SlideShare a Scribd company logo
1 of 8
Download to read offline
VICTOR LLANERA LAVALLE
No. 19 Nazario street Gulod Novaliches Quezon City, Philippines
Philippines Mobile No. : +639228551317 / +639189013705
Philippines Land line No. : +63 4145550
E – Mail Address lavalle_victor@yahoo.com / lavallevictor7@gmail.com
Skype Address : victor.lavalle2
POSITION DESIRED : QC - PAINTING / COATING INSPECTOR
Objective of the Jobs:
A knowledge acquires from Seminar and training on actual works on the field can make
opportunity to give strong contribution to the organizational goals through continued
development of professional skills. To developed further my talents and skills for continuing
career improvement and acquire a challenging position wherein I can contribute to the
effectiveness and overall productivity of the company. The objective is to ensure that services
comply with the requirements of the contract and applicable laws.
Qualification summary :
Extensive experience in Marine and Industrial Power Plant Projects - specialized in
Painting and Coating inspection. Performed quality assurance and implementing approved
Quality System for construction by monitoring and ensuring that Painting works were carried
out in accordance with standard and Specification. Thorough understanding and
implementation of Project Specification, Project Procedures and other Coating Work Method
Statements that required documents. Ability to solve and repaired coating defects. Experienced
in determining the Painting failure and generate effective solution in solving problems in
construction issues. Established and maintained effective working relationship within the
course work, coordinates effectively in a team environment, communicate clearly and concisely,
both oral and written.
WORK EXPERIENCE ABROAD :
AL KHALIJ 4 X 350 MW STEAM POWER PLANT – Gulf Company of Libya
HYUNDAI ENGINEERING & CONSTRUCTION LTD. – BECHTEL EPC
PAINTING ENGINEER – JUNE 14 , 2013 – JULY 23, 2014
Boquaria Sirte , LIBYA
FUNCTION
To report and coordinates to Painting Manager and painting supervisor regarding the daily and future
activities of the painting work plan , Performed per system area inspection of piping, Tanks & Steel
structures. Supervision of sub-contractor’s quality activities in accordance to Project Standards
and Specification, monitoring of punch list clearing activities in STG (Steam Turbine Generator)
Main Building Unit 1, 2, 3 & 4 and Quality Inspection issued punch. Surveillance and issuance
of non conformity reports for unaccepted practices on construction side upon performing
inspection. scheduling of manpower at designated jobsite for monitoring of their production output ,
conduct site investigation on untoward incident happened, monitor the surface preparation, ambient
condition, temperature, prior and during painting application. Supervise the dry film thickness of each
coating and make a pre final inspection, in order to check that Specification and Coating design are
strictly followed. Interpret and analyzed P & ID drawing, make documentations, NCR, painting reports
and important data in every accomplished Power plant project.
NEW SHIPBUILDING ATTENDED IN CHINA :
NEW CENTURY SHIPBUILDING 2008 - 2009
( Jingjiang City , Jiangsu Province. CHINA
CHUGOKU MARINE PAINT = QC – PAINTING INSPECTOR
FUNCTION
To report and coordinates to Site Manager and owner’s painting supervisor regarding the daily and future
activities of the painting work plan, Performed per system area inspection on Block stage area.
Monitoring of sub-contractor’s quality activities in accordance to Project Standards and
Specification, supervision of punch list clearing activities on Erection stage area and Quality
Inspection issued punch. Surveillance and issuance of non conformity reports for unaccepted
practices on construction side upon performing inspection. Conduct site investigation on untoward
incident happened, monitor the surface preparation, ambient condition, temperature, prior and during
painting application. Supervise the dry film thickness of each coating and make a pre final inspection, in
order to check that Specification and Coating design are strictly followed.Interpret and analyzed new
