operational


Repositioning User




                                             Interaction
Experience as a Strategic   organizational
Process
Jon Innes
Liam Friedland              strategic


                                               TM
Why Is User Experience Strategic?


   UX becomes a differentiating factor in a commodity market
       Technologies mature and become mainstream
       Competitors develop comparable offerings over time
       Mainstream markets value UX more than early adopters


   UX methods lower costs and reduce risks
       Improved planning & decision making
       More efficient development processes


   UX methods help companies adapt to market shifts
       Design research leads to systematic innovation
       When properly executed it can inform business strategy




                                                     © Jon Innes & Liam Friedland
The Experience Economy

                                                                                      Stage
Differentiated                                                                     Experiences




                                                                    Deliver
                                                                   Services
Competitive
Position
                                                          Make
                                                          Goods




Undifferentiated                 Extract
                               Commodities


                           Market                                                         Premium
                                                              Pricing
 From ―Welcome to the Experience Economy‖ by Pine & Gilmore
                                                                    © Jon Innes & Liam Friedland
Product Maturity and UX
                                                             Transition point
                                                           where technology meets
                                                                basic needs
             Product
           Performance


                                                                                          Excess quality
                                                                                          Most customers
                                                                                          uninterested in this
Level of                                                                                  region
performance
required by
average
users                                                                    Technology is good enough and
                        Unfilled need                                    therefore irrelevant.

                                                                         User experience dominates




                                   High technology                              Consumer commodity
                                  Customers want more                               Consumers want
                                       technology,                              convenience, reliability, low
                                   better performance                                    cost ...
   From ―The Innovator’s Dilemma‖ by Clayton Christensen
                                                                            © Jon Innes & Liam Friedland
Adoption of UX Strategic Thinking

                 We are Here




                      Early                 Early        Late
Innovators                                                             Laggards
                     Adopters              Majority     Majority




                     "The
                    Chasm"




                                    User Experience Adoption Process



Based on ―Crossing the Chasm‖ by Geoffrey Moore
                                                                   © Jon Innes & Liam Friedland
A Framework for Viewing UX Strategically



                                     The structured work processes which lead to a
              operations
                                     desired set of outputs (physical, knowledge, etc)
Interaction




                                     Groupings of people that provide concentrations of
              organization           specialized expertise, work experience, and skills


                                     A detailed plan for achieving success in situations
              strategy               such as war, politics, business, industry or
                                     sport, or the skill of planning for such situations
                                              -Cambridge Dictionary Online
                         TM




From ―Repositioning User Experience as a Strategic Process‖ by Innes & Friedland
                                                                                   © Jon Innes & Liam Friedland
Operational Processes

   UX contributes unique skills to the development process

   Leverage the ―sweet spot‖ to maximize impact and ROI

   Analyze where you spend time and what tangible outputs you
    produce:
      How UX work adds value to:

         •   The company and its customers
         •   Any internal groups that benefit from UX deliverables
       Track things quantitatively whenever possible
         •   Establish simple metrics that management at all levels can track
         •   Embed metrics into organizational consciousness




                                                       © Jon Innes & Liam Friedland
Organizational Processes

       UX needs to serve as a ―change agent‖
             Product designs reflect the organizations that create them
             You need to change the culture and influence others to change the UI


       Make influencing others a part of your job
             Gajendar’s concept of the ―Heroic Designer‖* acting as a catalyst
             Put together a plan and execute it

       Don’t be afraid to share responsibility for UX
             Engage others in your mission as team mates
             You can accomplish much more as a team
             Sharing your knowledge of UX makes other recognize it’s value and yours

       Introducing new UX processes impact many existing people
             Be proactive, talk to those impacted and partner with them
             Consider other groups your customers—listen to them!


*   From ―Barbarians or Bureacrats‖ by Uday Gajendar

                                                            © Jon Innes & Liam Friedland
Strategy—It’s Not Just for Marketing Anymore

   What is strategy?
       Defining long term goals and then using those goals to guide in
        the selection of the appropriate tactics to achieve those goals


   Strategy example: Types of management
       Operationally focused:
         •   Row harder!
       Tactically focused:
         •   Why row, put up a sail…
       Strategically focused
         •   Are we rowing in the right direction?
         •   Do we need to go there at all?


   For too long, people in our profession have been
    focusing on rowing harder



                                                      © Jon Innes & Liam Friedland
One External Worldview of UX

Outdated View: Consulting / Service Organization


     Design: Makes things look good
     Usability: Tests to find bugs after the code                    Need to move
      is working                                                      from this…

     Not a core business competency
     Important but not essential
     Practitioners don’t have a good sense of
      business issues




                                               © Jon Innes & Liam Friedland
Strategic Worldview of UX

Proposed View: Strategic Function


     User-centered product planning informs all
      aspects of product direction

     Essential part of the development process                         …to this

     Key contributions throughout the product
      or service lifecycle

     Business value is large, wide-ranging, and
      demonstrable

     Quantifiable, reproducible, high-quality
      processes



                                                 © Jon Innes & Liam Friedland
Run UX Like a Business

Optimize based on the following questions:
   What do you produce?
   How efficiently do you produce it?
   Can you justify what you cost to your customers (ROI)?
   Do you effectively leverage your value-network?
   Do you market your products and services effectively?
   Are you considering the market trends for UX?


