Contradictions result from the quest for information
                                     Product                           Product Variance
                                   Profitability                          And Health
      Distributed and                                    Workforce
  Outsourced Development                                Optimization




            52% of users                     59% of managers               42% of managers
            don’t have                            miss                      use wrong
            confidence                        information                   information
           in their information1            they should have used2         at least once a week2

                                                                                              1AIIM 2008 Survey
                                                                             2Accenture   2007 Managers Survey


                           Overcoming Contradictions…                       EXEC12                         2
IBM Rational Software Conference 2009



Move from a cost center to a business value driver

     Business
     Value




                                                      5X more value realized by
                                                         organizations using
                                                       information effectively




                                                                      Maturity of
                                                                 Information Use


                         Overcoming Contradictions…                  EXEC12         3
IBM Rational Software Conference 2009


Effective Information comes from proper metrics
communicated back to the business
                              Customer & Financial       Workforce     Dynamic            Multi-channel
      Create an                Product      Risk Insight Optimization Supply Chain         Marketing
  5
      Information Agenda      Profitability
                                                 Business                          Optimize
                                                                               4   Business Performance
                                                Optimization
                                                                                   Establish, Govern &
                                                                               3   Deliver Trusted Information

                                                                                   Optimize Content-based
                                                                               2   Operational & Compliance
                                                                                   Processes

                                                                                   Manage Data
                                 Flexible Architecture                         1   Over its Lifetime


                                                                                   ™
                                   DB2®       Informix® FileNet®    InfoSphere Cognos®
                                   software   software   software   software           software




                           Overcoming Contradictions…                              EXEC12                 4
IBM Rational Software Conference 2009



Software Measurement Status - Today


   Fortune 500 companies with productivity measures:                    30%
   Fortune 500 companies with quality measures:                         45%
   Fortune 500 companies with complete measures:                        15%
   Fortune 500 companies with missing measures:                         85%
   Number of software measurement personnel:                            5,500
   Number of software projects measured:                                160,000
   Number of software projects not measured:                            50,000,000

                                                      - Capers Jones




                         Overcoming Contradictions…                    EXEC12        5
IBM Rational Software Conference 2009



Is this REALLY the problem?

     Companies that measure:                          Companies that don’t:
       On-time projects:           75%                On-time projects:     45%
       Late projects:              20%                Late projects:       40%
       Cancelled projects: 5%                         Cancelled projects: 15%
       Defect removal:           > 95%                Defect removal:       Unknown
       Cost estimates:             Accurate           Cost estimates:       Optimistic
       User satisfaction: High                        User satisfaction:    Low
       Software status:           High                Software status:      Low
       Staff morale:              High                Staff morale:         Low
                                          - Software Productivity Research (2007)


                         Overcoming Contradictions…                        EXEC12        6
IBM Rational Software Conference 2009



Maybe we should blame the Project Managers?


                Less than 25% of project managers
                have formal training

                Less than 20% of project managers
                have access to cost / project estimating
                tools.

                Less than 10% of project managers
                have access to validated historical data
                           - Software Productivity Research (2008)




                         Overcoming Contradictions…                  EXEC12   7
IBM Rational Software Conference 2009



How about “lesser known” Metrics?

                  WSR (Work-to-Sleep Ratio)
                  DODO (Days On per Day Off)
                  HBT (Handbasket Temperature)
                  GALB (Going-Away-Lunch Budget)
                  or GAAB (Going Away-Alcohol-
                  Budget)
                  Dilbert Barometer
                  The Laugh Meter

                                                      - Martin L. Shoemaker


                         Overcoming Contradictions…                       EXEC12   8
IBM Rational Software Conference 2009



Beware: Metrics Must Be Used Properly

      Cost per Defect (Penalizes quality)
      Lines of Code (Ambiguous)
      Cost per Line of Code (Penalizes new languages)
      Lines of Code per Month (Ignores non-code work)
      Staff Work Hours per month (Ignores non-work tasks)
      Industry averages (Vague and ambiguous)
                                                      - Capers Jones



      Measurements must be SMART (Simple,
      Measurable, Actionable, Realistic, and Timely)
                         Overcoming Contradictions…                    EXEC12   9
IBM Rational Software Conference 2009



How do we succeed using measurement?
                   Fill in the blank. “The measurement _____.”