shipbuilding drawing, make documentations, NCR, painting reports and important data in every
accomplished new shipbuilding project.
APRIL,2008 to JUNE, 2008 : MT STARLING / HULL No. 0307318
: MT LOUISE / HULL No. 0307319
(PRODUCT CARRIER OIL TANKER).
SEAARLAND SHIPMANAGEMENT HAMBURGE
DWT – 73,400 TON CLASS.
MARCH,2009 to JUNE,2009 : SUMMIT AFRICA / HULL No. 0307366
: SUMMIT ASIA / HULL No. 0307365
(PRODUCT CARRIER OIL TANKER).
INTERSHIP NAVIGATION CO.LTD.
DWT – 73,400 TON CLASS
NEW TIMES SHIPBUILDING- 2008
( Jingjiang City , Jiangsu Province. CHINA)
CHUGOKU MARINE PAINT = QC – PAINTING INSPECTOR
FUNCTION
To report and coordinates to Site Manager and owner’s painting supervisor regarding the daily and future
activities of the painting work plan, Performed per system area inspection on Block stage area.
Monitoring of sub-contractor’s quality activities in accordance to Project Standards and
Specification, supervision of punch list clearing activities on Erection stage area and Quality
Inspection issued punch. Surveillance and issuance of non conformity reports for unaccepted
practices on construction side upon performing inspection. Conduct site investigation on untoward
incident happened, monitor the surface preparation, ambient condition, temperature, prior and during
painting application. Supervise the dry film thickness of each coating and make a pre final inspection, in
order to check that Specification and Coating design are strictly followed. Interpret and analyzed new
shipbuilding drawing, make documentations, NCR, painting reports and important data in every
accomplished new shipbuilding project.
JULY,2008 to NOVEMBER,2008 : MT OVERSEAS EVERGLADES /
HULL No. 0311502
: MT OVERSEAS YELLOWSTONES
HULL No. 0311501
(CRUDE OIL TANKER)
OVERSEAS SHIPHOLDING GROUP
DWT – 114,000 TON CLASS
NEW YANGZI JIANG SHIPBUILDING - 2009
( Jingjiang City , Jiangsu Province. CHINA)
CHUGOKU MARINE PAINT = QC – PAINTING INSPECTOR
FUNCTION
To report and coordinates to Site Manager and owner’s painting supervisor regarding the daily and future
activities of the painting work plan, Performed per system area inspection on Block stage area.
Monitoring of sub-contractor’s quality activities in accordance to Project Standards and
Specification, supervision of punch list clearing activities on Erection stage area and Quality
Inspection issued punch. Surveillance and issuance of non conformity reports for unaccepted
practices on construction side upon performing inspection. Conduct site investigation on untoward
incident happened, monitor the surface preparation, ambient condition, temperature, prior and during
painting application. Supervise the dry film thickness of each coating and make a pre final inspection, in
order to check that Specification and Coating design are strictly followed. Interpret and analyzed new
shipbuilding drawing, make documentations, NCR, painting reports and important data in every
accomplished new shipbuilding project.
JULY,2009 to DECEMBER,2009 : MT EAST SUNRISE 88 / HULL No. 886
DWT-92,500 TON CLASS (BULKCARRIER )
NEW YANGZI JIANG
: MT BOTTIGLIERI AMBITION / HULL No.763
DWT-92,500 TON CLASS (BULKCARRIER )
GIUSEPPE BOTTIGLIERI de NAVIGAZION
WORK EXPERIENCES IN THE PHILIPPINES
MAINCOAT, INC. DISTRIBUTOR OF CHUGOKU MARINE PAINTS.
COATING TECHNICAL ENGINEER ( February 1996 – June 13 , 2013 )
FUNCTIONS
1. Carry out quality control. Perform visual inspection & confirm that the work meets the
specification, codes & standards through statistically significant test & observation such as
surface preparation and the degree of cleanliness specified has been achieved accordingly
and that the required profile has been created.
2. Verify that all required instrument are available.
3. Monitoring of ambient conditions and wet film thickness reading prior and during
Application.
4. Inspection of dry film thickness (DFT ) of each coat against that specified and
Determine if each individual coat is suitable to receive the next coat, and to ensure
That such imperfections as over spray, pinholes, lack of adhension , insufficient film
Thickness, etc, has been corrected. This includes drying / curing times versus Temperature
