SUMMARY
Over 35 years of civil engineering infrastructure design and management experience for major
national and international EPCM projects.
International
 Project Engineer for the Conga mining Project in Peru and Chile
 Site Project Engineer for the Machala Power Project in Ecuador
 Site Project Engineer for the San Cristobal mining project in Bolivia
 Site Project Engineer for the Refugio mine road relocation Project in Chile
 Associate Civil Engineer for the Escondida mining Project
National
Over 10 years of experience working on Industrial Process projects for natural gas process plants.
 Over 5 years of experience with Domestic and International Power plant infrastructure design
and construction including upgrades of existing coal power plants.
 Over 5 years of experience with low and high head hydroelectric power plants including
feasibility, planning and design.
 Over 5 years of Municipal experience working as an Associate Civil engineer for a city
including capital cost implementation and subdivision improvement plans approval.
 Professional Engineer licensed in 10 states.
COMPUTER / LANGUAGE SKILLS
Languages
· Fluent in Spanish, read and write
Software
· Experience with various civil software’s such as Microsoft InRoads and
Civil 3D
EXPERIENCE
2015 to Present President, Nothaft & Associates, LLC
· A minority owned civil engineering consulting firm licensed in the State of
Colorado
· 8(a) Certificate (Pending)
Page 2
2012 to 09/2015 Aecom (URS) – Denver, Colorado – 2012 to present
Principal Civil Engineer for the Morenci Tailings Storage Expansion Project
covering the ETPS – expanded tailing pump station - and tailings distribution
lines.
2010 to 2012 Fluor - Project Engineer, Conga Project – Chile and Peru – Engineering
Management of three major subcontracts:
 Direct supervision for infrastructure civil engineering work done by Knight
Piesold responsible for the design and issuing of construction drawings
covering three major sediment ponds, two main reservoirs, 10 km of contact
and non-contact drainage channels
 Improvement plans for the ROM pad, Primary Crusher, Mine truck facility,
Haul road and Process plant.
 Weekly coordination meetings at the main office in Santiago and various site
visits to the main office in Denver to discuss design and schedule
implementation.
 Direct supervision of third party local sub-contractors providing much of the
offsite infrastructure such as roads, water and temporary camps.
 Construction management support for:
 Implementation of environmental BMP practices by the use of L1, L2 and L3
sediment control structures including the use of flocculants. Managed design
proposed by Mr. Richard Warner, present developer of the widely use
sediment control software SEDCAD.
 Mine Operations and Construction schedule coordination.
 Monthly meetings with operations to discuss any design improvements.
 Total earthwork capital cost estimated at over $650 million.
1997 to 2010 URS - (Morrison Knudsen)
Piceance Development Project – ExxonMobil
 Principal civil engineer for the EPCM Piceance Development Project.
Work covered design of three major evaporation ponds – not built - a
natural gas processing facility, natural gas process tank batteries, office
building complex and construction camp facilities.
Springerville Stage 4, 175 MW Power Project – Arizona Salt River
 Principal civil engineer for the EPCM Stage 4 175 Mw Power Project.
Work covered engineering design and field support during construction for
the main plant including 5 double-lined evaporation ponds, coal yard
facilities, cooling water towers, and 12-foot diameter reinforced concrete
recirculation water line.
Machala Power Project, Machala, Ecuador, Samedan Inc.
 Principal civil engineer for the EPCM design and construction for a new
120 MW plant and 230 kV substation including the construction of a 10
mile 230 kV transmission line. Field civil engineer during the two year
construction.
Apex Silver, San Cristobal Project, Bolivia,
 Managed coordination of subcontractors performing infrastructure design
services for all the site development at the San Cristobal mining project in
Bolivia. Project included a 300 km haul road into Chile.
Page 3
Compañía Minera Maricunga, Amax Gold, Chile
 Managed the design done by a third party engineering firm of a 100 km
alternative access road for the Amax Gold Refugio Mine in Chile. The road
is presently under use. Main coordination done at their main office in
Santiago.
Highway SR-125 Project. Chula Vista, California.
 Responsible for field design work to cover design/construct contract
documents for major highway drainage in Chula Vista, California.
1987 to 1997 Fluor Daniel, Inc., Redwood City, California and Golden, Colorado,
Newmont Mining Corporation, Batu Hijau, Indonesia
