STEPS IN SEISMIC DESIGN:
A.PLANNING STAGE:
1. Plan the building and structures in a symmetrical way
both in plan (horizontal axis) and elevation. (vertical
axis).
2. Avoid open ground (Soft storey) which is used for car
parking.
3. Avoid weak storey and provide strong diaphragm. That is
thinner slabs and flat slabs are to be avoided.
4. Provide openings for doors and windows at a distance of
min 0.6 m from the column edges. Follow the IS code
4326 –page 11-for more details for masonry structures.
5. Do not add appendages like water tanks and swimming
pools etc which will create a vast difference of Cm and
Cr. (Center of Mass & Center of rigidity)
6. Conduct soil test and investigate the soil nature
to avoid soil liquefactions.
7. Follow the IS codal and NBC provisions while in
Planning stage which will aid more safer structures.
8. Select good materials-concrete ingredients, brick, steel
etc. Specially steel having an elongation of above 14%
and yield strength of 415N/mm^2.
9. The yield stress shall not be greater than 415N/mm^2.
Steel having an yield strength 500 N/mm^2 may be used
provided the % of elongation is above 14%. Make sure
before approving it by means of lab. test results.
10. Provide plinth beam at ground level , lintel and roof
band (masonry structures).
11. Do not lower the beams in RCC frames at lintel level to
have financial savings since the load path will not be
there.
GEOMETRY:(ref: page 624 to 628 of earthquake
Design concept-by Dr.C.V.R.Murthy)
Building need to be proportioned reasonably to avoid unduly
long, tall or wide dimensions which are known to result in
poor seismic performance during an earthquake. Thus urban
by-laws tend to control the overall geometry of the buildings
with respect to the plot size. These are helpful in controlling
problems like blockade of roads or collapsing on adjacent
buildings in an unfortunate situation of a building collapse
during an earthquake.
Height/plot width <1.3 as per clause 6.6 NBC(1983)(part III)
for plot size and clause 9.4.1 for height.
Ex: plot area 10.0x18.0m-Max.permissible height=
1.3x10=13.0m
Length to width ratio<1.66 Clause 6.6 NBC & 8.2.1 for side
open space.
Ex: helps in ensuring rigid diaphragm action.
Plot area 12mx20m
-deduct standard setbacks.
-Remaining maximum coverage area:6.0mx15.5m.
-Maximum possible plan size: 6mx9.6m.
LENGTH OF BUILDING:
Shall not be more than 150m.
Clear height of 6m at every 30m intervals at ground level for
a passage of 7.5m width.
30m
150m (max)
6m
7.5m
Thermal consideration requires expansion joints after every
45m. These joints become seismic joints in buildings locates
in seismic zones. In such situations, the 150m specified is
not relevant.
OTHER CONSIDERATIONS:
IS 1893 Provisions.
-Improve shape and subsequently behavior of
building during earthquake shaking.
Design provisions may not exist to explicitly limit
the height of buildings. But, it is desirable to
ensure that
- Buildings are not made too long.
- Building height gives a regular (desired)
slenderness ratio.
B.DESIGN STAGE:
Structural analysis:
• The structural designer should address the influence of masonry infill
walls in the lateral force behavior of the structure, either by taking them
into account in the design process
or
• By a separation gap from the column. If a separation gap is provided,
then appropriate measures should be taken to warrant the out-of-plane
stability of the masonry when subjected to lateral forces from wind or
earthquake. The gap min 20 mm to 50mm or but comply with calculation.
1. Avoid weak column and strong beam design.
2. Provide thick slab which will help as a rigid diaphragm. Avoid thin slab
and flat
3. slab construction.
4. Provide cross walls which will stiffen the structures in a symmetric
manner.
5. Provide shear walls in a symmetrical fashion. It should be in outer
boundary to have large lever arm to resist the EQ forces.
6. FOR CANTILEVERS IT IS DESIGNED FOR GRVITY ANFD OTHER LOADS AS
USUAL FOR THE TOP BARS AND THICKNESS BUT DESIGNED IN ADDITION
TO THAT AS PER THE IS CODE 1893-2002 CLAUSE 7.12.2.2 which states:
All horizontal projections like corniced and balconies shall be designed and
checked for stability for five times the design coefficient specified in 6.4.5(that is
=10/3 Ah). .{Vb=AhW}
For design example wide page 335 of ADVANCED R.C. DESIGN BY P.C. VARGHESE.
HOW TO INCREASE THE DUCTILITY :
Ductility is defined as the ability of a structure to undergo inelastic deformations beyond
the initial yield deformation with NO DECREASE IN THE LOAD RESISTANCE.
CAN BE INCREASED IN A SECTION BY:
1. Decrease the percentage of tension steel (pt).
2. Increase the percentage compression steel (pc).
3. Decrease in the tensile strength of steel. (Fy=415N/mm^2).
4. Increase in the compressive strength of concrete.-Min M20 to M30 and above.
5. Increase in the compression flange area in flanged beams (T and L beams) and
6. Increase in the transverse (Shear) reinforcement.
opening
opening opening
masonry masonry
masonry
c
o
l
u
m
n
c
o
l
u
m
n
Beam
Solution:
1. Add ties at closer spacing. Preferably spiral ties.
2. Provide masonry walls on either side equal to twice the opening sizes by
reducing the openings.
3. The best solution is to avoid the opening so that no captive column is
created.
CAPTIVE COLUMNS:
Captive column
masonry masonry
masonry
c
o
l
u
m
n
c
o
l
u
m
n
Beam
CAPTIVE COLUMNS: SOLUTIONS.
OPENING
OPENING OPENING
L
L
L L
L
1 1
a
2
SOFT STOREY:
This case is usually by providing car park at the ground floor.
In this case try to provide masonry walls as possible as to
provide stiffness to columns.
If not possible design the columns and beams in soft storey for
moments and shears by 2.5 times from the analysis results.
Clause 7.10.3a –IS 1893(part1)-2002
b) Besides the columns designed and detailed for the calculated storey shears
and moments, shear walls placed symmetrically in both directions of the
buildings as far as away from the centre of the buildings as feasible; to be
designed exclusively for 1.5 times the lateral storey shear forces calculated
as before. (clause 7.10.3.b)
In another solution is to provide (cross bracings (in elevation) without hindrance to
vehicular movements.
L,T, + SHAPE COLUMNS CAN BE USED BUT DESING IS A STILL A
MATTER .
• SOME BASIC BRACING TYPES:
DIAGONAL BRACING X- BRACING V- BRACING
K- BRACING
INVERTED V- BRACING
DETAILING:
1) GOOD DETAILING IS AS IMPORTANT AS DESIGN AND
PLANNING.
2) FOLLOW THE DUCTILE DETAILING AS PER IS CODE 13920-
1993. ANCHORAGE AND OVERLAPPING ARE TO BE AS PER
THE CODE.
3) IS CODE 4326-1993-EARTHQUAKE RESISTANT DESIGN AND
CONSTRUCTION OF BUILDNGS-IS TO BE FOLLOWED.
CONSTRUCTION STAGE:
1. Good planning and design will not alone aid in resisting seismic
forces but good workmanship and construction practice will add
more strength for resisting the seismic forces.
2. Select good materials . Follow the mix design as obtained by the
lab.
3. Provide the covers as per codal provisions. Do not use the
aggregates, marble pieces and other means except the mortar
cover blocks.
4. Follow the design details as furnished by the structural engineer
and do not make any deviations.
5. Compact the concrete by means of needle vibrator.
6. Cure the concrete for at least a minimum period.
7. Experienced supervisor should be employed to have good quality
control at site.
THANK YOU.