and humidity confirmation.
5. Make final inspection to verify for any touch-up or repaired work that was found
Necessary , have final check for full compliance with the specification and to confirm that
the execution of corrosion protection work in accordance to relevant codes and standards.
NEW SHIPBUILDINGATTENDED at TSUNEISHI HEAVY INDUSTRIES,
CEBU PHILIPPINES . ( Coating Technical Engineer )
Dec.1997 – July 1998 MV J. CAPTAIN TRADER
Nishin Shipping Co.Ltd., Japan
23,510 DWT – Log / Bulk Carrier
Oct.2001 – March 2002 MV YASA KAPTAIN ERBIL
Yasa Shipping Industry & Trading S/ A
52,000 DWT – Bulk Carrier
July 2002 – Feb. 2003 MV BRIGHT BULKER
Nissin Shipping Co. Ltd. Japan
52,000 DWT – Bulk Carrier
Aug. 2005 – Jan. 2005 MV GECON 1
GLEAMRY MARITIME
52,000 DWT – Bulk Carrier
Aug. 2005 – Jan. 2006 MV TENSHOU MARU
KAMBARA STEAMSHIP Co.
52,000 DWT
June 1998 – Jan. 1999 MV MARION STAR
Orix Maritime Corp., Japan
23,492 DWT – Bulk Carrier
Feb. 2006 – Dec. 2006 MV HOEGH MANILA
HOEGH AUTOLINERS CO.
4,300Capacity, Pure Car Truck Carrier
Nov. 2006 – May 2007 MV METEORA
Global Navigational and Investment Inc.
58,485 DWT – Bulk Carrier
SHIP REPAIR ATTENDED(FOREIGN VESSELS ) at SUBIC SHIPYARD and
KEPPEL BATANGAS SHIPYARD, PHILIPPINES.(COATING TECHNICAL ENGINEER )
AUG 2003 MV KYUSHU STAR - Zodiac Maritime
MAR 2004 MV MING ASIA - Yang Ming Line
MAY 2004 MV ELLINITA - J.J. Ugland Shipping Co.
JUN 2007 MV WESTAMA - Project Shipping Inc.
JUL 2007 MV SIBULK INTEGRITY - Moonrise Shipping
SEPT 2007 MV EASTERN SKY - Eastern Shipping lines Inc.
DEC 2007 MV WHITE CATLLEYA 10 - VLK Marine Corp.
JUNE 2011 MV MARA - SCORPIO SHIPMANAGEMENT
INDUSTRIAL PROJECTS ATTENDED in PHILIPPINES .
2011- 2012 TAGANITO,HIGH PRESSURE ACID LEACH
PROJECT(S U R I G A O ) PHILIPPINES
QC - Painting Inspector
Taihei Alltech Construction Philippines / Overseas Technical
Engineering and Construction.Pte, Ltd.
2005 MAKILING – BANAHAW GEOTHERMAL POWER PLANT
REHABILITATION PHASE No.2
QC - Painting Inspector
National Power Corp./ MITSUBISHI HEAVY INDUSTRIES
2004 PETRON OIL REFINERY REHABILITATION PROJECT
QC - Painting Inspector
PETRON,LIMAY BATAAN PHILIPPINES
2003 TRAMO EDSA FLYOVER
QC - Painting Inspector
BF Metal Corp.
1998 FORD ASSEMBLY PLANT
QC - Painting Inspector
Kajima Construction
1997 TOYOTA PARTS ASSEMBLY PLANT
QC - Painting Inspector
Suwabe Phil.Sta. Rosa, Laguna Philippines
Certification and Training
. Protective Coating Inspector Program
SSPC The Society for Protective Coatings: October 1 – 6, 2012
I.D. No. 49595
. Personal and Business Development
Maincoat , Inc. Marine & Industrial Coatings: December 3 , 2003
PERSONAL INFORMATION:
CIVIL STATUS : MARRIED
DATE OF BIRTH : SEPTEMBER 20, 1971
AGE : 43 YEARS OLD
PLACE OF BIRTH : CALOOCAN METRO MANILA, PHILIPPINES
NATIONALITY : FILIPINO
RELIGION : ROMAN CATHOLIC
LANGUAGE : ENGLISH, FILIPINO
GENDER : MALE
NAME OF SPOUSE : MELLANY ARELLANO LAVALLE
NUMBER OF CHILDREN : TWO
EDUCATION
ELEMENTARY LEVEL : NOVALICHES ELEMENTARY SCHOOL
NOVALICHES,QUEZON CITY
1978 – 1984 GRADUATED
HIGH SCHOOL : METRO MANILA COLLEGE
NOVALICHES, QUEZON CITY
1984 – 1988 GRADUATED
VOCATIONAL : FOREST RANGER
PANAY STATE POLYTECHNIC COLLEGE
MAMBUSAO CAPIZ, PHILIPPINES
1988 – 1990
COLLEGES : BACHELOR OF SCIENCE IN
AGRICULTURAL ENGINEERING
PANAY STATE POLYTECHNIC COLLEGE
MAMBUSAO CAPIZ, PHILIPPINES
1990 – 1995 GRADUATED
SKILLS AND COMPETENCIES:
 Knowledgeable in MS Office Application.
 Expertise in Determining Painting failure and how to resolve the Coating failure.
REFERENCES :
MR. ROCELITO DEL ROSARIO
JUTON PHILIPPINES
COATING TECHNICAL ENGINEER
MOBILE No. +639178173918
Architect ABRAHAM D. ARELLANO
ARCHITECTURAL ENGINEER
MOBILE No.+639278615085
MR. CAMILO CUARENTAS
MAINCOAT , INC . ( Marine and Industrial Paints )
TECHNICAL MANAGER
MOBILE No. +639228450885
MR. LEOLISES LEONOR
HANJIN HEAVY INDUSTRIES
ANGLO EASTERN SHIPMANAGEMENT - PAINT SUPERVISOR
MOBILE No. +639173071569
MR. LOPE GRAJEDA
OFFICER IN CHARGE
Creative Power Solution
AL KHALIJ 4 X 350 MW STEAM POWER PLANT
BoquariaSirte , LIBYA
MR. VINCENT BARAZON
KAZAKHSTAN OFFSHORE PROJECT
Saipem ENI - PAINT SUPERVISOR
MR. EDWARD MARTELINO
Intership Navigational – HULL SUPERVISOR
MOBILE No. +8615052908278