 Principal civil engineer during the Feasibility and Interim Phase for the
$1.9 billion grassroots copper project in Indonesia.
Freeport McMoran, Indonesia,
 Field Civil Engineer for the 115,000 MTPD expansion in Irian Jaya.
Responsible for offsite rough grading implementation and bench blasting.
BHP Utah International, Inc, Coloso Copper Concentrate Leaching Project,
Chile
 Lead Civil Engineer. Responsible for the $150 million new concentrate-
leaching project built in Antofagasta, Chile. Work covered from early
feasibility studies to field construction.
Compañía Minera Quebrada Blanca, S.A., Quebrada Blanca, Chile,
 Assistant Lead Civil Engineer. Prepared heap leach grading plans using
DCA-CAD civil software. Work included earthwork calculations for leach
pads of varying height.
Phelps Dodge Corporation, Morenci Expansion Phase III, Morenci, Arizona.
 Responsible for the on-site SX plant infrastructure design. Work included
two lined ponds (Raffinate and PLS), tank farm, settlers, and one on-site
Raffinate pump stations. Off-site included all site preparation for three
14,000 gpm booster pump stations and access roads. Prepared plan and
profile drawings for a five mile Raffinate pipeline.
BHP Utah International, Inc., Escondida Copper project, Chile,
 Principal civil engineer responsible for rough and final grading contract
drawings covering the main concentrator area and the offshore loading
facilities at the Port of Coloso, Antofagasta, Chile
Newmont Mining Corporation, Yanacocha, Peru, Lead Civil Engineer.
 Responsible for Stages 2 and 3 at Carachugo, and Maqui contract drawings
and field support for the ongoing expansions at both sites.
Bond Gold, Inc., Bullfrog Gold Project, Beatty, Nevada, Assistant Lead Civil
Engineer.
 Responsible for preparation of rough and final grading plans and
construction specifications. Included were solution collection ponds and
tailings ponds.
Dallhold Resources, Inc., Richmond Hill Gold Project, South Dakota, Lead
Civil Engineer.
 Responsible for preparation of rough and final grading plans and
specifications. Leach pads including leach collection systems.
Page 4
Rum Creek Coal Sales, Aracoma Coal Project, Logan County, West
Virginia.
 Feasibility work done for various alternatives in open pit coal mining and
studies for optimum truck haulage routing.
Chevron Corporation, Asphalt Plant Environmental Clean-Up, Chevron
Refinery, Richmond, California, Project Engineer.
 Responsible for the management of a $2 million environmental clean-up
project. Project involved demolition of abandoned tanks, pipe racks, pump
stations followed by full land restoration including major storm water
segregation studies.
Chevron Corporation, Asphalt Plant Environmental Clean-Up, Chevron
Refinery, Richmond, California, Lead Civil Engineer.
 Responsible for implementing Chevron storm water design criteria in order
to assure process water and storm water are segregated. Created
improvement plans for the consolidation of all process equipment to assure
proper storm and process water was segregated.
1979 to 1987 Wild Cat and San Pablo Creek Project, Richmond, California
 Responsible for preparation of contract drawings and specifications for
major flood control project. Work consisted of 1.3 miles of channel
improvements containing levees, sedimentation basin, drainage structures,
and utility relocation.
West County Justice Center, Richmond, California, Lead Senior Civil
Engineer.
 Off-site civil design work consisted of relocation of two miles of primary
roads and one sanitary sewer pump station.
City of Danville, Associate Civil Engineer, 1985 to 1986.
 Responsible for the processing of tentative and final maps and
implementation of capital improvement projects.
Tudor Engineering Company, Associate Civil Engineer, 1979 to
1985
 Worked on various small hydroelectric projects, 10 MW, during feasibility
and final design. Studies covered transient conditions for proposed water
penstocks using John Parmakian water hammer program.
Alameda Navy Base Air Facility, Alameda, California, Lead Civil Engineer.
 Responsible for all civil work on the project including lift stations for
sanitary sewer and industrial waste, airplane parking apron, pavement
design, drainage, and utility relocation.
Los Angeles Mass transit district, Associate Civil Engineer.
 Prepared constructions drawings for 3.5 miles of underground mass transit
rail consisting of TBM tunneling design and a main underground train
station.
Sage Engineering company, Associate Civil engineer, 1978 to
1979
 Responsible for subdivision work in Phoenix, Arizona.
Page 5
EDUCATION
1977 B.S, Arizona State University
PROFESIONAL LICENSE
Licensed in the following states:
Alabama, Arizona, California, Colorado, Illinois, New Mexico, Louisiana, Missouri, Tennessee,
Pennsylvania, Wisconsin

