SlideShare a Scribd company logo
Muhammad WaseemMuhammad Waseem
Civil Engr. MBA Marketing
Permanent Address: A-172 Block # 15 Gulistane Jouhar Karachi,
Pakistan
Present Address: Riyadh KSA
Mobile: 00966-509700418
Email: mrwasim.muhammad@gmail.com
Skype ID: mrwaseem1410
Driving License: UAE & KSA
Date of Birth: 10th
October 1974
Nationality: Pakistani
Over 16th
years experience in construction industry at senior management level,
in managing multiple, complex and high value construction projects in Middle
East. In depth understanding of Middle East construction industry,
Successfully completed and handed over High Rise Residential Towers, Textile &
Chemical Industrial, Medical College /Office Buildings, Oil and Gas related
projects, Water Treatment and Sewage Treatment Plants, Sub Stations and
Infrastructure Projects.
PROFESSIONAL EXPERIENCE
KEY COMPETENCIES
AND SKILLS
 Construction Company – Azmeel Contracting Company
Aug. 2015 Present
Ministry Housing Western Region Khulais Construction
Manager
(Infrastructure
Structure Works)
Duties:
 Monitoring suitability and availability of drawings and other data to
ensure the contractor has the right information for the work in hand.
 Monitoring quality of product / information / coordination provided by
the consultant.
 Monitoring the quality and timeliness of inspections carried out by the
consultant.
 Monitoring progress of the works for compliance with the schedule.
 Ensuring that appropriate planning tools are implemented by the
contractor, including the accurate look ahead schedules.
 Ensuring that materials for the works are submitted for approval in time,
delivered on time and suitably stored on site prior to incorporation in the
works.
 Ensuring that client furnished materials is requested in sufficient time to
permit purchase and deliver to the site without delay to the schedule.
 Establishing and maintaining the procedures for meetings, meeting
documentation, follow-up and tracking of issues and participate actively in
resolving outstanding issues.
 Construction Company – Saudi Bin Laden Group (PBA&D)
June 2009 June 2015
King Abdullah Financial City Project (Riyadh) Parcel
Manager
(High Raised Building
Structure Works)
The project involves the design and construction of five star residential and
commercial project. KAFD is the first major Riyadh, which will become the new
Project Management
Site Management
Health & Safety
Regulations
Hiring Construction
Staff
Budget / Cost Control
Building Technology
Construction Materials
Follow the ISO 90001
“2008”
financial Hub of Middle East. A large number of office building are being
developed, aiming to attract the major financial institutions from around the
world .This is complimented by a mix of residential buildings, hotels and retail
area. Scheme in the Kingdom to achieve LEED silver accreditation.
Duties:
Zone – 4 Parcel 4.12, Residential and office 26 Stories Building.
 Responsible for project functions included but not limited to Project
Management, Site
Management, Project Control Management, Engineering Management,
Procurement,
Construction Management, etc. are all coordinated and properly staffed
to meet the project goals.
 Ensure safety and QA/QC programs are established by all parties and
maintained and conduct reviews of detailed design drawing and
specifications.
 Maintain effective and on-going communications with construction and
contractor management teams
 Assist with project QA/QC and commissioning systems and
documentation.
 Perform other project engineering and project management related duties.
 Ensuring that all quality control, environmental and health and safety
requirements are met.
 Analyzed any construction project profitability, revenue, margins, bill
rates and utilization.
 Providing independent professional advice and guidance to senior
manager and third parties.
 Planning site activities in detail, setting targets and accurately
forecasting completion dates.
 Accurately estimate material, construction and labour costs as well as
project timescales.
King Saud University (Riyadh) Sr. Civil Engineer
King Saud University project is ultra Modern medical university for women with
45 different stories buildings including laboratories, lectures halls, auditorium,
residential units, community hall, cafeterias etc. With well planned and
developed infrastructure.
Duties:
Zone – A Medical & Dental Building.
 Develop, maintain and communicate multidiscipline project execution
strategies and
 Programmes and co-ordinate their implementation.
 Assign and co-ordinate the workload of the resources allocated to the
project.
 Monitor project resource levels and report any shortage or excess.
 Ensure every document generated by the project resources allocated is
prepared, checked and approved in accordance with the company’s
quality management systems.
 Review and approve company designs and deliverables as meeting the
project objectives.
 Take responsibility for the timely completion of projects assigned while
meeting all project quality and budget objectives.
 Coordinate with MEP Works and medical installation department.
 Construction Company – Al Rajhi Group
2008 to 2009 Palm Jebel Ali Cresant – A (Dubai) Site
Agent
(Infr
astructure Works)
Responsible for managing and executing projects, including time and budget