Could you sell your UX business plan to investors?




                                           © Jon Innes & Liam Friedland
Operational Expertise—User Research
   Cataloging detailed information on users
       Key activities
       Goals & Tasks
       Needs & Wants


   Understanding human factors relating to product design
       Cognitive
       Physical


   Focusing on contexts of product use
       Communities
       Interactions
       Collaborations




                                           © Jon Innes & Liam Friedland
Deliverables—User Research

   User research is only useful when the information it creates
    reaches others and impacts organizational behavior

   The tangible deliverables are reports and presentations that
    capture:

       User requirements and profile data (formative)
         •   Surveys
         •   Field studies
         •   Formative usability tests

       Design defects and enhancements (refining or summative)
         •   Cognitive walkthroughs
         •   Traditional usability tests
         •   Field studies




                                                 © Jon Innes & Liam Friedland
Operational Expertise—Design

   Creates tangible artifacts by synthesizing data from multiple
    requirements streams:
       Marketing
       Technical
       Legal
       Usage
       Aesthetics

   Problem solving to guide planning and development
       Exploring multiple solution spaces
       Rapid, iterative prototyping processes

   Visualizations to communicate and help inform decision making
       Information, messaging, and branding materials
       Structural, and behavioral diagrams
       Descriptions of form associated with ergonomics


                                                 © Jon Innes & Liam Friedland
Deliverables—Design

   Design is only useful when it generates specifications
    from which products can be built


   Prototypes & specifications serve as detailed plans for
    building products and normally cover:
       Software
         •   Information architecture, conceptual models
         •   Interaction, and navigation
         •   Screen layout, and UI terminology
         •   Branding elements (product graphics & identity)


       Hardware
         •   Form
         •   Materials
         •   Branding elements (colors, finishes, product graphics)



                                                      © Jon Innes & Liam Friedland
Designing is Synthesizing


   Our future depends on synthesizing more than just
    design ideas but also:
       Our outputs with other UX related disciplines
         •   Highly collaborative multidisciplinary teams = innovation
       The work of other functional teams
         •   Engineering
         •   Quality Assurance
         •   Marketing
         •   Sales
         •   Professional Services
         •   Others...
       Most importantly with business leaders at all levels




                                                  © Jon Innes & Liam Friedland
Symbiotic Functions




                 Design


                     User
                  Experience




                Research


                               TM




                                    © Jon Innes & Liam Friedland
Organizational Synergy

                                         Market Research
                                             Field
                                            Studies
            Subject Matter Experts                         Project Planning


                Information                                Interaction
                Architecture                                 Design Product
 Technical Writing                                                Management

               Market                        User
                                              User
              Research                     Experience
                                          Experience                   Brand
                                                                      Strategy
  Engineering
                  Concept                                    Visual
                                                                 Advertising
                 Prototyping
                           Sales                             Design
                     Technical Support
                                            Quality
                                           Usability
                                           Assurance
                                           Testing
                                                                 TM




                                                                 © Jon Innes & Liam Friedland
Tactic—Product Differentiation
Design / Implementation                      Alpha / Beta                                   Release
 Field studies                Design refinement             Design refinement              Analyze support calls
 Task analysis                QA of the UI                  QA of the UI                   Site visits

 Use cases                    Formative testing                                            Next cycle planning
                                                            Usability testing
  Market analysis             Develop visual identity       Finalize visuals               UI post-mortem

 Competitive evaluation       UI Walkthrough                                               Baseline studies
                                                            Develop resource files
 Feature planning                                           Beta site visits
 Project plans & dev                                        Documentation review
 estimates                                                  UI Walkthrough
 Task diagramming
 Documentation plans
 Heuristic evaluations
 Info architecture
 Visualizations
 Concept prototypes
 Testing prototypes
 Design specs
 (flows & screens)




                                                                                                                   TM
 Research                 Design         Intensively Collaborative



                                                                               © Jon Innes & Liam Friedland
Tactic—Time Shifting
Design / Implementation                  Alpha / Beta                Release




                               Other UX Opportunities: Highest
                                   UX Sweet Spot: ROI
                              UI QA & Usability Validation




                                                                                       TM
    Ability to influence product direction

    Cost to make changes to product
                                                        © Jon Innes & Liam Friedland
Tactic—Resource Reallocation

High
 Level of Effort




Low




                   Before   After
                                    © Jon Innes & Liam Friedland
Consider Your Value Network

What is a value network?
 The context in which you produce your existing deliverables

 It limits what you can do and defines how you are rewarded



What should you consider?
 Who benefits from your work?

 What partners do you have in creating your value-add?