      …is meaningful and potentially           …supports multiple kinds of
      benefits the customer, manager           software, metrics, activities and
      and performer.                           deliverables.
                                               …demonstrates quantifiable correlation
   …supports a direct link between             between process perturbations and
   assessments and quantitative data.          business performance (e.g. it is as
                                               accurate as financial data)
  …explains why projects vary and
  by how much.
                                                 …is a natural by-product of the
    …is supported by automation.                 process (no night job).

            “Organizations exercising world-class performance management
          practices enjoy a 2.4 times market returns of typical companies”
                                                                              BusinessWeek Study:
                                                  The Payoff of Pervasive Performance Management




                         Overcoming Contradictions…                                 EXEC12          10
IBM Rational Software Conference 2009


But measurement is difficult amongst the chaos
                    Achieve Profit               Market Share         Business Alignment   Quality
                      Success can only come from a tight linkage
                     Headcount  Time to Market  Readiness    Renewals
                    from the development and Feedback process to
                                                delivery                                                         Business
                      Revenue    Performance                  Defects
                                                                                                                 Objectives
                      Expense         the business.
                                 Enablement    Satisfaction Consumability
  Executive           Products    Productivity Deployment      Calls

                    Project Schedule
                     Code
                             an annual report synthesizesContinuous Integration
                     LikeCoverage       Requirements Churn
                                        Tests Passed/Failed
                                                               the state of
                                                                 Tests per Build
                   Iteration overall business....a development report
                      the Burndown                                                                               Operational
                                            Code Churn        Work Item Completion
                                                                                                                 Objectives
                       Build Health needs to do the same.... Code Growth
                                             Defect Age
Management            Defect Density   Tests for Requirements    Defect Priority


                         Communicate the relativemanagement iterative
                        agile test driven developmentchange facts to give all
                    change set bill of materials VELOCITY dashboard WORK ITEMthis
                       stakeholders insight as to the health of                             code scan
                                                                                                                 Processes &
                    test script requirements project schedule team meeting chat waterfall
                                   critical part of their business.                                               Practices
                                                               UNIT TEST
Development

                   requirement             build definition defect   TEST CASE deploy image change
 Artifacts       set   bill of materialsSTREAM custom dashboards design model WORKSPACE       Eclipse plug-ins

                                    test script SNAPSHOT development assets Demo image


                           Overcoming Contradictions…                                          EXEC12                   11
IBM Rational Software Conference 2009


This fidelity mandates a control framework
                                                   Performance Measurement
                                                                                                           Value
                                                              Value Metrics
       Business Objectives          measures
                                                         e.g., ROI, ROA for SSD



                                                                                                       Efficiency
                                                 Operational Effectiveness Metrics




                                                                                            feedback
      Operational Objectives        measures
                                                    e.g., Time to market, productivity




                                                                                                        Control
   Process Definition / Practices
                                    measures      Control       Control     Governance
     Rational Method Composer
                                                  Metrics       Metrics     Dashboard
                                                 subjective     objective     compliance




        Process Enactment / Governance Enforcement / Process Awareness
                                         Jazz Platform


                           Overcoming Contradictions…                                      EXEC12                   12
IBM Rational Software Conference 2009


4 Fundamentals for implementing a control framework

      1. System definition: A discriminating C/ALM system for
         linking, tracing and accessing information across your
         SDLC.
      2. Best practices: Best practices for monitoring,
         measuring and reporting throughout the enterprise
      3. Interpretation: A capability to interpret your measures
         correctly and accurately the health of your
         development practices
      4. Operations: Guidance to define the right actions,
         workflows and policies to improve your measured
         results and be compliant


                         Overcoming Contradictions…   EXEC12       13
IBM Rational Software Conference 2009

 A Discriminating System
 Lets You Measure, Assess and Improve Information Blindspots
                                                          Where You
  Improving
                                                          Should Be!


                                     Where You Are                           Why You Are
 Assessing                                Productivity Rates                   Process Assess
                                                     Measuring
                                          Quality Levels                       Product Health



                                            Quantitative and Qualitative Data
                                                         Information Gaps



 Change &      Rational        Quality        Build &      Architecture    Security    Project Headcount Sales Customer Manual
Configuration Definition &   Management       Release      Management         &         Data       &         &     Support Data
Management Management                       Management                    Compliance           Financials Pipeline

                             Software Lifecycle Artifacts                                    3rd Party Data Artifacts

                                Overcoming Contradictions…                                             EXEC12               14
IBM Rational Software Conference 2009


Defining a best practice…

        “The likelihood of delivering a product on time,
           within budget, with acceptable revenue or
          benefits and an acceptable level of support
                             costs.”
      The definition points us to what we need to project
         Time to complete
         Cost to complete
         Expected revenue/benefits
         Expected support and ownership costs

