SlideShare a Scribd company logo
1 of 7
Curriculum Vitae
Name : Val A. Magtuba
Birthdate : July 22, 1979
Address : Plaridel, Baybay, Leyte
Contact Number : 0928-632-8772
Email Address : vmagtuba@yahoo.com.ph
Nationality : Filipino
Civil Status : Married
Educational Attainment : Bachelor of Science in Marine
Transportation
Undergraduate
Misamis Institute of Technology
Ozamis City
Languages Spoken : English, Tagalog, Cebuano
Position Desired : Batching Plant Operator
WORKING EXPERIENCE:
 TEDESCHIA CONSTRUCTION ENT.
Batching Plant Operator
September 2012 up to Present
Al Udied Air Based Doha Qatar
P.O Box 20159,380 Al Markhyia Street Doha State of Qatar
• Responsible for the entire operations and see to it that the correct design mix of
concrete is batched and delivered to site as per order/request by site supervisor
and site engineers.
• Coordinate with the laboratory personnel to conduct fresh concrete testing.
• Make sure that admixtures and cement are in correct designated silo’s to be
loaded.
• Monitoring on computerized concrete production during plant operation.
• Responsible in providing delivery tickets to transit mixer and dump truck drivers.
• Make sure that the materials aggregates are not mixing each other in the
aggregates bin.
• Responsible for minor repairs and preventive maintenance check up like central
mixer, cement silo, aggregate hopper, belt conveyors, weighting hopper,
unloading hopper, air compressor, water and admixture tanks and control room in
particular.
• Make some spot check on all equipments and give schedule for minor and major
repairs if found to be defective.
• Prepare daily concrete production and receiving of cement and aggregates
delivery tickets.
• Do other task as per instruction of Plant Manager.
 Mc Dowell Phils., Inc.
Batching Plant Operator
March 2009 up to September 2011
January 2012 up to February 2012
Alabang Muntinlupa City Philippines
Name of Project: Ambuklao & Binga Rehabilitation Project
SN Aboitiz Power(SNAP)
Bokod, Benguet, North Luzon
 Job Description
• Responsible for the entire batching operations, and ensure that mix delivered to
pouring site are of correct class of concrete as per plan requirement or as per
request by site engineers.
• Undertake minor troubleshooting and maintenance check up, e.g.; cement silo,
aggregate hopper, belt conveyors, weighing hopper, unloading hopper, air
compressor, water and admix tanks, and control panel.
• In -charge of batch plant manpower including utilization of equipment during
batching operations in the absence of the batch plant supervisor.
• Prepare batch weight correction based on moisture content determination prior to
concrete production.
• Provide delivery dockets to mixer truck drivers which will be accounted for every
pouring operations.
• Make sure the aggregates loaded to their respective bin are not contaminated with
clayey materials or other foreign matters such as small pieces of wood, plastic,
rags, etc., which could impair the strength of the concrete mix produced.
• Coordinate with the site laboratory personnel with regards to the sampling and
testing of fresh concrete mixes.
• Perform other related tasks as assigned by batch plant supervisor
 Leighton Contractors Asia Ltd.
Batching Plant Operator
April 2008 up to February 2009
Makati City, Philippines
Name of Project: Masbate Gold EPC Project – P2324
Brgy. Puro, Aroroy, Masbate
 Job Description
• Responsible for the entire batching operations, and ensure that mix delivered to
pouring site are of correct class of concrete as per plan requirement or as per
request by site engineers.
• Undertake minor troubleshooting and maintenance check up, e.g.; cement silo,
aggregate hopper, belt conveyors, weighing hopper, unloading hopper, air
compressor, water and admix tanks, and control panel.
• In -charge of batch plant manpower including utilization of equipment during
batching operations in the absence of the batch plant supervisor.
• Prepare batch weight correction based on moisture content determination prior to
concrete production.
• Provide delivery dockets to mixer truck drivers which will be accounted for every
pouring operations.
• Make sure the aggregates loaded to their respective bin are not contaminated with
clayey materials or other foreign matters such as small pieces of wood, plastic,
rags, etc., which could impair the strength of the concrete mix produced.
• Coordinate with the site laboratory personnel with regards to the sampling and
testing of fresh concrete mixes.
• Perform other related tasks as assigned by batch plant supervisor
 Leighton Contractors Asia Ltd.
Batching Plant Operator
October 2004 up to March 2008
Makati City, Philippines
Name of Project: Rapu-Rapu Phase B Project
Brgy. Pagcolbon, Rapu-Rapu, Albay
 Job Description
• Responsible for the entire batching operations, and ensure that mix delivered to
pouring site are of correct class of concrete as per plan requirement or as per
request by site engineers.
• Undertake minor troubleshooting and maintenance check up, e.g.; cement silo,
aggregate hopper, belt conveyors, weighing hopper, unloading hopper, air
compressor, water and admix tanks, and control panel.
• In -charge of batch plant manpower including utilization of equipment during
batching operations in the absence of the batch plant supervisor.
• Prepare batch weight correction based on moisture content determination prior to
concrete production.
• Provide delivery dockets to mixer truck drivers which will be accounted for every
pouring operations.
