A. Based On Construction Method
 Load Bearing Wall With Step/Strip Footing
 R.C.C. Frame Work
 Precast Structural Frame Work
www.auditstructures.in
Redesigning existing structure for nature forces
It is a comprehensive task & require planning which
include following Information gathering.
 Field investigations including details of sub strata,
foundation details, extent of damage
 Type of Existing structure & its members stability
 Design Data Collection
 Identification of components required to be
strengthened
 Cost Estimates (it is feasible up to 60% of new
construction)
 Method or Procedure to be followed.
www.auditstructures.in
Crack Investigation
 Location
 Profile (vertical, Horizontal, Diagonal)
 Crack Size (Depth & length)
www.auditstructures.in
Crack Location In Structure
 Foundation:
1. Cracks Travel vertical in step footing in case of unequal
settlement.
 Flooring:
1. It is circular, Linear.
 Column:
1. Generally at 1/3rd height from bottom & top depending
on fixing conditions of column ends.
2. At laps location ,if laps are not staggered or not
sufficient length.
www.auditstructures.in
 Brick Work:
 In wall at ends of lintel in Diagonal upward
directions.
1. Horizontal, generally at slab wall joint , when
whole wall sink.
2. Vertical, in case of unequal settlement
 Beam:
1. Near Support ,visible on both face of beam &
bottom.
2. At centre of beam in its bottom
www.auditstructures.in
 Slab :
1. At centre of Span in ceiling (slab bottom)
2. At top & bottom face of slab near the
supporting wall or at top surface in case of
cantilever
 Plaster:
1. At joints with R.C.C & brick work
2. At localized locations in wall due to different
reasons
3. Locations as briefed in cracks in B.W.
www.auditstructures.in
 Make structure floor, roof lighter as much as possible.
 Avoid Un- symmetry of structure as much as possible.
For this purpose structure can be divided.
 Sand Pilling ,Stabilization of weak soil, sandy soil
having high water level must be taken care off.
 Proper Connections of building Elements.
 Use steel to strengthen laterally for load bearing wall
as per code requirement.
 Provide adequate plinth protection.
 Avoid to built Rigid masonry Building freely resting on
rock in Earth Quack porn area.
www.auditstructures.in
 Avoid keeping shallow foundation on Black Cotton
Soil.
 Use one type of foundation in a whole building to
avoid differential settlement.
 Physical quality check on material should me
periodic.
 An addition of room, which is structurally
independent from an existing building should be
designed & constructed in accordance with the
seismic requirements of new compiled structures.
www.auditstructures.in
 Any existing seismic resistance building if
occupied for school building then the building
has to be rechecked for seismic resistance for
building importance factor of 1.5.
 Projecting parts like cornices, facia stones,
parapets etc. should be avoided as for as
possible, otherwise they should be properly
reinforced and firmly tied to the main structure
Refer IS 1893 CLAUSE -7.12.2
 Ceiling plaster should be avoided as possible.
www.auditstructures.in
 Whenever one un symmetrical building is divided
into two or more building by separation walls the
structure of the divided building up to plinth level
is generally monolithic. Refer code IS 4326 5.1 to
5.2
 Even Where calculations based on code- based
seismic coefficients may not indicate tension steel
requirements, the reinforcement suggested in the
form of seismic bands & vertical steel bars at
corners & junction of walls & jambs of openings
must be provided since these are safe guard for
probable maximum earthquake.
www.auditstructures.in
 Corrosion resistance precautions should also be
taken in ductility detailing of cyclone prone &
tsunami prone coastal areas.
 IS 456 does not allow R.C.C. below M20 grade.
www.auditstructures.in
 An addition of new structure which is not structurally
independent should be designed & constructed such
that the entire building conforms to the seismic
resistance requirements for new building configuration.
The addition should not increase the seismic force
in any structural elements of the existing building by
more than 5% unless the capacity of the element
subject to the increased force is still in compliance
with the standard.
The addition should not decrease the seismic
resistance of any structural element of the existing
building below that required by the design codes.
www.auditstructures.in
For more details
Red Cedar Consultancy services
At
www.auditstructures.in
Cell – 8879 33 55 31
Email: rajeshb08@gmail.com
www.auditstructures.in

More Related Content

What's hot

Design of Precast Elements
Design of Precast ElementsDesign of Precast Elements
Design of Precast ElementsRahul Biswas
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSOUMYA KHANDELWAL
 
Total precase concrete structure for multi storey
Total precase concrete structure for multi storeyTotal precase concrete structure for multi storey
Total precase concrete structure for multi storeyBroad Homes Intl.
 