More Related Content

Similar to 36405231_seismic_design_steps_153.ppt

Basic principles krishnamraju
Basic principles krishnamrajuBasic principles krishnamraju
Basic principles krishnamrajuRamaprasad Varma
 
Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc buildinghlksd
 
Reinforcedslab 100917010457-phpapp02
Reinforcedslab 100917010457-phpapp02Reinforcedslab 100917010457-phpapp02
Reinforcedslab 100917010457-phpapp02Alemu Workeneh
 
“Analysis and design of multi storeyed load bearing reinforced masonry struct...
“Analysis and design of multi storeyed load bearing reinforced masonry struct...“Analysis and design of multi storeyed load bearing reinforced masonry struct...
“Analysis and design of multi storeyed load bearing reinforced masonry struct...eSAT Publishing House
 
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsEssential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsErbil Polytechnic University
 
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...ijsrd.com
 
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...ijsrd.com
 
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...
IRJET - Study on Lateral Structural System on Different Height on Asymmet...IRJET Journal
 
Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...eSAT Journals
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdfRijuDasgupta
 
Seismic Behaviour of Reinforced Concrete Flat Plate Systems
Seismic Behaviour of Reinforced Concrete Flat Plate SystemsSeismic Behaviour of Reinforced Concrete Flat Plate Systems
Seismic Behaviour of Reinforced Concrete Flat Plate SystemsIRJET Journal
 
