Industrial estates are clearly related to urban planning, regional planning and national planning, and as such they form one of many tools for implementing national objectives.
•It aimed at expanding, strengthening and locating small or medium scale industries as part of a broad program of industrialization.
This presentation was given by VNIT Nagpur for "Samavesh" - XVl Annual NOSPlan Convention. The Theme of Presentation - "Accessibility in Peri-urban area".
Industrial estates are clearly related to urban planning, regional planning and national planning, and as such they form one of many tools for implementing national objectives.
•It aimed at expanding, strengthening and locating small or medium scale industries as part of a broad program of industrialization.
This presentation was given by VNIT Nagpur for "Samavesh" - XVl Annual NOSPlan Convention. The Theme of Presentation - "Accessibility in Peri-urban area".
NON-MOTORIZED TRANSPORT AND SUSTAINABLE URBAN PLANNING: A CASE STUDY OF PUNE ...IAEME Publication
With changing urbanization pattern along with socio-economic growth, a transport demand in urban area of India is growing rapidly. Non-motorized modes of transport have a significant role in catering to transport demand and ensuring a sustainable transport system for India. Indian situation is very different. India is poor in hydro-carbon and capital resources but rich in man power and animal draft power. A sustainable transport system must meet the mobility and accessibility needs of people by providing safe and environmentally friendly modes of transportation. Non-motorized transportation (NMT) meets these objectives of sustainability as it utilizes indigenously available human and animal energy which is non-polluting, safe, affordable and user friendly and need only a small fraction of the capital required for motorized transport.
This presentation talks about the process of Traffic & Transportation surveys, the bases of delineating Traffic Analysis Zones and the various surveys required to be carried out to understand the traffic behavior of the city.
Elements of city planning_Building and Town PlanningA Makwana
All the individual objects that are included in an urban area area the elements of city plan. These objects include residential building, public buildings, parks, factories, roads etc.
Land use and building control as a tool for implementation of master plan and...Dolat Ram
This presentation will help you understand the importance of land use and building control and its role in implementation of master plan and other local plans.
NON-MOTORIZED TRANSPORT AND SUSTAINABLE URBAN PLANNING: A CASE STUDY OF PUNE ...IAEME Publication
With changing urbanization pattern along with socio-economic growth, a transport demand in urban area of India is growing rapidly. Non-motorized modes of transport have a significant role in catering to transport demand and ensuring a sustainable transport system for India. Indian situation is very different. India is poor in hydro-carbon and capital resources but rich in man power and animal draft power. A sustainable transport system must meet the mobility and accessibility needs of people by providing safe and environmentally friendly modes of transportation. Non-motorized transportation (NMT) meets these objectives of sustainability as it utilizes indigenously available human and animal energy which is non-polluting, safe, affordable and user friendly and need only a small fraction of the capital required for motorized transport.
This presentation talks about the process of Traffic & Transportation surveys, the bases of delineating Traffic Analysis Zones and the various surveys required to be carried out to understand the traffic behavior of the city.
Elements of city planning_Building and Town PlanningA Makwana
All the individual objects that are included in an urban area area the elements of city plan. These objects include residential building, public buildings, parks, factories, roads etc.
Land use and building control as a tool for implementation of master plan and...Dolat Ram
This presentation will help you understand the importance of land use and building control and its role in implementation of master plan and other local plans.
PUBLIC PRIVATE PARTNERSHIPS ARE MOSTLY PURSUIED TO SATISFY THE INFRASTRUCTURAL NEEDS OF A COUNTRY, REGION OR A CITY . PPP Is an instrument for infrastructure development AND HAS BASIC TENETS AND PRINCIPLES UNDERLYING ITS SUCCESSFUL IMPLEMENTATION.
.
International Trade Laws: International Contracts of Sale of Goods Transactions, International Trade Insurance,
Patents, Trademarks, Copyright and Neighboring Rights. Intellectual property Rights, Dispute settlement
Procedures under GATT & WTO, Payment systems in International Trade, International Labour Organization and
International Labour Laws.
