This document describes an experiment to determine the molar mass of gases in a lighter. The mass of a lighter was measured after displacing 100 mL of water in three trials. The molar masses calculated from these trials were 64.3 g/mol, 40.5 g/mol, and 66.7 g/mol. The purpose was to find the molar mass of the mixed gases in the lighter and calculate the exact mixture.