - LAMPIRAN KETERANGAN KERJA - SERTIFIKAT
CV - LAMPIRAN KETERANGAN KERJA - SERTIFIKATCV - LAMPIRAN KETERANGAN KERJA - SERTIFIKAT
CV - LAMPIRAN KETERANGAN KERJA - SERTIFIKAT
 
CV Bambang Eko Hermawan
CV Bambang Eko HermawanCV Bambang Eko Hermawan
CV Bambang Eko Hermawan
 
CV
CVCV
CV
 
Wp 241016
Wp 241016Wp 241016
Wp 241016
 

CV - 16032016

  • 1. Last Update : Mar 16, 2016 Curriculum Vitae – Arief Kaprawira 1 CURRICULUM VITAE NAME : ARIEF KAPRAWIRA DATE, PLACE OF BIRTH : Cirebon, 11 Juni 1974 ADDRESS : Perumahan Taman Nuansa Majasem, Jl. Surabaya Blok B5 No. 8 Majasem Cirebon RT/RW 05/15 MOBILE : 0821-21073637 RELIGION : Moslem SEX : Male STATUS : Married EMAIL : wira_1106@yahoo.com REFERENCE 1. Hanapi Sidhojoyo ( Director of PT. Rayakonsult ) / 0816602995 2. Samsul Hadi ( General Manager PT. Senopati Sellularindo ) / 081399236919 3. Yose Rizal ( Manager PT. Indosat ) / 0816100262 4. Estepanus Tasin ( Project Manager / HSE Manager at DSLNG Project ) / 081379603012 LAST EDUCATION 1998 : Civil Engineering ( S1 ) Institut Teknologi Nasional – Bandung IPK 2,89 ( Scale 4.0 ) COURSE & TRAINING EXPERIENCE 1993 : Wood Courses – ITENAS 1994 : Stone Courses – ITENAS 1996 : Steel Construction & Concrete Grand Aquila Hotel Project Practical Work - Bandung 1997 : MS Project Course – Bandung 1997 : English Course – AECS Bandung 1997 : Rubber Dam Practical Work – Dinas Pengairan Indramayu Jawa Barat 1999 : SAP 90 Course – LPAK Bandung 1999 : Windows 98 & Autocad R14 Course – LPK Padjadjaran Mandiri Bandung 2002 : Training & Introduction about Cellular Telecommunication System – PT Rayakonsult – Bandung ( In office Training ) 2010 : Fire Suppression System – Fenwal 2013 : MS Project Trainer at PT. Danusari Mitra Sejahtera 2014 : HSE Site Induction, Environmental Induction, Working at High Elevation, Simops Training, Safety Defensive Driving – Donggi Senoro LNG 2015 : MS Project Trainer at PT. Karunia Berca Indonesia.
  • 2. Last Update : Mar 16, 2016 Curriculum Vitae – Arief Kaprawira 2 ADDITIONAL KNOWLEDGE - ISO 9001 - OHSAS 18001 Language Reading Writing Talking Listening Bahasa Indonesia Excellent Excellent Excellent Excellent English Good Good Average Average COMPUTER SKILLS Ms Project, Ms Office, Ms Visio, Autocad & Internet WORK EXPERIENCE 2015 – Present Position : Project Coordinator Company : PT. Karunia Berca Indonesia ( Fabrication & Galvanizing ) – Cilegon Banten Reporting Line : General Manager Project and Plan Project / Owner : - Supply Fabricated Steel Structure and Galvanizing of 3 x A 50 Bridges – Ambon, East Indonesia / PT. Nindya Karya / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure and Galvanizing of 3 x A 60 Bridges – Sulawesi, East Indonesia / PT. Naviri Konstruksi / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure and Galvanizing of 1 x A 60 Bridge – West Sulawesi, East Indonesia / PT. Graha Perkasa Mandiri / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure and Galvanizing of 1 x B 45 Bridge – Ambon, East Indonesia / PT. Hoka Pratama / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure and Galvanizing of 2 x A 60 Bridges – Maluku, East Indonesia / PT. Tarawesi Artha Megah / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure and Galvanizing of 1 x B 45 Bridge – Sumatera, Indonesia / PT. Lian Suasa / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure and Galvanizing of 1 x B 45 Bridge – Sumatera, Indonesia / PT. Surya Alnusa mandiri / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure and Galvanizing of Bridge Panel 2 x L 24 & 2 x L 30 – Maluku, East Indonesia / CV. Damas Jaya / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure and Galvanizing of Tower Pole & Acessories for WIGO 4G TD LTE – Sulawesi, Kalimantan, and Sumatera Area, Indonesia / PT. Berca Hardayaperkasa. - Supply Fabricated Steel Structure and Galvanizing of 1 x A 40 Bridge – Maluku, East Indonesia / PT. Wira Karsa Konstruksi / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure and Galvanizing of 1 x A 40 Bridge – Maluku, East Indonesia / PT. Multi Widya Pratama / Dinas Pekerjaan Umum.
