SlideShare a Scribd company logo
Curriculum Vitae - Moustapha Omar
Program Manager
Date: 21st
Dec 2014
Page 1 of 8
Moustapha Mohamed Ahmed Omar
PROGRAM MANAGER
Contact Information
Address : El Naim St, Jeddah, KSA
Egypt Phone : +966544665581
E-mail Address : omar.moustapha@gmail.com
Personal Information
Full Names : Moustapha Mohamed Ahmed Omar.
Birth date : 6th
October 1960.
Gender : Male.
Status : Married.
Children : Three Boys.
Nationality : Egyptian.
Resident of : Jeddah, KSA.
Military Status : Completed.
Career Objective
Looking forward to achieve a challenging Position in a multinational or a local remarkable organization
leading to a well-planned career. That matches my hopes and objectives in managing large scale projects
through utilizing my experience and skills.
Education
B.Sc. in Civil Engineering, Zagazig University, Egypt, May 1984.
M.Sc. in Construction Management – Ain Shams University, Cairo, Egypt, May 1992.
Arbitration – Engineer’s Association – July 1992 to September 1992.
Certified Internal Audit Assessor – Singapore Aug1997.
PMP preparation course
Language
Arabic Read, Write, Speak Native Language
English Read, Write, Speak Excellent
Curriculum Vitae - Moustapha Omar
Program Manager
Date: 21st
Dec 2014
Page 2 of 8
Skills
Primavera Enterprise up to Version 8.3 Very Good More than 22 years. Microsoft
Office up to Office 2010 Very Good More than 22 years.
Inter Audit Course – ISO Certificated.
Summary of Experience
I have around 30 years experience in construction management in mega major projects in Egypt,
Sultanate of Oman, United Arab Emirates and Saudi Arabia. I was involved with the construction of
towers of (+100m height), heavy steel construction, fast track construction programs, and high quality
workmanship. My major experience is in executing mega complex projects where I apply in depth the
knowledge of quality management systems. Coupled with many years experience in dealing with multi-
ethnical communities and a number of high caliber international contractors, I believe that I have a
good track record of success for large multi-million dollar schemes and will be able to demonstrate the
following Management Skills.
 Project Management;
 Project Control Management;
 Scheduling / Programming / Delay Analysis;
 Quality Management;
 Cost Control / Estimating / Budget Analysis;
 Contracts Administration;
 Planning and Development;
 Risk Management Identification and Mitigation.
 Control Variation & Studying Claims / Arbitration;
 International Procurement, Purchasing, Logistics, Shipping;
 Materials Management / Supply Chain Management / Inventory Control;
 Staff Training.
WORK EXPERIENCE
EMPLOYER : Saudi Bin Laden Group April 2012 Current
POSITION : Program Manager.
PROJECT : Haram Extention Projects - 9 Mega Projects
Security Building - PLOT - 1
Security Building - PLOT - 2
Security Building - PLOT - 3
Security Building - PLOT - 4
Haram Hospital
First Ring Road - Makkah
Transportation Bus Station - KUDAI
Transportation Bus Station - Marwa
Transportation Bus Station - Jabal El Kabaa
VALUE : 14 Billion Rial Saudi
CLIENT : Saudi Ministry of Finance
Curriculum Vitae - Moustapha Omar
Program Manager
Date: 21st
Dec 2014
Page 3 of 8
PROJECT DETAILS
SECURITY BUILDING (PLOT-1)
Basement Floor and 5 Podium and 14 Typical Floor in 3 Tower
with 272,000 Built Up Area.
SECURITY BUILDING (PLOT-2)
2 Basement Floors and 5 Podium and 14 Typical Floor in 3
Tower with 129,180 Built Up Area.
SECURITY BUILDING (PLOT-3)
Basement Floor and 5 Podium and 14 Typical Floor in 3 Tower
with 179,000 Built Up Area.
SECURITY BUILDING (PLOT - 4)
Basement Floor and 5 Podium and 14 Typical Floor in 3 Tower
with 90,760 Built Up Area.
HARAM HOSPITAL
4 Basement Floors and 5 Podium and 14 Typical Floor in 3
Tower with 195,000 Built Up Area.
FIRST RING ROAD
7 Bridges (Over Pass) with 15 Ramps and 2 Under Ground
Tunnels.
TRANSPORT STATION- KUDAI
2 Basement Floors and 9Parking Floor with 410,000 m2 Built
Up Area.
TRANSPORT STATION- MARWA
2 Basement Floor and 6Parking Floor with 320,000 m2 Built
Up Area.
TRANSPORT STATION- JABAL EL KAABA
2 Basement Floor and 9 Parking Floor with 410,000 m2 Built
Up Area.
JOB RESPONSIBILITIES
Responsible for the Program Management, from the Setup of The Projects, following the Design Stage with
the Consultant and determine the Scope Definition and make sure that every Manager define his roles
through the Construction phase.
- Prepare Management Information System for the projects undertaken.
- Leading Projects Management .
- Prepare Claim Programs for the projects undertaken with substantiation for Extension of Time.
- Allocate Project to Planning Engineers.
- To guide the Planning Engineer to prepare the Contract Master program and the method statement.
- Guide Planning Engineer in preparation of Key Performance Indices for respective project.
- Guide Planning Engineer in preparation of Resource Histogram.
- Attend Management Meetings.
- Train and orient new hires.
- Any other tasks assigned by Top Management.
- Committed to DSI HSE requirements and all applicable legislation and contractual requirements
affecting the HSE activities at project site and administrative offices.
- Risk management Identification and Mitigation.
- Providing project control summary to relevant stakeholders.
- Evaluates department staff and compute KPIs (Key performance indexes).
- Monitoring plan and drawing progress; highlight concerns for related managers.
Curriculum Vitae - Moustapha Omar
Program Manager
Date: 21st
Dec 2014
Page 4 of 8
EMPLOYER : EHAF Consulting Engineers January 2009 to March 2012
POSITION : Project Manager
PROJECT : Park Hyatt Abu Dhabi Hotel and Villas, Saadiyat Island
VALUE : 672 Million Dirham
CLIENT : Abu Dhabi National Hotels
PROJECT DETAILS
The project consists of a waterfront hotel and resort located on the North Beach of Saadiyat Island in Abu
Dhabi. The total plot area is approximately 93,000 while the buildable area is approximately
75,000 m². The project (322 total keys) comprises of 5-star resort style hotel with 278 rooms and suites, 7
Ryads, 4 Villas, Restaurants and Banqueting facilities, Swimming pools with beach club and spa, Parking
and extensive landscaping
JOB RESPONSIBILITIES
Responsible for reviewing the construction sequence activities on Site, preparing weekly/monthly reports,
working in coordination with the other disciplines relating to contract compliance, approval of interim
payment certificates, claims and variations.
1 - Providing project programming, cost / planning and scheduling leadership.
2 - Ensuring full implementation of planning systems.
3 - Preparation of project control plan for project in accordance with procedures and objectives.
