SlideShare a Scribd company logo
PERSONAL INFORMATION Ahmed Mustafa Elgammal
TELEPHONE (S) +966599064518
NATIONALITY Egyptian
DATE & PLACE OF BIRTH 15 August 1984 - Alexandra – Egypt
MARITAL STATUES Married
NUMBER OF DEPENDS 3 Children
E-MAIL ADDRESS Ahmedm2009@yahoo.com
LINKEDIN https://www.linkedin.com/in/ahmed-elgammal-5999b8105/
CAREER OBJECTIVE Continue developing civilization, through being part of an effective constructionproject
management team, in a leading company, with interesting prospects of progress and
advancement.
CORE COMPETENCIES ▪ Senior Planning Engineer
▪ Senior BIM Engineer
WORK EXPERIENCE:
NAME & ADDRESS OF
EMPLOYER
Advanced Construction Co.
Jeddah -KSA
DATE Jan-2019 until now
POSITION HELD Planning manager
MAIN ACTIVITIES AND
RESPONSIBILITIES
 Project planning, schedule development and maintenance.
 Management of the progress measurement system and reporting set-up and
implementation.
 Progress / performance evaluation and reporting.
 Turn-around planning and scheduling and implementation / monitoring.
 Project budget set-up and cost control.
 Tender preparation / adjudication
 Baseline management, resource loading and analysis, progress update and cash flow
integration based on earned value methods.
 Establish and define any job-oriented project control procedures and identify the level
of resources required to operate them.
 Develop in conjunction with the Project Director a suitable Work Breakdown Structure
for the project.
 Establish and agree the level and frequency of reporting required by the project.
 Establish and communicate cost and schedule baselines and ensure control
mechanisms are in place to monitor performance.
 Review overall project status with the Project Management team and recommend
corrective action where necessary.
 Liaise with all other Departments at all meetings relevant to project operations and
ensure time and cost plans are updated to reflect latest information.
NAME & ADDRESS OF
EMPLOYER
JOANNOU & PARASKEVAIDES ( OVERSEAS ) LIMITED
Riyadh -ksa
DATE Jun/2015 – Until Dec/2018
POSITION HELD Senior Planning Engineer
MAIN ACTIVITIES AND
RESPONSIBILITIES
In charge of MOI Investigation institute & Diplomatic institute projects with value of 720
million Saudi riyals includes the following:
 Selects the most appropriate techniques and logical sequence of activitiesto
complete project scope
 Determines appropriate logistics solution in managing resources
 Sets up alerts for all important contractual and milestone dates
 Prepares cash flow, charts and histograms on planning projects
 Verifies critical path and interfaces between design/ engineering/
procurement / execution
 Monitors progress periodically and compares it with the baseline planning
 Updates the schedule based on inputs received from project team
 Prepares the monthly Progress reports
 Responsible for creation and production work of 3D and 4D BIM models
using REVIT, Navisworks or other design software programs.
 Develop model to generate schedules and takeoffs
 Making programs (MS access & excel VBA) for loading resources and cost to
primavera p6
NAME & ADDRESS OF
EMPLOYER
ALTAIEF Advanced Contracting Company
Riyadh -ksa
DATE Jan-2012- May-2015
POSITION HELD Planning Engineer
MAIN ACTIVITIES AND
RESPONSIBILITIES
In charge of 300 Bed Obstetrics, Gynecology, Pediatrics Planning works with value of
420 million Saudi riyals includes the following:
 Review and study BOQ and project documents to proceed for project’s activities.
 Preparing estimation of quantities and adding them within the counting and
quantities tables and revised bill using Revit.
 Preparing variation order & invoices.
 Preparing schedules planning, cash flow & resources for the project by using
primavera p6 to get approval and cost control.
 Preparing and submission of monthly report to client.
 Preparing quality plan, safety plan & method of statement.
 Preparing vendors list & Material Submittal.
NAME & ADDRESS OF
EMPLOYER
Lotus Construction and Buildings Company
Muscat-Oman
DATE Nov-2009 until Dec-2011
POSITION HELD Site Engineer
MAIN ACTIVITIES AND
RESPONSIBILITIES
In charge of Information Ministry Mosque Project & Hotel Housing Project
Planning works with value of 75 million Saudi riyals includes the following:
 managing parts of construction projects
 overseeing building work
 undertaking surveys
 setting out sites and organizing facilities
 checking technical designs and drawings to ensure that they are followed
correctly
 supervising contracted staff
 ensuring projects meet agreed specifications, budgets or timescales
 liaising with clients, subcontractors and other professional staff, especially
quantity surveyors and the overall project manager
 providing technical advice and solving problems on site
 preparing site reports and filling in other paperwork
COMPUTER KNOWLEDGE
AND ABILITIES
Primavera MS project Tilos Microsoft Word ,PowerPoint
,(excel and MS access VBA)
Revit 3DS Max AutoCAD Photoshop
Navisworks. synchro Lumion Sparkol VideoScribe
video studio Visio Civil3d infraworks
EDUCATION
TITLE OF QUALIFICATION 2009 B.S.C. in Civil Engineering – Faculty of Engineering, University of Alexandria,
Egypt- Distinction in the Project and with a Pass Accumulation General Grade.
TRAININGS 2019 Quality Management Systems Auditor/Lead Auditor (ISO 9001:2015 Quality
Management Systems).
TRAININGS  2018 Environmental Management Systems Auditor /Lead
Auditor (ISO 14001:2015 Environmental Management Systems)
, Riyadh,Saudi Arabia.
 2016 Revit Structure -Basic Modeling -Online Course -Udemy.
 2014 Integrated Management System Internal Auditor Training
Course (Based On ISO 9001:2008, ISO 140001:2004 &
OHSAS18001:2007)
 2017 Arab Academy Training Course: AutoCAD Course in The
Arab Academy For Science And Technology, (48 Hrs.),
Alexandria Egypt.
 2007 PMS training in the Projects Department, (21days.),
Alexandria Egypt.
 Fluent in Arabic (Mother Tongue Language)
 Very Good in Oral and Written English.
ADAPTABLE Able to adapt oneself to new surroundings; to make suitable change so as to fit new
conditions. 
COOPERATIVE Work well with others.
DEPENDABLE May be relied on.
EFFICIENT Competent, capable to get results.
ORGANIZE: Place things in working order.
RELIABLE: Dependable.
RESPONSIBLE: Capable of rational conduct, trustworthy.
REFERENCES All References documents are available upon request.