      The other indicators (expected effort, probability of
      on-time completion and percent complete) can be
      driven from these


                            Overcoming Contradictions…   EXEC12   15
IBM Rational Software Conference 2009


And more specifically…
  The indicators that impact time                          The indicators that impact
  to complete –                                            expected revenue / benefits –
      Critical situations                                    Benefits of requirements
      Defect density/severity analysis                       Benefits of demonstrable capabilities by
      Defect repair latency                                  iteration (iteration status)
      Build health                                           Benefits of RFE 30/90-day SLA
      Velocity
      IPD timeliness
      Iteration status
      Variance in time-to-complete estimates by
      task

  The indicators that impact cost                          The indicators that impact
  to complete –                                            expected support and
      Staffing actuals vs. plan (is also an indicator of   ownership costs –
      project size)
                                                             APAR backlog
      Capital expense actuals vs. plan
                                                             RFE 30/90-day SLA
      Earned value
                                                             Build health
                                                             Time-to-resolution for internally-found defects
                                                             and APARs



                            Overcoming Contradictions…                                     EXEC12              16
IBM Rational Software Conference 2009



Best Practice Interpretation: Project Health
  Metric                   Weight       Source          Measure
 Defect Backlog               10        Change Mgmt     3 Months

 Enhancement SLA              10        RFE Website     60 Days

 Cost of Support              10        Analysis        25% Total

 Critical Situations          05        Support DB      <1 Month

 Defect Density               10        Analysis        By component
                                                                                        Project
 Defect Repair Latency        05        Support DB      By product maturity
                                                                                        Health
 Build Health                 10        Analysis        90% Clean

 Project Velocity             10        SCM Tool        Better than Average

 Staffing Actuals             10        Financials      10% Variance

 Process Timeliness           05        Process DB      <10% off plan

 Milestone Status             10        Agile Planner   90% of plan

 Severity Analysis            05        Analysis        Depends on timeframe

                         Overcoming Contradictions…                            EXEC12        17
IBM Rational Software Conference 2009



Best Practice Interpretation: Project Quality
  Metric                   Weight       Source         Measure
 Defect Backlog               10        Support DB     3 Months

 Test Escapes                 10        Analysis       60 Days

 Functional Test Trends       10        Analysis       25% Total

 Critical Situations          05        Support DB     <1 Month

 System Test Trends           10        Analysis       By component
                                                                                       Project
 S-Curve Progress             05        Quality Mgmt   By product maturity             Quality
 Automation Percentage        10        Analysis       90% Clean

 Customer Testcases           10        Quality Mgmt   Better than Average

 Consumability Scorecard      10        Spreadsheet    10% Variance

 Defect Latency               05        Change Mgmt    <10% off plan

 Quality Plan Commitments     10        Spreadsheet    90% of plan

 Test Coverage                05        Analysis       Depends on timeframe

                          Overcoming Contradictions…                          EXEC12        18
IBM Rational Software Conference 2009



  Rational Executive Dashboard
                                                                                          Rational
   DB2
                                                                                          Insight

  Oracle
                                      Where You Are                         Why You Are
                                         Productivity Rates                   Process Assess
SQL Server                                                                    Product Health
                                         Quality Levels



                                    REST Open Services / ODBC / XML

                                            Quantitative and Qualitative Data



   Rational    Rational     Rational   Rational  Rational     Rational     Rational   Project Headcount Sales Customer Manual
  ClearQuest Requirements Team Concert Quality Test Manager Requisite Pro ClearCase    Data       &         &     Support Data
              Composer                 Manager                                                Financials Pipeline

                                 Rational Data Sources                                          3rd Party Data Sources

                                 Overcoming Contradictions…                                           EXEC12               19
IBM Rational Software Conference 2009

                                                       IBM Rational User Technologies

                                                 Check out the Executive Dashboard that
                                                 allows IBM executives to manage product
                                                 development and delivery.
                                                 Based on MCIF and Rational Insight, the
                                                 Executive Dashboard pulls in live data from a
                                                 variety of sources for Jazz-based products,
                                                 such as Rational Team Concert, Rational
                                                 Requirements Composer, and Rational Quality
                                                 Manager.
                                                 This is a chance to share your reality with
                                                 us through direct and specific feedback!