More Related Content

What's hot

M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)Udaya Kumar
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineerandi dipayadnya
 
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorSaleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorsalimmalic
 
2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdfCary Dela Cruz
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi
 
QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_seraj ahmad
 
Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert
Nirmal_Kumar_Sinha - Sr. Quality cum Material ExpertNirmal_Kumar_Sinha - Sr. Quality cum Material Expert
Nirmal_Kumar_Sinha - Sr. Quality cum Material ExpertSinha Sab
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Naveed Gohar
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Joseph raj resume
Joseph raj resumeJoseph raj resume
Joseph raj resumeJOSEPH RAJ
 

What's hot (20)

QA/QC Inspector or Engineer
QA/QC Inspector or EngineerQA/QC Inspector or Engineer
QA/QC Inspector or Engineer
 
M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
Cv precast concrete
Cv   precast concreteCv   precast concrete
Cv precast concrete
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
 
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorSaleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf
 
CV
CVCV
CV
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert
Nirmal_Kumar_Sinha - Sr. Quality cum Material ExpertNirmal_Kumar_Sinha - Sr. Quality cum Material Expert
Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert
 
Resume_Anjanna
Resume_AnjannaResume_Anjanna
Resume_Anjanna
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.
 
navjay
navjaynavjay
navjay
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Joseph raj resume
Joseph raj resumeJoseph raj resume
Joseph raj resume
 

Viewers also liked

TBIZ 2012 - Web marketing - stumenti e metodi
TBIZ 2012 - Web marketing - stumenti e metodiTBIZ 2012 - Web marketing - stumenti e metodi
TBIZ 2012 - Web marketing - stumenti e metodiTechnologyBIZ
 
Curta! O Canal Independente
Curta! O Canal IndependenteCurta! O Canal Independente
Curta! O Canal IndependenteCurta-CABEQ12hs
 
plista Native Ads Survey
plista Native Ads Surveyplista Native Ads Survey
plista Native Ads Surveyplista GmbH
 
NISM Update November 2010
NISM Update November 2010NISM Update November 2010
NISM Update November 2010NISM
 
CV - Priya Safaya final
CV - Priya Safaya finalCV - Priya Safaya final
CV - Priya Safaya finalPriya Safaya
 
Presentacion conoce los 30 mejores plugins para tu wordpress
Presentacion conoce los 30 mejores plugins para tu wordpressPresentacion conoce los 30 mejores plugins para tu wordpress
Presentacion conoce los 30 mejores plugins para tu wordpressEnrique Rodriguez
 
A New Generation of Workers' Comp - How It Can Help Your Enterprise
A New Generation of Workers' Comp - How It Can Help Your EnterpriseA New Generation of Workers' Comp - How It Can Help Your Enterprise
A New Generation of Workers' Comp - How It Can Help Your EnterpriseMichael Murray
 
Indigenous Peoples of the Pacific Northwest Supplement - Native Peoples of th...
Indigenous Peoples of the Pacific Northwest Supplement - Native Peoples of th...Indigenous Peoples of the Pacific Northwest Supplement - Native Peoples of th...
Indigenous Peoples of the Pacific Northwest Supplement - Native Peoples of th...K-12 STUDY CANADA
 
snapdClarington_Aug2014_24page_final
snapdClarington_Aug2014_24page_finalsnapdClarington_Aug2014_24page_final
snapdClarington_Aug2014_24page_finalSiobhan Bothwell
 
Trens da Serra Verde Express
Trens da Serra Verde ExpressTrens da Serra Verde Express
Trens da Serra Verde ExpressAdonai Filho
 
Data and Processes: Can we Marry Them . . . and Make the Marriage Last?
Data and Processes: Can we Marry Them . . . and Make the Marriage Last?Data and Processes: Can we Marry Them . . . and Make the Marriage Last?
Data and Processes: Can we Marry Them . . . and Make the Marriage Last?INRIA-CEDAR
 
Obras singulares de Peyber
Obras singulares de PeyberObras singulares de Peyber
Obras singulares de Peybergrupo Peyber
 
Marketing Channel Optimisation: Achieving competitive advantage in higher edu...
Marketing Channel Optimisation: Achieving competitive advantage in higher edu...Marketing Channel Optimisation: Achieving competitive advantage in higher edu...
Marketing Channel Optimisation: Achieving competitive advantage in higher edu...Hobsons APAC
 
Dalcroze - Jueves
Dalcroze - JuevesDalcroze - Jueves
Dalcroze - Juevesabullejos
 
Analytische Ermittlungen mit InfoZoom, iBase und Analyst’s Notebook
Analytische Ermittlungen mit InfoZoom, iBase und Analyst’s NotebookAnalytische Ermittlungen mit InfoZoom, iBase und Analyst’s Notebook
Analytische Ermittlungen mit InfoZoom, iBase und Analyst’s Notebookcorma GmbH
 