management and quality control as well as delivering projects successfully and
being accountable for project planning and direction
Duties:
 To review the Shop drawing before development.
 Preparation, development and review of Project Health and Safety Plans
and Risk Assessment.
 Development and review project planning and program.
 Management and monitoring the construction work.
 Quality checking of deliverables at each stage and final product.
 Ensuring compliance with all project QA procedures and requirements.
 Make all coordination required with contractors and suppliers.
 Sustaining consultant relationships and developing.
 The proximity of the site to employees working in the facility and
security & safety controls on site.
 Construction Company – Al Futtaim Carillion
2006 to 2008 Palm Jumeirah (Building Works) Site
Agent
Jebel Ali Free Zone (Dubai)
Infrastructure & Building work
Enoc (Oil & Gas),
Responsible for managing and executing projects, including time and budget
management and quality control as well as delivering projects successfully and
being accountable for project planning and direction
Duties:
 Establishment and responsibility for project communication with
consultant and sub-contractor.
 Development and review project planning and program.
 Preparation, development and review of project safety & quality plan.
 Compliance with cooperate Quality Management System.
 Compliance with cooperate Health and Safety Management System.
 Preparation, development and review of Project Health and Safety Plans
and Risk Assessment.
 Ensure Project teams have a clear understanding of contract and
applicable obligation.
 Ensuring compliance with all project QA procedures and requirements.
 Make all coordination required with contractors and suppliers.
 Sustaining consultant relationships and developing.
 The proximity of the site to employees working in the facility and
security & safety controls on site
 Review of material / Sub contractor procurement and delivery schedule
and updates.
 Construction Company – Descon Engineering
2005 to 2006 1. Dolphin Gas Plant (Qatar) Area
Engineer
2. Olefin Cracker Unit Plant (Oil & Gas)
Duties:
 Proficient in industrial structures for pumps, compressors, separators,
dehydration units, storage tanks & required connection constructed
foundation support, drainage system
 Responsible for ensuring that the package for submittal to the
consultant meets all consultant requirements.
 Checks that all consultant comments have been incorporated.
 Assures that the package has been through all relevant checks in line
with the QA/QC manual.
 Prepares and coordinates the project schedule and maintains this
throughout the project. Optimizes the use of personnel to achieve the
schedule, Forecasts and addresses deviations to schedule.
 Compliance with cooperate Quality Management System.
 Compliance with cooperate Health and Safety Management System.
 Preparation, development and review of Project Health and Safety Plans
and Risk Assessment.
 Management and monitoring the construction works
 Construction Company – Paragon Constructors
2003 to 2005 Lucky Textile (Karachi) Project
Coordinator
(Industrial Building
Work)
Duties:
 Perform Site Project Coordination duties to plan and coordinate Project
Site and Construction activities to ensure that works are implemented
safely, to the specified requirements, within schedule and in a cost-
effective manner.
 Overall coordination of MEP/ Construction activities between
CONTRACTOR & Client.
 Project Administration, Document Management, transmittals & drawings
control. Monitor Construction Schedule Performance and investigate
causes of delay and report accordingly.
 Coordinates with the Site Construction Manager and Foreman to
optimize allocation of manpower, material and equipment for assigned
projects.
 Assists Site Construction Manager in updating progress on site to
Planning on a weekly basis. Ensures his site image is in compliance with
Company standards and policies.
 Construction Company – Abaseen Construction
1999 to 2003 AGA Khan Hospital (Karachi) Site
Engineer
Goodwill Textile, Pharmaceutical
(Industrial Building)
Responsibilities:
 As a Senior Civil Engineer I took up complex engineering projects in the
organization. I used specialized engineering tools and techniques to
efficiently solve the complex projects in a professional approach. I also
provided technical guidance in Civil Engineering area and also trained
other engineers in my team and took the responsibility of delivering the
final project with quality on time.
ACADEMIC QUALIFICATIONS
Master of Business Administration (MBA) Marketing (New Port
University)
Bachelor of Engineering (Civil) NED University Karachi.
COMPUTER SKILLS
 Microsoft Office & Excel
 Auto Cad
 Ms Project
 Primavera
PROFESSIONAL LICENCE
 Saudi Engineering Counsel
 Dubai Municipality Inspector License Infrastructure Works
PROFESSIONAL & SAFETY CERTIFICATION
 Project Management Training for PMP
 Nobesh International Certification (General Certification)
 Peri formwork. (Work shop Class) in Dubai.
 Confine Space Training.
 HSE Supervision & Leadership Certification
 Incident Investigation & Reporting Certification
 OSHA Safety Training (Construction Safety & Health Standard)
 IOSH Safety Management Certification.
REFERENCES - Available on request