More Related Content

What's hot

Cochran Resume June 2016
Cochran Resume June 2016Cochran Resume June 2016
Cochran Resume June 2016william cochran
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...The Piedmont Environmental Council
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
CV John Raugstad Woodgroup
CV John Raugstad WoodgroupCV John Raugstad Woodgroup
CV John Raugstad WoodgroupJohn Raugstad
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015Des Jameson
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resumecarlos betts
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
R Baldwin - 2015 pdf
R Baldwin - 2015 pdfR Baldwin - 2015 pdf
R Baldwin - 2015 pdfRusty Baldwin
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro PE
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTj Dickey
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaul Blaetz
 
Presentation project miel_ii
Presentation project miel_iiPresentation project miel_ii
Presentation project miel_iiProColombia
 
Ground engineering solutions for infrastructure projects
Ground engineering solutions for infrastructure projectsGround engineering solutions for infrastructure projects
Ground engineering solutions for infrastructure projectsAbhishek Mangukiya
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineerRobin Dargavel BEng (Hons)
 
William Power Resume
William Power ResumeWilliam Power Resume
William Power ResumeWilliam Power
 

What's hot (20)

Abugattas, Abraham
Abugattas, AbrahamAbugattas, Abraham
Abugattas, Abraham
 
Cochran Resume June 2016
Cochran Resume June 2016Cochran Resume June 2016
Cochran Resume June 2016
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
CV John Raugstad Woodgroup
CV John Raugstad WoodgroupCV John Raugstad Woodgroup
CV John Raugstad Woodgroup
 
G.Hillebrenner (Partial Resume)
G.Hillebrenner (Partial Resume)G.Hillebrenner (Partial Resume)
G.Hillebrenner (Partial Resume)
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resume
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
R Baldwin - 2015 pdf
R Baldwin - 2015 pdfR Baldwin - 2015 pdf
R Baldwin - 2015 pdf
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx complete
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
Presentation project miel_ii
Presentation project miel_iiPresentation project miel_ii
Presentation project miel_ii
 
JAIME_TOVAR
JAIME_TOVARJAIME_TOVAR
JAIME_TOVAR
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
Ground engineering solutions for infrastructure projects
Ground engineering solutions for infrastructure projectsGround engineering solutions for infrastructure projects
Ground engineering solutions for infrastructure projects
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
William Power Resume
William Power ResumeWilliam Power Resume
William Power Resume
 
RESUME JULY 2016
RESUME JULY 2016RESUME JULY 2016
RESUME JULY 2016
 

Viewers also liked

The name of god
The name of godThe name of god
The name of godjb1955
 
Carlos_Collaguazo_Actividad_3
Carlos_Collaguazo_Actividad_3Carlos_Collaguazo_Actividad_3
Carlos_Collaguazo_Actividad_3Pato Fe
 
Heaven is it for real
Heaven is it for realHeaven is it for real
Heaven is it for realjb1955
 
Bryant richmond, ginger multimedia project
Bryant richmond, ginger multimedia projectBryant richmond, ginger multimedia project
Bryant richmond, ginger multimedia projectgingerrichmond
 
Thieves in the church
Thieves in the churchThieves in the church
Thieves in the churchjb1955
 
30013319432034_report
30013319432034_report30013319432034_report
30013319432034_reportShubh Agarwal
 
Maiby iboricse olivera
Maiby iboricse oliveraMaiby iboricse olivera
Maiby iboricse oliveraMaibyIboricse
 
Md. nashir uddin cv 2
Md. nashir uddin  cv 2Md. nashir uddin  cv 2
Md. nashir uddin cv 2Nashir_u
 