  • 3. Last Update : Mar 16, 2016 Curriculum Vitae – Arief Kaprawira 3 - Supply Fabricated Steel Structure and Galvanizing of 1 x B 40 Bridge – East Timor, Timor Leste / Green Dragon, Lda / Public Work Department Government of Timor Leste. - Supply Fabricated Steel Structure and Galvanizing of 1 x A 50 Bridge – Maluku, East Indonesia / PT. Tiga Ikan Jaya Utama / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure and Galvanizing of Bridge 1 x B 50, 1 x B 40 include Link Set type B – Lampung, Sumatera - Indonesia / PT. AA Bersaudara / Dinas Pekerjaan Umum. - Supply Fabricated Steel Structure, Painting / Coating and installation of Building Canopy Structure – Jakarta, Indonesia / PT. Balfour Beatty Sakti - Supply Fabricated Steel Structure, Painting / Coating and Erection of Mezzanine Structure at JI EXPO Building – Jakarta, Indonesia / PT. Jakarta International EXPO - Supply Fabricated Steel Structure, Painting / Coating and Erection of Parit Baru Coal Fired Steam Power Plant Project 2 x 50 MW (Site Bengkayang) at West Kalimantan, Indonesia / PT. Praba Indo Persada (Consortium with CGGC). - Supply Fabricated Steel Structure, Painting / Coating and Erection of Canopy, Slab Structure, Trellis, and Roof Crown at WTC 3 – Jakarta, Indonesia / PT. Balfour Beatty Sakty - Supply Fabricated Steel Structure, Painting / Coating and Erection of Canopy, Guard House, Sky Light, and Upper Roof at Amarta Unilever Head Quarter – BSD City, Tangerang, Indonesia / PT. BAM Decorient - Supply Fabricated Steel Structure, Painting / Coating and Erection of Building Steel Structure at Project Convention & Theater JI EXPO – Kemayoran, Jakarta, Indonesia / PT. Total Bangun Persada & PT. Balfour Beatty Sakti Job Description : - Scheduling, monitoring of projects running (with S-Curve & Microsoft Project) from PO received until the invoice paid / Closed. - Provide Method Statement Erection Work - Making detailed progress report accurately and report to General Manager. - Support coordinating & arranging the project team ( Engineering, Procurement, QC, Production, & Document Control ) to execute the target based on the agreed time - Coordinating, monitoring, supervising and ensure all activities of the department provide the progress of the realization according with the Job Order target and Schedule - Integrating all department activity resulting a productive and efficient output - To ensure the company's operations generate progress according to plan and schedule - Processing & analyze project data for support invoicing document for client approval according to agreed time - Processing & analyze project data for payment/invoicing subcontractor 2014 – 2015 Position : Deputy Project Manager Company : PT. Artha Teknik Abadi ( Engineering& Construction ) – Cilegon Banten Reporting Line : Project Manager & Director Project / Owner : - Furniture Fixtures and Equipment for DSLNG Permanent Office Buildings – Luwuk, Center of Sulawesi / PT. Donggi Senoro LNG.