PPPs are a legitimate funding tool for development and should be embraced by governments globally. However, it should be remembered that governments need to recognize that attracting PPP investment requires an extensive marketing process that highlights their PPP readiness, including institutional capacity to manage PPP projects, the existence of an enabling environment, transparent procurement processes, and a comprehensive risk management structure.
With the increase in public debt, 100% privately funded initiatives are now re-emerging yet experience had shown earlier that early successes of privatization programs were short lived and led later to bailouts / subsidy by Governments. PPP,s are likely to remain a better way to allocate the risks based on each entity’s ability to manage , mitigate and absorb risks. This brief highlights various aspects of PPP’s in terms of explaining the various PPP’s models and PPP’s transactions types, fiscal risks in PPP’s, PPP’s best practices and how to create an enabling PPP Environment. Major MENA PPP’s projects preview of is highlighted.
Education is Fundamental to the Nation Building Process.
Right to Education is now a Fundamental Right of every child in India.
GST Law Recognizes this and provides Certain Exemption to Educational Institutions, providing Education
In this Presentation let's Discuss the Applicability of GST on Education Sector
Eliminating 8 Wastes For Improving Supplychain EfficacyMMR July 2022 SN Panigrahi, PMP
A supply chain is a Chain of Supplies -
is the network of all the individuals,
organizations, resources, activities and
technology involved in the creation and supply of a
product, from the delivery of source materials from
the Supplier to Manufacturer to Distributer to
Wholesaler to Retailer and Eventually Delivery to the
End User or Consumer. Lean is the concept of efficient
manufacturing/operations that grew out of
the Toyota Production System in the middle of the
20th century. Since then, “lean” which was started as
an important concept, in the world of manufacturing
first, has thrived in to other fields such as Supply Chain
Management (SCM). Lean management is an approach
to managing an organization that supports the concept
of continuous improvement, a long-term approach to
work that systematically seeks to achieve small,
incremental changes in the processes in order to
improve efficiency and quality by eliminating or
minimising the process waste and maximising the value
of the product or service to the customer.
In this article we shall discuss 8 types of wastes in the
entire value stream of supply chain and analyse Cause
- Effect & Solution for improving Supply Chain Efficacy.
SUPPLY CHAIN DISRUPTIONS & RESILIENCE - By SN PanigrahiSN Panigrahi, PMP
SUPPLY CHAIN DISRUPTIONS & RESILIENCE
Article Published in Materials Management Review of IIMM
SN Panigrahi
#IIMM,
#materialsmanagement,
#supplychainmanagement,
#supplychaindisruptions,
#supplychainresilience,
Challenges of Apparel Exports from India - Presentation @ Indian Institute...SN Panigrahi, PMP
I had an Opportunity to Provide Training to the Officials of Directorate of MSME, Govt. of West Bengal on "Training of Master Trainers for Export Consultancy in the Gems and Jewellery & Apparel Sector of West Bengal“
Through Indian Institute of Foreign Trade (IIFT), Kolkata on Hybrid Mode on 1st Dec'2021.
This is Part of West Bengal Government's Strategy to Promote Exports from the State. West Bengal Government Targeted to Double the Apparel Exports from the State in next 3-5 Years.
SN Panigrahi
What is Lean? Understanding Lean Principles by SN PanigrahiSN Panigrahi, PMP
What is Lean? Understanding Lean Principles by SN Panigrahi
Lean is a way of thinking about creating needed value with fewer resources and less waste. Lean is a practice consisting of continuous experimentation to achieve perfect value with zero waste.
RoDTEP Scheme - Manner to Issue & Utilization of Duty Credit for Goods Expor...SN Panigrahi, PMP
RoDTEP Scheme - Manner to Issue & Utilization of Duty Credit for Goods Exported - By SN Panigrahi
Remission of Duties or Taxes on Export Products (RoDTEP) was introduced for the Exporters to make Indian products cost-competitive and create a level playing field for them in the Global Market by Refund un-refunded Taxes or Duties / Levies, not Exempted or Rebated at Present by any other Mechanism.