 Who provides your necessary resources or materials?



Listening to your value network has both pros and cons
 Can help you determine how to improve existing offerings

 May blind you to new opportunities and limit growth




From ―The Innovator’s Dilemma‖ by Clayton Christensen


                                                        © Jon Innes & Liam Friedland
Collaboration is Key

   Step outside of your cube or office
       Make sure you interact with people in other groups regularly

   Take a big picture perspective of the organization
       What groups are responsible for what?
       What is your ―foreign policy‖?

   Define your goals and strategies for influencing other groups
       What have you done for them lately?
       What can they do for you?

   How do you interact with other groups in your company?
       Take their viewpoints to understand how to influence them

   Cultivate allies in other groups to help you:
       Drive UX initiatives
       Educate others and change the company culture



                                                      © Jon Innes & Liam Friedland
No One Understands What We Do—Why?

Does your           Is this mission clear to everyone in management?
group have a        Can managers in the other groups articulate UX’s mission?
clearly             Do those at the C-level know your mission?
defined
mission?


Does your           Do you have a group website?
group                    Does it highlight what your group produces?
communicate              Does it provide useful resources for those in other groups?
to the rest of           Is it up to date and informative?
the company?             Do other intranet pages link to it?




Does your           Is your group’s work part of the project plans?
group’s work        Do UX milestones/deliverables appear in the process
fit into what        documents?
the company
does?


                                                           © Jon Innes & Liam Friedland
Collaborating with Product Management
             PM Myths                                         UX Myths
UXconfuses developers by                    PM   doesn’t care about
 adding new requirements                       ―the user‖ or usability

Design is about form only                   Marketing   research and user
 (aesthetics) and not function                  research are not complementary

Next
    generation UI previews                   PM    only cares about feature lists
might stall current sales

                                       Win-Win
Improve   requirements processes & documents
   Develop detailed use cases based on user research
   Better consideration of overall design & tradeoffs among new features

   Bring end user versus customer perspective into requirements




Improve   communication with engineering teams



                                                            © Jon Innes & Liam Friedland
Tactics—PM & UX Initiatives

Work together to
                       Specify UI designs to support new feature descriptions
define UI related
requirements           Help provide UI samples for presentations and collateral




Do customer            Document what customers really do and need
case studies           Add UX skills to ensure user profiles and tasks are captured
together



Develop a
demo for a             Use as driving force behind UI prototype
trade show or          Helps create a shared vision that can be used in
for a sales             customer presentations
presentation


Introduce ―use         Introduce user-centered approach to the requirements
case‖ oriented
                        analysis phase and planning efforts
requirements
process                Benefits both customers of PM and UX

                                                     © Jon Innes & Liam Friedland
Collaborating with Engineering

               Engineering Myths                                    UX Myths
All   this (UX) stuff is impractical               Engineers    are the enemy
       It takes too much time to study users             They care more about technology
        and write specs                                    than users
       We need to focus on coding                        All they want to do is meet the

                                                           schedule
UX is a threat. They want to take the
 creativity out of being a developer                UX  doesn’t need to understand
          Process = Bureaucracy = Bad                anything about technology &
                                                      engineering
All it takes to design a usable product
 is intelligence & common sense

                                           Win - Win
Buildthe best product possible given the constraints
Improve efficiency and focus – stop wasting time!
       Determine the design earlier so we can focus on building it
       Avoid iterating in code needlessly and discussing it in endless meetings




                                                                 © Jon Innes & Liam Friedland
Tactics—Engineering & UX Initiatives

Develop a
reusable code         Helps enforce UI consistency
library for UI        Promotes reuse and reduces development time
development



Develop a style       Helps coordinate UI work across all staff & groups
guide for a
                      Ensures UI is consistent and UX has voice in process
product or
product line          Design re-factoring = code re-factoring


Collaborate on
prototyping           Reduces project uncertainty and risks for dev and UX
new product or        Helps build a sense of team ownership
features



Work together on      Help the development group specify the details related to UI
development &
                      Get involved in review of functional specifications
review of
specifications        Ensures UX specification is feasible & improves planning

                                                    © Jon Innes & Liam Friedland
Collaborating with QA

                QA Myths                                      UX Myths
UI   bugs aren’t really bugs                   UX process is unrelated to quality
      Unimportant or a matter of opinion         engineering approach
      Usability can’t be measured


                                                QA  engineers can’t help improve
UIbugs are unimportant or                        the UI or evaluate usability issues
 low priority



                                            Win - Win
Improve the quality of the product as measured by the bug counts
Improve the metrics by which the company tracks quality




                                                            © Jon Innes & Liam Friedland
Tactics—QA & UX Initiatives

Improve the bug
process to better        Improve process of tracking of usability and UI issues
capture UX               Integrate user research data into quality dashboards
issues


Organize UI
walkthroughs             Decrease QA’s workload by finding defects early
to catch UX
bugs earlier in          Allows QA to concentrate on functional & stress
the process               testing


Collaborate on
testing and bug          Help ensure UI bugs get identified and addressed early
prioritization with
QA                       Help QA better identify and classify UI bugs



Leverage use             Facilitates the test planning process
cases & UX
specs for QA             Helps QA create better test plans
testing                  Facilitates automated testing

                                                        © Jon Innes & Liam Friedland
Building Relationships for Success

The following principles should guide your interactions:

    Involving the right people at the right time
          Does everyone in your team know who to contact and when?