More Related Content

What's hot

CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerSoriya Mitesh
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Dr Sabih Laham
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTareq Eladawi
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Fergani
 
Cv 2019
Cv  2019Cv  2019
Mosanada-UGL-Company-Profile
Mosanada-UGL-Company-ProfileMosanada-UGL-Company-Profile
Mosanada-UGL-Company-ProfileRami Almahmoud
 
Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2
Chetan Pandharinath Padme
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia
 
QA/QC Engineer
QA/QC EngineerQA/QC Engineer
QA/QC Engineer
AHAMED USMAN SHAREEF
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHMusa Elsheikh
 

What's hot (20)

CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project Manager
 
Moh CV Updated
Moh CV UpdatedMoh CV Updated
Moh CV Updated
 
New_Hissam_CV (3).PDF
New_Hissam_CV (3).PDFNew_Hissam_CV (3).PDF
New_Hissam_CV (3).PDF
 
RESUME_ VIJAY - Saudi
RESUME_ VIJAY - SaudiRESUME_ VIJAY - Saudi
RESUME_ VIJAY - Saudi
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 
Cv 2019
Cv  2019Cv  2019
Cv 2019
 
Abdulrahman Shakboua15
Abdulrahman Shakboua15Abdulrahman Shakboua15
Abdulrahman Shakboua15
 
CV August 2015
CV August 2015CV August 2015
CV August 2015
 
Mosanada-UGL-Company-Profile
Mosanada-UGL-Company-ProfileMosanada-UGL-Company-Profile
Mosanada-UGL-Company-Profile
 
Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)
 
QA/QC Engineer
QA/QC EngineerQA/QC Engineer
QA/QC Engineer
 
Baba TODAI - Resume
Baba TODAI - ResumeBaba TODAI - Resume
Baba TODAI - Resume
 
Engineer Mahboob's CV
Engineer Mahboob's CVEngineer Mahboob's CV
Engineer Mahboob's CV
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
 
CV of Mehrdad Ziyaei
CV of Mehrdad ZiyaeiCV of Mehrdad Ziyaei
CV of Mehrdad Ziyaei
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 

Viewers also liked

American History at the Movies
American History at the MoviesAmerican History at the Movies
American History at the MoviesMatthew Hill
 
Jumyria powerpoint newest
Jumyria powerpoint newestJumyria powerpoint newest
Jumyria powerpoint newestcheerleaderjae
 
Guía de aprendizaje tec11 003
Guía de aprendizaje tec11 003Guía de aprendizaje tec11 003
Guía de aprendizaje tec11 003
Mariafer Ortiz
 
Bye bye dadar
Bye bye dadarBye bye dadar
Bye bye dadar
rajesh_gangar
 
Lesson plan puppets
Lesson plan   puppetsLesson plan   puppets
Lesson plan puppets
Mariano Hartfiel
 
Base de datos en sql
Base de datos en sql  Base de datos en sql
Base de datos en sql
K-rlos Pac
 
Lightning Components: The Future
Lightning Components: The FutureLightning Components: The Future
Lightning Components: The Future
Salesforce Developers
 