                                                            Sign up at tinyurl.com/djoj9b
                                                                 or in person at Europe 5
                         Overcoming Contradictions…                         EXEC12             20
IBM Rational Software Conference 2009




                         Overcoming Contradictions…   EXEC12   21
IBM Rational Software Conference 2009




                         Overcoming Contradictions…   EXEC12   22
IBM Rational Software Conference 2009




                         Overcoming Contradictions…   EXEC12   23
IBM Rational Software Conference 2009




                         Overcoming Contradictions…   EXEC12   24
IBM Rational Software Conference 2009




                         Overcoming Contradictions…   EXEC12   25
IBM Rational Software Conference 2009




                         Overcoming Contradictions…   EXEC12   26
IBM Rational Software Conference 2009




                         Overcoming Contradictions…   EXEC12   27
IBM Rational Software Conference 2009




                         Overcoming Contradictions…   EXEC12   28
IBM Rational Software Conference 2009




                         Overcoming Contradictions…   EXEC12   29
IBM Rational Software Conference 2009




© Copyright IBM Corporation 2009. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind,
express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have
the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM
software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities
referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature
availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines
Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others.


                                                  Overcoming Contradictions…                                                                                  EXEC12                            30

Overcoming contradictions mike-o_rourke

  • 1.
    Overcoming Contradictions ThroughImproved Governance, Risk Management and Compliance Michael O’Rourke Vice President of Development, Rational Software mikeorou@us.ibm.com Executive Track – EXEC 12 © 2009 IBM Corporation
  • 2.
    IBM Rational SoftwareConference 2009 Contradictions result from the quest for information Product Product Variance Profitability And Health Distributed and Workforce Outsourced Development Optimization 52% of users 59% of managers 42% of managers don’t have miss use wrong confidence information information in their information1 they should have used2 at least once a week2 1AIIM 2008 Survey 2Accenture 2007 Managers Survey Overcoming Contradictions… EXEC12 2
  • 3.
    IBM Rational SoftwareConference 2009 Move from a cost center to a business value driver Business Value 5X more value realized by organizations using information effectively Maturity of Information Use Overcoming Contradictions… EXEC12 3
  • 4.
    IBM Rational SoftwareConference 2009 Effective Information comes from proper metrics communicated back to the business Customer & Financial Workforce Dynamic Multi-channel Create an Product Risk Insight Optimization Supply Chain Marketing 5 Information Agenda Profitability Business Optimize 4 Business Performance Optimization Establish, Govern & 3 Deliver Trusted Information Optimize Content-based 2 Operational & Compliance Processes Manage Data Flexible Architecture 1 Over its Lifetime ™ DB2® Informix® FileNet® InfoSphere Cognos® software software software software software Overcoming Contradictions… EXEC12 4
  • 5.
    IBM Rational SoftwareConference 2009 Software Measurement Status - Today Fortune 500 companies with productivity measures: 30% Fortune 500 companies with quality measures: 45% Fortune 500 companies with complete measures: 15% Fortune 500 companies with missing measures: 85% Number of software measurement personnel: 5,500 Number of software projects measured: 160,000 Number of software projects not measured: 50,000,000 - Capers Jones Overcoming Contradictions… EXEC12 5
  • 6.
    IBM Rational SoftwareConference 2009 Is this REALLY the problem? Companies that measure: Companies that don’t: On-time projects: 75% On-time projects: 45% Late projects: 20% Late projects: 40% Cancelled projects: 5% Cancelled projects: 15% Defect removal: > 95% Defect removal: Unknown Cost estimates: Accurate Cost estimates: Optimistic User satisfaction: High User satisfaction: Low Software status: High Software status: Low Staff morale: High Staff morale: Low - Software Productivity Research (2007) Overcoming Contradictions… EXEC12 6
  • 7.
    IBM Rational SoftwareConference 2009 Maybe we should blame the Project Managers? Less than 25% of project managers have formal training Less than 20% of project managers have access to cost / project estimating tools. Less than 10% of project managers have access to validated historical data - Software Productivity Research (2008) Overcoming Contradictions… EXEC12 7