Government Issued an Advisory on 1st Jan’2021, to implement the Scheme effective from 1st Jan’2021, and allowed the exporters to claim in the Shipping Bill, even though Rates were not announced. Subsequently the Rates range from 0.5% to 4.3% for various Sectors at 8 Digit Level as per Appendix – 4R of Hand Book of Procedures were announced by DGFT vide: Notification 19 / 2015-2020, dated 17th Aug’2021.
Now, CBIC announced the Manner of Issue Duty Credit for Goods Exported under the scheme vide Notification No: 76/2021-Customs (N.T.), 23rd September, 2021.
Enterprise Risk Assessment : A Pro-active Measure to Establish Strategic Prio...SN Panigrahi, PMP
Enterprise Risk Assessment : A Pro-active Measure to Establish Strategic Priorities & To Tackle Key Business Risks- By SN Panigrahi
Enterprise Risk Assessment Tool is used by organizations to Manage Risks Pro-actively and Seize Opportunities related to the achievement of their Objectives. Risk Assessment outcomes help Organizations to Establish Strategic Priorities and Activities to Tackle Key Risks. Increasing Awareness and Imbibing Risk Culture with Involvement of Top Management & Cross Functional Teams shall enhance the Organizations ability to Understand, Identify, and Develop Action Plans in Advance to Pro-Actively Manage Risks.
Hybrid Project Life Cycle - By SN Panigrahi,
Understanding Project Phase & Project Life Cycle,
Types of Project Life Cycle,
Predictive Life Cycle,
Iterative Life Cycle,
Incremental Life Cycle,
Adaptive Life Cycle,
Agile Life Cycle,
Hybrid Life Cycle,
Characteristics of Hybrid Life Cycles,
1.Agile Development Followed by a Predictive Model,
2. Combined Agile and Predictive Approaches,
3. Predominantly Predictive Approach with Some Agile Components,
4. Largely Agile Approach with a Predictive Component,
#HybridLifeCycle,
#PredictiveLifeCycle,
#AgileLifeCycle
#pmpexam,
#pmpcertification,
#pmptraining,
#pmpexamprep,
#pmpcertificationexam,
#pmp2021,
#pmpcommunity
#ProjectFundamentals
#SNPanigrahi,
#EssAnnPee Business Solutions
Choosing Right CHA & Freight Forwarders - By SN PanigrahiSN Panigrahi, PMP
Choosing Right CHA & Freight Forwarders - By SN Panigrahi,
Basic Understanding of Exports,
Incoterms – 2020 : Key Considerations to Avoid Risk,
Role of Logistic Intermediaries : CHAs / Forwarders /1PL, 2PL, 3PL, 4PL,
Selection of CHAs / Freight Forwarders / Shipping Lines,
#SN Panigrahi,
#EssAnnPee Business Solutions,
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Company Valuation webinar series - Tuesday, 4 June 2024FelixPerez547899
This session provided an update as to the latest valuation data in the UK and then delved into a discussion on the upcoming election and the impacts on valuation. We finished, as always with a Q&A
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
2. 2
SN Panigrahi is a Versatile Practitioner, Strategist, Energetic Coach, Learning Enabler & Public Speaker.
He is an International-Corporate Trainer, Mentor & Author
He has diverse experience and expertise in Project Management, Contract
Management, Supply Chain Management, Procurement, Strategic
Sourcing, Global Sourcing, Logistics, Exports & Imports, Indirect Taxes –
GST etc.
He had done more than 150 Workshops on above
Published more than 500 Articles; More than 60 Youtube Presentations
He is an Engineer + MBA +PGD ISO 9000 / TQM with around 29 Yrs of
Experience
He is a certified PMP® from PMI (USA) and become PMI India
Champion
Also a Certified Lean Six Sigma Green Belt from Exemplar Global
Trained in COD for 31/2 Yrs. on Strategy & Leadership
GST Certified – MSME – Tech. Dev. Centre (Govt of India)
ZED Consultant – Certified by QCI – MSME (Govt of India)
Member Board of Studies, IIMM
Co-Chairman, Indirect Tax Committee, FTAPCCI
Empanelled Faculty in NI MSME
He has shared his domain expertise in various forums as a speaker & presented a number of papers in various national and
international public forums and received a number of awards for his writings and contribution to business thoughts.
