SEISMIC DESIGN STEPS
Er.T.Rangarajan,B.E,M.Sc(Struct.Engg),
Consulting structural engineer.
STEPS IN SEISMIC DESIGN:
A.PLANNING STAGE:
1. Plan the building and structures in a symmetrical way
both in plan (horizontal axis) and elevation. (vertical
axis).
2. Avoid open ground (Soft storey) which is used for car
parking.
3. Avoid weak storey and provide strong diaphragm. That is
thinner slabs and flat slabs are to be avoided.
4. Provide openings for doors and windows at a distance of
min 0.6 m from the column edges. Follow the IS code
4326 –page 11-for more details for masonry structures.
5. Do not add appendages like water tanks and swimming
pools etc which will create a vast difference of Cm and
Cr. (Center of Mass & Center of rigidity)
6. Conduct soil test and investigate the soil nature
to avoid soil liquefactions.
7. Follow the IS codal and NBC provisions while in
Planning stage which will aid more safer structures.
8. Select good materials-concrete ingredients, brick, steel
etc. Specially steel having an elongation of above 14%
and yield strength of 415N/mm^2.
9. The yield stress shall not be greater than 415N/mm^2.
Steel having an yield strength 500 N/mm^2 may be used
provided the % of elongation is above 14%. Make sure
before approving it by means of lab. test results.
10. Provide plinth beam at ground level , lintel and roof
band (masonry structures).
11. Do not lower the beams in RCC frames at lintel level to
have financial savings since the load path will not be
there.
GEOMETRY:(ref: page 624 to 628 of earthquake
Design concept-by Dr.C.V.R.Murthy)
Building need to be proportioned reasonably to avoid unduly
long, tall or wide dimensions which are known to result in
poor seismic performance during an earthquake. Thus urban
by-laws tend to control the overall geometry of the buildings
with respect to the plot size. These are helpful in controlling
problems like blockade of roads or collapsing on adjacent
buildings in an unfortunate situation of a building collapse
during an earthquake.
Height/plot width <1.3 as per clause 6.6 NBC(1983)(part III)
for plot size and clause 9.4.1 for height.
Ex: plot area 10.0x18.0m-Max.permissible height=
1.3x10=13.0m
Length to width ratio<1.66 Clause 6.6 NBC & 8.2.1 for side
open space.
Ex: helps in ensuring rigid diaphragm action.
Plot area 12mx20m
-deduct standard setbacks.
-Remaining maximum coverage area:6.0mx15.5m.
-Maximum possible plan size: 6mx9.6m.
LENGTH OF BUILDING:
Shall not be more than 150m.
Clear height of 6m at every 30m intervals at ground level for
a passage of 7.5m width.
30m
150m (max)
6m
7.5m
Thermal consideration requires expansion joints after every
45m. These joints become seismic joints in buildings locates
in seismic zones. In such situations, the 150m specified is
not relevant.
OTHER CONSIDERATIONS:
IS 1893 Provisions.
-Improve shape and subsequently behavior of
building during earthquake shaking.
Design provisions may not exist to explicitly limit
the height of buildings. But, it is desirable to
ensure that
- Buildings are not made too long.
- Building height gives a regular (desired)
slenderness ratio.
B.DESIGN STAGE:
Structural analysis:
• The structural designer should address the influence of masonry infill
walls in the lateral force behavior of the structure, either by taking them
into account in the design process
or
• By a separation gap from the column. If a separation gap is provided,
then appropriate measures should be taken to warrant the out-of-plane
stability of the masonry when subjected to lateral forces from wind or
earthquake. The gap min 20 mm to 50mm or but comply with calculation.
1. Avoid weak column and strong beam design.
2. Provide thick slab which will help as a rigid diaphragm. Avoid thin slab