  • 4. Last Update : Mar 16, 2016 Curriculum Vitae – Arief Kaprawira 4 Job Description : - Making a schedule and project completion schedule with S-Curve for Project Control and Client Approval - Support coordinating & arranging the project team ( Engineering, Procurement, QC, Production, & Document Control ) to execute the target based on the agreed time - Monitoring of projects running from the PO received until the invoice process with weekly & monthly progress report accurately to Management - Coordinating, monitoring, supervising and ensure all activities of the departement provide the progress of the realization according with the RPO target and Schedule - Integrating all department activity resulting a productive and efficient output - To ensure the company's operations generate progress according to plan and schedule - Processing & analyze project data for support invoicing document for client approval according to agreed time 2013 – 2014 Position : Project / Workshop Manager Company : PT. Artha Teknik Abadi ( Engineering& Construction ) – Cilegon Banten Reporting Line : Director Project / Owner : - Supply Fabricated Steel Structure of Ichthys On Shore LNG Precast – Cilegon / PT. BAM Decorient Indonesia. - Supply Fabricated Steel Structure of Wheatstone PLF and Tug Berth Project - Cilegon / PT. BAM Decorient Indonesia - Supply Fabricated Steel Structure of D2TA Staircase Tower & Piperack Support - Cilegon / PT. BAM Decorient Indonesia - Supply Fabricated Steel Structure of Loading Platform & Prestress Bed - Cilegon / PT. BAM Decorient Indonesia - Supply Fabricated Steel Structure of Ichthys Support Frame for Precast Element - Cilegon / PT. BAM Decorient Indonesia - Supply Fabricated Steel Structure of Precast Stairs South Quarter - / PT. Tata Mulia Nusantara Indah - Supply Fabricated Steel Structure of Precast Stairs Bahana Tower - Jakarta / PT. Tata Mulia Nusantara Indah - Supply & Installation ‘Furniture Fixtures and Equipment for DSLNG Permanent Buildings’ / PT. Donggi Senoro LNG - TAR Project ‘Vessel & Tower Lining Job Package’ / PT. Amoco Mitsui ( BPPI ) - Repair & Repainting Wall Fumira APU-1 / PT. Lotte Chemical Titan Nusantara - Dismantling & Mobilization Batching Plan Cidaun / PT. Holcim Indonesia Job Description : - Making a Project Completion Schedule with S-Curve for Project Control and Client Approval - Coordinating & arranging the project team (Engineering, Procurement, QC, Production, & Document Control) to execute the target based on the agreed time - Monitoring of projects running from the PO received until the invoice process with weekly & monthly progress report accurately to Management - Coordinating, monitoring, supervising and ensure all activities of the Department provide the progress of the realization according with the RPO target and Schedule
  • 5. Last Update : Mar 16, 2016 Curriculum Vitae – Arief Kaprawira 5 - Integrating all department activity resulting in a productive and efficient output - To ensure the company's operations generate progress according to plan and schedule - Processing of data to analyze project data supporting invoicing document approval by the client according to agreed time. 2012 – 2013 Position : Project Coordinator Company : PT. Danusari Mitra Sejahtera ( Steel Fabricator ) – Cileungsi Bogor Reporting Line : Director Project / Owner : - Supply Fabricated Steel Structure of Blast Furnace(Belt Conveyor) at Krakatau - Cilegon/ PT. Krakatau Engineering – PT POSCO Enc. - Supply Fabricated Steel Structure of Cook Oven Plant at Krakatau - Cilegon/ PT. Krakatau Engineering – PT POSCO Enc. - Supply Fabricated Steel Structure of Hot Gas Duct & Belt Conveyor at Indocement – Citeureup, Bogor / PT. Truba Jaya Engineering – PT. Supply Fabricated Steel Structure of Mill Feed Building at Indocement – Citeureup, Bogor / PT. Truba Jaya Engineering – PT. Heidelberg Technology Center Job Description : - Making a Project Completion Schedule with S-Curve for Project Control and Client Approval - Monitoring of projects running from the PO received until the invoice process with Weekly & Monthly Progress