SN Panigrahi
9652571117
snpanigrahi1963@gmail.com
Hyderabad
3. 3
Public-Private Partnership (PPP) is a funding model for
a public infrastructure project such as a new
telecommunications system, airport / sea port or power
plant / Roads & Bridges or Infrastructure Projects.
The public partner is represented by the Government at
a Local, State and/or National Level.
The Private Partner can be a privately-owned business,
public corporation or consortium of businesses with a
specific area of expertise.
4. 4
Public Private Partnership means an arrangement between a
government / statutory entity / government owned entity on one
side and a private sector entity on the other, for the provision of
public assets and/or public services, through investments being
made and/or management being undertaken by the private sector
entity, for a specified period of time, where there is well defined
allocation of risk between the private sector and the public entity
and the private entity receives performance linked payments that
conform (or are benchmarked) to specified and pre-determined
performance standards, measurable by the public entity or its
representative.
5. 5
PPP is a broad term that can be applied to anything from a simple, short
term management contract (with or without investment requirements) to a
long-term contract that includes funding, planning, building, operation,
maintenance and divestiture.
PPP arrangements are useful for large projects that require highly-
skilled workers and a significant cash outlay to get started.
They are also useful in countries that require the state to legally own any
infrastructure that serves the public.
Different models of PPP funding are characterized by which partner is
responsible for owning and maintaining assets at different stages of
the project.
6. 6
Public Private Partnership means an arrangement between a
government/statutory entity/government owned entity on one
side and a private sector entity on the other.
It is often done for the provision of public assets or public
services, through investments being made and/or management
being undertaken by the private sector entity, for a specified
period of time.
There is well defined allocation of risk between the private sector
and the public entity.
The private entity who is chosen on the basis of open competitive
bidding, receives performance linked payments that conform (or
are benchmarked) to specified and pre-determined performance
standards, measurable by the public entity or its representative.
7. The public entity should have the enabling authority to transfer its responsibility
– enabling legislative & policy framework, administrative order – the instrument
of transfer is through a contract
There is usually a significant transfer of responsibility to the private entity – and
usually includes financial investment obligations
The private sector is responsible for carrying out or operating the project and
takes on a substantial portion of the associated project risks
During the operational life of the project the public sector’s role is to monitor
the performance of the private partner and enforce the terms of the contract
The private sector’s costs may be recovered in whole or in part from charges
related to the use of the services provided by the project, and may be recovered
through payments from the public sector
8. For a payment to the private entity – directly by users or by the public entity
such that - a significant portion of project revenues and/ or the payments, are
conditional on achieving pre-specified levels of performance
Public sector payments are based on performance standards set out in the
contract
Often the private sector will contribute the majority of the project’s capital costs,
although this is not always the case
The nature of the relationship is usually long-term
9. 9
The Emergence of Public-Private Partnership (PPPs) is seen as a Sustainable Financing (Access
to private sector finance) and Institutional Mechanism with the Potential of Bridging the
Infrastructure Gap
Apart from enabling Private Investment Flows, PPPs also deliver Efficiency gains and Enhanced
Impact of the Investments from using private sector skills and from transferring risk to the private
sector
The Efficient use of Resources, availability of Modern Technology, better Project Design and
Implementation and Improved Operations Combine to deliver Efficiency and Effectiveness gains
which are not readily produced in a Public Sector Project
Potentially Increased Transparency
Enlargement of focus from only creating an asset to delivery of a service, including maintenance
of the infrastructure asset during its operating lifetime
PPP Projects also lead to Faster Implementation, Reduced Lifecycle Costs & Operational Costs,
and Optimal Risk allocation
Private Management also increase Accountability and Incenvizes Performance and maintenance of
Required Service Standards.