    Achieving results through formal & informal channels
          Who owns things and who has the power to get things done?

    Fostering effective give and take relationships
          Build relationships through reciprocity

    Understanding perspectives and agendas of others
          Learn about your ―organizational neighbors‖

    Knowing when to fight and when to compromise
          It’s fine to be an idealist in theory, but you have to be a realist in practice


Adapted from the ―Successful Managers Handbook‖


                                                             © Jon Innes & Liam Friedland
Long Term Strategic Planning

       For an organization to endure it must adapt

       All too often we neglect managing this change
             Too busy with operational work
             Fail to take the big picture/long term perspective

       Drucker* talks about planning from the following perspectives
             What will our business be
             What should our business be
             What new things should we go into
             What existing product lines and businesses should we abandon

       You need to consider these questions from a UX perspective




*   From ―Management: Tasks, Responsibilities, Practices‖ by Peter Drucker

                                                                             © Jon Innes & Liam Friedland
Six Forces Impacting Businesses

Power, vigor, and competence of          Power, vigor, and competence of      Power, vigor, and competence
     existing competitors                        complementors                        of customers




                                   The Business

       Power, vigor, and competence of                              Power, vigor, and competence of
                  suppliers                                             potential competitors


                                            Possibility that what your
                                         business is doing can be done in
                                                 a different way



     From ―Only the Paranoid Survive‖ by Andy Grove


                                                                            © Jon Innes & Liam Friedland
Strategic Inflection Points

The Inflection Curve
                                                     Business goes on to new heights




                                Inflection Point                   Business declines


Requires a fundamental transformation from what you were to what you will be



  From ―Only the Paranoid Survive‖ by Andy Grove


                                                            © Jon Innes & Liam Friedland
Inflection Points in Detail

             Home     to academic                                    Local   to global

 Market                           Usability/design   to User Experience

            Nuclear    family to aging boomer                        Consumer     to enterprise


           HTML    to RIA/AJAX                                     Pager   to Blackberry

  Tech             Disconnected      PC to WWW          Lab     testing to remote usability testing

             CD    to MP3                         Brick   & mortar to eCommerce


          iMac   to iPod                                         Database    to applications

             Version       23 to vision project               Concept   sketch to design spec
Product
            Software       utilities to enterprise security            Hardware    to software


              Total   quality management                             Balanced    scorecard

Process   Total   design management                True   UCD         Data-based    design

                   Extreme      programming           Offshore     development             6   Sigma




                                                                       © Jon Innes & Liam Friedland
Example: Vision Project

      Forces
         Need to invent a new product or market to survive
         Changes render old offerings obsolete or uncompetitive



      Inflection Point
         Product, market, or technology focused change
         Create a shared vision around new ways of doing business




                                          © Jon Innes & Liam Friedland
Example: Vision Project

High
 Level of Effort




Low




                   Before   After
                                       © Jon Innes & Liam Friedland
Example: iMac to iPod

      Forces
         Computers become a low margin, high volume business
         Internet & MP3s enable new distribution channel
         Music industry lacks digital-age strategy
         Existing MP3 players provide poor UX


         Inflection Point
         Focus: Market? Technology? Product? Process?
         Advances in technology impact content distribution and
          creation to create a unique product & market opportunity
         Designing with the ―Experience‖ mindset gave Apple the
          advantage over entrenched competitors (Sony)
         Traditional value network ―blinded‖ competitors




                                          © Jon Innes & Liam Friedland
Think & Act Strategically



                        Develop a UX                        Influence and drive
                        strategic initiative                corporate strategy
 Breadth of UX Vision




                        that leverages                      from a UX perspective
                        existing UX activities




                        Analyze and improve                 Align and integrate UX
                        current UX operations               to reflect existing
                        based on metrics                    strategic corporate
                                                            initiatives




                                           Level of Difficulty



                                                                 © Jon Innes & Liam Friedland
Driving Strategy: Planning
Plan                                                    Align         Execute

   Understand the corporate strategy by ―tapping-in‖
    organizationally

   Identify the thought leaders or their proxies and study what they
    are saying

   Inventory your assets and core competencies to assess where
    they lie relative to the new strategic initiatives

   Analyze the strengths, weaknesses and opportunities of your
    team and others

   Assess potential organizational alliances and blockages

   Perform initial business-value benefits analysis




                                                © Jon Innes & Liam Friedland
Driving Strategy: Alignment
Plan      Align                                                      Execute

