During all phases of an asset's lifecycle, from concept to design and construction, maintenance engineering and asset integrity management can optimize the asset's quality, functionality, reliability, and life cycle costs. These services include data and document management, developing a master equipment list, operability and maintainability analysis, reliability centered maintenance planning, spare parts management, inspection planning, risk-based inspection, and ensuring asset integrity. The goal is to evaluate the asset's lifecycle and optimize its useful life.
CMMS is the leading computerized tool for supporting maintenance services.
It facilitates the development of the IMS “Informational Maintenance System”, which is the set of standards, procedures and tools used to gather and process the information necessary for the management of the maintenance activities and for monitoring the plant activities.
Cmms³ is the leading computerized tool for supporting maintenance services.
It is a computer software that helps maintenance teams keep a record of all assets they are responsible for, schedule and track maintenance tasks and keep a historical record of work they perform.
This project work contains all the necessary information for class 12 accountancy project
This Project Contains two part. They are as follows.
1. Principles of Management (Henri Fayol)
2. Marketing Management (On Pickles)
This project work contains all the necessary information for class 12 accountancy project
This Project Contains three part. They are as follows.
1. Comprehensive Project
2. Specific - 01(Ratio Analysis)
3. Specific - 02(Cash Flow Statement)
Ramcube - Cmms³ maintenance management system sw Ver. 2016lt1968
CMMS3 is the asset management solution designed by RAMCUBE to support maintenance operations. It provides the means to develop a “Computerized Maintenance Management System” comprising the array of regulations, procedures and tools engaged in collecting and processing the information needed to manage maintenance operations and to monitor equipment activity.
Reliability Maintenance Engineering Day 3 session 1 Measuring AvailabilityThree day live course focused on reliability engineering for maintenance programs. Introductory material and discussion ranging from basic tools and techniques for data analysis to considerations when building or improving a program.
In this world of fast held movement of goods right from Medicines to low shelf life products all gets governed by Supply Chain. A robust supply chain can get an product placed on top in terms of sales and reach.
Solution Consulting presentation is a one of a kind product and practices collected and implemented over 5 years of experience in redefining supply chain.
With Business defining Tools from Muda/Muri, kaizen, Reverse Engineering, Business Allocations and Diagnostics, Manufacturing Diagnostics, Implementation of Industry 4.0, Project Management, Call outs, data Modeling are key pointers in the presentation.
Fish Bone diagram for warehouse Design, and inventory collection pointers are also talked in the presentation.
CMMS is the leading computerized tool for supporting maintenance services.
It facilitates the development of the IMS “Informational Maintenance System”, which is the set of standards, procedures and tools used to gather and process the information necessary for the management of the maintenance activities and for monitoring the plant activities.
Cmms³ is the leading computerized tool for supporting maintenance services.
It is a computer software that helps maintenance teams keep a record of all assets they are responsible for, schedule and track maintenance tasks and keep a historical record of work they perform.
This project work contains all the necessary information for class 12 accountancy project
This Project Contains two part. They are as follows.
1. Principles of Management (Henri Fayol)
2. Marketing Management (On Pickles)
This project work contains all the necessary information for class 12 accountancy project
This Project Contains three part. They are as follows.
1. Comprehensive Project
2. Specific - 01(Ratio Analysis)
3. Specific - 02(Cash Flow Statement)
Ramcube - Cmms³ maintenance management system sw Ver. 2016lt1968
CMMS3 is the asset management solution designed by RAMCUBE to support maintenance operations. It provides the means to develop a “Computerized Maintenance Management System” comprising the array of regulations, procedures and tools engaged in collecting and processing the information needed to manage maintenance operations and to monitor equipment activity.
Reliability Maintenance Engineering Day 3 session 1 Measuring AvailabilityThree day live course focused on reliability engineering for maintenance programs. Introductory material and discussion ranging from basic tools and techniques for data analysis to considerations when building or improving a program.
In this world of fast held movement of goods right from Medicines to low shelf life products all gets governed by Supply Chain. A robust supply chain can get an product placed on top in terms of sales and reach.
Solution Consulting presentation is a one of a kind product and practices collected and implemented over 5 years of experience in redefining supply chain.
With Business defining Tools from Muda/Muri, kaizen, Reverse Engineering, Business Allocations and Diagnostics, Manufacturing Diagnostics, Implementation of Industry 4.0, Project Management, Call outs, data Modeling are key pointers in the presentation.
Fish Bone diagram for warehouse Design, and inventory collection pointers are also talked in the presentation.
Mike Marshall, PE (mtmarshall.llc@gmail.com) is an Oil & Gas industry consultant who has recently developed an EAM loss prevention and asset optimization software product derived from various spreadsheet-based tools (consisting of business methods, practices, KPIs, scorecards, reports, data maps/views, etc.) which were central to the actual asset performance optimization/management and process safety improvement metrics and methodologies he implemented while working for both Marathon (23 years) and Chevron (10 years).
Definition of RCM, principles and goals of RCM; Four major components of RCM: reactive maintenance, preventive maintenance, predictive testing and inspection and proactive maintenance; RCM strategies.