More Related Content

What's hot

Eslam ramadan civil engineer
Eslam ramadan   civil engineerEslam ramadan   civil engineer
Eslam ramadan civil engineer
Eslam Ramadan Helmy ,PRMG®
 
Resume(Ali Mohebbi)
Resume(Ali Mohebbi)Resume(Ali Mohebbi)
Resume(Ali Mohebbi)Ali Mohebbi
 
Curriculum Vitae Eng.Mohanad Khalifa- Civil 2011, Cairo University
Curriculum Vitae Eng.Mohanad Khalifa- Civil 2011, Cairo UniversityCurriculum Vitae Eng.Mohanad Khalifa- Civil 2011, Cairo University
Curriculum Vitae Eng.Mohanad Khalifa- Civil 2011, Cairo UniversityMohanad Khalifa
 
Hossam yassin cv - technical office engineer
Hossam yassin   cv - technical office engineerHossam yassin   cv - technical office engineer
Hossam yassin cv - technical office engineer
Hossam Yassin
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)MAHMOUD SAYED
 
Muhammad Yamin (CV)
Muhammad Yamin (CV)Muhammad Yamin (CV)
Muhammad Yamin (CV)Najam Awan
 
Mohamed Shipl PMP CV
Mohamed Shipl PMP CVMohamed Shipl PMP CV
Mohamed Shipl PMP CV
Mohamed Shipl , PMP
 
C.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed ElsayedC.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed Elsayed
Mohamed Essayed
 
Muhammad amir-civil-engineer
Muhammad amir-civil-engineerMuhammad amir-civil-engineer
Muhammad amir-civil-engineer
muhammad amir
 
Eng.ahmed_Yousef CV
Eng.ahmed_Yousef   CVEng.ahmed_Yousef   CV
Eng.ahmed_Yousef CVahmed yousef
 