• Make sure the aggregates loaded to their respective bin are not contaminated with
clayey materials or other foreign matters such as small pieces of wood, plastic,
rags, etc., which could impair the strength of the concrete mix produced.
• Coordinate with the site laboratory personnel with regards to the sampling and
testing of fresh concrete mixes.
• Perform other related tasks as assigned by batch plant supervisor
 HANJIN Heavy Industries & Construction Co. Ltd.
Laboratory Aide
March 2004 up to October 2004
Taguig City, Philippines
Name of Project: Kuwait Fund Assistance for Economic Development
Mindanao Second Roads Improvement Project
Contract Package “A”
Kapatagan-Dobliston Jct.-Tukuran Road Project
 Job Description
• Assist in sampling of proposed materials intended for the project in conformance
to DPWH Standards and project specifications.
• Performed physical test of soils such as Grading test, Atterbergs Limit test,
Compaction test and CBR test.
• Performed property test of concrete aggregates, namely; grain size distribution
analysis, specific gravity and absorption test, unit weight determination, soundness
test and abrasion test.
• Performed field density test on embankment, subgrade and subbase elevation,
RCPC bedding and backfilling.
• Sampling and slump monitoring of concrete mix at pouring site during concrete
paving.
• Assist in preparing of monthly materials report and other related documents.
 Cavite Ideal International Construction and
Development Corp.
Batching Plant Operator
February 2002 up to December 2003
Pasay City, Philippines
Name of Project: Calbayog – Tacloban Road Improvement Project
Calbiga – San Juanico Bridge Road Section
San Pedro, Sta Rita, Samar
 Job Description
• Responsible for the entire batching operations, and ensure that mix delivered to
pouring site are of correct class of concrete as per plan requirement or as per
request by site engineers.
• Undertake minor troubleshooting and maintenance check up, e.g.; cement silo,
aggregate hopper, belt conveyors, weighing hopper, unloading hopper, air
compressor, water and admix tanks, and control panel.
• In -charge of batch plant manpower including utilization of equipment during
batching operations in the absence of the batch plant supervisor.
• Prepare batch weight correction based on moisture content determination prior to
concrete production.
• Provide delivery dockets to mixer truck drivers which will be accounted for every
pouring operations.
• Make sure the aggregates loaded to their respective bin are not contaminated with
clayey materials or other foreign matters such as small pieces of wood, plastic,
rags, etc., which could impair the strength of the concrete mix produced.
• Coordinate with the site laboratory personnel with regards to the sampling and
testing of fresh concrete mixes.
Perform other related tasks as assigned by batch plant supervisor
 Cavite Ideal International Construction and
Development Corp.
Laboratory Aide
July 1999 up to September 2001
Pasay City, Philippines
Name of Project: Arterial Road Link Development Project Phase II
Contract Package #14
Baybay – Bato Road Section
West Leyte Road
 Job Description
• Assist in sampling of proposed materials intended for the project in conformance
to DPWH Standards and project specifications.
• Performed physical test of soils such as Grading test, Atterbergs Limit test,
Compaction test and CBR test.
• Performed property test of concrete aggregates, namely; grain size distribution
analysis, specific gravity and absorption test, unit weight determination, soundness
test and abrasion test.
• Performed field density test on embankment, subgrade and subbase elevation,
RCPC bedding and backfilling.
• Sampling and slump monitoring of concrete mix at pouring site during concrete
paving.
• Assist in preparing of monthly materials report and other related documents.
 Cebu Foremost Construction
Assistant Batching Plant OPerator
December 1998 up to January 1999
Cebu, City, Philippines
Name of Project: Sual Coal Power Plant Jetty Project
Sual, Pangasinan
 Job Description
• Assist the batching plant operator on the batching operations and daily
maintenance check up of the entire system.
• Prepare batch weight correction prior to concrete production and see to it that
correct class of concrete is delivered to site as per submitted request by field/site
engineers.
• Provide concrete delivery slips to truck mixer drivers prior to site delivery.
• Coordinate with designated laboratory technicians with respect to concrete
sampling and testing.
• Prepare daily concrete production and materials consumption report.
 Cebu Foremost Construction
Laboratory Aide
September 1997 up to December 1998
Cebu, City, Philippines
Name of Project: Cebu North Road Project
Mandaue – San Remegio Road
Brgy. Taytayan, Bogo, Cebu
 Job Description
• Assist in sampling of soils, concrete aggregates and other proposed materials
intended for the project.
• Perform laboratory test such as gradation test, liquid limit test, proctor test and
CBR test of soils; property test of concrete aggregates, namely; grain size
distribution analysis, specific gravity and absorption test, unit weight
determination, clay lumps and friable particles, organic impurities, abrasion test
and soundness test.
• Slump monitoring and casting of concrete cylinder and beam samples for
compression and flexural test at 7, 14 and 28 days strength respectively.
• Assist in conducting field density test on embankment, final subrade and
subbase elevation.
• Demolding and soaking of concrete beam and cylinder samples in a clean
curing tank.

