Suhaib Hassan
Page 1 of 4
Resume
Suhaib Hassan
Architect
Nationality
Syrian
Date of Birth
November 16, 1980
Total years of experience
11
Education
Bachelor's, Diploma, and
master degree Date: 2004-
2005 - Faculty of
Engineering - Aleppo
University
Certificates
Licensed Architect
Languages
English
Arabic
Contact Information
Phone Number
00966 554210483
Email Address
eng.suhaib81@Hotmail.com
Address (Country of
residence)
Riyadh, KSA
Career Objectives
To work in a competitive environment as I am of an ambitious
, active , punctual , leading character to follow and achieve
my goals to the company benefit also the employees
working in the field as a colleagues ,
Then to enrich my experience through working for your
company.
Employment History:
From To Company Position
2014 Present
Proger for
Engineering and
Management.
Architectural
Quality
Control
Engineer and
follow up.
2012 2014
Architectural Elite
EST
Project
manager
2009 2012
Boudl Hotels &
Resorts (Narcissus
5 star hotel).
Project
manager
2007 2009
Durat Saba For
roads
&constructions
Area
manager.
2005 2007
Al-ZAKRAY for
Engineering and
Decoration.
Head of
architectural
Design &
Technical
office
Engineer.
Skills
• Business Operations Leadership
• Building, Construction & Engineering
• Project Control
• Management Consultant
Experience :
From 2014 TO NOW (Saudi Arabia):
*Proger for Engineering and Management.
*Position: Architectural Quality Control Engineer and follow up.
Key Responsibilities:
1. Direct, supervise and coordinate architectural
inspection/engineering QC activities and acts as MOI
Suhaib Hassan
Page 2 of 4
Resume
Registrations
Saudi Council of Engineers /
Professional Regulation
Commission/
representative on project sites.
2. Review and check submittals, shop drawings,
equipment data, material samples and/or
manufacturers for compliance with contract drawings
and specifications and project’s quality system.
Coordinate with design team to resolve all
construction issues, and site related quality conflicts.
3. Ensure that all requirements of the applicable
specifications and drawings are complied with; and
report on deficiencies and advise for the required
corrections on site.
4. Coordinate testing and inspection of off-site materials
provide necessary procedures for materials storage
and testing.
5. Inspect all materials for compliance to submittals and
drawings.
6. Monitor the performance of all control activities and
tests on architectural components of buildings.
7. Troubleshoot and resolve problems relating to
architectural quality control.
8. Highlights deficiencies, shortfalls and indicates areas
for improvements either within the construction
activities or for documenting procedures.
9. Participate in development of the commissioning plan,
roles and responsibilities. Implement commissioning
plan.
10. Assist in developing the operations & maintenance
program at project closure phase
11. Participate in and conduct coordination meetings with
the client, construction team and contractor.
12. Review, assist and facilitate daily report process; keep
an updated daily report; prepare and submit weekly
and monthly quality reports.
From 2012 TO 2014 (Saudi Arabia):
*Architectural Elite EST.
*Position: Project manager of 14 private villas in al Takasosi
Road.
Suhaib Hassan
Page 3 of 4
Resume
Cost of this project is: 47millions RS.
Key Responsibilities:
1-Studying the drawing plans and preparing the shop
drawing.
2-Designing the time schedule from the excavation to the
end of the project with finishing.
3-Preparing the weekly and monthly reports and submitting
them to the consultant.
4-Watching the quality of the execution step by step.
5-Preparing (RFI) request of the Inspections for all the steps
before execution and handle them to the consultant to get
the improvement.
6- Receiving and checking all the reports of the executed
works from the site engineers.
7- Giving the instructions and the needed notes for the site
engineers and foremen to be sure that the works are going at
the best way.
8- Running the meetings with the site engineers to get over
the obstacles.
9-Attending the monthly meetings with consultant.
From 2009 TO 2012 (Saudi Arabia)
*Boudl Hotels & Resorts (Narcissus 5 star hotel).
-The Narcissus Hotel and Residence is in the heart of Riyadh’s
business and financial center, 3 restaurants and meeting
facilities. This 5-star hotel is a 5-minute drive from Kingdom
Tower.
-Cost of this project is; 487millions RS.
*Position: Project manager of Five Stars Hotel Located in Al -
Olaya road (Corner of al Tahlia Road).
Key Responsibilities:
1-Responsible for the whole finishing works in the hotel.
2- Receiving all the finishing items (which were imported from
China especially for this hotel).
3-Controlling the quality of the imported items.
4-Finishing the typical floors which include the luxurious hotel
Suhaib Hassan
Page 4 of 4
Resume
suites.
5- Execution with the best quality of the central kitchen
equipment and the main restaurant on the roof with its
special swimming pool.
6- Finishing the (All Day) cafe on the ground floor with the
imported marble.
From 2007 to 2009 (Saudi Arabia):
*PNU (Princess Norah University) With Durat Saba For roads
&constructions
Cost of the project; 15 milliard $.
Position: Area manager.
Key Responsibilities:
I was in charge of the hospital, the main mosque and the
main library areas under the supervision of Saudi Ogre for
contracting works (the consulting part) and Bin Laden Co. Al
Riyadh city.
The performed work in this project was the complete
execution of the foundations in the project whether
separately or continuously, execution of the walls foundations
with works of filling up and grounds. We were charged of
making divisions of the walls in the mentioned areas. We were
also responsible for the back filling and excavation between
the big foundations.
-My duties also included Quality control and supervision of all
the concrete and steel works.
-Certificate of experience is available upon request.
From 2005 to 2007 (Saudi Arabia):
Al-ZAKRAY for Engineering and Decoration.
*Position: Head of architectural Design & Technical office
Engineer.