B4 book 02 - jose lucas gomes da silva - social inclusion
B4   book 02 - jose lucas gomes da silva - social inclusionB4   book 02 - jose lucas gomes da silva - social inclusion
B4 book 02 - jose lucas gomes da silva - social inclusionGerson Moura
 
Gerejadan negara materi27
Gerejadan negara materi27Gerejadan negara materi27
Gerejadan negara materi27Trsetiabudi
 
B1 book 01 - raphael
B1   book 01 - raphaelB1   book 01 - raphael
B1 book 01 - raphaelGerson Moura
 

Viewers also liked (16)

Resume
ResumeResume
Resume
 
The name of god
The name of godThe name of god
The name of god
 
Occupation
OccupationOccupation
Occupation
 
Carlos_Collaguazo_Actividad_3
Carlos_Collaguazo_Actividad_3Carlos_Collaguazo_Actividad_3
Carlos_Collaguazo_Actividad_3
 
Heaven is it for real
Heaven is it for realHeaven is it for real
Heaven is it for real
 
MY BOOK
MY BOOKMY BOOK
MY BOOK
 
Bryant richmond, ginger multimedia project
Bryant richmond, ginger multimedia projectBryant richmond, ginger multimedia project
Bryant richmond, ginger multimedia project
 
Thieves in the church
Thieves in the churchThieves in the church
Thieves in the church
 
30013319432034_report
30013319432034_report30013319432034_report
30013319432034_report
 
Maiby iboricse olivera
Maiby iboricse oliveraMaiby iboricse olivera
Maiby iboricse olivera
 
Md. nashir uddin cv 2
Md. nashir uddin  cv 2Md. nashir uddin  cv 2
Md. nashir uddin cv 2
 
B4 book 02 - jose lucas gomes da silva - social inclusion
B4   book 02 - jose lucas gomes da silva - social inclusionB4   book 02 - jose lucas gomes da silva - social inclusion
B4 book 02 - jose lucas gomes da silva - social inclusion
 
Advice
AdviceAdvice
Advice
 
2015 September resume
2015 September resume2015 September resume
2015 September resume
 
Gerejadan negara materi27
Gerejadan negara materi27Gerejadan negara materi27
Gerejadan negara materi27
 
B1 book 01 - raphael
B1   book 01 - raphaelB1   book 01 - raphael
B1 book 01 - raphael
 

Similar to NA

Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & ResumeRichard Rask
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig
 
Epw. Cv. Doc 2010 A1
Epw. Cv.  Doc  2010 A1Epw. Cv.  Doc  2010 A1
Epw. Cv. Doc 2010 A1Ted Warren
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard
 
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015Stan Fraley
 
2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs2016-07-28 Martin Jacobs
2016-07-28 Martin JacobsMartin Jacobs
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
dave resume sept 2015
dave resume sept 2015dave resume sept 2015
dave resume sept 2015Dave Hoover
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public ResumeLee Riopel
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 

Similar to NA (20)

Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
Epw Cv 2009
Epw Cv 2009Epw Cv 2009
Epw Cv 2009
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
 
Epw. Cv. Doc 2010 A1
Epw. Cv.  Doc  2010 A1Epw. Cv.  Doc  2010 A1
Epw. Cv. Doc 2010 A1
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
 
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - CopyCV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
 
Frank Del 0215
Frank Del 0215Frank Del 0215
Frank Del 0215
 
Jentz_Patrick
Jentz_PatrickJentz_Patrick
Jentz_Patrick
 
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
projects
projectsprojects
projects
 
2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
dave resume sept 2015
dave resume sept 2015dave resume sept 2015
dave resume sept 2015
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 

