SlideShare a Scribd company logo
1 of 3
Resume of
Gary M Jackson
89 Kinsey Hill Road
Birdsboro, Pa 19508
610-779-6556 (home)
610-698-6513 (cell)
SUMMARY
Technical Consultant with over 33 years of experience with WorleyParsons in design and
modification upgrades in power generating facilities. Extensive involvement in the development and
direction of Engineering Change (EC) packages in both A/E offices and as a seconded employee for
a major utility. Experience in the development and/or assessment of high energy line break
programs.
EXPERIENCE
2011 - Present Technical Consultant, WorleyParsons, Reading, Pennsylvania
Duke Energy – Robinson Nuclear Power Plant
Engineering Manager directing the development/evaluations and scope and budget
control of all aspects of the heavy haul path associated with the stator replacement
project. The major evaluation activities of this $2+ Million project included the path
along the route of the heavy hauler transporter, laydown area used for the heavy
hauler lifting rig, foundation designs, turbine pedestal analysis for loads imposed by
the stator lifting assembly, crane evaluation and drop protection in accordance with
NUREG – 0554 and NUREG – 0612. Main point of contact between Duke
Energy/Siemens/Sarens - Heavy Hauler/Third Party Reviewer.
Fukushima Initiatives – Hardened containment Vent System (HCVS)
Excelon Mark I Containment/PPL Susquehanna Steam Electric Station
Provided structural design input in the development of studies prepared for the installation of
reliable hardened containment vent systems meeting requirements documented in order and the
related ISG (JLD-ISG-2012-02, dated August 29, 2012).
Progress Energy Florida – Crystal River Nuclear Station Unit 3
Directed the development of engineering change packages as Responsible Engineer for Progress
Energy Florida for three major plant modifications in support of the Extended Power Uprate (EPU)
Project. These major modifications included the replacement of two Condensate Pumps and
Motors, two Feedwater Booster Pumps and two Main Feedwater Pumps. Provided the necessary
direction and interface with the A/E firm acting on behalf of Progress Energy as a seconded
employee during the design development stages of each engineering change package, including
final owner’s review. Coordinated and conducted the required design challenge meetings for each
project and followed each project through until completion of interfacing reviews/milestone signoffs
and Plant General Manager approval.
2008 – 2010 Principal Engineering Specialist, WorleyParsons, Reading, Pennsylvania
Progress Energy Florida – Crystal River Nuclear Station Unit 3. Lead the development and was
the A/E Responsible Engineer for the completion of engineering change (EC) packages in support of
the extended power uprate modifications. These EC packages include the implementation EC for
the moisture separator replacement, specification, and implementation EC for the moisture
separator shell drain heat exchanger addition and the implementation EC for the deaerator by-pass
addition.
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 1
Rev 6 (03-Feb-09)
Resume of
Gary M Jackson
89 Kinsey Hill Road
Birdsboro, Pa 19508
610-779-6556 (home)
610-698-6513 (cell)
2002 - 2007 Senior Technical Engineering Specialist, WorleyParsons, Reading, Pennsylvania
Responsible for man-hour estimates, task scope development, and project coordination/interface for
the evaluation of piping systems and pipe supports that are affected by the power uprate for the
following plants:
 Pennsylvania Power Light – Susquehanna Units 1 and 2
 Detroit Edison – Fermi 2 Energy Center
 Public Service Electric & Gas – Hope Creek Generating Station
 Tennessee Valley Authority (TVA) – Browns Ferry Units 2 and 3, Extended
Power Uprate
1987 - 2002 Lead Technical Engineering Specialist, WorleyParsons, Reading, Pennsylvania
SCE&G – V.C. Summer Nuclear Station, Unit 1. Responsible for man-hour estimates, task scope
development, and project coordination/interface of the design and analysis of piping
systems/supports and the development of various plant modification packages (major and minor).
Involvement with the resolution of various High Energy Line Break (HELB) issues to support plant
modifications including the performance of a third party review of the Emergency Feedwater
System, with emphasis on HELB criteria, to insure proper documentation and conformance to HELB
Licensing and Design Bases.
Northeast Nuclear Energy Company (NNEC) – Millstone Unit 2, Independent Corrective