Ростислав Чайка. Продаж продукту на рівні ідеї
Ростислав Чайка. Продаж продукту на рівні ідеїРостислав Чайка. Продаж продукту на рівні ідеї
Ростислав Чайка. Продаж продукту на рівні ідеї
Rostyslav Chayka
 
NORMALIZACIÓN
NORMALIZACIÓN  NORMALIZACIÓN
NORMALIZACIÓN
Jorge Paredes Toledo
 

Viewers also liked (14)

American History at the Movies
American History at the MoviesAmerican History at the Movies
American History at the Movies
 
Jumyria powerpoint newest
Jumyria powerpoint newestJumyria powerpoint newest
Jumyria powerpoint newest
 
Guía de aprendizaje tec11 003
Guía de aprendizaje tec11 003Guía de aprendizaje tec11 003
Guía de aprendizaje tec11 003
 
Resume Oct15
Resume Oct15Resume Oct15
Resume Oct15
 
Bye bye dadar
Bye bye dadarBye bye dadar
Bye bye dadar
 
Brian Rodriguez Resume
Brian Rodriguez ResumeBrian Rodriguez Resume
Brian Rodriguez Resume
 
Alumni Journal
Alumni Journal Alumni Journal
Alumni Journal
 
Lesson plan puppets
Lesson plan   puppetsLesson plan   puppets
Lesson plan puppets
 
Base de datos en sql
Base de datos en sql  Base de datos en sql
Base de datos en sql
 
Brandon Heaton
Brandon HeatonBrandon Heaton
Brandon Heaton
 
Lightning Components: The Future
Lightning Components: The FutureLightning Components: The Future
Lightning Components: The Future
 
Ростислав Чайка. Продаж продукту на рівні ідеї
Ростислав Чайка. Продаж продукту на рівні ідеїРостислав Чайка. Продаж продукту на рівні ідеї
Ростислав Чайка. Продаж продукту на рівні ідеї
 
Rainbows end
Rainbows endRainbows end
Rainbows end
 
NORMALIZACIÓN
NORMALIZACIÓN  NORMALIZACIÓN
NORMALIZACIÓN
 

Similar to Update CV

Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CVvimal nc
 
Shareef 1384 gr
Shareef 1384 grShareef 1384 gr
Kaleemullah. cv
Kaleemullah. cvKaleemullah. cv
Kaleemullah. cv
Kaleemullah Khan
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
Malik Ilyas KHATTAK
 
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.Viad zalaf
 
CHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUMECHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUMEChip Wedekind
 

Similar to Update CV (20)

Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
Shareef 1384 gr
Shareef 1384 grShareef 1384 gr
Shareef 1384 gr
 
Siva Sankaran Menon - Resume
Siva Sankaran Menon - ResumeSiva Sankaran Menon - Resume
Siva Sankaran Menon - Resume
 
Rahimulla CV
Rahimulla CVRahimulla CV
Rahimulla CV
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Kaleemullah. cv
Kaleemullah. cvKaleemullah. cv
Kaleemullah. cv
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.
 
RESUME
RESUMERESUME
RESUME
 
CV updated 28.07.2016
CV updated 28.07.2016CV updated 28.07.2016
CV updated 28.07.2016
 
Ahmed Kurdi-CV
Ahmed Kurdi-CVAhmed Kurdi-CV
Ahmed Kurdi-CV
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
NM_CV1
NM_CV1NM_CV1
NM_CV1
 
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.V
 
Chirag's CV as on 13-05-2015
Chirag's CV  as on 13-05-2015Chirag's CV  as on 13-05-2015
Chirag's CV as on 13-05-2015
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
CHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUMECHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUME
 