More Related Content

What's hot

Brian Charles Hoskins
Brian Charles HoskinsBrian Charles Hoskins
Brian Charles HoskinsBrian Hoskins
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015Keith Vary
 
CV for the post of Mud Specialist I Drilling Fluids Engineer
CV for the post of Mud Specialist I Drilling Fluids EngineerCV for the post of Mud Specialist I Drilling Fluids Engineer
CV for the post of Mud Specialist I Drilling Fluids EngineerBhaskar Hazarika
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - ResumeJohn Keenan
 
Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)Khalid Khan
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhil Karow
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBabu K
 
MY CV-RAMON AVELLANA - QSTec1
MY CV-RAMON AVELLANA - QSTec1MY CV-RAMON AVELLANA - QSTec1
MY CV-RAMON AVELLANA - QSTec1RAMON AVELLANA
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015Rodrigo Rodriguez
 
Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)Timothy Nikolai
 

What's hot (20)

Brian Charles Hoskins
Brian Charles HoskinsBrian Charles Hoskins
Brian Charles Hoskins
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
 
Paul R 2015
Paul R 2015Paul R 2015
Paul R 2015
 
CV for the post of Mud Specialist I Drilling Fluids Engineer
CV for the post of Mud Specialist I Drilling Fluids EngineerCV for the post of Mud Specialist I Drilling Fluids Engineer
CV for the post of Mud Specialist I Drilling Fluids Engineer
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - Resume
 
Christopher Kinnon Resume
Christopher Kinnon ResumeChristopher Kinnon Resume
Christopher Kinnon Resume
 
Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)
 
CV 3
CV 3CV 3
CV 3
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
Topside
TopsideTopside
Topside
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTIL
 
jovy's RESUME
jovy's RESUMEjovy's RESUME
jovy's RESUME
 
MY CV-RAMON AVELLANA - QSTec1
MY CV-RAMON AVELLANA - QSTec1MY CV-RAMON AVELLANA - QSTec1
MY CV-RAMON AVELLANA - QSTec1
 
azhar ali cv
azhar ali cvazhar ali cv
azhar ali cv
 
Akash
AkashAkash
Akash
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015
 
OBENDRA_NEW__1_
OBENDRA_NEW__1_OBENDRA_NEW__1_
OBENDRA_NEW__1_
 
Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)
 

Viewers also liked

Wavelength March 2014 Volume 18 No. 1
Wavelength March 2014 Volume 18 No. 1Wavelength March 2014 Volume 18 No. 1
Wavelength March 2014 Volume 18 No. 1Jerry Duncan
 
Wavelength August 2011 Volume 15 No 2
Wavelength August 2011 Volume 15 No 2Wavelength August 2011 Volume 15 No 2
Wavelength August 2011 Volume 15 No 2Jerry Duncan
 
Wavelength October Volume 16 No. 2
Wavelength October Volume 16 No. 2Wavelength October Volume 16 No. 2
Wavelength October Volume 16 No. 2Jerry Duncan
 
Wavelength February 2011 Volume 14 No.1
Wavelength February 2011 Volume 14 No.1Wavelength February 2011 Volume 14 No.1
Wavelength February 2011 Volume 14 No.1Jerry Duncan
 
Wavelength March 2013 Volume 17 No. 1
Wavelength March 2013 Volume 17 No. 1Wavelength March 2013 Volume 17 No. 1
Wavelength March 2013 Volume 17 No. 1Jerry Duncan
 
FS30_4522_962_18711_LR_psd
FS30_4522_962_18711_LR_psdFS30_4522_962_18711_LR_psd
FS30_4522_962_18711_LR_psdJerry Duncan
 
Procedimiento de determinación de oficio y la violación del articulo 49 de la...
Procedimiento de determinación de oficio y la violación del articulo 49 de la...Procedimiento de determinación de oficio y la violación del articulo 49 de la...
Procedimiento de determinación de oficio y la violación del articulo 49 de la...Katherine Leonor Castillo Margiotta
 

Viewers also liked (8)

Wavelength March 2014 Volume 18 No. 1
Wavelength March 2014 Volume 18 No. 1Wavelength March 2014 Volume 18 No. 1
Wavelength March 2014 Volume 18 No. 1
 
Wavelength August 2011 Volume 15 No 2
Wavelength August 2011 Volume 15 No 2Wavelength August 2011 Volume 15 No 2
Wavelength August 2011 Volume 15 No 2
 
Wavelength October Volume 16 No. 2
Wavelength October Volume 16 No. 2Wavelength October Volume 16 No. 2
Wavelength October Volume 16 No. 2
 
Wavelength February 2011 Volume 14 No.1
Wavelength February 2011 Volume 14 No.1Wavelength February 2011 Volume 14 No.1
Wavelength February 2011 Volume 14 No.1
 
Wavelength March 2013 Volume 17 No. 1
Wavelength March 2013 Volume 17 No. 1Wavelength March 2013 Volume 17 No. 1
Wavelength March 2013 Volume 17 No. 1
 
FS30_4522_962_18711_LR_psd
FS30_4522_962_18711_LR_psdFS30_4522_962_18711_LR_psd
FS30_4522_962_18711_LR_psd
 
Procedimiento de determinación de oficio y la violación del articulo 49 de la...
Procedimiento de determinación de oficio y la violación del articulo 49 de la...Procedimiento de determinación de oficio y la violación del articulo 49 de la...
Procedimiento de determinación de oficio y la violación del articulo 49 de la...
 