   Meet with the organizational thought leaders or their proxies

   Interview these individuals to determine opportunities

   Explain your position, alignments, and key value add to other
    organizations and the business overall

   Determine mutually beneficial points of collaboration

   Ask for feedback and recommendations for additional points
    of synergy company-wide




                                               © Jon Innes & Liam Friedland
Driving Strategy: Execution
Plan      Align       Execute

   Adjust group’s priorities to align with the new initiatives

   Develop value-benefit metrics based on new UX outputs

   Always be on the lookout for new ways that UX can contribute

   Collaborate with partners to ensure successful execution




                                                 © Jon Innes & Liam Friedland
Fine-tuning Strategy

   It’s all about creating a self adapting organization
        Cybernetics
        Kaizen
        ―The Fifth Discipline‖
   Organizations must adapt or they become extinct


   Setup reliable feedback loops and evaluate your strategy continuously
        How does the current strategy impact UX and its deliverables
        Always be on the look out for unique ways UX can contribute


   Be prepared for changes!
        Long term plans are by nature dynamic
        Make sure you get continual feedback on any strategy
        Avoid putting all of your eggs in one basket
        Always have a backup plan (or two)




                                                             © Jon Innes & Liam Friedland
Final Thoughts




Strategy without tactics is the slowest route
to victory. Tactics without strategy is the
noise before defeat.