NA

  • 1. MARK NOTHAFT, P.E. NOTHAFT & ASSOCIATES, LLC 1185 S Welch Circle, Lakewood, CO, 80228 | (303) 522 3820 | mnothaft@me.com SUMMARY Over 35 years of civil engineering infrastructure design and management experience for major national and international EPCM projects. International  Project Engineer for the Conga mining Project in Peru and Chile  Site Project Engineer for the Machala Power Project in Ecuador  Site Project Engineer for the San Cristobal mining project in Bolivia  Site Project Engineer for the Refugio mine road relocation Project in Chile  Associate Civil Engineer for the Escondida mining Project National Over 10 years of experience working on Industrial Process projects for natural gas process plants.  Over 5 years of experience with Domestic and International Power plant infrastructure design and construction including upgrades of existing coal power plants.  Over 5 years of experience with low and high head hydroelectric power plants including feasibility, planning and design.  Over 5 years of Municipal experience working as an Associate Civil engineer for a city including capital cost implementation and subdivision improvement plans approval.  Professional Engineer licensed in 10 states. COMPUTER / LANGUAGE SKILLS Languages · Fluent in Spanish, read and write Software · Experience with various civil software’s such as Microsoft InRoads and Civil 3D EXPERIENCE 2015 to Present President, Nothaft & Associates, LLC · A minority owned civil engineering consulting firm licensed in the State of Colorado · 8(a) Certificate (Pending)
  • 2. Page 2 2012 to 09/2015 Aecom (URS) – Denver, Colorado – 2012 to present Principal Civil Engineer for the Morenci Tailings Storage Expansion Project covering the ETPS – expanded tailing pump station - and tailings distribution lines. 2010 to 2012 Fluor - Project Engineer, Conga Project – Chile and Peru – Engineering Management of three major subcontracts:  Direct supervision for infrastructure civil engineering work done by Knight Piesold responsible for the design and issuing of construction drawings covering three major sediment ponds, two main reservoirs, 10 km of contact and non-contact drainage channels  Improvement plans for the ROM pad, Primary Crusher, Mine truck facility, Haul road and Process plant.  Weekly coordination meetings at the main office in Santiago and various site visits to the main office in Denver to discuss design and schedule implementation.  Direct supervision of third party local sub-contractors providing much of the offsite infrastructure such as roads, water and temporary camps.  Construction management support for:  Implementation of environmental BMP practices by the use of L1, L2 and L3 sediment control structures including the use of flocculants. Managed design proposed by Mr. Richard Warner, present developer of the widely use sediment control software SEDCAD.  Mine Operations and Construction schedule coordination.  Monthly meetings with operations to discuss any design improvements.  Total earthwork capital cost estimated at over $650 million. 1997 to 2010 URS - (Morrison Knudsen) Piceance Development Project – ExxonMobil  Principal civil engineer for the EPCM Piceance Development Project. Work covered design of three major evaporation ponds – not built - a natural gas processing facility, natural gas process tank batteries, office building complex and construction camp facilities. Springerville Stage 4, 175 MW Power Project – Arizona Salt River  Principal civil engineer for the EPCM Stage 4 175 Mw Power Project. Work covered engineering design and field support during construction for the main plant including 5 double-lined evaporation ponds, coal yard facilities, cooling water towers, and 12-foot diameter reinforced concrete recirculation water line. Machala Power Project, Machala, Ecuador, Samedan Inc.  Principal civil engineer for the EPCM design and construction for a new 120 MW plant and 230 kV substation including the construction of a 10 mile 230 kV transmission line. Field civil engineer during the two year construction. Apex Silver, San Cristobal Project, Bolivia,  Managed coordination of subcontractors performing infrastructure design services for all the site development at the San Cristobal mining project in Bolivia. Project included a 300 km haul road into Chile.