and flat
3. slab construction.
4. Provide cross walls which will stiffen the structures in a symmetric
manner.
5. Provide shear walls in a symmetrical fashion. It should be in outer
boundary to have large lever arm to resist the EQ forces.
6. FOR CANTILEVERS IT IS DESIGNED FOR GRVITY ANFD OTHER LOADS AS
USUAL FOR THE TOP BARS AND THICKNESS BUT DESIGNED IN ADDITION
TO THAT AS PER THE IS CODE 1893-2002 CLAUSE 7.12.2.2 which states:
All horizontal projections like corniced and balconies shall be designed and
checked for stability for five times the design coefficient specified in 6.4.5(that is
=10/3 Ah). .{Vb=AhW}
For design example wide page 335 of ADVANCED R.C. DESIGN BY P.C. VARGHESE.
HOW TO INCREASE THE DUCTILITY :
Ductility is defined as the ability of a structure to undergo inelastic deformations beyond
the initial yield deformation with NO DECREASE IN THE LOAD RESISTANCE.
CAN BE INCREASED IN A SECTION BY:
1. Decrease the percentage of tension steel (pt).
2. Increase the percentage compression steel (pc).
3. Decrease in the tensile strength of steel. (Fy=415N/mm^2).
4. Increase in the compressive strength of concrete.-Min M20 to M30 and above.
5. Increase in the compression flange area in flanged beams (T and L beams) and
6. Increase in the transverse (Shear) reinforcement.
opening
opening opening
masonry masonry
masonry
c
o
l
u
m
n
c
o
l
u
m
n
Beam
Solution:
1. Add ties at closer spacing. Preferably spiral ties.
2. Provide masonry walls on either side equal to twice the opening sizes by
reducing the openings.
3. The best solution is to avoid the opening so that no captive column is
created.
CAPTIVE COLUMNS:
Captive column
masonry masonry
masonry
c
o
l
u
m
n
c
o
l
u
m
n
Beam
CAPTIVE COLUMNS: SOLUTIONS.
OPENING
OPENING OPENING
L
L
L L
L
1 1
a
2
SOFT STOREY:
This case is usually by providing car park at the ground floor.
In this case try to provide masonry walls as possible as to
provide stiffness to columns.
If not possible design the columns and beams in soft storey for
moments and shears by 2.5 times from the analysis results.
Clause 7.10.3a –IS 1893(part1)-2002
b) Besides the columns designed and detailed for the calculated storey shears
and moments, shear walls placed symmetrically in both directions of the
buildings as far as away from the centre of the buildings as feasible; to be
designed exclusively for 1.5 times the lateral storey shear forces calculated
as before. (clause 7.10.3.b)
In another solution is to provide (cross bracings (in elevation) without hindrance to
vehicular movements.
L,T, + SHAPE COLUMNS CAN BE USED BUT DESING IS A STILL A
MATTER .
• SOME BASIC BRACING TYPES:
DIAGONAL BRACING X- BRACING V- BRACING
K- BRACING
INVERTED V- BRACING
DETAILING:
1) GOOD DETAILING IS AS IMPORTANT AS DESIGN AND
PLANNING.
2) FOLLOW THE DUCTILE DETAILING AS PER IS CODE 13920-
1993. ANCHORAGE AND OVERLAPPING ARE TO BE AS PER
THE CODE.
3) IS CODE 4326-1993-EARTHQUAKE RESISTANT DESIGN AND
CONSTRUCTION OF BUILDNGS-IS TO BE FOLLOWED.
CONSTRUCTION STAGE:
1. Good planning and design will not alone aid in resisting seismic
forces but good workmanship and construction practice will add
more strength for resisting the seismic forces.
2. Select good materials . Follow the mix design as obtained by the
lab.
3. Provide the covers as per codal provisions. Do not use the
aggregates, marble pieces and other means except the mortar
cover blocks.
4. Follow the design details as furnished by the structural engineer
and do not make any deviations.
5. Compact the concrete by means of needle vibrator.
6. Cure the concrete for at least a minimum period.
7. Experienced supervisor should be employed to have good quality
control at site.
THANK YOU.