  • 8.
    IBM Rational SoftwareConference 2009 How about “lesser known” Metrics? WSR (Work-to-Sleep Ratio) DODO (Days On per Day Off) HBT (Handbasket Temperature) GALB (Going-Away-Lunch Budget) or GAAB (Going Away-Alcohol- Budget) Dilbert Barometer The Laugh Meter - Martin L. Shoemaker Overcoming Contradictions… EXEC12 8
  • 9.
    IBM Rational SoftwareConference 2009 Beware: Metrics Must Be Used Properly Cost per Defect (Penalizes quality) Lines of Code (Ambiguous) Cost per Line of Code (Penalizes new languages) Lines of Code per Month (Ignores non-code work) Staff Work Hours per month (Ignores non-work tasks) Industry averages (Vague and ambiguous) - Capers Jones Measurements must be SMART (Simple, Measurable, Actionable, Realistic, and Timely) Overcoming Contradictions… EXEC12 9
  • 10.
    IBM Rational SoftwareConference 2009 How do we succeed using measurement? Fill in the blank. “The measurement _____.” …is meaningful and potentially …supports multiple kinds of benefits the customer, manager software, metrics, activities and and performer. deliverables. …demonstrates quantifiable correlation …supports a direct link between between process perturbations and assessments and quantitative data. business performance (e.g. it is as accurate as financial data) …explains why projects vary and by how much. …is a natural by-product of the …is supported by automation. process (no night job). “Organizations exercising world-class performance management practices enjoy a 2.4 times market returns of typical companies” BusinessWeek Study: The Payoff of Pervasive Performance Management Overcoming Contradictions… EXEC12 10
  • 11.
    IBM Rational SoftwareConference 2009 But measurement is difficult amongst the chaos Achieve Profit Market Share Business Alignment Quality Success can only come from a tight linkage Headcount Time to Market Readiness Renewals from the development and Feedback process to delivery Business Revenue Performance Defects Objectives Expense the business. Enablement Satisfaction Consumability Executive Products Productivity Deployment Calls Project Schedule Code an annual report synthesizesContinuous Integration LikeCoverage Requirements Churn Tests Passed/Failed the state of Tests per Build Iteration overall business....a development report the Burndown Operational Code Churn Work Item Completion Objectives Build Health needs to do the same.... Code Growth Defect Age Management Defect Density Tests for Requirements Defect Priority Communicate the relativemanagement iterative agile test driven developmentchange facts to give all change set bill of materials VELOCITY dashboard WORK ITEMthis stakeholders insight as to the health of code scan Processes & test script requirements project schedule team meeting chat waterfall critical part of their business. Practices UNIT TEST Development requirement build definition defect TEST CASE deploy image change Artifacts set bill of materialsSTREAM custom dashboards design model WORKSPACE Eclipse plug-ins test script SNAPSHOT development assets Demo image Overcoming Contradictions… EXEC12 11
  • 12.
    IBM Rational SoftwareConference 2009 This fidelity mandates a control framework Performance Measurement Value Value Metrics Business Objectives measures e.g., ROI, ROA for SSD Efficiency Operational Effectiveness Metrics feedback Operational Objectives measures e.g., Time to market, productivity Control Process Definition / Practices measures Control Control Governance Rational Method Composer Metrics Metrics Dashboard subjective objective compliance Process Enactment / Governance Enforcement / Process Awareness Jazz Platform Overcoming Contradictions… EXEC12 12
  • 13.
    IBM Rational SoftwareConference 2009 4 Fundamentals for implementing a control framework 1. System definition: A discriminating C/ALM system for linking, tracing and accessing information across your SDLC. 2. Best practices: Best practices for monitoring, measuring and reporting throughout the enterprise 3. Interpretation: A capability to interpret your measures correctly and accurately the health of your development practices 4. Operations: Guidance to define the right actions, workflows and policies to improve your measured results and be compliant Overcoming Contradictions… EXEC12 13
  • 14.
    IBM Rational SoftwareConference 2009 A Discriminating System Lets You Measure, Assess and Improve Information Blindspots Where You Improving Should Be! Where You Are Why You Are Assessing Productivity Rates Process Assess Measuring Quality Levels Product Health Quantitative and Qualitative Data Information Gaps Change & Rational Quality Build & Architecture Security Project Headcount Sales Customer Manual Configuration Definition & Management Release Management & Data & & Support Data Management Management Management Compliance Financials Pipeline Software Lifecycle Artifacts 3rd Party Data Artifacts Overcoming Contradictions… EXEC12 14