PPPs Results in Improved delivery of Public Services and Promote Public Sector Reforms
11. 11
A central characteristic of a PPP contract is that it bundles together multiple project phases or functions.
Nonetheless, the functions for which the private party is responsible vary and depend on the type of asset
and service involved. Typical functions include:
•Design (also called engineering work)—involves developing the project from initial concept and output
requirements to construction-ready design specifications.
•Build, or Rehabilitate—when PPPs are used for new infrastructure assets, they typically require the private
party to construct the asset and install all equipment. Where PPPs involve existing assets, the private party
may be responsible for rehabilitating or extending the asset.
•Finance—when a PPP includes building or rehabilitating the asset, the private party is typically also required
to finance all or part of the necessary capital expenditure, as described further in How PPPs Are Financed.
•Maintain—PPPs assign responsibility to the private party for maintaining an infrastructure asset to a specified
standard over the life of the contract. This is a fundamental feature of PPP contracts.
•Operate—the operating responsibilities of the private party to a PPP can vary widely, depending on the
nature of the underlying asset and associated service. For example, the private party could be responsible for:
• Technical operation of an asset, and providing a bulk service to a government off-taker—for example, a
bulk water treatment plant
• Technical operation of an asset, and providing services directly to users—for example, a PPP for a
water distribution system
• Providing support services, with the government agency remaining responsible for delivering the public
service to users—for example, a PPP for a school building that includes janitorial service
12. 12
For the provision of these services, the private party typically
creates a PPP company, a Special Purpose Vehicle (SPV)
solely to serve a particular function, such as the facilitation of a
financial arrangement or creation of a financial instrument.
A dedicated SPV allows for the segregation of all assets and
liabilities linked to the private provision of services.
The concession period is determined primarily by the length of
time needed for the facility’s revenue stream to pay off the
company’s debt and provide a reasonable rate of return for its
effort and risk.
13. 13
The PPP Payment Mechanism
The private party can be paid by collecting fees from service users, by the
government, or by a combination of the two—with the common, defining
characteristic that payment is contingent on performance.
The payment mechanism should be structured in such a way that the net
remuneration of the private party is linked to performance. For the private
party to have the right incentives to deliver services at the performance levels
intended by the procuring authority,
Payment
collecting fees
from service
users
by the
Government
by a
combination
of the two
14. 14
Assets revert to the authority at the end of the concession period,
including assets purchased by the concessionaire. In a concession the
concessionaire typically obtains most of its revenues directly from the
consumer and so it has a direct relationship with the consumer. The
concessionaire will pay a concession fee to the authority.
A Concession gives a concessionaire the long term right to
use all utility assets conferred on the concessionaire,
including responsibility for operations and some investment.
Asset ownership remains with the authority and the authority
is typically responsible for replacement of larger assets.
private operator is responsible for operating and
maintaining the utility. In the case of a lease the
rental payment to the authority tends to be fixed
irrespective of the level of tariff collection that is
achieved and so the operator takes a risk on bill
collection and on receipts covering its operating
costs.
Contractual arrangement for the management of a part
or whole of a public facility or service by the private
sector. Capital investment is typically not the primary
focus in such arrangements.
Build-Operate-Transfer (BOT) Projects, and Design-
Build-Operate (DBO) Projects are types of public-
private partnerships that are output focused. BOT and
DBO projects typically involve significant design and
construction as well as long term operations, for new
build (greenfield) or projects involving significant
refurbishment and extension (brownfield).
15. SN Panigrahi 15
Design-Build
(DB)
Operation &
Maintenance
Contract
(O & M)
Design-Build-
Finance (DBF)
Design-Build-
Finance-Operate
(DBFO)
Design Build
Finance Operate
Manage
(DBFOM)
Design Build
Operate
(DBO)
Build-Own-
Operate
(BOO)
Build Operate
Transfer
(BOT)
Build Own
Operate
Transfer
(BOOT)
Buy-Build-
Operate
(BBO)
Finance Only
Build Lease
Transfer(BLT)
Build-Lease-
Operate-
Transfer (BLOT)
Lease Renovate
Operate
Transfer
(LROT)
Design
Construct
Manage Finance
(DCMF)
Operation
License
16. 16
•Design-Build (DB): The private-sector partner designs and builds the infrastructure to meet the public-
sector partner's specifications, often for a fixed price. The private-sector partner assumes all risk.