Action Verification Program, Tier 1 Vertical Slice. Confirm the adequacy of NNEC efforts to
ensure Millstone Unit 2 physical and functional characteristics are in conformance with its licensing
and design bases. Responsible for review of various piping analyses in a vertical slice investigation
of four major plant systems that encompasses physical and functional characteristics, and all
modifications to these systems. Also responsible for the review and evaluation of NNEC’s HELB
Project Upgrade Program for both inside and outside of the containment building.
Florida Power Corporation (FPC) – Crystal River Nuclear Station Unit 3 Responsible for man-
hour estimates, task scope development, project coordination/interface and the performance of the
design and analysis of piping systems/pipe supports; seismic qualification of equipment including the
main control board in support of plant modifications (major and minor). Also assisted in the upgrade
of the CR3 HELB program to update this program to current standards.
1981 - 1995 Technical Engineering Specialist, WorleyParsons, Reading, Pennsylvania
TVA – Johnsonville Cogeneration Project. Responsible for the design and analysis of piping
systems and pipe supports of various high pressure steam lines for interconnection of four existing
boilers and the installation of a new cogeneration turbine. Performed the piping analysis and
support designs of a 24" diameter low pressure/high temperature steam supply line of approximately
6,000 feet in length that was routed over a variety of terrain and piping bridges to the steam
customer.
Brookhaven National Laboratory – High Flux Beam Reactor (HFBR). Performed SQUG
walkdowns to verify the seismic adequacy of connections to the HFBR primary system piping.
Project provided a systematic methodology for documentation of the seismic adequacy of the small
bore pipe and tubing connections (predominantly drain and instrument sensing lines) required to
maintain the pressure boundary integrity of the primary and shutdown systems.
Calvert Cliffs Steam Electric Station Units 1 and 2 Performed SQUG walkdowns of various tanks
based on the GIP criteria to assist in the resolution of Unresolved Safety Issue USI A-46.
Comanche Peak Steam Electric Station Units 1 and 2 – Comanche Peak Review Team.
Reviewed the design and analysis of conduit supports.
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 2
Rev 6 (03-Feb-09)
Resume of
Gary M Jackson
89 Kinsey Hill Road
Birdsboro, Pa 19508
610-779-6556 (home)
610-698-6513 (cell)
FPC, Crystal River Station, Unit 3. Responsible for the redesign and engineering evaluations of
large-bore pipe supports and various heating, ventilating, and air conditioning (HVAC) duct supports.
Also, responsible for the evaluation of field change notices during construction of large-bore pipe
supports and HVAC supports.
ESCOM – Koeberg Power Station, Unit 2, Paris, France, Office. Involved with the as-built
verification program. Worked directly with the architect/engineer in comparing and analyzing
as-built versus as-designed conditions of selected piping systems and supports. Coordinated the
process and issued weekly progress reports for the last six weeks of the project.
Rochester Gas & Electric Corporation – R.E. Ginna Generating Facility, Unit 1 – Responsible
for design and redesign of pipe supports for the seismic upgrade of safety shutdown piping.
Evaluated field change requests and performed line walkdowns to solve pipe support related
construction problems. Assisted contractor with problems encountered during construction of new
support and modifications to existing supports.
EDUCATION
B.S., Civil Engineering Technology, University of Pittsburgh at Johnstown, 1979
A.A., Architectural Technology, Montgomery Community College, Rockville, Md., 1975
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES
SCE&G – 10CFR50.59 Evaluation and Reviewer Qualification, 2013
WorleyParsons – Lead First Training, 2013
Progress Energy – Calculation – Analysis, Perform and Review/Design Verifier Qualification, 2012
Progress Energy – Civil Engineering Qualification, 2012
Progress Energy – Modification Engineer Qualification including Civil Modification Engineer
Qualification, 2012
Progress Energy (Robinson NP) – Access Authorization & Fitness for Duty, 2014 (Protected Area)
SQUG Walkdown Screening and Seismic Evaluation Training Course, 1992
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 3
Rev 6 (03-Feb-09)