Behavioural Study of RC Flat Plate Multi-Storey Building Persuaded By Stiffne...
Behavioural Study of RC Flat Plate Multi-Storey Building Persuaded By Stiffne...Behavioural Study of RC Flat Plate Multi-Storey Building Persuaded By Stiffne...
Behavioural Study of RC Flat Plate Multi-Storey Building Persuaded By Stiffne...IJERA Editor
 
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...IRJET Journal
 
IRJET- Comparative Study of Flat Slab and Conventional Slab Structure wit...
IRJET-  	  Comparative Study of Flat Slab and Conventional Slab Structure wit...IRJET-  	  Comparative Study of Flat Slab and Conventional Slab Structure wit...
IRJET- Comparative Study of Flat Slab and Conventional Slab Structure wit...IRJET Journal
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSOUMYA KHANDELWAL
 
Comparative Analysis of Cantilever Retaining Wall With And Without Column-Bea...
Comparative Analysis of Cantilever Retaining Wall With And Without Column-Bea...Comparative Analysis of Cantilever Retaining Wall With And Without Column-Bea...
Comparative Analysis of Cantilever Retaining Wall With And Without Column-Bea...IRJET Journal
 
IRJET- Seismic Analysis of Multistoried Building with and without Shear Wall ...
IRJET- Seismic Analysis of Multistoried Building with and without Shear Wall ...IRJET- Seismic Analysis of Multistoried Building with and without Shear Wall ...
IRJET- Seismic Analysis of Multistoried Building with and without Shear Wall ...IRJET Journal
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 

Similar to 36405231_seismic_design_steps_153.ppt (20)

Basic principles krishnamraju
Basic principles krishnamrajuBasic principles krishnamraju
Basic principles krishnamraju
 
Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc building
 
Reinforcedslab 100917010457-phpapp02
Reinforcedslab 100917010457-phpapp02Reinforcedslab 100917010457-phpapp02
Reinforcedslab 100917010457-phpapp02
 
“Analysis and design of multi storeyed load bearing reinforced masonry struct...
“Analysis and design of multi storeyed load bearing reinforced masonry struct...“Analysis and design of multi storeyed load bearing reinforced masonry struct...
“Analysis and design of multi storeyed load bearing reinforced masonry struct...
 
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsEssential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
 
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
 
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
 
Shear wall
Shear wallShear wall
Shear wall
 
23
2323
23
 
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
 
Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
 
Seismic Behaviour of Reinforced Concrete Flat Plate Systems
Seismic Behaviour of Reinforced Concrete Flat Plate SystemsSeismic Behaviour of Reinforced Concrete Flat Plate Systems
Seismic Behaviour of Reinforced Concrete Flat Plate Systems
 
Behavioural Study of RC Flat Plate Multi-Storey Building Persuaded By Stiffne...
Behavioural Study of RC Flat Plate Multi-Storey Building Persuaded By Stiffne...Behavioural Study of RC Flat Plate Multi-Storey Building Persuaded By Stiffne...
Behavioural Study of RC Flat Plate Multi-Storey Building Persuaded By Stiffne...
 
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
 
IRJET- Comparative Study of Flat Slab and Conventional Slab Structure wit...
IRJET-  	  Comparative Study of Flat Slab and Conventional Slab Structure wit...IRJET-  	  Comparative Study of Flat Slab and Conventional Slab Structure wit...
IRJET- Comparative Study of Flat Slab and Conventional Slab Structure wit...
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 
Comparative Analysis of Cantilever Retaining Wall With And Without Column-Bea...
Comparative Analysis of Cantilever Retaining Wall With And Without Column-Bea...Comparative Analysis of Cantilever Retaining Wall With And Without Column-Bea...
Comparative Analysis of Cantilever Retaining Wall With And Without Column-Bea...
 
IRJET- Seismic Analysis of Multistoried Building with and without Shear Wall ...
IRJET- Seismic Analysis of Multistoried Building with and without Shear Wall ...IRJET- Seismic Analysis of Multistoried Building with and without Shear Wall ...
IRJET- Seismic Analysis of Multistoried Building with and without Shear Wall ...
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 

Recently uploaded

Notes of bca Question paper for exams and tests
Notes of bca Question paper for exams and testsNotes of bca Question paper for exams and tests
Notes of bca Question paper for exams and testspriyanshukumar97908
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样umasea
 
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdfobuhobo
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一Fs sss
 
Gray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfGray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfpadillaangelina0023
 
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...Suhani Kapoor
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of JobRemote DBA Services
 
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
Call Girl in Low Price Delhi Punjabi Bagh  9711199012Call Girl in Low Price Delhi Punjabi Bagh  9711199012
Call Girl in Low Price Delhi Punjabi Bagh 9711199012sapnasaifi408
 