Michael Gamal Fayez - C.V - 1 AUG 2015-
Michael Gamal Fayez - C.V - 1 AUG 2015-Michael Gamal Fayez - C.V - 1 AUG 2015-
Michael Gamal Fayez - C.V - 1 AUG 2015-Michael gamal
 
Abbas khan resume
Abbas khan resumeAbbas khan resume
Abbas khan resume
Abbas Khan
 

What's hot (20)

Eslam ramadan civil engineer
Eslam ramadan   civil engineerEslam ramadan   civil engineer
Eslam ramadan civil engineer
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 
Mohamed khamis
Mohamed khamisMohamed khamis
Mohamed khamis
 
C.V
C.VC.V
C.V
 
Resume(Ali Mohebbi)
Resume(Ali Mohebbi)Resume(Ali Mohebbi)
Resume(Ali Mohebbi)
 
Mahmoud Abdel Hakem 2-2017
Mahmoud Abdel Hakem 2-2017Mahmoud Abdel Hakem 2-2017
Mahmoud Abdel Hakem 2-2017
 
C.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._DattaC.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._Datta
 
Ahmed Aboelezz cv
Ahmed  Aboelezz  cvAhmed  Aboelezz  cv
Ahmed Aboelezz cv
 
Curriculum Vitae Eng.Mohanad Khalifa- Civil 2011, Cairo University
Curriculum Vitae Eng.Mohanad Khalifa- Civil 2011, Cairo UniversityCurriculum Vitae Eng.Mohanad Khalifa- Civil 2011, Cairo University
Curriculum Vitae Eng.Mohanad Khalifa- Civil 2011, Cairo University
 
Hossam yassin cv - technical office engineer
Hossam yassin   cv - technical office engineerHossam yassin   cv - technical office engineer
Hossam yassin cv - technical office engineer
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)
 
Muhammad Yamin (CV)
Muhammad Yamin (CV)Muhammad Yamin (CV)
Muhammad Yamin (CV)
 
Risath_cv_
Risath_cv_Risath_cv_
Risath_cv_
 
Mohamed Shipl PMP CV
Mohamed Shipl PMP CVMohamed Shipl PMP CV
Mohamed Shipl PMP CV
 
C.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed ElsayedC.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed Elsayed
 
Muhammad amir-civil-engineer
Muhammad amir-civil-engineerMuhammad amir-civil-engineer
Muhammad amir-civil-engineer
 
Ravi cv Bsc(Hons)
Ravi cv Bsc(Hons)Ravi cv Bsc(Hons)
Ravi cv Bsc(Hons)
 
Eng.ahmed_Yousef CV
Eng.ahmed_Yousef   CVEng.ahmed_Yousef   CV
Eng.ahmed_Yousef CV
 
Michael Gamal Fayez - C.V - 1 AUG 2015-
Michael Gamal Fayez - C.V - 1 AUG 2015-Michael Gamal Fayez - C.V - 1 AUG 2015-
Michael Gamal Fayez - C.V - 1 AUG 2015-
 
Abbas khan resume
Abbas khan resumeAbbas khan resume
Abbas khan resume
 

Similar to My cv

MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000Ahmed Adel
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerKHAJA Raheemuddin
 
Resume - Moustapha Omar
Resume - Moustapha OmarResume - Moustapha Omar
Resume - Moustapha OmarMoustapha Omar
 
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
Mbachu Clinton
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor
Danger Riyas
 
Senior Document Controller & Admin Support
Senior Document Controller & Admin SupportSenior Document Controller & Admin Support
Senior Document Controller & Admin SupportSyed Jameel Ahmed Razvi
 
Functional CV - Aslam Khan
Functional CV - Aslam KhanFunctional CV - Aslam Khan
Functional CV - Aslam KhanAslam Khan
 
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
satish kumar
 
Mohanad MansourCivil Engineer
Mohanad MansourCivil EngineerMohanad MansourCivil Engineer
Mohanad MansourCivil EngineerMohanad Mansour
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016Faraz Yasin
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad
 
Planner's Resume
Planner's ResumePlanner's Resume
Planner's Resume
Tanveer Ahmed Niazi
 