Report accurately to Management - Coordinating, monitoring, supervising and ensure all activities of the Departement provide the progress of the realization according with the RPO target and Schedule - Integrating all Department activity resulting in a productive and efficient output - To ensure the company's operations generate progress according to plan and schedule - Processing of data to analyze project data supporting invoicing document approval by the client according to agreed time. 2012 Position : Project Manager Company : PT. Delapan Delapan Teknik Reporting Line : Director Project / Owner : - Site Co Location Implementation & Tower Strengthening / PT. SAP – Jabodetabek & Banten Area - Site Co Location Implementation & Tower Strengthening / PT. Ericsson – Jabodetabek & Banten Area - Site Co Location Implementation & Tower Strengthening/ PT. Tower Bersama Group Jabodetabek & Jateng Area - Site Acquisition Project / PT. STP – Jabodetabek & West Java Area
  • 6. Last Update : Mar 16, 2016 Curriculum Vitae – Arief Kaprawira 6 Job Description : - Making a Project Completion Schedule with S-Curve for Project Control and Client Approval - Survey, Re-calculation, Estimating Volume of Work - Compiling and Analyzing BoQ (Bill of Quantity) for Project Budgetting - Coordinating / Monitoring / Reporting Progress Work - Coordinating / Controlling Job Budget - Support Document Control for Project Invoicing - To ensure the company's operations generate progress according to plan and schedule - Processing of data to analyze project data supporting invoicing document approval by the client according to agreed time. 2011 – 2012 Position : Project Manager Company : PT. Swakarya Sari - Jakarta Reporting Line : Operational Director Project / Owner : - Site Implementation RO 2012 Flores Area / PT. Tower Bersama Group Job Description : - Making a Project Completion Schedule with S-Curve for Project Control and Client Approval - Survey, Re-calculation, Estimating Volume of Work - Compiling and Analyzing BoQ (Bill of Quantity) for Project Budgetting - Coordinating / Monitoring / Reporting Progress Work - Coordinating / Controlling Job Budget - Support Document Control for Project Invoicing - To ensure the company's operations generate progress according to plan and schedule - Processing of data to analyze project data supporting invoicing document approval by the client according to agreed time. 2011 Position : Site Manager Company : PT. Kidang Gesit Perkasa Reporting Line : President Director Project / Owner : - Project Owner Management, Development Resort, Club House 3rd floor, 5th floor villa Flats, Shaolin International School, Cikidang Sukabumi, West Java / PT. Kidang Gesit Perkasa Job Description : - Making a schedule and Project Completion Schedule with S-Curve for Project Control and Client Approval - Survey, Re-calculation, Estimating Volume of Work - Compiling and Analyzing BoQ ( Bill of Quantity ) - Making simple fabrication & erection drawing for building steel structure - Managing Subcontractors for achievement target priority - Coordinating / Monitoring / Reporting Job Progress - Controlling Project Budget
  • 7. Last Update : Mar 16, 2016 Curriculum Vitae – Arief Kaprawira 7 2006 – 2011 Position : Engineering Manager ( West Region Sumatera 90 New BTS sites ) Company : PT. Senopati Sellularindo – Jakarta Reporting Line : Project Manager Project / Owner : - Expanding New Battery Room MSC Aceh / PT. Indosat Jakarta - Indosat Backbone Project Area Sumbagsel & Babel ( Perkuatan Struktur Tower ) / PT. Indosat – Jakarta - Project Indosat Fiber Optic Java Sumatera BSS Modernization Segmen Lubuk Linggau – Bengkulu / PT. Indosat - Jakarta - Site Renovation DRC Building Jatiluhur 2010 / PT. Indosat – Jakarta - Site Implementation Renovation MSC Building Cirebon 2009 / PT. Indosat – Jakarta - Site Implementation Roll Out 2006 – 2009 / PT. Indosat – Jakarta - Site Implementation Roll Out 2006 – 2007 / PT. Sampoerna Telekomunikasi Indonesia Job Description : - Survey, Re-calculation and cost estimating - Design & Review Design Works ( Shopdrawing - As Built