M.elsayed CV
M.elsayed CVM.elsayed CV
M.elsayed CV
 
BIJU DIVAKARAN
BIJU DIVAKARANBIJU DIVAKARAN
BIJU DIVAKARAN
 

Update CV

  • 1. Muhammad WaseemMuhammad Waseem Civil Engr. MBA Marketing Permanent Address: A-172 Block # 15 Gulistane Jouhar Karachi, Pakistan Present Address: Riyadh KSA Mobile: 00966-509700418 Email: mrwasim.muhammad@gmail.com Skype ID: mrwaseem1410 Driving License: UAE & KSA Date of Birth: 10th October 1974 Nationality: Pakistani Over 16th years experience in construction industry at senior management level, in managing multiple, complex and high value construction projects in Middle East. In depth understanding of Middle East construction industry, Successfully completed and handed over High Rise Residential Towers, Textile & Chemical Industrial, Medical College /Office Buildings, Oil and Gas related projects, Water Treatment and Sewage Treatment Plants, Sub Stations and Infrastructure Projects. PROFESSIONAL EXPERIENCE KEY COMPETENCIES AND SKILLS  Construction Company – Azmeel Contracting Company Aug. 2015 Present Ministry Housing Western Region Khulais Construction Manager (Infrastructure Structure Works) Duties:  Monitoring suitability and availability of drawings and other data to ensure the contractor has the right information for the work in hand.  Monitoring quality of product / information / coordination provided by the consultant.  Monitoring the quality and timeliness of inspections carried out by the consultant.  Monitoring progress of the works for compliance with the schedule.  Ensuring that appropriate planning tools are implemented by the contractor, including the accurate look ahead schedules.  Ensuring that materials for the works are submitted for approval in time, delivered on time and suitably stored on site prior to incorporation in the works.  Ensuring that client furnished materials is requested in sufficient time to permit purchase and deliver to the site without delay to the schedule.  Establishing and maintaining the procedures for meetings, meeting documentation, follow-up and tracking of issues and participate actively in resolving outstanding issues.  Construction Company – Saudi Bin Laden Group (PBA&D) June 2009 June 2015 King Abdullah Financial City Project (Riyadh) Parcel Manager (High Raised Building Structure Works) The project involves the design and construction of five star residential and commercial project. KAFD is the first major Riyadh, which will become the new Project Management Site Management Health & Safety Regulations Hiring Construction Staff Budget / Cost Control Building Technology Construction Materials Follow the ISO 90001 “2008”
  • 2. financial Hub of Middle East. A large number of office building are being developed, aiming to attract the major financial institutions from around the world .This is complimented by a mix of residential buildings, hotels and retail area. Scheme in the Kingdom to achieve LEED silver accreditation. Duties: Zone – 4 Parcel 4.12, Residential and office 26 Stories Building.  Responsible for project functions included but not limited to Project Management, Site Management, Project Control Management, Engineering Management, Procurement, Construction Management, etc. are all coordinated and properly staffed to meet the project goals.  Ensure safety and QA/QC programs are established by all parties and maintained and conduct reviews of detailed design drawing and specifications.  Maintain effective and on-going communications with construction and contractor management teams  Assist with project QA/QC and commissioning systems and documentation.  Perform other project engineering and project management related duties.  Ensuring that all quality control, environmental and health and safety requirements are met.  Analyzed any construction project profitability, revenue, margins, bill rates and utilization.  Providing independent professional advice and guidance to senior manager and third parties.  Planning site activities in detail, setting targets and accurately forecasting completion dates.  Accurately estimate material, construction and labour costs as well as project timescales. King Saud University (Riyadh) Sr. Civil Engineer King Saud University project is ultra Modern medical university for women with 45 different stories buildings including laboratories, lectures halls, auditorium, residential units, community hall, cafeterias etc. With well planned and developed infrastructure. Duties: Zone – A Medical & Dental Building.  Develop, maintain and communicate multidiscipline project execution strategies and  Programmes and co-ordinate their implementation.  Assign and co-ordinate the workload of the resources allocated to the project.  Monitor project resource levels and report any shortage or excess.  Ensure every document generated by the project resources allocated is prepared, checked and approved in accordance with the company’s quality management systems.  Review and approve company designs and deliverables as meeting the project objectives.  Take responsibility for the timely completion of projects assigned while meeting all project quality and budget objectives.  Coordinate with MEP Works and medical installation department.