More Related Content

What's hot

Mark c resume installation
Mark c resume installationMark c resume installation
Mark c resume installationMark Hensley
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
Wallace Matt - Substation 2
Wallace Matt - Substation 2Wallace Matt - Substation 2
Wallace Matt - Substation 2Matt Wallace
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEErik NEILSEN
 
Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)Ken Peartree
 
McManus_Shane_Resume
McManus_Shane_ResumeMcManus_Shane_Resume
McManus_Shane_ResumeShane McManus
 
Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2kim himel
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Victoria King Resume
Victoria King ResumeVictoria King Resume
Victoria King ResumeVictoria King
 
Phillip P. Randel Resume
Phillip P. Randel ResumePhillip P. Randel Resume
Phillip P. Randel ResumePhillip Randel
 

What's hot (19)

Resume MEW 2015
Resume MEW 2015 Resume MEW 2015
Resume MEW 2015
 
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
 
Mark c resume installation
Mark c resume installationMark c resume installation
Mark c resume installation
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Wallace Matt - Substation 2
Wallace Matt - Substation 2Wallace Matt - Substation 2
Wallace Matt - Substation 2
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PE
 
Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)
 
Nevins Resume
Nevins ResumeNevins Resume
Nevins Resume
 
McManus_Shane_Resume
McManus_Shane_ResumeMcManus_Shane_Resume
McManus_Shane_Resume
 
Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014
 
Richard Martinez #1 PDF
Richard Martinez #1 PDFRichard Martinez #1 PDF
Richard Martinez #1 PDF
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2
 
5.1 pressure pipelinedesign
5.1 pressure pipelinedesign5.1 pressure pipelinedesign
5.1 pressure pipelinedesign
 
Climate change paper genge and kerr
Climate change paper genge and kerrClimate change paper genge and kerr
Climate change paper genge and kerr
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Victoria King Resume
Victoria King ResumeVictoria King Resume
Victoria King Resume
 
Phillip P. Randel Resume
Phillip P. Randel ResumePhillip P. Randel Resume
Phillip P. Randel Resume
 
Current Resume
Current ResumeCurrent Resume
Current Resume
 

Viewers also liked

Viewers also liked (7)

Transfer Pricing Function Benchmarking Report
Transfer Pricing Function Benchmarking ReportTransfer Pricing Function Benchmarking Report
Transfer Pricing Function Benchmarking Report
 
Taragadh bundi
Taragadh bundiTaragadh bundi
Taragadh bundi
 
SG TR 212kb
SG TR 212kbSG TR 212kb
SG TR 212kb
 
Presentasi OS Linux
Presentasi OS LinuxPresentasi OS Linux
Presentasi OS Linux
 
Application of Superconductors
Application of SuperconductorsApplication of Superconductors
Application of Superconductors
 
Tourism Life Cycle Analysis
Tourism Life Cycle AnalysisTourism Life Cycle Analysis
Tourism Life Cycle Analysis
 
Christine Thompson - Resume - March 2015
Christine Thompson - Resume - March 2015Christine Thompson - Resume - March 2015
Christine Thompson - Resume - March 2015
 

Similar to Jackson-GM0415 Personal

Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)Khwaja Haque
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Randy Seperak
 
Marcelo Alvarez cv042516
Marcelo Alvarez cv042516Marcelo Alvarez cv042516
Marcelo Alvarez cv042516Marcelo Alvarez
 
Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Dennis Kehoe
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering ResumeStephen Davidson
 
Resume Frank Bianca
Resume  Frank Bianca Resume  Frank Bianca
Resume Frank Bianca Fank Bianca
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan Dey
 
Resume-QiangHan-March 2015
Resume-QiangHan-March 2015Resume-QiangHan-March 2015
Resume-QiangHan-March 2015Qiang Han
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor ResumeRoy Firtha
 

Similar to Jackson-GM0415 Personal (20)

Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
Resume Ramagost k 8 2016
Resume Ramagost k 8 2016Resume Ramagost k 8 2016
Resume Ramagost k 8 2016
 
Resume Ramagost_K 7_2016
Resume Ramagost_K 7_2016Resume Ramagost_K 7_2016
Resume Ramagost_K 7_2016
 
Resume ramagost k 7 2016
Resume ramagost k 7 2016Resume ramagost k 7 2016
Resume ramagost k 7 2016
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
Marcelo Alvarez cv042516
Marcelo Alvarez cv042516Marcelo Alvarez cv042516
Marcelo Alvarez cv042516
 
Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015
 
Revised Brady Resume 04292015
Revised Brady Resume 04292015Revised Brady Resume 04292015
Revised Brady Resume 04292015
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
Resume Frank Bianca
Resume  Frank Bianca Resume  Frank Bianca
Resume Frank Bianca
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017
 