Sameh elshehaby pmc-senior planning & control lead cv (1)
Sameh elshehaby   pmc-senior planning & control lead cv (1)Sameh elshehaby   pmc-senior planning & control lead cv (1)
Sameh elshehaby pmc-senior planning & control lead cv (1)
سامح الشهابي
 

Similar to My cv (20)

MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
 
Resume - Moustapha Omar
Resume - Moustapha OmarResume - Moustapha Omar
Resume - Moustapha Omar
 
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
 
JOHN RESUME_PROJECT PLANNER
JOHN RESUME_PROJECT PLANNERJOHN RESUME_PROJECT PLANNER
JOHN RESUME_PROJECT PLANNER
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor
 
Senior Document Controller & Admin Support
Senior Document Controller & Admin SupportSenior Document Controller & Admin Support
Senior Document Controller & Admin Support
 
Functional CV - Aslam Khan
Functional CV - Aslam KhanFunctional CV - Aslam Khan
Functional CV - Aslam Khan
 
NEW CV
NEW CVNEW CV
NEW CV
 
Basel Maksousa_CV
Basel Maksousa_CVBasel Maksousa_CV
Basel Maksousa_CV
 
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
 
Mohanad MansourCivil Engineer
Mohanad MansourCivil EngineerMohanad MansourCivil Engineer
Mohanad MansourCivil Engineer
 
CV (Document Controller)
CV (Document Controller)CV (Document Controller)
CV (Document Controller)
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Planner's Resume
Planner's ResumePlanner's Resume
Planner's Resume
 
Ehab Radwan
Ehab RadwanEhab Radwan
Ehab Radwan
 
Ahmed Elsamahy CV _
Ahmed Elsamahy CV _Ahmed Elsamahy CV _
Ahmed Elsamahy CV _
 
Sameh elshehaby pmc-senior planning & control lead cv (1)
Sameh elshehaby   pmc-senior planning & control lead cv (1)Sameh elshehaby   pmc-senior planning & control lead cv (1)
Sameh elshehaby pmc-senior planning & control lead cv (1)
 

Recently uploaded

Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 

Recently uploaded (20)

Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 

My cv

  • 1. PERSONAL INFORMATION Ahmed Mustafa Elgammal TELEPHONE (S) +966599064518 NATIONALITY Egyptian DATE & PLACE OF BIRTH 15 August 1984 - Alexandra – Egypt MARITAL STATUES Married NUMBER OF DEPENDS 3 Children E-MAIL ADDRESS Ahmedm2009@yahoo.com LINKEDIN https://www.linkedin.com/in/ahmed-elgammal-5999b8105/ CAREER OBJECTIVE Continue developing civilization, through being part of an effective constructionproject management team, in a leading company, with interesting prospects of progress and advancement. CORE COMPETENCIES ▪ Senior Planning Engineer ▪ Senior BIM Engineer WORK EXPERIENCE: NAME & ADDRESS OF EMPLOYER Advanced Construction Co. Jeddah -KSA DATE Jan-2019 until now POSITION HELD Planning manager MAIN ACTIVITIES AND RESPONSIBILITIES  Project planning, schedule development and maintenance.  Management of the progress measurement system and reporting set-up and implementation.  Progress / performance evaluation and reporting.  Turn-around planning and scheduling and implementation / monitoring.  Project budget set-up and cost control.  Tender preparation / adjudication  Baseline management, resource loading and analysis, progress update and cash flow integration based on earned value methods.  Establish and define any job-oriented project control procedures and identify the level of resources required to operate them.  Develop in conjunction with the Project Director a suitable Work Breakdown Structure for the project.  Establish and agree the level and frequency of reporting required by the project.  Establish and communicate cost and schedule baselines and ensure control mechanisms are in place to monitor performance.  Review overall project status with the Project Management team and recommend corrective action where necessary.  Liaise with all other Departments at all meetings relevant to project operations and ensure time and cost plans are updated to reflect latest information.
  • 2. NAME & ADDRESS OF EMPLOYER JOANNOU & PARASKEVAIDES ( OVERSEAS ) LIMITED Riyadh -ksa DATE Jun/2015 – Until Dec/2018 POSITION HELD Senior Planning Engineer MAIN ACTIVITIES AND RESPONSIBILITIES In charge of MOI Investigation institute & Diplomatic institute projects with value of 720 million Saudi riyals includes the following:  Selects the most appropriate techniques and logical sequence of activitiesto complete project scope  Determines appropriate logistics solution in managing resources  Sets up alerts for all important contractual and milestone dates  Prepares cash flow, charts and histograms on planning projects  Verifies critical path and interfaces between design/ engineering/ procurement / execution  Monitors progress periodically and compares it with the baseline planning  Updates the schedule based on inputs received from project team  Prepares the monthly Progress reports  Responsible for creation and production work of 3D and 4D BIM models using REVIT, Navisworks or other design software programs.  Develop model to generate schedules and takeoffs  Making programs (MS access & excel VBA) for loading resources and cost to primavera p6 NAME & ADDRESS OF EMPLOYER ALTAIEF Advanced Contracting Company Riyadh -ksa DATE Jan-2012- May-2015 POSITION HELD Planning Engineer MAIN ACTIVITIES AND RESPONSIBILITIES In charge of 300 Bed Obstetrics, Gynecology, Pediatrics Planning works with value of 420 million Saudi riyals includes the following:  Review and study BOQ and project documents to proceed for project’s activities.  Preparing estimation of quantities and adding them within the counting and quantities tables and revised bill using Revit.  Preparing variation order & invoices.  Preparing schedules planning, cash flow & resources for the project by using primavera p6 to get approval and cost control.  Preparing and submission of monthly report to client.  Preparing quality plan, safety plan & method of statement.  Preparing vendors list & Material Submittal. NAME & ADDRESS OF EMPLOYER Lotus Construction and Buildings Company Muscat-Oman DATE Nov-2009 until Dec-2011 POSITION HELD Site Engineer
  • 3. MAIN ACTIVITIES AND RESPONSIBILITIES In charge of Information Ministry Mosque Project & Hotel Housing Project Planning works with value of 75 million Saudi riyals includes the following:  managing parts of construction projects  overseeing building work  undertaking surveys  setting out sites and organizing facilities  checking technical designs and drawings to ensure that they are followed correctly  supervising contracted staff  ensuring projects meet agreed specifications, budgets or timescales  liaising with clients, subcontractors and other professional staff, especially quantity surveyors and the overall project manager  providing technical advice and solving problems on site  preparing site reports and filling in other paperwork COMPUTER KNOWLEDGE AND ABILITIES Primavera MS project Tilos Microsoft Word ,PowerPoint ,(excel and MS access VBA) Revit 3DS Max AutoCAD Photoshop Navisworks. synchro Lumion Sparkol VideoScribe video studio Visio Civil3d infraworks EDUCATION TITLE OF QUALIFICATION 2009 B.S.C. in Civil Engineering – Faculty of Engineering, University of Alexandria, Egypt- Distinction in the Project and with a Pass Accumulation General Grade. TRAININGS 2019 Quality Management Systems Auditor/Lead Auditor (ISO 9001:2015 Quality Management Systems). TRAININGS  2018 Environmental Management Systems Auditor /Lead Auditor (ISO 14001:2015 Environmental Management Systems) , Riyadh,Saudi Arabia.  2016 Revit Structure -Basic Modeling -Online Course -Udemy.  2014 Integrated Management System Internal Auditor Training Course (Based On ISO 9001:2008, ISO 140001:2004 & OHSAS18001:2007)  2017 Arab Academy Training Course: AutoCAD Course in The Arab Academy For Science And Technology, (48 Hrs.), Alexandria Egypt.  2007 PMS training in the Projects Department, (21days.), Alexandria Egypt.  Fluent in Arabic (Mother Tongue Language)  Very Good in Oral and Written English. ADAPTABLE Able to adapt oneself to new surroundings; to make suitable change so as to fit new conditions.  COOPERATIVE Work well with others. DEPENDABLE May be relied on. EFFICIENT Competent, capable to get results. ORGANIZE: Place things in working order. RELIABLE: Dependable. RESPONSIBLE: Capable of rational conduct, trustworthy. REFERENCES All References documents are available upon request.