4 - Providing project control summary to relevant stakeholders.
5- Ensuring full implementation of planning systems.
6 - Preparation of project control plan for project in accordance with procedures and objectives.
7 - Providing project control summary to relevant stakeholders.
8 - Evaluates department staff and compute KPIs (Key performance indexes)
9- Monitoring plan and drawing progress; highlight concerns for related managers
EMPLOYER : Nakheel Dubai World – Waterfront June 2008 to December 2008
POSITION : Senior Project Manager
PROJECT : Madinat Al Arab – Phase 1 District A-B-C-D
VALUE : 4.3 Billion Dirhams
CLIENT : Nakheel - Dubai World
JOB RESPONSIBILITIES
Responsible for Madinat Al Arab Phase 1, following up from the design phase with the Consultant, the
construction phase with the Contractors, checking and prepare the budget with the Commercial Manager,
reviewing and following up the detailed master time schedule including resource allocation and S-curves,
and preparing the Cost Control Status related to the invoicing, attending regular weekly project meetings
and preparing the Weekly and Monthly Reports.
EMPLOYER : Arabian Construction Company (ACC), Abu Dhabi, UAE
DATES : September 2005 to May 2008
POSITION : Senior Planning Manager
PROJECT : Branch of VIP Projects for all Sheikh Rulers comprising 12 Projects
VALUE : 3,000 Million Dirhams
CLIENT : Department of Presidential Affairs
Curriculum Vitae - Moustapha Omar
Program Manager
Date: 21st
Dec 2014
Page 5 of 8
JOB RESPONSIBILITIES
Responsible for preparing and following up the design phase with the Consultant, the construction
phase with the Contractors, checking and prepare the budget with the Commercial Manager, reviewing and
following up the detailed master time schedule including resource allocation and S-curves, and preparing
the Cost Control Status related to the invoicing, attending regular weekly project meetings and preparing
the Weekly and Monthly Reports.
DUTIES AND RESPONSIBILITIES
INCLUDED:
 Track contracts from original estimates to by outs.
 Keep up to date on estimates, contracts, job cost, subcontracts.
 Complete Issue and Risk management functions to ensure projects status is understood and
decision are made in a timely mannar.
 View current trends and forecasts for projects within a business unit or a profit & lost centre.
 Review, analyze and manage issues and risks across portfolios of projects and programs
to ensure that there are no surprises near the completion deadlines.
 Manage by acceptation by using calculated key performance indicator and automated
alerts.Quickly determine which projects or programs need to get back on track
 Communication with the project manager concern and praise on particular project issues
and thread discussions within the project workspace.
 Drill into program and project details by viewing project dashboards that contain schedule
performance, cost performance, earned value, milestone dates, WBS summaries, RFI
status and change control documents.
 Track and follow up Change orders that need approval or decline gets automatically routed to the
appropriate person.
 Keep up to date by reading executive summaries about each project or program within the
customized portfolio.
 Run Reports from the projects via the web, to get the data needed when they needed.
 Balance the back log of work by viewing a high level Gant chart profile of the projects to view
when projects are complete and to arrange another open/new project.
EMPLOYER : Siemens International Limited, Cairo, Egypt
DATES : March 2004 to August 2005
POSITION : Planning/Cost Control Manager
PROJECT : Children Oncology Hospital, Cairo, Egypt
VALUE : 200 Million Egyptian Pounds
CLIENT : Egyptian Government
JOB RESPONSIBILITIES
Responsible for coordination with Consultant and Contractor to deliver better results for Client, Prepare
and attending regular meeting, involved in the commenting and approval of the Master Schedule and
coordinated with the Consultants, Contractor and Suppliers.
DUTIES AND RESPONSIBILITIES
INCLUDED:
 Follow up contractual and scope of work deliverables status.
 Integrate schedules from engineering, architects, subcontractors and owners to create
a master program schedule.
 Quick plan for the upcoming day, week or month to ensure everyone knows what they are
Curriculum Vitae - Moustapha Omar
Program Manager
Date: 21st
Dec 2014
Page 6 of 8
responsible for.
 Log issues that are known problems within a project plan that require attention or
corrective action. E-mail issue details, along with notes and the issue’s history, to relevant
members of the project's staff.
 Build thresholds for tolerable project performance and get notified when performance is
outside of the acceptable performance window.
 Perform earned value analysis by using past performance to predict a more accurate cost
to completion
 Control budgets, changes and estimates at completion to ensure a successful project delivery.
 Prepare the Master Schedule for the Project.
 Follow up contractual requirements / deliverable.
 Prepare the weekly and Monthly Meeting for the client.
 Prepare the Monthly Invoice.
EMPLOYER : Saud Consult, Cairo, Egypt
DATES : June 2003 to February 2004
POSITION : Project Support Specialist
PROJECT : Al Khafji Master Plan (A City between Saudi Arabia and Kuwait)
VALUE : 750 Million Saudi Riyals
CLIENT : Aramco – Saudi Arabia & Kuwait
JOB RESPONSIBILITIES
Engineer Omar was responsible for the Consultant Office, managing and controlling a team of 145
Engineers and Draftsmen to produce the Design drawings for a big city (6 types of Villas, Schools, Hospitals
and Police Station) at Al Khobar between Saudi Arabia and Kuwait. Other duties included the
preparation and update of the Master Schedule, preparation of time sheet for Engineers and
Draftsmen and evaluate their productivity against the Master Schedule, issuing the weekly invoice approved
from Client / Consultant and attending weekly meetings.
DUTIES AND RESPONSIBILITIES
INCLUDED:
 Follow up contractual and scope of work deliverables status.
 Planning and schedule for a design consultant office.
 Assist the Project Manager in all programming.
 Prepare Weekly Report and Discussion with the consultant (Dar Al Handasa).
 Prepare the Weekly and Monthly Report.
 Measuring the progress of works.
 Coordination between all departments.
 Perform earned value analysis by using past performance to predict a more accurate cost to completion.
EMPLOYER : WS Atkins, Cairo, Egypt
DATES : April 2000 to May 2003
POSITION : Assistant Project Manager
PROJECT : Luxor Holiday Tourist Village
VALUE : 300 Million Egyptian Pounds