SaifMogriResume (2)
SaifMogriResume (2)SaifMogriResume (2)
SaifMogriResume (2)
 
Resume Rev 02 (1)
Resume Rev 02 (1)Resume Rev 02 (1)
Resume Rev 02 (1)
 
Resume Rev 02 (1)
Resume Rev 02 (1)Resume Rev 02 (1)
Resume Rev 02 (1)
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-Resume
 
Resume-QiangHan-March 2015
Resume-QiangHan-March 2015Resume-QiangHan-March 2015
Resume-QiangHan-March 2015
 
Chris doran resume 03 08-16
Chris doran resume 03 08-16Chris doran resume 03 08-16
Chris doran resume 03 08-16
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
 

Jackson-GM0415 Personal

  • 1. Resume of Gary M Jackson 89 Kinsey Hill Road Birdsboro, Pa 19508 610-779-6556 (home) 610-698-6513 (cell) SUMMARY Technical Consultant with over 33 years of experience with WorleyParsons in design and modification upgrades in power generating facilities. Extensive involvement in the development and direction of Engineering Change (EC) packages in both A/E offices and as a seconded employee for a major utility. Experience in the development and/or assessment of high energy line break programs. EXPERIENCE 2011 - Present Technical Consultant, WorleyParsons, Reading, Pennsylvania Duke Energy – Robinson Nuclear Power Plant Engineering Manager directing the development/evaluations and scope and budget control of all aspects of the heavy haul path associated with the stator replacement project. The major evaluation activities of this $2+ Million project included the path along the route of the heavy hauler transporter, laydown area used for the heavy hauler lifting rig, foundation designs, turbine pedestal analysis for loads imposed by the stator lifting assembly, crane evaluation and drop protection in accordance with NUREG – 0554 and NUREG – 0612. Main point of contact between Duke Energy/Siemens/Sarens - Heavy Hauler/Third Party Reviewer. Fukushima Initiatives – Hardened containment Vent System (HCVS) Excelon Mark I Containment/PPL Susquehanna Steam Electric Station Provided structural design input in the development of studies prepared for the installation of reliable hardened containment vent systems meeting requirements documented in order and the related ISG (JLD-ISG-2012-02, dated August 29, 2012). Progress Energy Florida – Crystal River Nuclear Station Unit 3 Directed the development of engineering change packages as Responsible Engineer for Progress Energy Florida for three major plant modifications in support of the Extended Power Uprate (EPU) Project. These major modifications included the replacement of two Condensate Pumps and Motors, two Feedwater Booster Pumps and two Main Feedwater Pumps. Provided the necessary direction and interface with the A/E firm acting on behalf of Progress Energy as a seconded employee during the design development stages of each engineering change package, including final owner’s review. Coordinated and conducted the required design challenge meetings for each project and followed each project through until completion of interfacing reviews/milestone signoffs and Plant General Manager approval. 2008 – 2010 Principal Engineering Specialist, WorleyParsons, Reading, Pennsylvania Progress Energy Florida – Crystal River Nuclear Station Unit 3. Lead the development and was the A/E Responsible Engineer for the completion of engineering change (EC) packages in support of the extended power uprate modifications. These EC packages include the implementation EC for the moisture separator replacement, specification, and implementation EC for the moisture separator shell drain heat exchanger addition and the implementation EC for the deaerator by-pass addition. 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 1 Rev 6 (03-Feb-09)
  • 2. Resume of Gary M Jackson 89 Kinsey Hill Road Birdsboro, Pa 19508 610-779-6556 (home) 610-698-6513 (cell) 2002 - 2007 Senior Technical Engineering Specialist, WorleyParsons, Reading, Pennsylvania Responsible for man-hour estimates, task scope development, and project coordination/interface for the evaluation of piping systems and pipe supports that are affected by the power uprate for the following plants:  Pennsylvania Power Light – Susquehanna Units 1 and 2  Detroit Edison – Fermi 2 Energy Center  Public Service Electric & Gas – Hope Creek Generating Station  Tennessee Valley Authority (TVA) – Browns Ferry Units 2 and 3, Extended Power Uprate 1987 - 2002 Lead Technical Engineering Specialist, WorleyParsons, Reading, Pennsylvania SCE&G – V.C. Summer Nuclear Station, Unit 1. Responsible for man-hour estimates, task scope development, and project coordination/interface of the design and analysis of piping systems/supports and the development of various plant modification packages (major and minor). Involvement with the resolution of various High Energy Line Break (HELB) issues