•Operation & Maintenance Contract (O & M): The private-sector partner, under contract, operates a
publicly-owned asset for a specific period of time. The public partner retains ownership of the assets.
•Design-Build-Finance (DBF) : With the design-build-finance (DBF) procurement model, a single contract is
awarded for the design, construction, and full or partial financing of a facility. Responsibility for the long-term
maintenance and operation of the facility remains with the project sponsor, but could be included in a
separate agreement. This approach takes advantage of the efficiencies of the design-build (DB) approach
and also allows the project sponsor to defer financing either completely or partially during the construction
period.
•Design-Build-Finance-Operate (DBFO): The private-sector partner designs, finances and constructs a
new infrastructure component and operates/maintains it under a long-term lease. The private-sector partner
transfers the infrastructure component to the public-sector partner when the lease is up.
Design Build Finance Operate Manage (DBFOM)
•The responsibilities for designing, building, financing and operating are bundled together and transferred to
private sector partners. There is a great deal of variety in DBFOM arrangements, and especially the degree
to which financial responsibilities are actually transferred to the private sector.
17. 17
Design Build Operate (DBO): A design build operate (DBO) contract is a project delivery model in
which a single contractor is appointed to design and build a project and then to operate it for a
period of time, while the Sponsoring Authority finances the project and retains ownership
•Build-Own-Operate (BOO): The private-sector partner finances, builds, owns and operates the
infrastructure component in perpetuity. The public-sector partner's constraints are stated in the
original agreement and through on-going regulatory authority.
Build Operate Transfer (BOT) : The agreement commits the private company to build and operate
a facility - such as a power plant - for a period of time then transfer ownership to the government.
Build-Own-Operate-Transfer (BOOT): The private-sector partner is granted authorization to
finance, design, build and operate an infrastructure component (and to charge user fees) for a
specific period of time, after which ownership is transferred back to the public-sector partner.
•Buy-Build-Operate (BBO): This publicly-owned asset is legally transferred to a private-sector
partner for a designated period of time
18. 18
•Build Lease Transfer(BLT) Under BLT a private entity builds a complete project and leases it to
the government. On this way the control over the project is transferred from the project owner to a
lessee. In other words, the ownership remains by the shareholders but operation purposes are
leased. After the expiry of the leasing the ownership of the asset and the operational
responsibility are transferred to the government at a previously agreed price.
•Build-lease-operate-transfer (BLOT): The private-sector partner designs, finances and builds
a facility on leased public land. The private-sector partner operates the facility for the duration of
the land lease. When the lease expires, assets are transferred to the public-sector partner.
Lease Renovate Operate Transfer (LROT): In this type, the existing infrastructure is handed
over to a private facility for a particular time period. This is given to undergo renovation and its
operation for a specific time period. The operation is performed on the condition that the private
facility will recover the cost that is agreed in return as per the contractual agreement along with
the transferring of the entity back to the government.
19. 19
Design Construct Manage Finance (DCMF) : Some examples for the DCMF model are prisons
or public hospitals. A private entity is entrusted to design, construct, manage, and finance a
facility, based on the specifications of the government. Project cash flows result from the
government's payment for the rent of the facility. In the case of hospitals, the government has the
ownership over the facility and has the price and quality control. The same financial model could
be applied to other projects such as prisons. Therefore, this model could be interpreted as a
means to avoid new indebtedness of public finance
•Operation License: The private-sector partner is granted a license or other expression of legal
permission to operate a public service, usually for a specified term. (This model is often used in
IT projects.)