CLIENT : Abu Dhabi Office
JOB RESPONSIBILITIES
Curriculum Vitae - Moustapha Omar
Program Manager
Date: 21st
Dec 2014
Page 7 of 8
Engineer Omar worked with WS Atkins as an Assistant Project Manager to coordinate one of the biggest
tourist villages situated at Luxor between all Contractors and all Consultants for a project over 22 hectares
consisting of 220 room hotel and all facilities. Other responsibilities included approval of the detailed master
Schedule and combining various Contractors’ schedules, following up and updating and also attending
regular weekly meetings.
DUTIES AND RESPONSIBILITIES INCLUDED:
 Identify all critical paths within a project by using float path analysis.
 Integrate schedules from engineering, architects, subcontractors and owners to create a
master program schedule.
 Quickly plan for the upcoming day, week or month to ensure everyone knows what they
are responsible for.
 Control budgets, changes and estimates at completion to ensure a successful project delivery.
 Allocate resources to activities using distribution curves to accurately reflect how the work
is performed.
 Exchange data seamlessly with all Primavera scheduling products, Primavera Contract
Management and Microsoft Project.
 Communicate status to general contractors, subcontractors, owners and other project
team members via customizable industry standard reports.
 Coordinate labor, material, equipment and subcontractors to ensure on-schedule, on-
budget completion.
 Quickly compare your baseline budgets to the actual costs and work performed
while maintaining independent versions of cost to complete estimations.
 Store actual cost, units, earned value and planned value by customizable financial period,
so you can compare current and future trends.
 Break activities down into smaller weighted steps and track the completion of the steps
to determine the activity percent complete.
 Document risks and calculate risk exposure values and impacts on the project's
schedule, costs, and durations.
 Log issues that are known problems within a project plan that require attention or
corrective action. E-mail issue details, along with your notes and the issue’s history, to any
member of the project's staff.
 Build thresholds for tolerable project performance and get notified when performance is
outside of the acceptable performance window.
 Leverage best practices by using templates and completed projects to build new projects.
 Perform earned value analysis by using past performance to predict a more accurate cost
to completion.
EMPLOYER : Bilad (Oman) Steel Industry, Muscat, Sultanate of Oman
DATES : July 1997 to March 2000
POSITION : Planning and QA/QC Engineer
PROJECT : Head Office Responsibility for all Projects
VALUE : 300 Million Omani Riyals
JOB RESPONSIBILITIES
Engineer Omar’s work responsibilities were in coordination with the design / fabrication / erection
departments for the Oman and UAE projects. The coordination between the above departments to get the
job done at the specific time and quality, arrange the meeting and give priority to the projects to all
departments.
Curriculum Vitae - Moustapha Omar
Program Manager
Date: 21st
Dec 2014
Page 8 of 8
DUTIES AND RESPONSIBILITIES
INCLUDED:
 Scheduling and updating for different stages for Company Jobs (design, fabrication, and
Erection stages).
 Measure the progress for all the stages and update according to client
requirements.
 Internal Audit for the entire Department.
 Attend the meeting with the Consultant and Clients.
EMPLOYER : Siac, Cairo, Egypt
DATES : May 1995 to June 1997
POSITION : Planning Engineer
PROJECT : Greater Cairo Tunnel Metro – Line No. 2
VALUE : 10 Billion Egyptian Pounds
CLIENT : Egyptian Government
JOB RESPONSIBILITIES
Work in the biggest project at Cairo in tunnel under the walk way of traffic, prepare the master schedule for 2
Station and approved them with the French Consultant, follow up and updated the work progress, attend
the weekly meeting, coordination with other contractor to get the delivery done and handing over to other
contractors.
DUTIES AND RESPONSIBILITIES
INCLUDED:
 Preparing the project plan and execution schedule.
 Preparation of Resource Histograms (Labor, material, equipment).
 Preparation of S- Curve for the financial status (income and outcome).
 Daily follow up and updating progress to achieve the project target program.
 Attend weekly meeting to monitor progress & coordinate with Contractors.
 Liaising with Clients and Consultant regarding project items.
 Preparation of progress reports for the Company Management.
 Preparation of monthly cost-control reports for the Company Management.
EMPLOYER : The Nile General Company for Reinforcement Concrete (Speco), Egypt
DATES : September 1986 to April 1995
POSITION : Tender Engineer - Estimator
PROJECT : Head Office – Management Department
JOB RESPONSIBILITIES
Engineer Omar started his working career with one of the largest Contractors in Egypt SPECO, working as a
Tender/Estimating Engineer. The work comprised of studying and analyzing the programmed activities
starting with Civil Works, Plumbing and Electrical Works. This was followed by the preparation of the
Tender Programme and subsequent Subcontractor Contracts. The basis of Contract was Cost Plus where he
was required to obtain approval of the price with the Government. He was also involved with an
International Tender in a Joint Venture with an Italian Company for El Monib Bridge which amounted to
approximately 400 Million Egyptian Pounds at that time.
DUTIES AND RESPONSIBILITIES
INCLUDED:
Curriculum Vitae - Moustapha Omar
Program Manager
Date: 21st
Dec 2014
Page 9 of 8
 Study of tenders performed cost analysis for Civil, Plumbing and Electrical Works.
 Preparation of Offers and Estimation of the Project.
 Preparation of cost analysis for additional items and negotiations with Consultant.
 Review of Contacts to ensure compliance with the Offer.
 Preparation of the Project Plan and Schedule.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - E N D O F D O C U M E N T - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Curriculum Vitae - Moustapha Omar
Program Manager
Date: 21st
Dec 2014
Page 9 of 8
 Study of tenders performed cost analysis for Civil, Plumbing and Electrical Works.
 Preparation of Offers and Estimation of the Project.
 Preparation of cost analysis for additional items and negotiations with Consultant.
 Review of Contacts to ensure compliance with the Offer.
 Preparation of the Project Plan and Schedule.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - E N D O F D O C U M E N T - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