           -Sun Tzu




                              © Jon Innes & Liam Friedland

TALK: Repositioning User Experience

  • 1.
    operational Repositioning User Interaction Experience as a Strategic organizational Process Jon Innes Liam Friedland strategic TM
  • 2.
    Why Is UserExperience Strategic?  UX becomes a differentiating factor in a commodity market  Technologies mature and become mainstream  Competitors develop comparable offerings over time  Mainstream markets value UX more than early adopters  UX methods lower costs and reduce risks  Improved planning & decision making  More efficient development processes  UX methods help companies adapt to market shifts  Design research leads to systematic innovation  When properly executed it can inform business strategy © Jon Innes & Liam Friedland
  • 3.
    The Experience Economy Stage Differentiated Experiences Deliver Services Competitive Position Make Goods Undifferentiated Extract Commodities Market Premium Pricing From ―Welcome to the Experience Economy‖ by Pine & Gilmore © Jon Innes & Liam Friedland
  • 4.
    Product Maturity andUX Transition point where technology meets basic needs Product Performance Excess quality Most customers uninterested in this Level of region performance required by average users Technology is good enough and Unfilled need therefore irrelevant. User experience dominates High technology Consumer commodity Customers want more Consumers want technology, convenience, reliability, low better performance cost ... From ―The Innovator’s Dilemma‖ by Clayton Christensen © Jon Innes & Liam Friedland
  • 5.
    Adoption of UXStrategic Thinking We are Here Early Early Late Innovators Laggards Adopters Majority Majority "The Chasm" User Experience Adoption Process Based on ―Crossing the Chasm‖ by Geoffrey Moore © Jon Innes & Liam Friedland
  • 6.
    A Framework forViewing UX Strategically The structured work processes which lead to a operations desired set of outputs (physical, knowledge, etc) Interaction Groupings of people that provide concentrations of organization specialized expertise, work experience, and skills A detailed plan for achieving success in situations strategy such as war, politics, business, industry or sport, or the skill of planning for such situations -Cambridge Dictionary Online TM From ―Repositioning User Experience as a Strategic Process‖ by Innes & Friedland © Jon Innes & Liam Friedland
  • 7.
    Operational Processes  UX contributes unique skills to the development process  Leverage the ―sweet spot‖ to maximize impact and ROI  Analyze where you spend time and what tangible outputs you produce:  How UX work adds value to: • The company and its customers • Any internal groups that benefit from UX deliverables  Track things quantitatively whenever possible • Establish simple metrics that management at all levels can track • Embed metrics into organizational consciousness © Jon Innes & Liam Friedland
  • 8.
    Organizational Processes  UX needs to serve as a ―change agent‖  Product designs reflect the organizations that create them  You need to change the culture and influence others to change the UI  Make influencing others a part of your job  Gajendar’s concept of the ―Heroic Designer‖* acting as a catalyst  Put together a plan and execute it  Don’t be afraid to share responsibility for UX  Engage others in your mission as team mates  You can accomplish much more as a team  Sharing your knowledge of UX makes other recognize it’s value and yours  Introducing new UX processes impact many existing people  Be proactive, talk to those impacted and partner with them  Consider other groups your customers—listen to them! * From ―Barbarians or Bureacrats‖ by Uday Gajendar © Jon Innes & Liam Friedland
  • 9.
    Strategy—It’s Not Justfor Marketing Anymore  What is strategy?  Defining long term goals and then using those goals to guide in the selection of the appropriate tactics to achieve those goals  Strategy example: Types of management  Operationally focused: • Row harder!  Tactically focused: • Why row, put up a sail…  Strategically focused • Are we rowing in the right direction? • Do we need to go there at all?  For too long, people in our profession have been focusing on rowing harder © Jon Innes & Liam Friedland
  • 10.
    One External Worldviewof UX Outdated View: Consulting / Service Organization  Design: Makes things look good  Usability: Tests to find bugs after the code Need to move is working from this…  Not a core business competency  Important but not essential  Practitioners don’t have a good sense of business issues © Jon Innes & Liam Friedland
  • 11.
    Strategic Worldview ofUX Proposed View: Strategic Function  User-centered product planning informs all aspects of product direction  Essential part of the development process …to this  Key contributions throughout the product or service lifecycle  Business value is large, wide-ranging, and demonstrable  Quantifiable, reproducible, high-quality processes © Jon Innes & Liam Friedland
  • 12.
    Run UX Likea Business Optimize based on the following questions:  What do you produce?  How efficiently do you produce it?  Can you justify what you cost to your customers (ROI)?  Do you effectively leverage your value-network?  Do you market your products and services effectively?  Are you considering the market trends for UX? Could you sell your UX business plan to investors? © Jon Innes & Liam Friedland
  • 13.
    Operational Expertise—User Research  Cataloging detailed information on users  Key activities  Goals & Tasks  Needs & Wants  Understanding human factors relating to product design  Cognitive  Physical  Focusing on contexts of product use  Communities  Interactions  Collaborations © Jon Innes & Liam Friedland
  • 14.
    Deliverables—User Research  User research is only useful when the information it creates reaches others and impacts organizational behavior  The tangible deliverables are reports and presentations that capture:  User requirements and profile data (formative) • Surveys • Field studies • Formative usability tests  Design defects and enhancements (refining or summative) • Cognitive walkthroughs • Traditional usability tests • Field studies © Jon Innes & Liam Friedland
  • 15.
    Operational Expertise—Design  Creates tangible artifacts by synthesizing data from multiple requirements streams:  Marketing  Technical  Legal  Usage  Aesthetics  Problem solving to guide planning and development  Exploring multiple solution spaces  Rapid, iterative prototyping processes  Visualizations to communicate and help inform decision making  Information, messaging, and branding materials  Structural, and behavioral diagrams  Descriptions of form associated with ergonomics © Jon Innes & Liam Friedland
  • 16.
    Deliverables—Design  Design is only useful when it generates specifications from which products can be built  Prototypes & specifications serve as detailed plans for building products and normally cover:  Software • Information architecture, conceptual models • Interaction, and navigation • Screen layout, and UI terminology • Branding elements (product graphics & identity)  Hardware • Form • Materials • Branding elements (colors, finishes, product graphics) © Jon Innes & Liam Friedland