FS39_Book
FS39_BookFS39_Book
FS39_Book
 

Similar to VAL resume

CV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IICV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IIdanilo acosta
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae limFilemon Lim
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015Ricky Dasal
 
internship report report
internship report reportinternship report report
internship report reportMohan Sai G
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CVLeo Rosario
 
new resume stephen hobbs
new resume  stephen hobbsnew resume  stephen hobbs
new resume stephen hobbsLiptrap Lawns
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15Aaron Lian Kian Hoe
 
Resume (Material Specialist)
Resume (Material Specialist)Resume (Material Specialist)
Resume (Material Specialist)Saeed Ahmad
 
PERSONAL DATA John Fabian
PERSONAL DATA John FabianPERSONAL DATA John Fabian
PERSONAL DATA John FabianJohn Fabian
 

Similar to VAL resume (20)

Katleho P LETELE CV with picture
Katleho P LETELE CV with pictureKatleho P LETELE CV with picture
Katleho P LETELE CV with picture
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
 
CV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IICV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer II
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
CURICULUM VITAE
CURICULUM VITAECURICULUM VITAE
CURICULUM VITAE
 
internship report report
internship report reportinternship report report
internship report report
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CV
 
new resume stephen hobbs
new resume  stephen hobbsnew resume  stephen hobbs
new resume stephen hobbs
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Hillary CV
Hillary CVHillary CV
Hillary CV
 
Abhishek presentation.pptx
Abhishek presentation.pptxAbhishek presentation.pptx
Abhishek presentation.pptx
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
 
Alvito CV-2
Alvito CV-2Alvito CV-2
Alvito CV-2
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
 
Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)
 
Resume (Material Specialist)
Resume (Material Specialist)Resume (Material Specialist)
Resume (Material Specialist)
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
 
PERSONAL DATA John Fabian
PERSONAL DATA John FabianPERSONAL DATA John Fabian
PERSONAL DATA John Fabian
 