The value proposition of Marketing Automation
The value proposition of Marketing AutomationThe value proposition of Marketing Automation
The value proposition of Marketing AutomationMukul Krishna
 

Viewers also liked (20)

TBIZ 2012 - Web marketing - stumenti e metodi
TBIZ 2012 - Web marketing - stumenti e metodiTBIZ 2012 - Web marketing - stumenti e metodi
TBIZ 2012 - Web marketing - stumenti e metodi
 
Curta! O Canal Independente
Curta! O Canal IndependenteCurta! O Canal Independente
Curta! O Canal Independente
 
Comportam niv i
Comportam niv iComportam niv i
Comportam niv i
 
plista Native Ads Survey
plista Native Ads Surveyplista Native Ads Survey
plista Native Ads Survey
 
NISM Update November 2010
NISM Update November 2010NISM Update November 2010
NISM Update November 2010
 
CV - Priya Safaya final
CV - Priya Safaya finalCV - Priya Safaya final
CV - Priya Safaya final
 
Presentacion conoce los 30 mejores plugins para tu wordpress
Presentacion conoce los 30 mejores plugins para tu wordpressPresentacion conoce los 30 mejores plugins para tu wordpress
Presentacion conoce los 30 mejores plugins para tu wordpress
 
A New Generation of Workers' Comp - How It Can Help Your Enterprise
A New Generation of Workers' Comp - How It Can Help Your EnterpriseA New Generation of Workers' Comp - How It Can Help Your Enterprise
A New Generation of Workers' Comp - How It Can Help Your Enterprise
 
Equipo11 final
Equipo11 finalEquipo11 final
Equipo11 final
 
Indigenous Peoples of the Pacific Northwest Supplement - Native Peoples of th...
Indigenous Peoples of the Pacific Northwest Supplement - Native Peoples of th...Indigenous Peoples of the Pacific Northwest Supplement - Native Peoples of th...
Indigenous Peoples of the Pacific Northwest Supplement - Native Peoples of th...
 
snapdClarington_Aug2014_24page_final
snapdClarington_Aug2014_24page_finalsnapdClarington_Aug2014_24page_final
snapdClarington_Aug2014_24page_final
 
Trens da Serra Verde Express
Trens da Serra Verde ExpressTrens da Serra Verde Express
Trens da Serra Verde Express
 
Data and Processes: Can we Marry Them . . . and Make the Marriage Last?
Data and Processes: Can we Marry Them . . . and Make the Marriage Last?Data and Processes: Can we Marry Them . . . and Make the Marriage Last?
Data and Processes: Can we Marry Them . . . and Make the Marriage Last?
 
Obras singulares de Peyber
Obras singulares de PeyberObras singulares de Peyber
Obras singulares de Peyber
 
Marketing Channel Optimisation: Achieving competitive advantage in higher edu...
Marketing Channel Optimisation: Achieving competitive advantage in higher edu...Marketing Channel Optimisation: Achieving competitive advantage in higher edu...
Marketing Channel Optimisation: Achieving competitive advantage in higher edu...
 
La movilidad del 9
La movilidad del 9La movilidad del 9
La movilidad del 9
 
Examen2002 2
Examen2002 2Examen2002 2
Examen2002 2
 
Dalcroze - Jueves
Dalcroze - JuevesDalcroze - Jueves
Dalcroze - Jueves
 
Analytische Ermittlungen mit InfoZoom, iBase und Analyst’s Notebook
Analytische Ermittlungen mit InfoZoom, iBase und Analyst’s NotebookAnalytische Ermittlungen mit InfoZoom, iBase und Analyst’s Notebook
Analytische Ermittlungen mit InfoZoom, iBase und Analyst’s Notebook
 
The value proposition of Marketing Automation
The value proposition of Marketing AutomationThe value proposition of Marketing Automation
The value proposition of Marketing Automation
 

Similar to QC Paint Inspector Resume

Similar to QC Paint Inspector Resume (20)

Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1
 
JOSEPH_RESUME.DOC
JOSEPH_RESUME.DOCJOSEPH_RESUME.DOC
JOSEPH_RESUME.DOC
 
resume of felixvillezon.doc.
resume of felixvillezon.doc.resume of felixvillezon.doc.
resume of felixvillezon.doc.
 