  • 17.
    Designing is Synthesizing  Our future depends on synthesizing more than just design ideas but also:  Our outputs with other UX related disciplines • Highly collaborative multidisciplinary teams = innovation  The work of other functional teams • Engineering • Quality Assurance • Marketing • Sales • Professional Services • Others...  Most importantly with business leaders at all levels © Jon Innes & Liam Friedland
  • 18.
    Symbiotic Functions Design User Experience Research TM © Jon Innes & Liam Friedland
  • 19.
    Organizational Synergy Market Research Field Studies Subject Matter Experts Project Planning Information Interaction Architecture Design Product Technical Writing Management Market User User Research Experience Experience Brand Strategy Engineering Concept Visual Advertising Prototyping Sales Design Technical Support Quality Usability Assurance Testing TM © Jon Innes & Liam Friedland
  • 20.
    Tactic—Product Differentiation Design /Implementation Alpha / Beta Release Field studies Design refinement Design refinement Analyze support calls Task analysis QA of the UI QA of the UI Site visits Use cases Formative testing Next cycle planning Usability testing Market analysis Develop visual identity Finalize visuals UI post-mortem Competitive evaluation UI Walkthrough Baseline studies Develop resource files Feature planning Beta site visits Project plans & dev Documentation review estimates UI Walkthrough Task diagramming Documentation plans Heuristic evaluations Info architecture Visualizations Concept prototypes Testing prototypes Design specs (flows & screens) TM Research Design Intensively Collaborative © Jon Innes & Liam Friedland
  • 21.
    Tactic—Time Shifting Design /Implementation Alpha / Beta Release Other UX Opportunities: Highest UX Sweet Spot: ROI UI QA & Usability Validation TM Ability to influence product direction Cost to make changes to product © Jon Innes & Liam Friedland
  • 22.
    Tactic—Resource Reallocation High Levelof Effort Low Before After © Jon Innes & Liam Friedland
  • 23.
    Consider Your ValueNetwork What is a value network?  The context in which you produce your existing deliverables  It limits what you can do and defines how you are rewarded What should you consider?  Who benefits from your work?  What partners do you have in creating your value-add?  Who provides your necessary resources or materials? Listening to your value network has both pros and cons  Can help you determine how to improve existing offerings  May blind you to new opportunities and limit growth From ―The Innovator’s Dilemma‖ by Clayton Christensen © Jon Innes & Liam Friedland
  • 24.
    Collaboration is Key  Step outside of your cube or office  Make sure you interact with people in other groups regularly  Take a big picture perspective of the organization  What groups are responsible for what?  What is your ―foreign policy‖?  Define your goals and strategies for influencing other groups  What have you done for them lately?  What can they do for you?  How do you interact with other groups in your company?  Take their viewpoints to understand how to influence them  Cultivate allies in other groups to help you:  Drive UX initiatives  Educate others and change the company culture © Jon Innes & Liam Friedland
  • 25.
    No One UnderstandsWhat We Do—Why? Does your  Is this mission clear to everyone in management? group have a  Can managers in the other groups articulate UX’s mission? clearly  Do those at the C-level know your mission? defined mission? Does your  Do you have a group website? group  Does it highlight what your group produces? communicate  Does it provide useful resources for those in other groups? to the rest of  Is it up to date and informative? the company?  Do other intranet pages link to it? Does your  Is your group’s work part of the project plans? group’s work  Do UX milestones/deliverables appear in the process fit into what documents? the company does? © Jon Innes & Liam Friedland
  • 26.
    Collaborating with ProductManagement PM Myths UX Myths UXconfuses developers by PM doesn’t care about adding new requirements ―the user‖ or usability Design is about form only Marketing research and user (aesthetics) and not function research are not complementary Next generation UI previews PM only cares about feature lists might stall current sales Win-Win Improve requirements processes & documents Develop detailed use cases based on user research Better consideration of overall design & tradeoffs among new features Bring end user versus customer perspective into requirements Improve communication with engineering teams © Jon Innes & Liam Friedland
  • 27.
    Tactics—PM & UXInitiatives Work together to  Specify UI designs to support new feature descriptions define UI related requirements  Help provide UI samples for presentations and collateral Do customer  Document what customers really do and need case studies  Add UX skills to ensure user profiles and tasks are captured together Develop a demo for a  Use as driving force behind UI prototype trade show or  Helps create a shared vision that can be used in for a sales customer presentations presentation Introduce ―use  Introduce user-centered approach to the requirements case‖ oriented analysis phase and planning efforts requirements process  Benefits both customers of PM and UX © Jon Innes & Liam Friedland
  • 28.
    Collaborating with Engineering Engineering Myths UX Myths All this (UX) stuff is impractical Engineers are the enemy It takes too much time to study users They care more about technology and write specs than users We need to focus on coding All they want to do is meet the schedule UX is a threat. They want to take the creativity out of being a developer UX doesn’t need to understand  Process = Bureaucracy = Bad anything about technology & engineering All it takes to design a usable product is intelligence & common sense Win - Win Buildthe best product possible given the constraints Improve efficiency and focus – stop wasting time! Determine the design earlier so we can focus on building it Avoid iterating in code needlessly and discussing it in endless meetings © Jon Innes & Liam Friedland
  • 29.
    Tactics—Engineering & UXInitiatives Develop a reusable code  Helps enforce UI consistency library for UI  Promotes reuse and reduces development time development Develop a style  Helps coordinate UI work across all staff & groups guide for a  Ensures UI is consistent and UX has voice in process product or product line  Design re-factoring = code re-factoring Collaborate on prototyping  Reduces project uncertainty and risks for dev and UX new product or  Helps build a sense of team ownership features Work together on  Help the development group specify the details related to UI development &  Get involved in review of functional specifications review of specifications  Ensures UX specification is feasible & improves planning © Jon Innes & Liam Friedland
  • 30.
