Project presentation pre work on waste generation and management in bscic area, mymensingh by sumon,showrav
1. WELCOME TO THE
PRESENTATION ON “A
PROJECT ON WASTE
GENERATION AND
MANAGEMENT IN
BSCIC AREA,
MYMENSINGH”
PRESENTED BY –
DPERATMENT OF FARM STRUCTURE AND ENVIRONMENTAL ENGINEERING,
BANGLADESH AGRICULTURAL UNIVERSITY
2. SUPERVISOR OF THE PROJECT:
Associate Professor Md. Siddikur Rahman
Department of Farm Structure and Environmental Engineering,
Faculty of Agricultural Engineering & Technology,
Bangladesh Agricultural University, Mymensingh – 2202.
Email: siddik@bau.edu.bd
PROJECT BODY:
Sumon Datta Showrav Islam Abir
ID No. – 1005035 ID No. - 1005009
REG No. – 36674 REG No. - 36648
4. INTRODUCTION
Wastes may be defined as any substance which
constitute a scrap material or other unwanted
surplus substance arising from the application of
any process. – EPA, 1990
Wastes may be of 3 types:
1. Solid Wastes
2. Liquid Wastes
3. Gaseous Wastes
5. INTRODUCTION
Solid Wastes consist of
polythene, paper, steel, aluminum, copper, cardb
oard materials, sludge etc.
Liquid wastes consist of slurry, biomedical
wastes, urine, human wastes, sewage water, toxic
wastes etc.
Gaseous wastes consist of airborne emissions and
effluents that may contain particulate
matter, fumes, smoke, vapor etc. releasing from
industries.
6. INTRODUCTION
BSCIC elaborates as Bangladesh Small &
Cottage Industries Corporation.
BSCIC was established in 1957.
Its sole purpose is to promote the
development of small, medium and
cottage industries (SMICs) in the
manufacturing sector through the provision
of advisory services, fiscal and financial
assistance, market facilities.
7. INTRODUCTION
BSCIC, Mymensingh was established on 1st
September, 1968 in Maskanda, central
Mymensingh.
It had an area of 10.81 acres.
It currently occupies 9.69 acres consisting of 51
industries of different types.
8. INTRODUCTION
Following table will demonstrate the types and
corresponding numbers of industries:
Types of Industry Numbers
Mustered Oil Mill 14
Coconut Oil Mill 2
Mosquito Coil Mill 2
Bicycle Parts Manufacturing 2
Puffed Rice Mill 2
Fried Rice (Muri) Mill 3
Electrical Wire Manufacturing 4
Biscuit Mill 3
Wheat Products (Flour, Noodles) 4
Material Processing ( Plastic, etc ) 4
Marble Manufacturing Mill 1
9. INTRODUCTION
Rest:
Types of Industry Number
Cotton Mill 1
Pulse Crushing 1
Pesticide and Fertilizer Producing 1
Mat Producing Mill 1
Soap Producing Mill 1
Packaging Mill 1
Spices Producing Mill 1
Printing Mill 1
Dress Producing Mill 1
Fruit Processing Mill 1
Miscellaneous Parts Manufacturing
Mill
1
14. OBJECTIVES
To assess the types and amount of wastes that is
generated in the study area.
To determine the relationship between waste
generation and other variables.
To assess the present waste management practices in
the study area.
To assess the environment impact of the generated
wastes.
To develop a guideline for the betterment of waste
disposal as well as management system for the study
area.
16. METHODOLOGY
The survey and work plan will be implemented according to following
steps:
1. Study Area:
Maskanda, Mymensingh
17. METHODOLOGY
2. Design of Study:
The steps in the study are:
First of all, the study areas are selected.
The important variables, directly related to the objective
of the study, are determined.
Method of obtaining data is designed.
Required study will be collected.
The collected data will be analyzed and reported.
18. METHODOLOGY
3. Industries Selected for Surveying:
Ms. H.K. Traders
Ms. Maloti Enterprise
Ms. Heicame Bangladesh
Ms. Bismillah Enterprise
Ms. Habib Food Products
Ms. Rahman Plastic Industries
Ms. M.K. Mat Industry
Ms. Rajabaria Chemical Industries
Ms. Next Line Production
Ms. Tricom Foods Ltd.