More Related Content

What's hot

Canal alignment
Canal alignmentCanal alignment
Canal alignmentNaveenaa
 
Types of samplers used in soil sampling
Types of samplers used in soil samplingTypes of samplers used in soil sampling
Types of samplers used in soil samplingAna Debbarma
 
Earthquake Resistant Designs
Earthquake Resistant DesignsEarthquake Resistant Designs
Earthquake Resistant DesignsJNTU
 
1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of explorationjagadish108
 
Masonry structures -_chapter_9_and_10
Masonry structures -_chapter_9_and_10Masonry structures -_chapter_9_and_10
Masonry structures -_chapter_9_and_10Jagajyoti Panda
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920INTEZAAR ALAM
 
Dredging equipment
Dredging equipmentDredging equipment
Dredging equipmentSwarna Rajan
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTShankar Ramasamy
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parkingManoj Navneeth
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed ConcreteRavi Savani
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingAnkit Patel
 
Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structurevikskyn
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadampradip dangar
 
Seismic Analysis
Seismic AnalysisSeismic Analysis
Seismic AnalysisKrishnagnr
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parkingSagar Vekariya
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt1971995
 

What's hot (20)

Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
Types of samplers used in soil sampling
Types of samplers used in soil samplingTypes of samplers used in soil sampling
Types of samplers used in soil sampling
 
Earthquake Resistant Designs
Earthquake Resistant DesignsEarthquake Resistant Designs
Earthquake Resistant Designs
 
1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of exploration
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
Masonry structures -_chapter_9_and_10
Masonry structures -_chapter_9_and_10Masonry structures -_chapter_9_and_10
Masonry structures -_chapter_9_and_10
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Dredging equipment
Dredging equipmentDredging equipment
Dredging equipment
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
 
distress of concrete
distress of concretedistress of concrete
distress of concrete
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parking
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiiting
 
Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structure
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadam
 
Seismic Analysis
Seismic AnalysisSeismic Analysis
Seismic Analysis
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
 
Building by laws
Building  by lawsBuilding  by laws
Building by laws
 

Similar to SEISMIC DESIGN STEPS.ppt

IRJET- A Research on Comparing the Effect of Seismic Waves on Multistoried Bu...
IRJET- A Research on Comparing the Effect of Seismic Waves on Multistoried Bu...IRJET- A Research on Comparing the Effect of Seismic Waves on Multistoried Bu...
IRJET- A Research on Comparing the Effect of Seismic Waves on Multistoried Bu...IRJET Journal
 
Changes in IS 1893 and IS 13920.pdf
Changes in IS 1893 and IS 13920.pdfChanges in IS 1893 and IS 13920.pdf
Changes in IS 1893 and IS 13920.pdfMaharshiSalvi1
 
TECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxTECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxChandanLawrence
 
Design of lifts & escalators
Design of lifts & escalatorsDesign of lifts & escalators
Design of lifts & escalatorsShubham Arora
 
Overview of IS 16700:2023 (by priyansh verma)
Overview of IS 16700:2023 (by priyansh verma)Overview of IS 16700:2023 (by priyansh verma)
Overview of IS 16700:2023 (by priyansh verma)Priyansh
 
Analysis and design of reinforced concrete stepped cantilever retaining wall
Analysis and design of reinforced concrete stepped cantilever retaining wallAnalysis and design of reinforced concrete stepped cantilever retaining wall
Analysis and design of reinforced concrete stepped cantilever retaining walleSAT Journals
 
Basic principles krishnamraju
Basic principles krishnamrajuBasic principles krishnamraju
Basic principles krishnamrajuRamaprasad Varma
 
Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc buildinghlksd
 
Reinforcedslab 100917010457-phpapp02
Reinforcedslab 100917010457-phpapp02Reinforcedslab 100917010457-phpapp02
Reinforcedslab 100917010457-phpapp02Alemu Workeneh
 
“Analysis and design of multi storeyed load bearing reinforced masonry struct...
“Analysis and design of multi storeyed load bearing reinforced masonry struct...“Analysis and design of multi storeyed load bearing reinforced masonry struct...
“Analysis and design of multi storeyed load bearing reinforced masonry struct...eSAT Publishing House
 
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsEssential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsErbil Polytechnic University
 
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...ijsrd.com
 
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...ijsrd.com
 
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...
IRJET - Study on Lateral Structural System on Different Height on Asymmet...IRJET Journal
 
Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...eSAT Journals
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdfRijuDasgupta
 

Similar to SEISMIC DESIGN STEPS.ppt (20)

Flat_slab.pptx
Flat_slab.pptxFlat_slab.pptx
Flat_slab.pptx
 
IRJET- A Research on Comparing the Effect of Seismic Waves on Multistoried Bu...
IRJET- A Research on Comparing the Effect of Seismic Waves on Multistoried Bu...IRJET- A Research on Comparing the Effect of Seismic Waves on Multistoried Bu...
IRJET- A Research on Comparing the Effect of Seismic Waves on Multistoried Bu...
 