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...shivangimorya083
 
Final Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipFinal Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipSoham Mondal
 
NPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdfNPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdfDivyeshPatel234692
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterHector Del Castillo, CPM, CPMM
 
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call GirlsDelhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girlsshivangimorya083
 
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一lvtagr7
 
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一2s3dgmej
 
Business Development and Product Strategy for a SME named SARL based in Leban...
Business Development and Product Strategy for a SME named SARL based in Leban...Business Development and Product Strategy for a SME named SARL based in Leban...
Business Development and Product Strategy for a SME named SARL based in Leban...Soham Mondal
 
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012rehmti665
 
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home MadeDubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Madekojalkojal131
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一A SSS
 

Recently uploaded (20)

Notes of bca Question paper for exams and tests
Notes of bca Question paper for exams and testsNotes of bca Question paper for exams and tests
Notes of bca Question paper for exams and tests
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
 
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 
Gray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfGray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdf
 
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Job
 
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort ServiceYoung Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
 
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
Call Girl in Low Price Delhi Punjabi Bagh  9711199012Call Girl in Low Price Delhi Punjabi Bagh  9711199012
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
 
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
 
Final Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipFinal Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management Internship
 
NPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdfNPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdf
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring Chapter
 
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call GirlsDelhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
 
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
 
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一
 
Business Development and Product Strategy for a SME named SARL based in Leban...
Business Development and Product Strategy for a SME named SARL based in Leban...Business Development and Product Strategy for a SME named SARL based in Leban...
Business Development and Product Strategy for a SME named SARL based in Leban...
 
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
 
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home MadeDubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
 