  • 3. Page 3 Compañía Minera Maricunga, Amax Gold, Chile  Managed the design done by a third party engineering firm of a 100 km alternative access road for the Amax Gold Refugio Mine in Chile. The road is presently under use. Main coordination done at their main office in Santiago. Highway SR-125 Project. Chula Vista, California.  Responsible for field design work to cover design/construct contract documents for major highway drainage in Chula Vista, California. 1987 to 1997 Fluor Daniel, Inc., Redwood City, California and Golden, Colorado, Newmont Mining Corporation, Batu Hijau, Indonesia  Principal civil engineer during the Feasibility and Interim Phase for the $1.9 billion grassroots copper project in Indonesia. Freeport McMoran, Indonesia,  Field Civil Engineer for the 115,000 MTPD expansion in Irian Jaya. Responsible for offsite rough grading implementation and bench blasting. BHP Utah International, Inc, Coloso Copper Concentrate Leaching Project, Chile  Lead Civil Engineer. Responsible for the $150 million new concentrate- leaching project built in Antofagasta, Chile. Work covered from early feasibility studies to field construction. Compañía Minera Quebrada Blanca, S.A., Quebrada Blanca, Chile,  Assistant Lead Civil Engineer. Prepared heap leach grading plans using DCA-CAD civil software. Work included earthwork calculations for leach pads of varying height. Phelps Dodge Corporation, Morenci Expansion Phase III, Morenci, Arizona.  Responsible for the on-site SX plant infrastructure design. Work included two lined ponds (Raffinate and PLS), tank farm, settlers, and one on-site Raffinate pump stations. Off-site included all site preparation for three 14,000 gpm booster pump stations and access roads. Prepared plan and profile drawings for a five mile Raffinate pipeline. BHP Utah International, Inc., Escondida Copper project, Chile,  Principal civil engineer responsible for rough and final grading contract drawings covering the main concentrator area and the offshore loading facilities at the Port of Coloso, Antofagasta, Chile Newmont Mining Corporation, Yanacocha, Peru, Lead Civil Engineer.  Responsible for Stages 2 and 3 at Carachugo, and Maqui contract drawings and field support for the ongoing expansions at both sites. Bond Gold, Inc., Bullfrog Gold Project, Beatty, Nevada, Assistant Lead Civil Engineer.  Responsible for preparation of rough and final grading plans and construction specifications. Included were solution collection ponds and tailings ponds. Dallhold Resources, Inc., Richmond Hill Gold Project, South Dakota, Lead Civil Engineer.  Responsible for preparation of rough and final grading plans and specifications. Leach pads including leach collection systems.
  • 4. Page 4 Rum Creek Coal Sales, Aracoma Coal Project, Logan County, West Virginia.  Feasibility work done for various alternatives in open pit coal mining and studies for optimum truck haulage routing. Chevron Corporation, Asphalt Plant Environmental Clean-Up, Chevron Refinery, Richmond, California, Project Engineer.  Responsible for the management of a $2 million environmental clean-up project. Project involved demolition of abandoned tanks, pipe racks, pump stations followed by full land restoration including major storm water segregation studies. Chevron Corporation, Asphalt Plant Environmental Clean-Up, Chevron Refinery, Richmond, California, Lead Civil Engineer.  Responsible for implementing Chevron storm water design criteria in order to assure process water and storm water are segregated. Created improvement plans for the consolidation of all process equipment to assure proper storm and process water was segregated. 1979 to 1987 Wild Cat and San Pablo Creek Project, Richmond, California  Responsible for preparation of contract drawings and specifications for major flood control project. Work consisted of 1.3 miles of channel improvements containing levees, sedimentation basin, drainage structures, and utility relocation. West County Justice Center, Richmond, California, Lead Senior Civil Engineer.  Off-site civil design work consisted of relocation of two miles of primary roads and one sanitary sewer pump station. City of Danville, Associate Civil Engineer, 1985 to 1986.  Responsible for the processing of tentative and final maps and implementation of capital improvement projects. Tudor Engineering Company, Associate Civil Engineer, 1979 to 1985  Worked on various small hydroelectric projects, 10 MW, during feasibility and final design. Studies covered transient conditions for proposed water penstocks using John Parmakian water hammer program. Alameda Navy Base Air Facility, Alameda, California, Lead Civil Engineer.  Responsible for all civil work on the project including lift stations for sanitary sewer and industrial waste, airplane parking apron, pavement design, drainage, and utility relocation. Los Angeles Mass transit district, Associate Civil Engineer.  Prepared constructions drawings for 3.5 miles of underground mass transit rail consisting of TBM tunneling design and a main underground train station. Sage Engineering company, Associate Civil engineer, 1978 to 1979  Responsible for subdivision work in Phoenix, Arizona.
  • 5. Page 5 EDUCATION 1977 B.S, Arizona State University PROFESIONAL LICENSE Licensed in the following states: Alabama, Arizona, California, Colorado, Illinois, New Mexico, Louisiana, Missouri, Tennessee, Pennsylvania, Wisconsin