  • 15.
    IBM Rational SoftwareConference 2009 Defining a best practice… “The likelihood of delivering a product on time, within budget, with acceptable revenue or benefits and an acceptable level of support costs.” The definition points us to what we need to project Time to complete Cost to complete Expected revenue/benefits Expected support and ownership costs The other indicators (expected effort, probability of on-time completion and percent complete) can be driven from these Overcoming Contradictions… EXEC12 15
  • 16.
    IBM Rational SoftwareConference 2009 And more specifically… The indicators that impact time The indicators that impact to complete – expected revenue / benefits – Critical situations Benefits of requirements Defect density/severity analysis Benefits of demonstrable capabilities by Defect repair latency iteration (iteration status) Build health Benefits of RFE 30/90-day SLA Velocity IPD timeliness Iteration status Variance in time-to-complete estimates by task The indicators that impact cost The indicators that impact to complete – expected support and Staffing actuals vs. plan (is also an indicator of ownership costs – project size) APAR backlog Capital expense actuals vs. plan RFE 30/90-day SLA Earned value Build health Time-to-resolution for internally-found defects and APARs Overcoming Contradictions… EXEC12 16
  • 17.
    IBM Rational SoftwareConference 2009 Best Practice Interpretation: Project Health Metric Weight Source Measure Defect Backlog 10 Change Mgmt 3 Months Enhancement SLA 10 RFE Website 60 Days Cost of Support 10 Analysis 25% Total Critical Situations 05 Support DB <1 Month Defect Density 10 Analysis By component Project Defect Repair Latency 05 Support DB By product maturity Health Build Health 10 Analysis 90% Clean Project Velocity 10 SCM Tool Better than Average Staffing Actuals 10 Financials 10% Variance Process Timeliness 05 Process DB <10% off plan Milestone Status 10 Agile Planner 90% of plan Severity Analysis 05 Analysis Depends on timeframe Overcoming Contradictions… EXEC12 17
  • 18.
    IBM Rational SoftwareConference 2009 Best Practice Interpretation: Project Quality Metric Weight Source Measure Defect Backlog 10 Support DB 3 Months Test Escapes 10 Analysis 60 Days Functional Test Trends 10 Analysis 25% Total Critical Situations 05 Support DB <1 Month System Test Trends 10 Analysis By component Project S-Curve Progress 05 Quality Mgmt By product maturity Quality Automation Percentage 10 Analysis 90% Clean Customer Testcases 10 Quality Mgmt Better than Average Consumability Scorecard 10 Spreadsheet 10% Variance Defect Latency 05 Change Mgmt <10% off plan Quality Plan Commitments 10 Spreadsheet 90% of plan Test Coverage 05 Analysis Depends on timeframe Overcoming Contradictions… EXEC12 18
  • 19.
    IBM Rational SoftwareConference 2009 Rational Executive Dashboard Rational DB2 Insight Oracle Where You Are Why You Are Productivity Rates Process Assess SQL Server Product Health Quality Levels REST Open Services / ODBC / XML Quantitative and Qualitative Data Rational Rational Rational Rational Rational Rational Rational Project Headcount Sales Customer Manual ClearQuest Requirements Team Concert Quality Test Manager Requisite Pro ClearCase Data & & Support Data Composer Manager Financials Pipeline Rational Data Sources 3rd Party Data Sources Overcoming Contradictions… EXEC12 19
  • 20.
    IBM Rational SoftwareConference 2009 IBM Rational User Technologies Check out the Executive Dashboard that allows IBM executives to manage product development and delivery. Based on MCIF and Rational Insight, the Executive Dashboard pulls in live data from a variety of sources for Jazz-based products, such as Rational Team Concert, Rational Requirements Composer, and Rational Quality Manager. This is a chance to share your reality with us through direct and specific feedback! Sign up at tinyurl.com/djoj9b or in person at Europe 5 Overcoming Contradictions… EXEC12 20
  • 21.
    IBM Rational SoftwareConference 2009 Overcoming Contradictions… EXEC12 21
  • 22.
    IBM Rational SoftwareConference 2009 Overcoming Contradictions… EXEC12 22
  • 23.
    IBM Rational SoftwareConference 2009 Overcoming Contradictions… EXEC12 23
  • 24.
    IBM Rational SoftwareConference 2009 Overcoming Contradictions… EXEC12 24
  • 25.
    IBM Rational SoftwareConference 2009 Overcoming Contradictions… EXEC12 25
  • 26.
    IBM Rational SoftwareConference 2009 Overcoming Contradictions… EXEC12 26
  • 27.
    IBM Rational SoftwareConference 2009 Overcoming Contradictions… EXEC12 27
  • 28.
    IBM Rational SoftwareConference 2009 Overcoming Contradictions… EXEC12 28
  • 29.
    IBM Rational SoftwareConference 2009 Overcoming Contradictions… EXEC12 29
  • 30.
    IBM Rational SoftwareConference 2009 © Copyright IBM Corporation 2009. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others. Overcoming Contradictions… EXEC12 30