More Related Content

What's hot

Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hani Ahmed
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 finalHaytham Taalab
 
Adli Fataftah Civil Engineer-CV
Adli Fataftah  Civil  Engineer-CVAdli Fataftah  Civil  Engineer-CV
Adli Fataftah Civil Engineer-CVdsd dfd
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansourahmed mansour
 
Mina Naiem CV (Civil Engineer)
Mina Naiem CV (Civil Engineer)Mina Naiem CV (Civil Engineer)
Mina Naiem CV (Civil Engineer)mina naiem
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016Ahmed Sakr
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTareq Eladawi
 
Arch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sfArch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sfMahmoud Mansour
 
Sameh elshehaby pmc-senior planning & control lead cv (1)
Sameh elshehaby   pmc-senior planning & control lead cv (1)Sameh elshehaby   pmc-senior planning & control lead cv (1)
Sameh elshehaby pmc-senior planning & control lead cv (1)
سامح الشهابي
 
Architect mohamed el-tarabily
Architect mohamed el-tarabilyArchitect mohamed el-tarabily
Architect mohamed el-tarabilyTasamim Online
 
Michalis Kouyialis c v 2015E
Michalis Kouyialis c v  2015EMichalis Kouyialis c v  2015E
Michalis Kouyialis c v 2015EMikis Kouyialis
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
Tarek Ali
 
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيليPortfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Tasamim Online
 

What's hot (20)

Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016
 
Personal CV (Mohd) BM
Personal CV (Mohd) BMPersonal CV (Mohd) BM
Personal CV (Mohd) BM
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 final
 
Adli Fataftah Civil Engineer-CV
Adli Fataftah  Civil  Engineer-CVAdli Fataftah  Civil  Engineer-CV
Adli Fataftah Civil Engineer-CV
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Mina Naiem CV (Civil Engineer)
Mina Naiem CV (Civil Engineer)Mina Naiem CV (Civil Engineer)
Mina Naiem CV (Civil Engineer)
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
Arch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sfArch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sf
 
My CV
My CVMy CV
My CV
 
C.V - Hosam A. Eid Mohammed kandeel
C.V - Hosam A. Eid Mohammed kandeelC.V - Hosam A. Eid Mohammed kandeel
C.V - Hosam A. Eid Mohammed kandeel
 