Analysis of precast shear wall connection state of the art review
Analysis of precast shear wall connection  state of the art reviewAnalysis of precast shear wall connection  state of the art review
Analysis of precast shear wall connection state of the art revieweSAT Journals
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Ramin Vaghei
 
Precast modular structures
Precast modular structuresPrecast modular structures
Precast modular structuresAnirudh Gupta
 
Provisions for non -structural fastenings
Provisions for non -structural fasteningsProvisions for non -structural fastenings
Provisions for non -structural fasteningsSafaSheriff
 
Ppt supersstructure
Ppt supersstructurePpt supersstructure
Ppt supersstructureShrafatBalti
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated componentsSofia Rajesh
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionRamin Vaghei
 
B tech individual report
B tech individual reportB tech individual report
B tech individual reportong93
 
Classification based on structure
Classification based on structureClassification based on structure
Classification based on structuredanappadharwad
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemIan Toisa
 

What's hot (19)

Measurements in construction
Measurements in constructionMeasurements in construction
Measurements in construction
 
Design of Precast Elements
Design of Precast ElementsDesign of Precast Elements
Design of Precast Elements
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 
Week 4
Week 4Week 4
Week 4
 
Total precase concrete structure for multi storey
Total precase concrete structure for multi storeyTotal precase concrete structure for multi storey
Total precase concrete structure for multi storey
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Precast-concrete Details
Precast-concrete DetailsPrecast-concrete Details
Precast-concrete Details
 
Analysis of precast shear wall connection state of the art review
Analysis of precast shear wall connection  state of the art reviewAnalysis of precast shear wall connection  state of the art review
Analysis of precast shear wall connection state of the art review
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
 
Precast modular structures
Precast modular structuresPrecast modular structures
Precast modular structures
 
Provisions for non -structural fastenings
Provisions for non -structural fasteningsProvisions for non -structural fastenings
Provisions for non -structural fastenings
 
Ppt supersstructure
Ppt supersstructurePpt supersstructure
Ppt supersstructure
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
B tech individual report
B tech individual reportB tech individual report
B tech individual report
 
Classification based on structure
Classification based on structureClassification based on structure
Classification based on structure
 
Building Economics
Building EconomicsBuilding Economics
Building Economics
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 

Similar to Construction with structural restoration methods of working

Basic principles krishnamraju
Basic principles krishnamrajuBasic principles krishnamraju
Basic principles krishnamrajuRamaprasad Varma
 
Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc buildinghlksd
 
SHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGS
SHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGSSHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGS
SHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGSIRJET Journal
 
36405231_seismic_design_steps_153.ppt
36405231_seismic_design_steps_153.ppt36405231_seismic_design_steps_153.ppt
36405231_seismic_design_steps_153.pptIrshadKhan97473
 
SEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptSEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptAteeqRahman26
 
Overview of IS 16700:2023 (by priyansh verma)
Overview of IS 16700:2023 (by priyansh verma)Overview of IS 16700:2023 (by priyansh verma)
Overview of IS 16700:2023 (by priyansh verma)Priyansh
 
Basic designn criteria for highrise buildings
Basic designn criteria for highrise buildingsBasic designn criteria for highrise buildings
Basic designn criteria for highrise buildingsysuranga
 
Earth resistant design philosophy
Earth resistant design philosophyEarth resistant design philosophy
Earth resistant design philosophyRishabh Lala
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...IAEME Publication
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...IAEME Publication
 
TECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxTECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxChandanLawrence
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxVinayak247538
 
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.pptSEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.pptpravin45743
 
IRJET- Study of Behaviour of Multi-Storey Building with Shear Walls
IRJET-  	  Study of Behaviour of Multi-Storey Building with Shear WallsIRJET-  	  Study of Behaviour of Multi-Storey Building with Shear Walls
IRJET- Study of Behaviour of Multi-Storey Building with Shear WallsIRJET Journal
 
Building technology report
Building technology reportBuilding technology report
Building technology reportChong Yi Hui
 

Similar to Construction with structural restoration methods of working (20)

Basic principles krishnamraju
Basic principles krishnamrajuBasic principles krishnamraju
Basic principles krishnamraju
 
Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc building
 
SHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGS
SHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGSSHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGS
SHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGS
 
What measures are adequate for the safety of land and building?
What measures are adequate for the safety of land and building?What measures are adequate for the safety of land and building?
What measures are adequate for the safety of land and building?
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
36405231_seismic_design_steps_153.ppt
36405231_seismic_design_steps_153.ppt36405231_seismic_design_steps_153.ppt
36405231_seismic_design_steps_153.ppt
 
SEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptSEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.ppt
 
Seismic design steps
Seismic design stepsSeismic design steps
Seismic design steps
 
Overview of IS 16700:2023 (by priyansh verma)
Overview of IS 16700:2023 (by priyansh verma)Overview of IS 16700:2023 (by priyansh verma)
Overview of IS 16700:2023 (by priyansh verma)
 