Successful transfer of pharmaceutical products and their processes is critical to the successful launch. Its success ensures that products of the highest quality are delivered to the patients along with meeting the business demands of the company. However execution of that transfer is complex involving the interactions of many disciplines across an organization. It depends both on the careful development, management, and transfer of technical and business knowledge along with the development of steps to define the formal transfer of that knowledge from R&D documents and systems to commercial manufacturing documents and systems.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
2. ASSET MANAGEMENT SERVICES 1 • 6
During the lifecycle phases of a Project, starting from the Project Concept,
followed by a feasibility study/preliminary Design and then the detail of
the asset design, there are a lot of opportunities for influencing the quality
of the asset in terms of:construction, functionality, reliability, availability,
maintainability, inspectability and cost.
Maintenance Engineering and Asset Integrity Management are sure two
approaches useful to evaluate the lifecycle of the asset, during the different
phases of a Project, and finalized to optimize the Asset Life.
3. RAMCUBE Asset Management
Services are addressed to
provide and to assure the best
Asset Life Cycle
Management
ASSET MANAGEMENT SERVICES 2 • 6
MAINTENANCEENGINEERING
ASSETINTEGRITYMANAGEMENT
ASSET
MANAGEMENT
DATA& DOCUMENT
MANAGEMENT
CIMS
MASTER EQUIPMENT
LIST - MEL
OPERABILITY &
MAINTAINABILITY
ANALYSIS
RELIABILITY CENTRED
MAINTENANCE - RCM
SPARE PARTS &
WAREHOUSE
MANAGEMENT
CMMS
INSPECTION
PLAN
FITNESS FOR
SERVICE “FFS”
RISK BASED
INSPECTION
“RBI”
DEGRADATION
MECHANISMS
CORROSION
LOOP
INSPECTION
ASSET REGISTER
4. DATA & DOCUMENT MANAGEMENT
• Managing data & document relevant to components, materials and
documents
• Cost reduction
• Rationalization and optimization of company processes integration of
engineering, maintenance and production
MASTER EQUIPMENT LIST - MEL
• Definition of the item to be included in the maintenance analysis
• Development an appropriate “maintenance manual” for the collection
of all the vendor operation and maintenance manuals
MAINTENANCE ENGINEERING 3 • 6
OPERABILITY & MAINTAINABILITY ANALYSIS
• Checking and assuring operability and maintainability aspects
• Ensuring that engineering and procurement of project facilities meet
safety, accessibility, operability, maintainability and HFE objectives
RELIABILITY CENTRED MAINTENANCE - RCM
• Determination of “what activity” is required for each item in terms of
maintenance
• Failure mode and effect analysis (FMEA) development
• Criticality analysis development
• Selection of the right maintenance policy to apply for each item
• Customized maintenance plan
2
3
4
1
5. • Evaluation of the reliability, availability, maintainability and safety of
complex systems
• Determination of the production availability
• Suggestion of potential solutions in order to improve the reliability
and the availability of the plant
WAREHOUSE MANAGEMENT
• Managing and optimization of all spare parts necessary for the
operations
• Material coding
• Optimization of the warehouse stock levels with the anticipated
behaviour of the equipment
• Availability and storing into the site warehouses
• Interchangeability report
MAINTENANCE ENGINEERING 4 • 6
CMMS
• Document management
• Maintenance activities management and scheduling
• Approving work flow
• Resources and material optimization
• Key performance evaluation
RAM ANALYSIS
5
6
7
6. INSPECTION ASSET REGISTER
• Clearly definition of the item to be inspected
• Appropriate, adequate and customized inspection plan
• Rationalization and optimization of company processes integration of
engineering, maintenance and production
CORROSION LOOP
• Definition of homogeneous groups of items in terms of design,
operating parameters, material, and inspection topics
• Determination of potential damage mechanisms, corrosion types and
corrosion rates for each corrosion loop and item
• Risk ranking
ASSET INTEGRITY MANAGEMENT 5 • 6
DEGRADATION MECHANISMS
• Identification of the appropriate degradation mechanism
• Determination of the susceptibilities for all item
• Quality, appropriate and effectiveness of the inspection techniques to
be selected
RISK BASED INSPECTION - RBI
• Optimization of the inspection activities performed
• Risk ranking
• Improving the management of the assets integrity and reducing the
overall costs for inspection and monitoring
• Identification of the areas and items with higher risk categories and
development a prioritized list for more in-depth inspection or analysis
2
3
4
1
7. • Procedures assessment
• Taking in consideration of the plant history
• Calculation of the remaining life of an item
• Defects characterization
INSPECTION PLAN
• Development of the appropriate and customized inspection plan
• Development of written scheme of examination linked for each item in
order to manage what, when and where inspection will be performed
and the most appropriate inspection techniques
ASSET INTEGRITY MANAGEMENT 6 • 6
CIMS
• Inspection activities management and scheduling
• Approving work flow
• Inspection report management
• Non destructive testing - resources and material optimization
• Remaining life and corrosion rate calculation
FITNESS FOR SERVICE - FFS
5
6
7