Cv mohd syahril awth
Cv mohd syahril awthCv mohd syahril awth
Cv mohd syahril awth
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
 
ADAMRIDZUANRESUME
ADAMRIDZUANRESUMEADAMRIDZUANRESUME
ADAMRIDZUANRESUME
 
RESUME 26 JAN
RESUME 26 JANRESUME 26 JAN
RESUME 26 JAN
 
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONRESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
 
Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015
 
My Resume
My ResumeMy Resume
My Resume
 
Ibe's Resume'
Ibe's Resume'Ibe's Resume'
Ibe's Resume'
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 
Tin's CV
Tin's CVTin's CV
Tin's CV
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014
 
CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 
Mark Smith-CV 1(1)2016WORD
Mark Smith-CV 1(1)2016WORDMark Smith-CV 1(1)2016WORD
Mark Smith-CV 1(1)2016WORD
 
CV TWO
CV TWOCV TWO
CV TWO
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 

QC Paint Inspector Resume

  • 1. VICTOR LLANERA LAVALLE No. 19 Nazario street Gulod Novaliches Quezon City, Philippines Philippines Mobile No. : +639228551317 / +639189013705 Philippines Land line No. : +63 4145550 E – Mail Address lavalle_victor@yahoo.com / lavallevictor7@gmail.com Skype Address : victor.lavalle2 POSITION DESIRED : QC - PAINTING / COATING INSPECTOR Objective of the Jobs: A knowledge acquires from Seminar and training on actual works on the field can make opportunity to give strong contribution to the organizational goals through continued development of professional skills. To developed further my talents and skills for continuing career improvement and acquire a challenging position wherein I can contribute to the effectiveness and overall productivity of the company. The objective is to ensure that services comply with the requirements of the contract and applicable laws. Qualification summary : Extensive experience in Marine and Industrial Power Plant Projects - specialized in Painting and Coating inspection. Performed quality assurance and implementing approved Quality System for construction by monitoring and ensuring that Painting works were carried out in accordance with standard and Specification. Thorough understanding and implementation of Project Specification, Project Procedures and other Coating Work Method Statements that required documents. Ability to solve and repaired coating defects. Experienced in determining the Painting failure and generate effective solution in solving problems in construction issues. Established and maintained effective working relationship within the course work, coordinates effectively in a team environment, communicate clearly and concisely, both oral and written.
  • 2. WORK EXPERIENCE ABROAD : AL KHALIJ 4 X 350 MW STEAM POWER PLANT – Gulf Company of Libya HYUNDAI ENGINEERING & CONSTRUCTION LTD. – BECHTEL EPC PAINTING ENGINEER – JUNE 14 , 2013 – JULY 23, 2014 Boquaria Sirte , LIBYA FUNCTION To report and coordinates to Painting Manager and painting supervisor regarding the daily and future activities of the painting work plan , Performed per system area inspection of piping, Tanks & Steel structures. Supervision of sub-contractor’s quality activities in accordance to Project Standards and Specification, monitoring of punch list clearing activities in STG (Steam Turbine Generator) Main Building Unit 1, 2, 3 & 4 and Quality Inspection issued punch. Surveillance and issuance of non conformity reports for unaccepted practices on construction side upon performing inspection. scheduling of manpower at designated jobsite for monitoring of their production output , conduct site investigation on untoward incident happened, monitor the surface preparation, ambient condition, temperature, prior and during painting application. Supervise the dry film thickness of each coating and make a pre final inspection, in order to check that Specification and Coating design are strictly followed. Interpret and analyzed P & ID drawing, make documentations, NCR, painting reports and important data in every accomplished Power plant project. NEW SHIPBUILDING ATTENDED IN CHINA : NEW CENTURY SHIPBUILDING 2008 - 2009 ( Jingjiang City , Jiangsu Province. CHINA CHUGOKU MARINE PAINT = QC – PAINTING INSPECTOR FUNCTION To report and coordinates to Site Manager and owner’s painting supervisor regarding the daily and future activities of the painting work plan, Performed per system area inspection on Block stage area. Monitoring of sub-contractor’s quality activities in accordance to Project