VAL resume

  • 1. Curriculum Vitae Name : Val A. Magtuba Birthdate : July 22, 1979 Address : Plaridel, Baybay, Leyte Contact Number : 0928-632-8772 Email Address : vmagtuba@yahoo.com.ph Nationality : Filipino Civil Status : Married Educational Attainment : Bachelor of Science in Marine Transportation Undergraduate Misamis Institute of Technology Ozamis City Languages Spoken : English, Tagalog, Cebuano Position Desired : Batching Plant Operator WORKING EXPERIENCE:  TEDESCHIA CONSTRUCTION ENT. Batching Plant Operator September 2012 up to Present Al Udied Air Based Doha Qatar P.O Box 20159,380 Al Markhyia Street Doha State of Qatar
  • 2. • Responsible for the entire operations and see to it that the correct design mix of concrete is batched and delivered to site as per order/request by site supervisor and site engineers. • Coordinate with the laboratory personnel to conduct fresh concrete testing. • Make sure that admixtures and cement are in correct designated silo’s to be loaded. • Monitoring on computerized concrete production during plant operation. • Responsible in providing delivery tickets to transit mixer and dump truck drivers. • Make sure that the materials aggregates are not mixing each other in the aggregates bin. • Responsible for minor repairs and preventive maintenance check up like central mixer, cement silo, aggregate hopper, belt conveyors, weighting hopper, unloading hopper, air compressor, water and admixture tanks and control room in particular. • Make some spot check on all equipments and give schedule for minor and major repairs if found to be defective. • Prepare daily concrete production and receiving of cement and aggregates delivery tickets. • Do other task as per instruction of Plant Manager.  Mc Dowell Phils., Inc. Batching Plant Operator March 2009 up to September 2011 January 2012 up to February 2012 Alabang Muntinlupa City Philippines Name of Project: Ambuklao & Binga Rehabilitation Project SN Aboitiz Power(SNAP) Bokod, Benguet, North Luzon  Job Description • Responsible for the entire batching operations, and ensure that mix delivered to pouring site are of correct class of concrete as per plan requirement or as per request by site engineers. • Undertake minor troubleshooting and maintenance check up, e.g.; cement silo, aggregate hopper, belt conveyors, weighing hopper, unloading hopper, air compressor, water and admix tanks, and control panel. • In -charge of batch plant manpower including utilization of equipment during batching operations in the absence of the batch plant supervisor. • Prepare batch weight correction based on moisture content determination prior to concrete production. • Provide delivery dockets to mixer truck drivers which will be accounted for every pouring operations.
  • 3. • Make sure the aggregates loaded to their respective bin are not contaminated with clayey materials or other foreign matters such as small pieces of wood, plastic, rags, etc., which could impair the strength of the concrete mix produced. • Coordinate with the site laboratory personnel with regards to the sampling and testing of fresh concrete mixes. • Perform other related tasks as assigned by batch plant supervisor  Leighton Contractors Asia Ltd. Batching Plant Operator April 2008 up to February 2009 Makati City, Philippines Name of Project: Masbate Gold EPC Project – P2324 Brgy. Puro, Aroroy, Masbate  Job Description • Responsible for the entire batching operations, and ensure that mix delivered to pouring site are of correct class of concrete as per plan requirement or as per request by site engineers. • Undertake minor troubleshooting and maintenance check up, e.g.; cement silo, aggregate hopper, belt conveyors, weighing hopper, unloading hopper, air compressor, water and admix tanks, and control panel. • In -charge of batch plant manpower including utilization of equipment during batching operations in the absence of the batch plant supervisor. • Prepare batch weight correction based on moisture content determination prior to concrete production. • Provide delivery dockets to mixer truck drivers which will be accounted for every pouring operations. • Make sure the aggregates loaded to their respective bin are not contaminated with clayey materials or other foreign matters such as small pieces of wood, plastic, rags, etc., which could impair the strength of the concrete mix produced. • Coordinate with the site laboratory personnel with regards to the sampling and testing of fresh concrete mixes. • Perform other related tasks as assigned by batch plant supervisor  Leighton Contractors Asia Ltd. Batching Plant Operator October 2004 up to March 2008 Makati City, Philippines
  • 4. Name of Project: Rapu-Rapu Phase B Project Brgy. Pagcolbon, Rapu-Rapu, Albay  Job Description • Responsible for the entire batching operations, and ensure that mix delivered to pouring site are of correct class of concrete as per plan requirement or as per request by site engineers. • Undertake minor troubleshooting and maintenance check up, e.g.; cement silo, aggregate hopper, belt conveyors, weighing hopper, unloading hopper, air compressor, water and admix tanks, and control panel. • In -charge of batch plant manpower including utilization of equipment during batching operations in the absence of the batch plant supervisor. • Prepare batch weight correction based on moisture content determination prior to concrete production. • Provide delivery dockets to mixer truck drivers which will be accounted for every pouring operations. • Make sure the aggregates loaded to their respective bin are not contaminated with clayey materials or other foreign matters such as small pieces of wood, plastic, rags, etc., which could impair the strength of the concrete mix produced. • Coordinate with the site laboratory personnel with regards to the sampling and testing of fresh concrete mixes. • Perform other related tasks as assigned by batch plant supervisor  HANJIN Heavy Industries & Construction Co. Ltd. Laboratory Aide March 2004 up to October 2004 Taguig City, Philippines Name of Project: Kuwait Fund Assistance for Economic Development Mindanao Second Roads Improvement Project Contract Package “A” Kapatagan-Dobliston Jct.