  • 3.  Construction Company – Al Rajhi Group 2008 to 2009 Palm Jebel Ali Cresant – A (Dubai) Site Agent (Infr astructure Works) Responsible for managing and executing projects, including time and budget management and quality control as well as delivering projects successfully and being accountable for project planning and direction Duties:  To review the Shop drawing before development.  Preparation, development and review of Project Health and Safety Plans and Risk Assessment.  Development and review project planning and program.  Management and monitoring the construction work.  Quality checking of deliverables at each stage and final product.  Ensuring compliance with all project QA procedures and requirements.  Make all coordination required with contractors and suppliers.  Sustaining consultant relationships and developing.  The proximity of the site to employees working in the facility and security & safety controls on site.  Construction Company – Al Futtaim Carillion 2006 to 2008 Palm Jumeirah (Building Works) Site Agent Jebel Ali Free Zone (Dubai) Infrastructure & Building work Enoc (Oil & Gas), Responsible for managing and executing projects, including time and budget management and quality control as well as delivering projects successfully and being accountable for project planning and direction Duties:  Establishment and responsibility for project communication with consultant and sub-contractor.  Development and review project planning and program.  Preparation, development and review of project safety & quality plan.  Compliance with cooperate Quality Management System.  Compliance with cooperate Health and Safety Management System.  Preparation, development and review of Project Health and Safety Plans and Risk Assessment.  Ensure Project teams have a clear understanding of contract and applicable obligation.  Ensuring compliance with all project QA procedures and requirements.  Make all coordination required with contractors and suppliers.  Sustaining consultant relationships and developing.  The proximity of the site to employees working in the facility and security & safety controls on site  Review of material / Sub contractor procurement and delivery schedule and updates.  Construction Company – Descon Engineering 2005 to 2006 1. Dolphin Gas Plant (Qatar) Area
  • 4. Engineer 2. Olefin Cracker Unit Plant (Oil & Gas) Duties:  Proficient in industrial structures for pumps, compressors, separators, dehydration units, storage tanks & required connection constructed foundation support, drainage system  Responsible for ensuring that the package for submittal to the consultant meets all consultant requirements.  Checks that all consultant comments have been incorporated.  Assures that the package has been through all relevant checks in line with the QA/QC manual.  Prepares and coordinates the project schedule and maintains this throughout the project. Optimizes the use of personnel to achieve the schedule, Forecasts and addresses deviations to schedule.  Compliance with cooperate Quality Management System.  Compliance with cooperate Health and Safety Management System.  Preparation, development and review of Project Health and Safety Plans and Risk Assessment.  Management and monitoring the construction works  Construction Company – Paragon Constructors 2003 to 2005 Lucky Textile (Karachi) Project Coordinator (Industrial Building Work) Duties:  Perform Site Project Coordination duties to plan and coordinate Project Site and Construction activities to ensure that works are implemented safely, to the specified requirements, within schedule and in a cost- effective manner.  Overall coordination of MEP/ Construction activities between CONTRACTOR & Client.  Project Administration, Document Management, transmittals & drawings control. Monitor Construction Schedule Performance and investigate causes of delay and report accordingly.  Coordinates with the Site Construction Manager and Foreman to optimize allocation of manpower, material and equipment for assigned projects.  Assists Site Construction Manager in updating progress on site to Planning on a weekly basis. Ensures his site image is in compliance with Company standards and policies.  Construction Company – Abaseen Construction 1999 to 2003 AGA Khan Hospital (Karachi) Site Engineer Goodwill Textile, Pharmaceutical (Industrial Building) Responsibilities:  As a Senior Civil Engineer I took up complex engineering projects in the organization. I used specialized engineering tools and techniques to efficiently solve the complex projects in a professional approach. I also provided technical guidance in Civil Engineering area and also trained other engineers in my team and took the responsibility of delivering the final project with quality on time.
  • 5. ACADEMIC QUALIFICATIONS Master of Business Administration (MBA) Marketing (New Port University) Bachelor of Engineering (Civil) NED University Karachi. COMPUTER SKILLS  Microsoft Office & Excel  Auto Cad  Ms Project  Primavera PROFESSIONAL LICENCE  Saudi Engineering Counsel  Dubai Municipality Inspector License Infrastructure Works PROFESSIONAL & SAFETY CERTIFICATION  Project Management Training for PMP  Nobesh International Certification (General Certification)  Peri formwork. (Work shop Class) in Dubai.  Confine Space Training.  HSE Supervision & Leadership Certification  Incident Investigation & Reporting Certification  OSHA Safety Training (Construction Safety & Health Standard)  IOSH Safety Management Certification. REFERENCES - Available on request