•Finance Only: The private-sector partner, usually a financial services company, funds the
infrastructure component and charges the public-sector partner interest for use of the funds.
20. 20
There are Different PPP models.
Each model has its own pros and cons and can be suitable to
achieve some of the objectives of private participation. Special
characteristics of some sectors and their technological development,
legal and regulatory regimes, and public and political perception
about the services in a sector may also be factors in deciding the
suitability of a particular form of private participation. For example,
management contracts are common for existing assets in the water
and transport sectors, affermage / lease is common in the transport
sector, concessions are common in the transport and
telecommunication sectors, and turnkey and private ownership of
assets are common in the power sector.
22. 22
Examples of PPP projects of the combination type include The Shanghai Container Terminal
Company Limited (between the Port Authority and Hutchinson Whampoa in Shanghai, China),
International Container Terminal Services, Inc. (in Manila, Philippines), and Delhi International Airport
Limited (under an Operation-Maintenance-Development Agreement between GMR-Fraport
Consortium and Airports Authority of India in New Delhi, India). These long-term lease/concession
combination contracts involve operation and management and significant investments in existing
public assets.
The Port Klang Container terminal deal in Malaysia is also an example of the combination type of
PPP that involved leasing of existing infrastructure facilities at the port and Build-Rehabilitate-
Operate-Transfer (BROT) for further infrastructure development. The terminal facility was located on
land that could not be legally sold to any private company. In order to circumvent this problem, the
Port Authority leased the land to the private company for 21 years for the express purpose of
operating a container terminal.
23. 23
SECOND VIVEKANANDA BRIDGE (now Sister Nivedita Bridge) in Kolkota:
This bridge is one the first BOT projects, undertaken in 1995. The concession agreement was signed in
September;2002. The consortium members are from USA, UK, Mauritius and India. Though the financial close
was delayed by one year, the construction thereafter was almost on time and the bridge was commissioned on
July4, 2007. This bridge also won award for excellence for the year 2007 under the Foreign Bridge Project
Category from the American Segmental Bridge Institute. Total project cost of INR 640 (USD 128 millions). The
concession period of the project is 30 years.
MUMBAI METRO:
First MRTS project in India being implemented on Public Private Partnership (PPP) format. DMRC (Delhi
Metro Rail Corporation) prepared the master plan for Mumbai Metro. The Private party involved was- Reliance
Energy Ltd.
Total Project cost- Rs. 2356 Crores
First phase- 2006-1011
Commencement of Operations- 2009-2012
mass transit corridor from Andheri to Ghatkopar
24. 24
DND – LINK ROAD:
The 4 lane 1.5 km long road will intersect the Delhi Noida link road at the intersection of the proposed Mayur
Vihar District Centre. This link has been proposed to provide better access and the shortest connectivity from the
existing DND flyway to the Trans Yamuna East Delhi area. The work involved detailed geometric design and
structure design of the flyover over DND Flyway and another bridge. Estimated civil work cost of the project is
Rs. 30 crores. The concession period of the project is 30 years.
UNDERGROUND CAR PARKING SYSTEM CITY- Kolkata, West Bengal
Year of execution- April 2007. Parking in central Kolkata, the heart of this mega city, has always been a hassle is
the case with most of the inner city areas. In an attempt to address the situation, the Kolkata Municipal
Corporation (KMC) decided to utilize the rights to underground space and undertake the parking project as a
Public Private Partnership project on a Build-Own-Operate-Transfer (BOOT) basis for 20 years. The Private
parties involved were- KMC and Simplex
UG Level 1: Commercial Development
UG Level 2: Parking lot
25. 25
List of all PPP Projects - Data collated since 2006
https://www.pppinindia.gov.in/infrastructureindia/project-
list?id=1&searchType=Government%20Infrastructure%20Projects
%20(PPP)
www.infrastructureindia.gov.in is a repository of information on
infrastructure projects being implemented in India by various
Government Departments and Private Sector companies. This
database has been developed by PPP Cell, Infrastructure Division,
Department of Economic Affairs, Ministry of Finance, Government of
India.