Changes in IS 1893 and IS 13920.pdf
Changes in IS 1893 and IS 13920.pdfChanges in IS 1893 and IS 13920.pdf
Changes in IS 1893 and IS 13920.pdf
 
Tall buildings
Tall buildingsTall buildings
Tall buildings
 
TECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxTECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptx
 
Design of lifts & escalators
Design of lifts & escalatorsDesign of lifts & escalators
Design of lifts & escalators
 
Overview of IS 16700:2023 (by priyansh verma)
Overview of IS 16700:2023 (by priyansh verma)Overview of IS 16700:2023 (by priyansh verma)
Overview of IS 16700:2023 (by priyansh verma)
 
Analysis and design of reinforced concrete stepped cantilever retaining wall
Analysis and design of reinforced concrete stepped cantilever retaining wallAnalysis and design of reinforced concrete stepped cantilever retaining wall
Analysis and design of reinforced concrete stepped cantilever retaining wall
 
Basic principles krishnamraju
Basic principles krishnamrajuBasic principles krishnamraju
Basic principles krishnamraju
 
Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc building
 
Reinforcedslab 100917010457-phpapp02
Reinforcedslab 100917010457-phpapp02Reinforcedslab 100917010457-phpapp02
Reinforcedslab 100917010457-phpapp02
 
“Analysis and design of multi storeyed load bearing reinforced masonry struct...
“Analysis and design of multi storeyed load bearing reinforced masonry struct...“Analysis and design of multi storeyed load bearing reinforced masonry struct...
“Analysis and design of multi storeyed load bearing reinforced masonry struct...
 
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsEssential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
 