Standards and Specification, supervision of punch list clearing activities on Erection stage area and Quality Inspection issued punch. Surveillance and issuance of non conformity reports for unaccepted practices on construction side upon performing inspection. Conduct site investigation on untoward incident happened, monitor the surface preparation, ambient condition, temperature, prior and during painting application. Supervise the dry film thickness of each coating and make a pre final inspection, in order to check that Specification and Coating design are strictly followed.Interpret and analyzed new shipbuilding drawing, make documentations, NCR, painting reports and important data in every accomplished new shipbuilding project. APRIL,2008 to JUNE, 2008 : MT STARLING / HULL No. 0307318 : MT LOUISE / HULL No. 0307319 (PRODUCT CARRIER OIL TANKER). SEAARLAND SHIPMANAGEMENT HAMBURGE DWT – 73,400 TON CLASS.
  • 3. MARCH,2009 to JUNE,2009 : SUMMIT AFRICA / HULL No. 0307366 : SUMMIT ASIA / HULL No. 0307365 (PRODUCT CARRIER OIL TANKER). INTERSHIP NAVIGATION CO.LTD. DWT – 73,400 TON CLASS NEW TIMES SHIPBUILDING- 2008 ( Jingjiang City , Jiangsu Province. CHINA) CHUGOKU MARINE PAINT = QC – PAINTING INSPECTOR FUNCTION To report and coordinates to Site Manager and owner’s painting supervisor regarding the daily and future activities of the painting work plan, Performed per system area inspection on Block stage area. Monitoring of sub-contractor’s quality activities in accordance to Project Standards and Specification, supervision of punch list clearing activities on Erection stage area and Quality Inspection issued punch. Surveillance and issuance of non conformity reports for unaccepted practices on construction side upon performing inspection. Conduct site investigation on untoward incident happened, monitor the surface preparation, ambient condition, temperature, prior and during painting application. Supervise the dry film thickness of each coating and make a pre final inspection, in order to check that Specification and Coating design are strictly followed. Interpret and analyzed new shipbuilding drawing, make documentations, NCR, painting reports and important data in every accomplished new shipbuilding project. JULY,2008 to NOVEMBER,2008 : MT OVERSEAS EVERGLADES / HULL No. 0311502 : MT OVERSEAS YELLOWSTONES HULL No. 0311501 (CRUDE OIL TANKER) OVERSEAS SHIPHOLDING GROUP DWT – 114,000 TON CLASS NEW YANGZI JIANG SHIPBUILDING - 2009 ( Jingjiang City , Jiangsu Province. CHINA) CHUGOKU MARINE PAINT = QC – PAINTING INSPECTOR FUNCTION To report and coordinates to Site Manager and owner’s painting supervisor regarding the daily and future activities of the painting work plan, Performed per system area inspection on Block stage area. Monitoring of sub-contractor’s quality activities in accordance to Project Standards and Specification, supervision of punch list clearing activities on Erection stage area and Quality Inspection issued punch. Surveillance and issuance of non conformity reports for unaccepted practices on construction side upon performing inspection. Conduct site investigation on untoward incident happened, monitor the surface preparation, ambient condition, temperature, prior and during painting application. Supervise the dry film thickness of each coating and make a pre final inspection, in
  • 4. order to check that Specification and Coating design are strictly followed. Interpret and analyzed new shipbuilding drawing, make documentations, NCR, painting reports and important data in every accomplished new shipbuilding project. JULY,2009 to DECEMBER,2009 : MT EAST SUNRISE 88 / HULL No. 886 DWT-92,500 TON CLASS (BULKCARRIER ) NEW YANGZI JIANG : MT BOTTIGLIERI AMBITION / HULL No.763 DWT-92,500 TON CLASS (BULKCARRIER ) GIUSEPPE BOTTIGLIERI de NAVIGAZION WORK EXPERIENCES IN THE PHILIPPINES MAINCOAT, INC. DISTRIBUTOR OF CHUGOKU MARINE PAINTS. COATING TECHNICAL ENGINEER ( February 1996 – June 13 , 2013 ) FUNCTIONS 1. Carry out quality control. Perform visual inspection & confirm that the work meets the specification, codes & standards through statistically significant test & observation such as surface preparation and the degree of cleanliness specified has been achieved accordingly and that the required profile has been created. 2. Verify that all required instrument are available. 3. Monitoring of ambient conditions and wet film thickness reading prior and during Application. 