36405231_seismic_design_steps_153.ppt

  • 2. STEPS IN SEISMIC DESIGN: A.PLANNING STAGE: 1. Plan the building and structures in a symmetrical way both in plan (horizontal axis) and elevation. (vertical axis). 2. Avoid open ground (Soft storey) which is used for car parking. 3. Avoid weak storey and provide strong diaphragm. That is thinner slabs and flat slabs are to be avoided. 4. Provide openings for doors and windows at a distance of min 0.6 m from the column edges. Follow the IS code 4326 –page 11-for more details for masonry structures. 5. Do not add appendages like water tanks and swimming pools etc which will create a vast difference of Cm and Cr. (Center of Mass & Center of rigidity)
  • 3. 6. Conduct soil test and investigate the soil nature to avoid soil liquefactions. 7. Follow the IS codal and NBC provisions while in Planning stage which will aid more safer structures. 8. Select good materials-concrete ingredients, brick, steel etc. Specially steel having an elongation of above 14% and yield strength of 415N/mm^2. 9. The yield stress shall not be greater than 415N/mm^2. Steel having an yield strength 500 N/mm^2 may be used provided the % of elongation is above 14%. Make sure before approving it by means of lab. test results. 10. Provide plinth beam at ground level , lintel and roof band (masonry structures). 11. Do not lower the beams in RCC frames at lintel level to have financial savings since the load path will not be there.
  • 4. GEOMETRY:(ref: page 624 to 628 of earthquake Design concept-by Dr.C.V.R.Murthy) Building need to be proportioned reasonably to avoid unduly long, tall or wide dimensions which are known to result in poor seismic performance during an earthquake. Thus urban by-laws tend to control the overall geometry of the buildings with respect to the plot size. These are helpful in controlling problems like blockade of roads or collapsing on adjacent buildings in an unfortunate situation of a building collapse during an earthquake. Height/plot width <1.3 as per clause 6.6 NBC(1983)(part III) for plot size and clause 9.4.1 for height. Ex: plot area 10.0x18.0m-Max.permissible height= 1.3x10=13.0m Length to width ratio<1.66 Clause 6.6 NBC & 8.2.1 for side open space. Ex: helps in ensuring rigid diaphragm action.
  • 5. Plot area 12mx20m -deduct standard setbacks. -Remaining maximum coverage area:6.0mx15.5m. -Maximum possible plan size: 6mx9.6m. LENGTH OF BUILDING: Shall not be more than 150m. Clear height of 6m at every 30m intervals at ground level for a passage of 7.5m width. 30m 150m (max) 6m 7.5m
  • 6. Thermal consideration requires expansion joints after every 45m. These joints become seismic joints in buildings locates in seismic zones. In such situations, the 150m specified is not relevant. OTHER CONSIDERATIONS: IS 1893 Provisions. -Improve shape and subsequently behavior of building during earthquake shaking. Design provisions may not exist to explicitly limit the height of buildings. But, it is desirable to ensure that - Buildings are not made too long. - Building height gives a regular (desired) slenderness ratio.
  • 7. B.DESIGN STAGE: Structural analysis: • The structural designer should address the influence of masonry infill walls in the lateral force behavior of the structure, either by taking them into account in the design process or • By a separation gap from the column. If a separation gap is provided, then appropriate measures should be taken to warrant the out-of-plane stability of the masonry when subjected to lateral forces from wind or earthquake. The gap min 20 mm to 50mm or but comply with calculation. 1. Avoid weak column and strong beam design. 2. Provide thick slab which will help as a rigid diaphragm. Avoid thin slab and flat 3. slab construction. 4. Provide cross walls which will stiffen the structures in a symmetric manner. 5. Provide shear walls in a symmetrical fashion. It should be in outer boundary to have large lever arm to resist the EQ forces.
  • 8. 6. FOR CANTILEVERS IT IS DESIGNED FOR GRVITY ANFD OTHER LOADS AS USUAL FOR THE TOP BARS AND THICKNESS BUT DESIGNED IN ADDITION TO THAT AS PER THE IS CODE 1893-2002 CLAUSE 7.12.2.2 which states: All horizontal projections like corniced and balconies shall be designed and checked for stability for five times the design coefficient specified in 6.4.5(that is =10/3 Ah). .{Vb=AhW} For design example wide page 335 of ADVANCED R.C. DESIGN BY P.C. VARGHESE. HOW TO INCREASE THE DUCTILITY : Ductility is defined as the ability of a structure to undergo inelastic deformations beyond the initial yield deformation with NO DECREASE IN THE LOAD RESISTANCE. CAN BE INCREASED IN A SECTION BY: 1. Decrease the percentage of tension steel (pt). 2. Increase the percentage compression steel (pc). 3. Decrease in the tensile strength of steel. (Fy=415N/mm^2). 4. Increase in the compressive strength of concrete.-Min M20 to M30 and above. 5. Increase in the compression flange area in flanged beams (T and L beams) and 6. Increase in the transverse (Shear) reinforcement.
  • 9. opening opening opening masonry masonry masonry c o l u m n c o l u m n Beam Solution: 1. Add ties at closer spacing. Preferably spiral ties. 2. Provide masonry walls on either side equal to twice the opening sizes by reducing the openings. 3. The best solution is to avoid the opening so that no captive column is created. CAPTIVE COLUMNS: Captive column
  • 10. masonry masonry masonry c o l u m n c o l u m n Beam CAPTIVE COLUMNS: SOLUTIONS. OPENING OPENING OPENING L L L L L 1 1 a 2
  • 11. SOFT STOREY: This case is usually by providing car park at the ground floor. In this case try to provide masonry walls as possible as to provide stiffness to columns. If not possible design the columns and beams in soft storey for moments and shears by 2.5 times from the analysis results. Clause 7.10.3a –IS 1893(part1)-2002
  • 12. b) Besides the columns designed and detailed for the calculated storey shears and moments, shear walls placed symmetrically in both directions of the buildings as far as away from the centre of the buildings as feasible; to be designed exclusively for 1.5 times the lateral storey shear forces calculated as before. (clause 7.10.3.b) In another solution is to provide (cross bracings (in elevation) without hindrance to vehicular movements. L,T, + SHAPE COLUMNS CAN BE USED BUT DESING IS A STILL A MATTER .
  • 13. • SOME BASIC BRACING TYPES: DIAGONAL BRACING X- BRACING V- BRACING K- BRACING INVERTED V- BRACING
  • 14. DETAILING: 1) GOOD DETAILING IS AS IMPORTANT AS DESIGN AND PLANNING. 2) FOLLOW THE DUCTILE DETAILING AS PER IS CODE 13920- 1993. ANCHORAGE AND OVERLAPPING ARE TO BE AS PER THE CODE. 3) IS CODE 4326-1993-EARTHQUAKE RESISTANT DESIGN AND CONSTRUCTION OF BUILDNGS-IS TO BE FOLLOWED.
  • 15. CONSTRUCTION STAGE: 1. Good planning and design will not alone aid in resisting seismic forces but good workmanship and construction practice will add more strength for resisting the seismic forces. 2. Select good materials . Follow the mix design as obtained by the lab. 3. Provide the covers as per codal provisions. Do not use the aggregates, marble pieces and other means except the mortar cover blocks. 4. Follow the design details as furnished by the structural engineer and do not make any deviations. 5. Compact the concrete by means of needle vibrator. 6. Cure the concrete for at least a minimum period. 7. Experienced supervisor should be employed to have good quality control at site.