-Tukuran Road Project  Job Description • Assist in sampling of proposed materials intended for the project in conformance to DPWH Standards and project specifications. • Performed physical test of soils such as Grading test, Atterbergs Limit test, Compaction test and CBR test. • Performed property test of concrete aggregates, namely; grain size distribution analysis, specific gravity and absorption test, unit weight determination, soundness test and abrasion test.
  • 5. • Performed field density test on embankment, subgrade and subbase elevation, RCPC bedding and backfilling. • Sampling and slump monitoring of concrete mix at pouring site during concrete paving. • Assist in preparing of monthly materials report and other related documents.  Cavite Ideal International Construction and Development Corp. Batching Plant Operator February 2002 up to December 2003 Pasay City, Philippines Name of Project: Calbayog – Tacloban Road Improvement Project Calbiga – San Juanico Bridge Road Section San Pedro, Sta Rita, Samar  Job Description • Responsible for the entire batching operations, and ensure that mix delivered to pouring site are of correct class of concrete as per plan requirement or as per request by site engineers. • Undertake minor troubleshooting and maintenance check up, e.g.; cement silo, aggregate hopper, belt conveyors, weighing hopper, unloading hopper, air compressor, water and admix tanks, and control panel. • In -charge of batch plant manpower including utilization of equipment during batching operations in the absence of the batch plant supervisor. • Prepare batch weight correction based on moisture content determination prior to concrete production. • Provide delivery dockets to mixer truck drivers which will be accounted for every pouring operations. • Make sure the aggregates loaded to their respective bin are not contaminated with clayey materials or other foreign matters such as small pieces of wood, plastic, rags, etc., which could impair the strength of the concrete mix produced. • Coordinate with the site laboratory personnel with regards to the sampling and testing of fresh concrete mixes. Perform other related tasks as assigned by batch plant supervisor  Cavite Ideal International Construction and Development Corp. Laboratory Aide July 1999 up to September 2001 Pasay City, Philippines
  • 6. Name of Project: Arterial Road Link Development Project Phase II Contract Package #14 Baybay – Bato Road Section West Leyte Road  Job Description • Assist in sampling of proposed materials intended for the project in conformance to DPWH Standards and project specifications. • Performed physical test of soils such as Grading test, Atterbergs Limit test, Compaction test and CBR test. • Performed property test of concrete aggregates, namely; grain size distribution analysis, specific gravity and absorption test, unit weight determination, soundness test and abrasion test. • Performed field density test on embankment, subgrade and subbase elevation, RCPC bedding and backfilling. • Sampling and slump monitoring of concrete mix at pouring site during concrete paving. • Assist in preparing of monthly materials report and other related documents.  Cebu Foremost Construction Assistant Batching Plant OPerator December 1998 up to January 1999 Cebu, City, Philippines Name of Project: Sual Coal Power Plant Jetty Project Sual, Pangasinan  Job Description • Assist the batching plant operator on the batching operations and daily maintenance check up of the entire system. • Prepare batch weight correction prior to concrete production and see to it that correct class of concrete is delivered to site as per submitted request by field/site engineers. • Provide concrete delivery slips to truck mixer drivers prior to site delivery. • Coordinate with designated laboratory technicians with respect to concrete sampling and testing. • Prepare daily concrete production and materials consumption report.
  • 7.  Cebu Foremost Construction Laboratory Aide September 1997 up to December 1998 Cebu, City, Philippines Name of Project: Cebu North Road Project Mandaue – San Remegio Road Brgy. Taytayan, Bogo, Cebu  Job Description • Assist in sampling of soils, concrete aggregates and other proposed materials intended for the project. • Perform laboratory test such as gradation test, liquid limit test, proctor test and CBR test of soils; property test of concrete aggregates, namely; grain size distribution analysis, specific gravity and absorption test, unit weight determination, clay lumps and friable particles, organic impurities, abrasion test and soundness test. • Slump monitoring and casting of concrete cylinder and beam samples for compression and flexural test at 7, 14 and 28 days strength respectively. • Assist in conducting field density test on embankment, final subrade and subbase elevation. • Demolding and soaking of concrete beam and cylinder samples in a clean curing tank.