4. Inspection of dry film thickness (DFT ) of each coat against that specified and Determine if each individual coat is suitable to receive the next coat, and to ensure That such imperfections as over spray, pinholes, lack of adhension , insufficient film Thickness, etc, has been corrected. This includes drying / curing times versus Temperature and humidity confirmation. 5. Make final inspection to verify for any touch-up or repaired work that was found Necessary , have final check for full compliance with the specification and to confirm that the execution of corrosion protection work in accordance to relevant codes and standards. NEW SHIPBUILDINGATTENDED at TSUNEISHI HEAVY INDUSTRIES, CEBU PHILIPPINES . ( Coating Technical Engineer ) Dec.1997 – July 1998 MV J. CAPTAIN TRADER Nishin Shipping Co.Ltd., Japan 23,510 DWT – Log / Bulk Carrier Oct.2001 – March 2002 MV YASA KAPTAIN ERBIL Yasa Shipping Industry & Trading S/ A 52,000 DWT – Bulk Carrier
  • 5. July 2002 – Feb. 2003 MV BRIGHT BULKER Nissin Shipping Co. Ltd. Japan 52,000 DWT – Bulk Carrier Aug. 2005 – Jan. 2005 MV GECON 1 GLEAMRY MARITIME 52,000 DWT – Bulk Carrier Aug. 2005 – Jan. 2006 MV TENSHOU MARU KAMBARA STEAMSHIP Co. 52,000 DWT June 1998 – Jan. 1999 MV MARION STAR Orix Maritime Corp., Japan 23,492 DWT – Bulk Carrier Feb. 2006 – Dec. 2006 MV HOEGH MANILA HOEGH AUTOLINERS CO. 4,300Capacity, Pure Car Truck Carrier Nov. 2006 – May 2007 MV METEORA Global Navigational and Investment Inc. 58,485 DWT – Bulk Carrier SHIP REPAIR ATTENDED(FOREIGN VESSELS ) at SUBIC SHIPYARD and KEPPEL BATANGAS SHIPYARD, PHILIPPINES.(COATING TECHNICAL ENGINEER ) AUG 2003 MV KYUSHU STAR - Zodiac Maritime MAR 2004 MV MING ASIA - Yang Ming Line MAY 2004 MV ELLINITA - J.J. Ugland Shipping Co. JUN 2007 MV WESTAMA - Project Shipping Inc. JUL 2007 MV SIBULK INTEGRITY - Moonrise Shipping SEPT 2007 MV EASTERN SKY - Eastern Shipping lines Inc. DEC 2007 MV WHITE CATLLEYA 10 - VLK Marine Corp. JUNE 2011 MV MARA - SCORPIO SHIPMANAGEMENT INDUSTRIAL PROJECTS ATTENDED in PHILIPPINES . 2011- 2012 TAGANITO,HIGH PRESSURE ACID LEACH PROJECT(S U R I G A O ) PHILIPPINES QC - Painting Inspector Taihei Alltech Construction Philippines / Overseas Technical Engineering and Construction.Pte, Ltd. 2005 MAKILING – BANAHAW GEOTHERMAL POWER PLANT REHABILITATION PHASE No.2 QC - Painting Inspector National Power Corp./ MITSUBISHI HEAVY INDUSTRIES
  • 6. 2004 PETRON OIL REFINERY REHABILITATION PROJECT QC - Painting Inspector PETRON,LIMAY BATAAN PHILIPPINES 2003 TRAMO EDSA FLYOVER QC - Painting Inspector BF Metal Corp. 1998 FORD ASSEMBLY PLANT QC - Painting Inspector Kajima Construction 1997 TOYOTA PARTS ASSEMBLY PLANT QC - Painting Inspector Suwabe Phil.Sta. Rosa, Laguna Philippines Certification and Training . Protective Coating Inspector Program SSPC The Society for Protective Coatings: October 1 – 6, 2012 I.D. No. 49595 . Personal and Business Development Maincoat , Inc. Marine & Industrial Coatings: December 3 , 2003 PERSONAL INFORMATION: CIVIL STATUS : MARRIED DATE OF BIRTH : SEPTEMBER 20, 1971 AGE : 43 YEARS OLD PLACE OF BIRTH : CALOOCAN METRO MANILA, PHILIPPINES NATIONALITY : FILIPINO RELIGION : ROMAN CATHOLIC LANGUAGE : ENGLISH, FILIPINO GENDER : MALE NAME OF SPOUSE : MELLANY ARELLANO LAVALLE NUMBER OF CHILDREN : TWO EDUCATION
  • 7. ELEMENTARY LEVEL : NOVALICHES ELEMENTARY SCHOOL NOVALICHES,QUEZON CITY 1978 – 1984 GRADUATED HIGH SCHOOL : METRO MANILA COLLEGE NOVALICHES, QUEZON CITY 1984 – 1988 GRADUATED VOCATIONAL : FOREST RANGER PANAY STATE POLYTECHNIC COLLEGE MAMBUSAO CAPIZ, PHILIPPINES 1988 – 1990 COLLEGES : BACHELOR OF SCIENCE IN AGRICULTURAL ENGINEERING PANAY STATE POLYTECHNIC COLLEGE MAMBUSAO CAPIZ, PHILIPPINES 1990 – 1995 GRADUATED SKILLS AND COMPETENCIES:  Knowledgeable in MS Office Application.  Expertise in Determining Painting failure and how to resolve the Coating failure. REFERENCES : MR. ROCELITO DEL ROSARIO JUTON PHILIPPINES COATING TECHNICAL ENGINEER MOBILE No. +639178173918 Architect ABRAHAM D. ARELLANO ARCHITECTURAL ENGINEER MOBILE No.+639278615085 MR. CAMILO CUARENTAS MAINCOAT , INC . ( Marine and Industrial Paints ) TECHNICAL MANAGER MOBILE No. +639228450885
  • 8. MR. LEOLISES LEONOR HANJIN HEAVY INDUSTRIES ANGLO EASTERN SHIPMANAGEMENT - PAINT SUPERVISOR MOBILE No. +639173071569 MR. LOPE GRAJEDA OFFICER IN CHARGE Creative Power Solution AL KHALIJ 4 X 350 MW STEAM POWER PLANT BoquariaSirte , LIBYA MR. VINCENT BARAZON KAZAKHSTAN OFFSHORE PROJECT Saipem ENI - PAINT SUPERVISOR MR. EDWARD MARTELINO Intership Navigational – HULL SUPERVISOR MOBILE No. +8615052908278