to support plant modifications including the performance of a third party review of the Emergency Feedwater System, with emphasis on HELB criteria, to insure proper documentation and conformance to HELB Licensing and Design Bases. Northeast Nuclear Energy Company (NNEC) – Millstone Unit 2, Independent Corrective Action Verification Program, Tier 1 Vertical Slice. Confirm the adequacy of NNEC efforts to ensure Millstone Unit 2 physical and functional characteristics are in conformance with its licensing and design bases. Responsible for review of various piping analyses in a vertical slice investigation of four major plant systems that encompasses physical and functional characteristics, and all modifications to these systems. Also responsible for the review and evaluation of NNEC’s HELB Project Upgrade Program for both inside and outside of the containment building. Florida Power Corporation (FPC) – Crystal River Nuclear Station Unit 3 Responsible for man- hour estimates, task scope development, project coordination/interface and the performance of the design and analysis of piping systems/pipe supports; seismic qualification of equipment including the main control board in support of plant modifications (major and minor). Also assisted in the upgrade of the CR3 HELB program to update this program to current standards. 1981 - 1995 Technical Engineering Specialist, WorleyParsons, Reading, Pennsylvania TVA – Johnsonville Cogeneration Project. Responsible for the design and analysis of piping systems and pipe supports of various high pressure steam lines for interconnection of four existing boilers and the installation of a new cogeneration turbine. Performed the piping analysis and support designs of a 24" diameter low pressure/high temperature steam supply line of approximately 6,000 feet in length that was routed over a variety of terrain and piping bridges to the steam customer. Brookhaven National Laboratory – High Flux Beam Reactor (HFBR). Performed SQUG walkdowns to verify the seismic adequacy of connections to the HFBR primary system piping. Project provided a systematic methodology for documentation of the seismic adequacy of the small bore pipe and tubing connections (predominantly drain and instrument sensing lines) required to maintain the pressure boundary integrity of the primary and shutdown systems. Calvert Cliffs Steam Electric Station Units 1 and 2 Performed SQUG walkdowns of various tanks based on the GIP criteria to assist in the resolution of Unresolved Safety Issue USI A-46. Comanche Peak Steam Electric Station Units 1 and 2 – Comanche Peak Review Team. Reviewed the design and analysis of conduit supports. 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 2 Rev 6 (03-Feb-09)
  • 3. Resume of Gary M Jackson 89 Kinsey Hill Road Birdsboro, Pa 19508 610-779-6556 (home) 610-698-6513 (cell) FPC, Crystal River Station, Unit 3. Responsible for the redesign and engineering evaluations of large-bore pipe supports and various heating, ventilating, and air conditioning (HVAC) duct supports. Also, responsible for the evaluation of field change notices during construction of large-bore pipe supports and HVAC supports. ESCOM – Koeberg Power Station, Unit 2, Paris, France, Office. Involved with the as-built verification program. Worked directly with the architect/engineer in comparing and analyzing as-built versus as-designed conditions of selected piping systems and supports. Coordinated the process and issued weekly progress reports for the last six weeks of the project. Rochester Gas & Electric Corporation – R.E. Ginna Generating Facility, Unit 1 – Responsible for design and redesign of pipe supports for the seismic upgrade of safety shutdown piping. Evaluated field change requests and performed line walkdowns to solve pipe support related construction problems. Assisted contractor with problems encountered during construction of new support and modifications to existing supports. EDUCATION B.S., Civil Engineering Technology, University of Pittsburgh at Johnstown, 1979 A.A., Architectural Technology, Montgomery Community College, Rockville, Md., 1975 SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES SCE&G – 10CFR50.59 Evaluation and Reviewer Qualification, 2013 WorleyParsons – Lead First Training, 2013 Progress Energy – Calculation – Analysis, Perform and Review/Design Verifier Qualification, 2012 Progress Energy – Civil Engineering Qualification, 2012 Progress Energy – Modification Engineer Qualification including Civil Modification Engineer Qualification, 2012 Progress Energy (Robinson NP) – Access Authorization & Fitness for Duty, 2014 (Protected Area) SQUG Walkdown Screening and Seismic Evaluation Training Course, 1992 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 3 Rev 6 (03-Feb-09)