Sameh elshehaby pmc-senior planning & control lead cv (1)
Sameh elshehaby   pmc-senior planning & control lead cv (1)Sameh elshehaby   pmc-senior planning & control lead cv (1)
Sameh elshehaby pmc-senior planning & control lead cv (1)
 
John Botros
John BotrosJohn Botros
John Botros
 
Architect mohamed el-tarabily
Architect mohamed el-tarabilyArchitect mohamed el-tarabily
Architect mohamed el-tarabily
 
RAED CV
RAED CVRAED CV
RAED CV
 
Resume (final cv)
Resume (final cv)Resume (final cv)
Resume (final cv)
 
Michalis Kouyialis c v 2015E
Michalis Kouyialis c v  2015EMichalis Kouyialis c v  2015E
Michalis Kouyialis c v 2015E
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
 
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيليPortfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
 

Similar to Resume - Moustapha Omar

MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000Ahmed Adel
 
My cv
My cvMy cv
Wesam Maannee CV- Aug16
Wesam Maannee CV- Aug16Wesam Maannee CV- Aug16
Wesam Maannee CV- Aug16Wesam Maannee
 
Albuhaisi, osama cipm-2016
Albuhaisi, osama   cipm-2016Albuhaisi, osama   cipm-2016
Albuhaisi, osama cipm-2016
Osama Al Buhaisi CIPM™
 
HANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - LatestHANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - LatestHani Herzallah
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016Faraz Yasin
 
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
Mbachu Clinton
 
01. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016Karim Absawi
 
Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)mustafa menaisy
 
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWfadi kuwaik
 

Similar to Resume - Moustapha Omar (20)

MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000
 
04-2016
04-201604-2016
04-2016
 
My cv
My cvMy cv
My cv
 
Wesam Maannee CV- Aug16
Wesam Maannee CV- Aug16Wesam Maannee CV- Aug16
Wesam Maannee CV- Aug16
 
Albuhaisi, osama cipm-2016
Albuhaisi, osama   cipm-2016Albuhaisi, osama   cipm-2016
Albuhaisi, osama cipm-2016
 
HANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - LatestHANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - Latest
 
Ehab Radwan
Ehab RadwanEhab Radwan
Ehab Radwan
 
Rahimulla CV
Rahimulla CVRahimulla CV
Rahimulla CV
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
 
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
 
01. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016
 
CV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABORCV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABOR
 
C.V Mohd Dardar
C.V Mohd DardarC.V Mohd Dardar
C.V Mohd Dardar
 
Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)Eng_mustafa Menaisy CV[3](Procurment manager)
Eng_mustafa Menaisy CV[3](Procurment manager)
 
CV-MIB-CM (QS)
CV-MIB-CM (QS)CV-MIB-CM (QS)
CV-MIB-CM (QS)
 
Update CV
Update CVUpdate CV
Update CV
 
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEW
 
Ahmed Kurdi-CV
Ahmed Kurdi-CVAhmed Kurdi-CV
Ahmed Kurdi-CV
 
CV-MIB-CM (QS)
CV-MIB-CM (QS)CV-MIB-CM (QS)
CV-MIB-CM (QS)
 