    Collaborating with QA QA Myths UX Myths UI bugs aren’t really bugs UX process is unrelated to quality Unimportant or a matter of opinion engineering approach Usability can’t be measured QA engineers can’t help improve UIbugs are unimportant or the UI or evaluate usability issues low priority Win - Win Improve the quality of the product as measured by the bug counts Improve the metrics by which the company tracks quality © Jon Innes & Liam Friedland
  • 31.
    Tactics—QA & UXInitiatives Improve the bug process to better  Improve process of tracking of usability and UI issues capture UX  Integrate user research data into quality dashboards issues Organize UI walkthroughs  Decrease QA’s workload by finding defects early to catch UX bugs earlier in  Allows QA to concentrate on functional & stress the process testing Collaborate on testing and bug  Help ensure UI bugs get identified and addressed early prioritization with QA  Help QA better identify and classify UI bugs Leverage use  Facilitates the test planning process cases & UX specs for QA  Helps QA create better test plans testing  Facilitates automated testing © Jon Innes & Liam Friedland
  • 32.
    Building Relationships forSuccess The following principles should guide your interactions:  Involving the right people at the right time  Does everyone in your team know who to contact and when?  Achieving results through formal & informal channels  Who owns things and who has the power to get things done?  Fostering effective give and take relationships  Build relationships through reciprocity  Understanding perspectives and agendas of others  Learn about your ―organizational neighbors‖  Knowing when to fight and when to compromise  It’s fine to be an idealist in theory, but you have to be a realist in practice Adapted from the ―Successful Managers Handbook‖ © Jon Innes & Liam Friedland
  • 33.
    Long Term StrategicPlanning  For an organization to endure it must adapt  All too often we neglect managing this change  Too busy with operational work  Fail to take the big picture/long term perspective  Drucker* talks about planning from the following perspectives  What will our business be  What should our business be  What new things should we go into  What existing product lines and businesses should we abandon  You need to consider these questions from a UX perspective * From ―Management: Tasks, Responsibilities, Practices‖ by Peter Drucker © Jon Innes & Liam Friedland
  • 34.
    Six Forces ImpactingBusinesses Power, vigor, and competence of Power, vigor, and competence of Power, vigor, and competence existing competitors complementors of customers The Business Power, vigor, and competence of Power, vigor, and competence of suppliers potential competitors Possibility that what your business is doing can be done in a different way From ―Only the Paranoid Survive‖ by Andy Grove © Jon Innes & Liam Friedland
  • 35.
    Strategic Inflection Points TheInflection Curve Business goes on to new heights Inflection Point Business declines Requires a fundamental transformation from what you were to what you will be From ―Only the Paranoid Survive‖ by Andy Grove © Jon Innes & Liam Friedland
  • 36.
    Inflection Points inDetail Home to academic Local to global Market Usability/design to User Experience Nuclear family to aging boomer Consumer to enterprise HTML to RIA/AJAX Pager to Blackberry Tech Disconnected PC to WWW Lab testing to remote usability testing CD to MP3 Brick & mortar to eCommerce iMac to iPod Database to applications Version 23 to vision project Concept sketch to design spec Product Software utilities to enterprise security Hardware to software Total quality management Balanced scorecard Process Total design management True UCD Data-based design Extreme programming Offshore development 6 Sigma © Jon Innes & Liam Friedland
  • 37.
    Example: Vision Project Forces  Need to invent a new product or market to survive  Changes render old offerings obsolete or uncompetitive Inflection Point  Product, market, or technology focused change  Create a shared vision around new ways of doing business © Jon Innes & Liam Friedland
  • 38.
    Example: Vision Project High Level of Effort Low Before After © Jon Innes & Liam Friedland
  • 39.
    Example: iMac toiPod Forces  Computers become a low margin, high volume business  Internet & MP3s enable new distribution channel  Music industry lacks digital-age strategy  Existing MP3 players provide poor UX  Inflection Point  Focus: Market? Technology? Product? Process?  Advances in technology impact content distribution and creation to create a unique product & market opportunity  Designing with the ―Experience‖ mindset gave Apple the advantage over entrenched competitors (Sony)  Traditional value network ―blinded‖ competitors © Jon Innes & Liam Friedland
  • 40.
    Think & ActStrategically Develop a UX Influence and drive strategic initiative corporate strategy Breadth of UX Vision that leverages from a UX perspective existing UX activities Analyze and improve Align and integrate UX current UX operations to reflect existing based on metrics strategic corporate initiatives Level of Difficulty © Jon Innes & Liam Friedland
  • 41.
    Driving Strategy: Planning Plan Align Execute  Understand the corporate strategy by ―tapping-in‖ organizationally  Identify the thought leaders or their proxies and study what they are saying  Inventory your assets and core competencies to assess where they lie relative to the new strategic initiatives  Analyze the strengths, weaknesses and opportunities of your team and others  Assess potential organizational alliances and blockages  Perform initial business-value benefits analysis © Jon Innes & Liam Friedland
  • 42.
    Driving Strategy: Alignment Plan Align Execute  Meet with the organizational thought leaders or their proxies  Interview these individuals to determine opportunities  Explain your position, alignments, and key value add to other organizations and the business overall  Determine mutually beneficial points of collaboration  Ask for feedback and recommendations for additional points of synergy company-wide © Jon Innes & Liam Friedland
  • 43.
    Driving Strategy: Execution Plan Align Execute  Adjust group’s priorities to align with the new initiatives  Develop value-benefit metrics based on new UX outputs  Always be on the lookout for new ways that UX can contribute  Collaborate with partners to ensure successful execution © Jon Innes & Liam Friedland
  • 44.
    Fine-tuning Strategy  It’s all about creating a self adapting organization  Cybernetics  Kaizen  ―The Fifth Discipline‖  Organizations must adapt or they become extinct  Setup reliable feedback loops and evaluate your strategy continuously  How does the current strategy impact UX and its deliverables  Always be on the look out for unique ways UX can contribute  Be prepared for changes!  Long term plans are by nature dynamic  Make sure you get continual feedback on any strategy  Avoid putting all of your eggs in one basket  Always have a backup plan (or two) © Jon Innes & Liam Friedland
  • 45.
    Final Thoughts Strategy withouttactics is the slowest route to victory. Tactics without strategy is the noise before defeat. -Sun Tzu © Jon Innes & Liam Friedland