Ms. Sun-moon Food Industries
Ms. Brahmaputro Printing & Packaging
Ms. Sayma Overseas Co. Ltd.
Ms. Dong Zing Chemical Complex Ltd.
Ms. Super Cables Industries
Ms. Sakoa Enterprise
Ms. Aroti Group of Industries
Ms. Shelly Enterprise
19. METHODOLOGY
3. Industries Selected for Surveying:
Ms. Super Cables Industries
Ms. M. K. Mat Industries
Ms. Mita Garments
Ms. Ruhul Enterprise
Ms. Baba Loknath Enterprise(1)
Ms. Hasib Oil Mill
Ms. Golden Biscuit Factory
Ms. Kiron Food Products
Ms. B. S. Food Industries
Ms. Old Bombay Marble Factory
20. METHODOLOGY
3. Industries Selected for Surveying:
Ms. Pakiza Electric
Ms. Brishti Biscuit Factory
Ms. T.K. Food Industries
Ms. Laxmi Industries
Ms. Brishti Flour Mill
Ms. Matri Industries
Ms. Matri Enterprise
Ms. Kiron Food Industries
Ms. Nur Chira Muri Mill
Ms. Forazi Food Industries
Ms. Ruhul Amin Enterprise (2)
Ms. Super Cables
Ms. Baba Loknath Enterprise(2)
Ms. A. S. Food Industries
Ms. Mia Oil Mill
Ms. Monisha Enterprise
Ms. P.L. Oil Mill
Ms. P.L. Coconut Oil Mill
Ms. Rupon Oil Mill
Ms. R. S. Enterprise
Ms. Laxmi Enterprise
21. METHODOLOGY
4. Study Period:
Although some irrelevant information was collected prior to study, the
main information for the study will be conducted from July 2013 to
October 2013.
5. Instruments for Data Collection:
An Interview schedule will be used in order to collect relevant
information from the different industries.
The schedule is carefully designed keeping the objectives of the study
in view.
For easy communication, the schedule is made in both Bengali/English
form.
22. METHODOLOGY
6. Collection of Data:
Collection of data will be done through direct contact
with industry representative on relevant industry site.
Manager and other stuffs will be interviewed for obtaining
information regarding the product of the industry, waste
generation.
Its management practices and pollution due to the waste.
In order to minimize the error in responses, questions will be
asked in Bengali for easy access.
A Sample of Questionnaire is shown in next slide.
23. METHODOLOGY
QUESTIONNAIRE FOR OBTAINING INFORMATION ON WASTE GENERATION AND
MANAGEMENT IN BSCIC INDUSTRIAL AREA, MYMENSINGH
BANGLADESH AGRICULTURAL UNIVERSITY
FACULTY OF AGRICULTURAL ENGINEERING AND TECHNOLOGY
DEPARTMENT OF FARM STRUCTURE AND ENVIRONMENTAL ENGINEERING
Date: ____ / ____ / ________ Serial No. –
Objective: To collect firsthand information on waste generation and
management.
Name of Industry:
------________________________________________________________
Address: __________________________________________________________________
Name of Information Provider/ Representing Officer:
____________________________________________________________________________
_
Date of Establishment: _________________
24. METHODOLOGY
Type of Industry: ____________________________________
Size of Industry: ______________________________________ (In local unit)
: ______________________________________ (In Hectares)
Number of Employees: _______________________________ (In Total)
Production Quantity: _____________________
Waste Generated in the Industry:
1. Types of Wastes:
____________________________________________________________________________
____________________________________________________________________________
__
2. Waste Generation:
____________________________________________________________________________
_
Presence of Treatment Plant: _________ (Yes/No)
26. METHODOLOGY
This is the methodology for conducting the project and
results and discussion will be provided after the collection
and proper analysis of data after study period.
27. CONCLUSION
THANKS TO ALL RESPECTED
TEACHERS AND AUDIENCE FOR
ATTENDING THE PRESENTATION ON
PROJECT.