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
 
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
 
Shear wall
Shear wallShear wall
Shear wall
 
23
2323
23
 
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
 
Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
 

Recently uploaded

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

SEISMIC DESIGN STEPS.ppt

  • 2. STEPS IN SEISMIC DESIGN: A.PLANNING STAGE: 1. Plan the building and structures in a symmetrical way both in plan (horizontal axis) and elevation. (vertical axis). 2. Avoid open ground (Soft storey) which is used for car parking. 3. Avoid weak storey and provide strong diaphragm. That is thinner slabs and flat slabs are to be avoided. 4. Provide openings for doors and windows at a distance of min 0.6 m from the column edges. Follow the IS code 4326 –page 11-for more details for masonry structures. 5. Do not add appendages like water tanks and swimming pools etc which will create a vast difference of Cm and Cr. (Center of Mass & Center of rigidity)
  • 3. 6. Conduct soil test and investigate the soil nature to avoid soil liquefactions. 7. Follow the IS codal and NBC provisions while in Planning stage which will aid more safer structures. 8. Select good materials-concrete ingredients, brick, steel etc. Specially steel having an elongation of above 14% and yield strength of 415N/mm^2. 9. The yield stress shall not be greater than 415N/mm^2. Steel having an yield strength 500 N/mm^2 may be used provided the % of elongation is above 14%. Make sure before approving it by means of lab. test results. 10. Provide plinth beam at ground level , lintel and roof band (masonry structures). 11. Do not lower the beams in RCC frames at lintel level to have financial savings since the load path will not be there.
  • 4. GEOMETRY:(ref: page 624 to 628 of earthquake Design concept-by Dr.C.V.R.Murthy) Building need to be proportioned reasonably to avoid unduly long, tall or wide dimensions which are known to result in poor seismic performance during an earthquake. Thus urban by-laws tend to control the overall geometry of the buildings with respect to the plot size. These are helpful in controlling problems like blockade of roads or collapsing on adjacent buildings in an unfortunate situation of a building collapse during an earthquake. Height/plot width <1.3 as per clause 6.6 NBC(1983)(part III) for plot size and clause 9.4.1 for height. Ex: plot area 10.0x18.0m-Max.permissible height= 1.3x10=13.0m Length to width ratio<1.66 Clause 6.6 NBC & 8.2.1 for side open space. Ex: helps in ensuring rigid diaphragm action.
  • 5. Plot area 12mx20m -deduct standard setbacks. -Remaining maximum coverage area:6.0mx15.5m. -Maximum possible plan size: 6mx9.6m. LENGTH OF BUILDING: Shall not be more than 150m. Clear height of 6m at every 30m intervals at ground level for a passage of 7.5m width. 30m 150m (max) 6m 7.5m
  • 6. Thermal consideration requires expansion joints after every 45m. These joints become seismic joints in buildings locates in seismic zones. In such situations, the 150m specified is not relevant. OTHER CONSIDERATIONS: IS 1893 Provisions. -Improve shape and subsequently behavior of building during earthquake shaking. Design provisions may not exist to explicitly limit the height of buildings. But, it is desirable to ensure that - Buildings are not made too long. - Building height gives a regular (desired) slenderness ratio.
  • 7. B.DESIGN STAGE: Structural analysis: • The structural designer should address the influence of masonry infill walls in the lateral force behavior of the structure, either by taking them into account in the design process or • By a separation gap from the column. If a separation gap is provided, then appropriate measures should be taken to warrant the out-of-plane stability of the masonry when subjected to lateral forces from wind or earthquake. The gap min 20 mm to 50mm or but comply with calculation. 1. Avoid weak column and strong beam design. 2. Provide thick slab which will help as a rigid diaphragm. Avoid thin slab and flat 3. slab construction. 4. Provide cross walls which will stiffen the structures in a symmetric manner. 5. Provide shear walls in a symmetrical fashion. It should be in outer boundary to have large lever arm to resist the EQ forces.
  • 8. 6. FOR CANTILEVERS IT IS DESIGNED FOR GRVITY ANFD OTHER LOADS AS USUAL FOR THE TOP BARS AND THICKNESS BUT DESIGNED IN ADDITION TO THAT AS PER THE IS CODE 1893-2002 CLAUSE 7.12.2.2 which states: All horizontal projections like corniced and balconies shall be designed and checked for stability for five times the design coefficient specified in 6.4.5(that is =10/3 Ah). .{Vb=AhW} For design example wide page 335 of ADVANCED R.C. DESIGN BY P.C. VARGHESE. HOW TO INCREASE THE DUCTILITY : Ductility is defined as the ability of a structure to undergo inelastic deformations beyond the initial yield deformation with NO DECREASE IN THE LOAD RESISTANCE. CAN BE INCREASED IN A SECTION BY: 1. Decrease the percentage of tension steel (pt). 2. Increase the percentage compression steel (pc). 3. Decrease in the tensile strength of steel. (Fy=415N/mm^2). 4. Increase in the compressive strength of concrete.-Min M20 to M30 and above. 5. Increase in the compression flange area in flanged beams (T and L beams) and 6. Increase in the transverse (Shear) reinforcement.
  • 9. opening opening opening masonry masonry masonry c o l u m n c o l u m n Beam Solution: 1. Add ties at closer spacing. Preferably spiral ties. 2. Provide masonry walls on either side equal to twice the opening sizes by reducing the openings. 3. The best solution is to avoid the opening so that no captive column is created. CAPTIVE COLUMNS: Captive column
  • 10. masonry masonry masonry c o l u m n c o l u m n Beam CAPTIVE COLUMNS: SOLUTIONS. OPENING OPENING OPENING L L L L L 1 1 a 2
  • 11. SOFT STOREY: This case is usually by providing car park at the ground floor. In this case try to provide masonry walls as possible as to provide stiffness to columns. If not possible design the columns and beams in soft storey for moments and shears by 2.5 times from the analysis results. Clause 7.10.3a –IS 1893(part1)-2002
  • 12. b) Besides the columns designed and detailed for the calculated storey shears and moments, shear walls placed symmetrically in both directions of the buildings as far as away from the centre of the buildings as feasible; to be designed exclusively for 1.5 times the lateral storey shear forces calculated as before. (clause 7.10.3.b) In another solution is to provide (cross bracings (in elevation) without hindrance to vehicular movements. L,T, + SHAPE COLUMNS CAN BE USED BUT DESING IS A STILL A MATTER .
  • 13. • SOME BASIC BRACING TYPES: DIAGONAL BRACING X- BRACING V- BRACING K- BRACING INVERTED V- BRACING
  • 14. DETAILING: 1) GOOD DETAILING IS AS IMPORTANT AS DESIGN AND PLANNING. 2) FOLLOW THE DUCTILE DETAILING AS PER IS CODE 13920- 1993. ANCHORAGE AND OVERLAPPING ARE TO BE AS PER THE CODE. 3) IS CODE 4326-1993-EARTHQUAKE RESISTANT DESIGN AND CONSTRUCTION OF BUILDNGS-IS TO BE FOLLOWED.
  • 15. CONSTRUCTION STAGE: 1. Good planning and design will not alone aid in resisting seismic forces but good workmanship and construction practice will add more strength for resisting the seismic forces. 2. Select good materials . Follow the mix design as obtained by the lab. 3. Provide the covers as per codal provisions. Do not use the aggregates, marble pieces and other means except the mortar cover blocks. 4. Follow the design details as furnished by the structural engineer and do not make any deviations. 5. Compact the concrete by means of needle vibrator. 6. Cure the concrete for at least a minimum period. 7. Experienced supervisor should be employed to have good quality control at site.