2015 CV
2015 CV 2015 CV
2015 CV
 

Resume - Moustapha Omar

  • 1. Curriculum Vitae - Moustapha Omar Program Manager Date: 21st Dec 2014 Page 1 of 8 Moustapha Mohamed Ahmed Omar PROGRAM MANAGER Contact Information Address : El Naim St, Jeddah, KSA Egypt Phone : +966544665581 E-mail Address : omar.moustapha@gmail.com Personal Information Full Names : Moustapha Mohamed Ahmed Omar. Birth date : 6th October 1960. Gender : Male. Status : Married. Children : Three Boys. Nationality : Egyptian. Resident of : Jeddah, KSA. Military Status : Completed. Career Objective Looking forward to achieve a challenging Position in a multinational or a local remarkable organization leading to a well-planned career. That matches my hopes and objectives in managing large scale projects through utilizing my experience and skills. Education B.Sc. in Civil Engineering, Zagazig University, Egypt, May 1984. M.Sc. in Construction Management – Ain Shams University, Cairo, Egypt, May 1992. Arbitration – Engineer’s Association – July 1992 to September 1992. Certified Internal Audit Assessor – Singapore Aug1997. PMP preparation course Language Arabic Read, Write, Speak Native Language English Read, Write, Speak Excellent
  • 2. Curriculum Vitae - Moustapha Omar Program Manager Date: 21st Dec 2014 Page 2 of 8 Skills Primavera Enterprise up to Version 8.3 Very Good More than 22 years. Microsoft Office up to Office 2010 Very Good More than 22 years. Inter Audit Course – ISO Certificated. Summary of Experience I have around 30 years experience in construction management in mega major projects in Egypt, Sultanate of Oman, United Arab Emirates and Saudi Arabia. I was involved with the construction of towers of (+100m height), heavy steel construction, fast track construction programs, and high quality workmanship. My major experience is in executing mega complex projects where I apply in depth the knowledge of quality management systems. Coupled with many years experience in dealing with multi- ethnical communities and a number of high caliber international contractors, I believe that I have a good track record of success for large multi-million dollar schemes and will be able to demonstrate the following Management Skills.  Project Management;  Project Control Management;  Scheduling / Programming / Delay Analysis;  Quality Management;  Cost Control / Estimating / Budget Analysis;  Contracts Administration;  Planning and Development;  Risk Management Identification and Mitigation.  Control Variation & Studying Claims / Arbitration;  International Procurement, Purchasing, Logistics, Shipping;  Materials Management / Supply Chain Management / Inventory Control;  Staff Training. WORK EXPERIENCE EMPLOYER : Saudi Bin Laden Group April 2012 Current POSITION : Program Manager. PROJECT : Haram Extention Projects - 9 Mega Projects Security Building - PLOT - 1 Security Building - PLOT - 2 Security Building - PLOT - 3 Security Building - PLOT - 4 Haram Hospital First Ring Road - Makkah Transportation Bus Station - KUDAI Transportation Bus Station - Marwa Transportation Bus Station - Jabal El Kabaa VALUE : 14 Billion Rial Saudi CLIENT : Saudi Ministry of Finance
  • 3. Curriculum Vitae - Moustapha Omar Program Manager Date: 21st Dec 2014 Page 3 of 8 PROJECT DETAILS SECURITY BUILDING (PLOT-1) Basement Floor and 5 Podium and 14 Typical Floor in 3 Tower with 272,000 Built Up Area. SECURITY BUILDING (PLOT-2) 2 Basement Floors and 5 Podium and 14 Typical Floor in 3 Tower with 129,180 Built Up Area. SECURITY BUILDING (PLOT-3) Basement Floor and 5 Podium and 14 Typical Floor in 3 Tower with 179,000 Built Up Area. SECURITY BUILDING (PLOT - 4) Basement Floor and 5 Podium and 14 Typical Floor in 3 Tower with 90,760 Built Up Area. HARAM HOSPITAL 4 Basement Floors and 5 Podium and 14 Typical Floor in 3 Tower with 195,000 Built Up Area. FIRST RING ROAD 7 Bridges (Over Pass) with 15 Ramps and 2 Under Ground Tunnels. TRANSPORT STATION- KUDAI 2 Basement Floors and 9Parking Floor with 410,000 m2 Built Up Area. TRANSPORT STATION- MARWA 2 Basement Floor and 6Parking Floor with 320,000 m2 Built Up Area. TRANSPORT STATION- JABAL EL KAABA 2 Basement Floor and 9 Parking Floor with 410,000 m2 Built Up Area. JOB RESPONSIBILITIES Responsible for the Program Management, from the Setup of The Projects, following the Design Stage with the Consultant and determine the Scope Definition and make sure that every Manager define his roles through the Construction phase. - Prepare Management Information System for the projects undertaken. - Leading Projects Management . - Prepare Claim Programs for the projects undertaken with substantiation for Extension of Time. - Allocate Project to Planning Engineers. - To guide the Planning Engineer to prepare the Contract Master program and the method statement. - Guide Planning Engineer in preparation of Key Performance Indices for respective project. - Guide Planning Engineer in preparation of Resource Histogram. - Attend Management Meetings. - Train and orient new hires. - Any other tasks assigned by Top Management. - Committed to DSI HSE requirements and all applicable legislation and contractual requirements affecting the HSE activities at project site and administrative offices. - Risk management Identification and Mitigation. - Providing project control summary to relevant stakeholders. - Evaluates department staff and compute KPIs (Key performance indexes). - Monitoring plan and drawing progress; highlight concerns for related managers.
  • 4. Curriculum Vitae - Moustapha Omar Program Manager Date: 21st Dec 2014 Page 4 of 8 EMPLOYER : EHAF Consulting Engineers January 2009 to March 2012 POSITION : Project Manager PROJECT : Park Hyatt Abu Dhabi Hotel and Villas, Saadiyat Island VALUE : 672 Million Dirham CLIENT : Abu Dhabi National Hotels PROJECT DETAILS The project consists of a waterfront hotel and resort located on the North Beach of Saadiyat Island in Abu Dhabi. The total plot area is approximately 93,000 while the buildable area is approximately 75,000 m². The project (322 total keys) comprises of 5-star resort style hotel with 278 rooms and suites, 7 Ryads, 4 Villas, Restaurants and Banqueting facilities, Swimming pools with beach club and spa, Parking and extensive landscaping JOB RESPONSIBILITIES Responsible for reviewing the construction sequence activities on Site, preparing weekly/monthly reports, working in coordination with the other disciplines relating to contract compliance, approval of interim payment certificates, claims and variations. 1 - Providing project programming, cost / planning and scheduling leadership. 2 - Ensuring full implementation of planning systems. 