Key Responsibilities:
1. Following and supervising some projects.
2. Designing and implementing many decoration
projects including services and villas.
3. Quantity control and pricing the items of the designed
projects.

My CV

  • 1.
    Suhaib Hassan Page 1of 4 Resume Suhaib Hassan Architect Nationality Syrian Date of Birth November 16, 1980 Total years of experience 11 Education Bachelor's, Diploma, and master degree Date: 2004- 2005 - Faculty of Engineering - Aleppo University Certificates Licensed Architect Languages English Arabic Contact Information Phone Number 00966 554210483 Email Address eng.suhaib81@Hotmail.com Address (Country of residence) Riyadh, KSA Career Objectives To work in a competitive environment as I am of an ambitious , active , punctual , leading character to follow and achieve my goals to the company benefit also the employees working in the field as a colleagues , Then to enrich my experience through working for your company. Employment History: From To Company Position 2014 Present Proger for Engineering and Management. Architectural Quality Control Engineer and follow up. 2012 2014 Architectural Elite EST Project manager 2009 2012 Boudl Hotels & Resorts (Narcissus 5 star hotel). Project manager 2007 2009 Durat Saba For roads &constructions Area manager. 2005 2007 Al-ZAKRAY for Engineering and Decoration. Head of architectural Design & Technical office Engineer. Skills • Business Operations Leadership • Building, Construction & Engineering • Project Control • Management Consultant Experience : From 2014 TO NOW (Saudi Arabia): *Proger for Engineering and Management. *Position: Architectural Quality Control Engineer and follow up. Key Responsibilities: 1. Direct, supervise and coordinate architectural inspection/engineering QC activities and acts as MOI
  • 2.
    Suhaib Hassan Page 2of 4 Resume Registrations Saudi Council of Engineers / Professional Regulation Commission/ representative on project sites. 2. Review and check submittals, shop drawings, equipment data, material samples and/or manufacturers for compliance with contract drawings and specifications and project’s quality system. Coordinate with design team to resolve all construction issues, and site related quality conflicts. 3. Ensure that all requirements of the applicable specifications and drawings are complied with; and report on deficiencies and advise for the required corrections on site. 4. Coordinate testing and inspection of off-site materials provide necessary procedures for materials storage and testing. 5. Inspect all materials for compliance to submittals and drawings. 6. Monitor the performance of all control activities and tests on architectural components of buildings. 7. Troubleshoot and resolve problems relating to architectural quality control. 8. Highlights deficiencies, shortfalls and indicates areas for improvements either within the construction activities or for documenting procedures. 9. Participate in development of the commissioning plan, roles and responsibilities. Implement commissioning plan. 10. Assist in developing the operations & maintenance program at project closure phase 11. Participate in and conduct coordination meetings with the client, construction team and contractor. 12. Review, assist and facilitate daily report process; keep an updated daily report; prepare and submit weekly and monthly quality reports. From 2012 TO 2014 (Saudi Arabia): *Architectural Elite EST. *Position: Project manager of 14 private villas in al Takasosi Road.
  • 3.
    Suhaib Hassan Page 3of 4 Resume Cost of this project is: 47millions RS. Key Responsibilities: 1-Studying the drawing plans and preparing the shop drawing. 2-Designing the time schedule from the excavation to the end of the project with finishing. 3-Preparing the weekly and monthly reports and submitting them to the consultant. 4-Watching the quality of the execution step by step. 5-Preparing (RFI) request of the Inspections for all the steps before execution and handle them to the consultant to get the improvement. 6- Receiving and checking all the reports of the executed works from the site engineers. 7- Giving the instructions and the needed notes for the site engineers and foremen to be sure that the works are going at the best way. 8- Running the meetings with the site engineers to get over the obstacles. 9-Attending the monthly meetings with consultant. From 2009 TO 2012 (Saudi Arabia) *Boudl Hotels & Resorts (Narcissus 5 star hotel). -The Narcissus Hotel and Residence is in the heart of Riyadh’s business and financial center, 3 restaurants and meeting facilities. This 5-star hotel is a 5-minute drive from Kingdom Tower. -Cost of this project is; 487millions RS. *Position: Project manager of Five Stars Hotel Located in Al - Olaya road (Corner of al Tahlia Road). Key Responsibilities: 1-Responsible for the whole finishing works in the hotel. 2- Receiving all the finishing items (which were imported from China especially for this hotel). 3-Controlling the quality of the imported items. 4-Finishing the typical floors which include the luxurious hotel
  • 4.
    Suhaib Hassan Page 4of 4 Resume suites. 5- Execution with the best quality of the central kitchen equipment and the main restaurant on the roof with its special swimming pool. 6- Finishing the (All Day) cafe on the ground floor with the imported marble. From 2007 to 2009 (Saudi Arabia): *PNU (Princess Norah University) With Durat Saba For roads &constructions Cost of the project; 15 milliard $. Position: Area manager. Key Responsibilities: I was in charge of the hospital, the main mosque and the main library areas under the supervision of Saudi Ogre for contracting works (the consulting part) and Bin Laden Co. Al Riyadh city. The performed work in this project was the complete execution of the foundations in the project whether separately or continuously, execution of the walls foundations with works of filling up and grounds. We were charged of making divisions of the walls in the mentioned areas. We were also responsible for the back filling and excavation between the big foundations. -My duties also included Quality control and supervision of all the concrete and steel works. -Certificate of experience is available upon request. From 2005 to 2007 (Saudi Arabia): Al-ZAKRAY for Engineering and Decoration. *Position: Head of architectural Design & Technical office Engineer. Key Responsibilities: 1. Following and supervising some projects. 2. Designing and implementing many decoration projects including services and villas. 3. Quantity control and pricing the items of the designed projects.