Basic design criteria for high rise buildings
Basic design criteria for high rise buildings Basic design criteria for high rise buildings
Basic design criteria for high rise buildings
 
Basic designn criteria for highrise buildings
Basic designn criteria for highrise buildingsBasic designn criteria for highrise buildings
Basic designn criteria for highrise buildings
 
Earth resistant design philosophy
Earth resistant design philosophyEarth resistant design philosophy
Earth resistant design philosophy
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
 
Retrofitting
Retrofitting Retrofitting
Retrofitting
 
TECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxTECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptx
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.pptSEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
 
IRJET- Study of Behaviour of Multi-Storey Building with Shear Walls
IRJET-  	  Study of Behaviour of Multi-Storey Building with Shear WallsIRJET-  	  Study of Behaviour of Multi-Storey Building with Shear Walls
IRJET- Study of Behaviour of Multi-Storey Building with Shear Walls
 
Building technology report
Building technology reportBuilding technology report
Building technology report
 

Recently uploaded

Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)NareenAsad
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfMadan Karki
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxalijaker017
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfJNTUA
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5T.D. Shashikala
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxRashidFaridChishti
 
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...ShivamTiwari995432
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Lovely Professional University
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
ChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdfChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdfqasastareekh
 
Circuit Breaker arc phenomenon.pdf engineering
Circuit Breaker arc phenomenon.pdf engineeringCircuit Breaker arc phenomenon.pdf engineering
Circuit Breaker arc phenomenon.pdf engineeringKanchhaTamang
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2T.D. Shashikala
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdfKamal Acharya
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AISheetal Jain
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor banktawat puangthong
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.MdManikurRahman
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 

Recently uploaded (20)

Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
ChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdfChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdf
 
Circuit Breaker arc phenomenon.pdf engineering
Circuit Breaker arc phenomenon.pdf engineeringCircuit Breaker arc phenomenon.pdf engineering
Circuit Breaker arc phenomenon.pdf engineering
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 

Construction with structural restoration methods of working

  • 2. Type Of Building Construction A. Based On Construction Method B. Based On Design & Supervision www.auditstructures.in RED CEDAR
  • 3. A. Based On Construction Method  Load Bearing Wall With Step/Strip Footing  R.C.C. Frame Work  Precast Structural Frame Work www.auditstructures.in
  • 4. Redesigning existing structure for nature forces It is a comprehensive task & require planning which include following Information gathering.  Field investigations including details of sub strata, foundation details, extent of damage  Type of Existing structure & its members stability  Design Data Collection  Identification of components required to be strengthened  Cost Estimates (it is feasible up to 60% of new construction)  Method or Procedure to be followed. www.auditstructures.in
  • 5. Crack Investigation  Location  Profile (vertical, Horizontal, Diagonal)  Crack Size (Depth & length) www.auditstructures.in
  • 6. Crack Location In Structure  Foundation: 1. Cracks Travel vertical in step footing in case of unequal settlement.  Flooring: 1. It is circular, Linear.  Column: 1. Generally at 1/3rd height from bottom & top depending on fixing conditions of column ends. 2. At laps location ,if laps are not staggered or not sufficient length. www.auditstructures.in
  • 7.  Brick Work:  In wall at ends of lintel in Diagonal upward directions. 1. Horizontal, generally at slab wall joint , when whole wall sink. 2. Vertical, in case of unequal settlement  Beam: 1. Near Support ,visible on both face of beam & bottom. 2. At centre of beam in its bottom www.auditstructures.in
  • 8.  Slab : 1. At centre of Span in ceiling (slab bottom) 2. At top & bottom face of slab near the supporting wall or at top surface in case of cantilever  Plaster: 1. At joints with R.C.C & brick work 2. At localized locations in wall due to different reasons 3. Locations as briefed in cracks in B.W. www.auditstructures.in
  • 9.  Make structure floor, roof lighter as much as possible.  Avoid Un- symmetry of structure as much as possible. For this purpose structure can be divided.  Sand Pilling ,Stabilization of weak soil, sandy soil having high water level must be taken care off.  Proper Connections of building Elements.  Use steel to strengthen laterally for load bearing wall as per code requirement.  Provide adequate plinth protection.  Avoid to built Rigid masonry Building freely resting on rock in Earth Quack porn area. www.auditstructures.in
  • 10.  Avoid keeping shallow foundation on Black Cotton Soil.  Use one type of foundation in a whole building to avoid differential settlement.  Physical quality check on material should me periodic.  An addition of room, which is structurally independent from an existing building should be designed & constructed in accordance with the seismic requirements of new compiled structures. www.auditstructures.in
  • 11.  Any existing seismic resistance building if occupied for school building then the building has to be rechecked for seismic resistance for building importance factor of 1.5.  Projecting parts like cornices, facia stones, parapets etc. should be avoided as for as possible, otherwise they should be properly reinforced and firmly tied to the main structure Refer IS 1893 CLAUSE -7.12.2  Ceiling plaster should be avoided as possible. www.auditstructures.in
  • 12.  Whenever one un symmetrical building is divided into two or more building by separation walls the structure of the divided building up to plinth level is generally monolithic. Refer code IS 4326 5.1 to 5.2  Even Where calculations based on code- based seismic coefficients may not indicate tension steel requirements, the reinforcement suggested in the form of seismic bands & vertical steel bars at corners & junction of walls & jambs of openings must be provided since these are safe guard for probable maximum earthquake. www.auditstructures.in
  • 13.  Corrosion resistance precautions should also be taken in ductility detailing of cyclone prone & tsunami prone coastal areas.  IS 456 does not allow R.C.C. below M20 grade. www.auditstructures.in
  • 14.  An addition of new structure which is not structurally independent should be designed & constructed such that the entire building conforms to the seismic resistance requirements for new building configuration. The addition should not increase the seismic force in any structural elements of the existing building by more than 5% unless the capacity of the element subject to the increased force is still in compliance with the standard. The addition should not decrease the seismic resistance of any structural element of the existing building below that required by the design codes. www.auditstructures.in
  • 15. For more details Red Cedar Consultancy services At www.auditstructures.in Cell – 8879 33 55 31 Email: rajeshb08@gmail.com www.auditstructures.in