3 - Preparation of project control plan for project in accordance with procedures and objectives. 4 - Providing project control summary to relevant stakeholders. 5- Ensuring full implementation of planning systems. 6 - Preparation of project control plan for project in accordance with procedures and objectives. 7 - Providing project control summary to relevant stakeholders. 8 - Evaluates department staff and compute KPIs (Key performance indexes) 9- Monitoring plan and drawing progress; highlight concerns for related managers EMPLOYER : Nakheel Dubai World – Waterfront June 2008 to December 2008 POSITION : Senior Project Manager PROJECT : Madinat Al Arab – Phase 1 District A-B-C-D VALUE : 4.3 Billion Dirhams CLIENT : Nakheel - Dubai World JOB RESPONSIBILITIES Responsible for Madinat Al Arab Phase 1, following up from the design phase with the Consultant, the construction phase with the Contractors, checking and prepare the budget with the Commercial Manager, reviewing and following up the detailed master time schedule including resource allocation and S-curves, and preparing the Cost Control Status related to the invoicing, attending regular weekly project meetings and preparing the Weekly and Monthly Reports. EMPLOYER : Arabian Construction Company (ACC), Abu Dhabi, UAE DATES : September 2005 to May 2008 POSITION : Senior Planning Manager PROJECT : Branch of VIP Projects for all Sheikh Rulers comprising 12 Projects VALUE : 3,000 Million Dirhams CLIENT : Department of Presidential Affairs
  • 5. Curriculum Vitae - Moustapha Omar Program Manager Date: 21st Dec 2014 Page 5 of 8 JOB RESPONSIBILITIES Responsible for preparing and following up the design phase with the Consultant, the construction phase with the Contractors, checking and prepare the budget with the Commercial Manager, reviewing and following up the detailed master time schedule including resource allocation and S-curves, and preparing the Cost Control Status related to the invoicing, attending regular weekly project meetings and preparing the Weekly and Monthly Reports. DUTIES AND RESPONSIBILITIES INCLUDED:  Track contracts from original estimates to by outs.  Keep up to date on estimates, contracts, job cost, subcontracts.  Complete Issue and Risk management functions to ensure projects status is understood and decision are made in a timely mannar.  View current trends and forecasts for projects within a business unit or a profit & lost centre.  Review, analyze and manage issues and risks across portfolios of projects and programs to ensure that there are no surprises near the completion deadlines.  Manage by acceptation by using calculated key performance indicator and automated alerts.Quickly determine which projects or programs need to get back on track  Communication with the project manager concern and praise on particular project issues and thread discussions within the project workspace.  Drill into program and project details by viewing project dashboards that contain schedule performance, cost performance, earned value, milestone dates, WBS summaries, RFI status and change control documents.  Track and follow up Change orders that need approval or decline gets automatically routed to the appropriate person.  Keep up to date by reading executive summaries about each project or program within the customized portfolio.  Run Reports from the projects via the web, to get the data needed when they needed.  Balance the back log of work by viewing a high level Gant chart profile of the projects to view when projects are complete and to arrange another open/new project. EMPLOYER : Siemens International Limited, Cairo, Egypt DATES : March 2004 to August 2005 POSITION : Planning/Cost Control Manager PROJECT : Children Oncology Hospital, Cairo, Egypt VALUE : 200 Million Egyptian Pounds CLIENT : Egyptian Government JOB RESPONSIBILITIES Responsible for coordination with Consultant and Contractor to deliver better results for Client, Prepare and attending regular meeting, involved in the commenting and approval of the Master Schedule and coordinated with the Consultants, Contractor and Suppliers. DUTIES AND RESPONSIBILITIES INCLUDED:  Follow up contractual and scope of work deliverables status.  Integrate schedules from engineering, architects, subcontractors and owners to create a master program schedule.  Quick plan for the upcoming day, week or month to ensure everyone knows what they are
  • 6. Curriculum Vitae - Moustapha Omar Program Manager Date: 21st Dec 2014 Page 6 of 8 responsible for.  Log issues that are known problems within a project plan that require attention or corrective action. E-mail issue details, along with notes and the issue’s history, to relevant members of the project's staff.  Build thresholds for tolerable project performance and get notified when performance is outside of the acceptable performance window.  Perform earned value analysis by using past performance to predict a more accurate cost to completion  Control budgets, changes and estimates at completion to ensure a successful project delivery.  Prepare the Master Schedule for the Project.  Follow up contractual requirements / deliverable.  Prepare the weekly and Monthly Meeting for the client.  Prepare the Monthly Invoice. EMPLOYER : Saud Consult, Cairo, Egypt DATES : June 2003 to February 2004 POSITION : Project Support Specialist PROJECT : Al Khafji Master Plan (A City between Saudi Arabia and Kuwait) VALUE : 750 Million Saudi Riyals CLIENT : Aramco – Saudi Arabia & Kuwait JOB RESPONSIBILITIES Engineer Omar was responsible for the Consultant Office, managing and controlling a team of 145 Engineers and Draftsmen to produce the Design drawings for a big city (6 types of Villas, Schools, Hospitals and Police Station) at Al Khobar between Saudi Arabia and Kuwait. Other duties included the preparation and update of the Master Schedule, preparation of time sheet for Engineers and Draftsmen and evaluate their productivity against the Master Schedule, issuing the weekly invoice approved from Client / Consultant and attending weekly meetings. DUTIES AND RESPONSIBILITIES INCLUDED:  Follow up contractual and scope of work deliverables status.  Planning and schedule for a design consultant office.  Assist the Project Manager in all programming.  Prepare Weekly Report and Discussion with the consultant (Dar Al Handasa).  Prepare the Weekly and Monthly Report.  Measuring the progress of works.  Coordination between all departments.  Perform earned value analysis by using past performance to predict a more accurate cost to completion. EMPLOYER : WS Atkins, Cairo, Egypt DATES : April 2000 to May 2003 POSITION : Assistant Project Manager PROJECT : Luxor Holiday Tourist Village VALUE : 300 Million Egyptian Pounds CLIENT : Abu Dhabi Office JOB RESPONSIBILITIES