drawings ) - Prepare BoQ ( Bill of Quantity ) - Coordinating / Scheduling / Controlling / Reporting Progress of Work to Management & Owner - Monitoring, Coordination with the Owner, and subcon Area Supervisor, Quality Control for tower concrete foundation structure, erection tower steel structure, installation mechanical electrical shelter for BTS - Provide site problem-solving if it requires re-calculation which requires the consent of the owner center / consultant planner. - Coordinating, Reporting Job Progress to Owner 2004 – 2006 Position : Site Coordinator Area Sumatera Utara dan Barat ( West Region Sumatera 51 New BTS sites ) Company : PT. Senopati Sellularindo – Jakarta Reporting Line : Project Manager Project / Owner : Site Implementation Roll Out 2005 – 2006 / PT. Indosat – Jakarta Job Description : - Survey, Re-calculation and cost estimating - Conduct field implementation (Shopdrawing) - Scheduling / Manpower and Materials Management in the Field / Area - Prepare BoQ (Bill of Quantity) - Monitoring, Coordination with subcon and Owner, Quality Control CME BTS project. - Provide site problem-solving - Perform Daily Inspection & Weekly, tower concrete foundation structure, erection tower steel structure, installation mechanical electrical shelter for BTS - Coordinating, Reporting Job Progress to Owner
  • 8. Last Update : Mar 16, 2016 Curriculum Vitae – Arief Kaprawira 8 2004 Position : Ass. Core Team Manager Sumatera Area / Construction Management Company : PT. Rayakonsult – Bandung Reporting Line : Core Team Manager Project / Owner : Outsourcing Of Site Implementation Roll Out 2003 – 2004 Sumatera Area / PT. Indosat – Jakarta Job Description : - Coordination with each - each Field Quality Control Team BTS Job CME - Survey, Re-calculation, Estimation of the job volume, control scheduling team member each team area. - Preparing BoQ ( Bill of Quantity ) - Perform Supervising tower concrete foundation structure, erection tower steel structure, installation mechanical electrical shelter for BTS - Monitoring progress per-area for a target accuracy as client schedule required - Coordination, Prepare weekly & monthly progress report to Owner 2003 - 2004 Position : Field Team Manager Sumatera Area / Construction Management ( 200 sites ) Company : PT. Rayakonsult – Bandung Reporting Line : Core Team Manager Project / Owner : Outsourcing Of Site Implementation Roll Out 2003 – 2004 Sumatera Area / PT. Indosat – Jakarta Job Description : - Monitoring, Coordination, Quality Control on site for CME BTS construction. - Survey, Re-calculation and Estimation of the job volume - Preparing weekly progress report to Owner - Supervising tower concrete foundation structure, erection tower steel structure, installation mechanical electrical shelter for BTS - Survey, Re-Calculation and Estimation of the job volume to owner - Coordination, Reporting Job Progress to Indosat Regional. 2000 - 2001 Position : Inspector Company : PT. Rayakonsult – Bandung Reporting Line : Project Coordinator Project / Owner : SPL - OECF INP - 22 - Fishing Harbour Development Cirebon / Dinas Perikanan Jawa Barat Job Description : - Survey, Re-calculation and estimating the job volume - Design and Review Work Fishery Port - Supervision of the construction of access roads, dock fenders, swamp reclamation, bathymetry, dredging of harbor groove depth, drilling artesian wells and installation of waste water treatment - Coordination, Reporting Job Progress to Owner
  • 9. Last Update : Mar 16, 2016 Curriculum Vitae – Arief Kaprawira 9 1999 Position : Civil Engineer Assistant Company : PT. Rayakonsult – Bandung Reporting Line : Civil Engineer Project / Owner : - Technical Design Review PPP / PP-Package III ( Area Ambon & Ternate ) / Dinas Perikanan Pusat - Technical Design Review of Fish Storage Terminal ( PPI ) Binuangeun / Dinas Perikanan Jawa Barat Job Description : - Design and Review Development Pre Port Facilities - Estimating job volume I hereby declare that the above details are true and correct to the best of my knowledge and belief. Cirebon, March 16, 2016 (Arief Kaprawira )