Editor's Notes

  1. This presentation should be read in continuation of presentation 1 & 2 which were on low strength masonry building , building of higher strength of masonry & R.C.C.
  2. Major task is to redesign an existing old structure for functional & earthquake, cyclone or more than one reasons without having any design & drawing of existing structures. Information are gathered & investigated by surveyor, architect ,designer, estimator to decide feasibility of retrofitting as per SSA norms.
  3. Cracks investigations. we have already dealt in our earlier presentations & which are on SSA website .Those cracks which are stable & non increasing are easiest to repair.& those cracks which are expanding or changing in shape need further investigations for cause & then elimination of cause & then off course repair of cracks is carried out.
  4. There are three slides which may help to identify some of major important cracks & its cause. For all cracks please refer earlier presentation of TSG in SSA web site. Some time we may find crack at corner in joint of two load bearing wall & cracks also in floor. In such case we should also check verticality of walls. In my view When wall is out of plumb by more than 10mm in 3.0 m then it is better to re built the wall from foundation after foundation soil stabilization. If wall is vertical then two wall can be connected as per slides shown, latter on in this presentation.
  5. I again repeat that I have already dealt on cracks in detail in my earlier presentations. Please refer those presentation . next
  6. This is third slide on structural & non structural crack locations.
  7. These are some of tips for school building planning, designing & executions.
  8. Avoid keeping shallow foundation on Black Cotton Soil. Use one type of foundation in a whole building to avoid differential settlement. Physical quality check on material should me periodic. An addition of room, which is structurally independent from an existing building should be designed & constructed in accordance with the seismic requirements of new compiled structures
  9. Any existing seismic resistance building if occupied for school building then the building has to be rechecked for seismic resistance for building importance factor of 1.5. Projecting parts like cornices, fascia stones, parapets etc. should be avoided as for as possible, otherwise they should be properly reinforced and firmly tied to the main structure Refer IS 1893 CLAUSE -7.12.2 Ceiling plaster should be avoided as possible
  10. Whenever one un symmetrical building is divided into two or more building by separation walls the structure of the divided building up to plinth level is generally monolithic. Refer code IS 4326 5.1 to 5.2 Codes says that Even Where calculations based on code- based seismic coefficients may not indicate tension steel requirements, the reinforcement suggested in the form of seismic bands & vertical steel bars at corners & junction of walls & jambs of openings must be provided since these are safe guard for probable maximum earthquake.
  11. Corrosion is reduced by proper selection of cement, aggregate, water & cover around bar. There are cement which are acid & alkaline resistant as per requirement. Aggregate should be chemically passive i.e. inert & Cover should be as per code IS 456 requirement.
  12. This slide show designing information but we as a engineer should know that An addition of new structure which is not structurally independent should be designed & constructed such that the entire building conforms to the seismic resistance requirements for new building configuration. The addition should not increase the seismic force in any structural elements of the existing building by more than 5% unless the capacity of the element subject to the increased force is still in compliance with the standard. The addition should not decrease the seismic resistance of any structural element of the existing building below that required by the design codes.
  13. This slide show designing information but we as a engineer should know that An addition of new structure which is not structurally independent should be designed & constructed such that the entire building conforms to the seismic resistance requirements for new building configuration. The addition should not increase the seismic force in any structural elements of the existing building by more than 5% unless the capacity of the element subject to the increased force is still in compliance with the standard. The addition should not decrease the seismic resistance of any structural element of the existing building below that required by the design codes.