  • 7. Curriculum Vitae - Moustapha Omar Program Manager Date: 21st Dec 2014 Page 7 of 8 Engineer Omar worked with WS Atkins as an Assistant Project Manager to coordinate one of the biggest tourist villages situated at Luxor between all Contractors and all Consultants for a project over 22 hectares consisting of 220 room hotel and all facilities. Other responsibilities included approval of the detailed master Schedule and combining various Contractors’ schedules, following up and updating and also attending regular weekly meetings. DUTIES AND RESPONSIBILITIES INCLUDED:  Identify all critical paths within a project by using float path analysis.  Integrate schedules from engineering, architects, subcontractors and owners to create a master program schedule.  Quickly plan for the upcoming day, week or month to ensure everyone knows what they are responsible for.  Control budgets, changes and estimates at completion to ensure a successful project delivery.  Allocate resources to activities using distribution curves to accurately reflect how the work is performed.  Exchange data seamlessly with all Primavera scheduling products, Primavera Contract Management and Microsoft Project.  Communicate status to general contractors, subcontractors, owners and other project team members via customizable industry standard reports.  Coordinate labor, material, equipment and subcontractors to ensure on-schedule, on- budget completion.  Quickly compare your baseline budgets to the actual costs and work performed while maintaining independent versions of cost to complete estimations.  Store actual cost, units, earned value and planned value by customizable financial period, so you can compare current and future trends.  Break activities down into smaller weighted steps and track the completion of the steps to determine the activity percent complete.  Document risks and calculate risk exposure values and impacts on the project's schedule, costs, and durations.  Log issues that are known problems within a project plan that require attention or corrective action. E-mail issue details, along with your notes and the issue’s history, to any member of the project's staff.  Build thresholds for tolerable project performance and get notified when performance is outside of the acceptable performance window.  Leverage best practices by using templates and completed projects to build new projects.  Perform earned value analysis by using past performance to predict a more accurate cost to completion. EMPLOYER : Bilad (Oman) Steel Industry, Muscat, Sultanate of Oman DATES : July 1997 to March 2000 POSITION : Planning and QA/QC Engineer PROJECT : Head Office Responsibility for all Projects VALUE : 300 Million Omani Riyals JOB RESPONSIBILITIES Engineer Omar’s work responsibilities were in coordination with the design / fabrication / erection departments for the Oman and UAE projects. The coordination between the above departments to get the job done at the specific time and quality, arrange the meeting and give priority to the projects to all departments.
  • 8. Curriculum Vitae - Moustapha Omar Program Manager Date: 21st Dec 2014 Page 8 of 8 DUTIES AND RESPONSIBILITIES INCLUDED:  Scheduling and updating for different stages for Company Jobs (design, fabrication, and Erection stages).  Measure the progress for all the stages and update according to client requirements.  Internal Audit for the entire Department.  Attend the meeting with the Consultant and Clients. EMPLOYER : Siac, Cairo, Egypt DATES : May 1995 to June 1997 POSITION : Planning Engineer PROJECT : Greater Cairo Tunnel Metro – Line No. 2 VALUE : 10 Billion Egyptian Pounds CLIENT : Egyptian Government JOB RESPONSIBILITIES Work in the biggest project at Cairo in tunnel under the walk way of traffic, prepare the master schedule for 2 Station and approved them with the French Consultant, follow up and updated the work progress, attend the weekly meeting, coordination with other contractor to get the delivery done and handing over to other contractors. DUTIES AND RESPONSIBILITIES INCLUDED:  Preparing the project plan and execution schedule.  Preparation of Resource Histograms (Labor, material, equipment).  Preparation of S- Curve for the financial status (income and outcome).  Daily follow up and updating progress to achieve the project target program.  Attend weekly meeting to monitor progress & coordinate with Contractors.  Liaising with Clients and Consultant regarding project items.  Preparation of progress reports for the Company Management.  Preparation of monthly cost-control reports for the Company Management. EMPLOYER : The Nile General Company for Reinforcement Concrete (Speco), Egypt DATES : September 1986 to April 1995 POSITION : Tender Engineer - Estimator PROJECT : Head Office – Management Department JOB RESPONSIBILITIES Engineer Omar started his working career with one of the largest Contractors in Egypt SPECO, working as a Tender/Estimating Engineer. The work comprised of studying and analyzing the programmed activities starting with Civil Works, Plumbing and Electrical Works. This was followed by the preparation of the Tender Programme and subsequent Subcontractor Contracts. The basis of Contract was Cost Plus where he was required to obtain approval of the price with the Government. He was also involved with an International Tender in a Joint Venture with an Italian Company for El Monib Bridge which amounted to approximately 400 Million Egyptian Pounds at that time. DUTIES AND RESPONSIBILITIES INCLUDED:
  • 9. Curriculum Vitae - Moustapha Omar Program Manager Date: 21st Dec 2014 Page 9 of 8  Study of tenders performed cost analysis for Civil, Plumbing and Electrical Works.  Preparation of Offers and Estimation of the Project.  Preparation of cost analysis for additional items and negotiations with Consultant.  Review of Contacts to ensure compliance with the Offer.  Preparation of the Project Plan and Schedule. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - E N D O F D O C U M E N T - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
  • 10. Curriculum Vitae - Moustapha Omar Program Manager Date: 21st Dec 2014 Page 9 of 8  Study of tenders performed cost analysis for Civil, Plumbing and Electrical Works.  Preparation of Offers and Estimation of the Project.  Preparation of cost analysis for additional items and negotiations with Consultant.  Review of Contacts to ensure compliance with the Offer.  Preparation of the Project Plan and Schedule. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - E N D O F D O C U M E N T - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -