Ali Ibrahim Ahmed is seeking a position as a Project Engineer in oil and gas where he can make use of his experience. He has a Bachelor's degree in Mechanical Engineering from Ain Shams University. His current role is as a Project Engineer at Advanced Energy Systems since 2015 where he is working on converting an offshore drilling rig into a production unit. Previously he has over 10 years of experience in engineering roles for oil and gas construction projects.
THIRTEEN (13.4) years of extensive experience as Mechanical ,Piping , Shutdown project, Material Inspection/Material Prevention in Laydown Area or site area/ Structural QA/QC Inspector & QC Supervisor in Mechanical field of construction in various projects like Oil & Gas Industries, Petro chemicals, Chemical Plants, high rise building and infrastructure sector.
I would like to enroll in your esteemed organization as a candidate for an opening in the field of QA/QC Manager . I expect to here from your end in near future.
Excellent planner and strategist with proven abilities in surveying the projects of all kinds of earth works, power plant, chemical plant, water treatment plant, oil & gas plant etc.
Strong analytical and Organizational abilities with skills to plan and implement novel ideas
THIRTEEN (13.4) years of extensive experience as Mechanical ,Piping , Shutdown project, Material Inspection/Material Prevention in Laydown Area or site area/ Structural QA/QC Inspector & QC Supervisor in Mechanical field of construction in various projects like Oil & Gas Industries, Petro chemicals, Chemical Plants, high rise building and infrastructure sector.
I would like to enroll in your esteemed organization as a candidate for an opening in the field of QA/QC Manager . I expect to here from your end in near future.
Excellent planner and strategist with proven abilities in surveying the projects of all kinds of earth works, power plant, chemical plant, water treatment plant, oil & gas plant etc.
Strong analytical and Organizational abilities with skills to plan and implement novel ideas
Top 8 mechanical project engineer resume samplesjoycejames46
In this file, you can ref resume materials for mechanical project engineer such as mechanical project engineer resume samples, mechanical project engineer resume writing tips, mechanical project engineer cover letters, mechanical project engineer interview questions with answers…
Sr. QA/QC Mechanical Engineer with 8 years experience in power plant, oil and gas.
Industrial Project QA/QC Mechanical Head professional with 8 years of experience from the well-recognized organizations in the field of Industrial Inspection, Quality assurance, Quality control, Welding inspection and conformity Assessment of products and services.
Expertise in conducting receiving, in process and final inspection for achieving enhanced Quality. Having good working experience as a Third party inspector for SGS industrial services.
Distinctively been a Internal auditor for ISO 9001:2008 Quality management systems. Self-directed, team-oriented, enthusiastic & possessing solid organizational skills.
Lefebvre Engineering is an integrated service provider in engineering, fabrication, machining and equipment building in the region. Incorporated in 2006 as a Free Zone company in Hamriyah Free Zone, Sharjah, United Arab Emirates was originally founded in 1914 in Montreal, Canada as Lefebvre Freres. Lefebvre was at that time specialized in automobile industry. Over the years the company diversified as fabricators and manufacturers of custom build machinery for use in aluminium, steel, Power and Oil & Gas industry.
For close to a century, Lefebvre has built pressure vessels, Heat exchangers, steel and aluminium weldments, specialized equipment and machinery for Hydro carbon, Power, aluminium and Oil & Gas Industry.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
1. Curriculum Vitae
-Personal data:
Name : ALI IBRAHIM AHMED
Date of birth : 20/11/1981
Address : 4, AbdEl Aziz, Ahmed Esmat, Ain Shams,
Cairo, Egypt
: 0020-01006687438 -01125566665Tel
/249110790020- 24926552
Nationality : Egyptian
Military Service: exempted
E-mail :Alipower4@yahoo.com
Career Objective:-
Primary objective is to continue career development Project engineer in the field of Oil
and gas Construction & Industrial (offshore & onshore). Seeks a position, where I shall
be able to make significant contributions and make use of the experience, technical
knowledge and Skills gained in previous positions. Would welcome challenging and
stimulating work Environment and willing make long term commitment to meet these
ends.
Academic Qualifications:-
B.SC : Mechanical Engineering.
Department : Power Mechanical Dept.
University : Ain Shams University.
Cumulative Grades: pass.
Graduation Project: Internal Combustion engine.
Graduation Year : 2004.
PRESENT EMPLOYMENT:-
Present Employment: 6-2015– To date
Employer : Advanced Energy Systems
Designation : Project Engineer
PROJECT:- PETROZNIMA MUZHIL FIELD DEVELOPMENT PROJECT
Convert the Jack-up Drilling Rig ADMARINE 1 (MODU) to Mobile Offshore Production Unit
(MOPU). It will be equipped with facilities consisting of oil, gas and water separation.
All drilling equipment has been removed, jack-up rig has been refurbished and installation of new
equipment on main deck Ex. Heater Treater ,Desalter,Chemical Injection ,Water Treatment ,Gas
boot, flare system, firefighting system , SCADA ,Utilities and accommodation ,Hull and Piping,
Jack-up will be connected to 12 slot wellhead platform fixed to the seabed and linked by bridge ,the
Floating storage and offloading FSO will be stand alone to receive the treated oil . in this scope the
engineering work is required to comply with all relevant codes and standards such as (where
applicable) ABS Rules ,API,ASME,ANSI,NACE and any related stander or regulations deemed
applicable as modification Helideck compliant with CAP 437 rules .Pre-Commissioning,
Commissioning and startup supervision for the plant
2. PREVIOUS EMPLOYMENTS HISTORY
Project engineer in the field of Oil and gas Construction & Industrial fabrication.
ervicesPetrolift oil s
From 5/2011 to 5/2015
TOTAL SOLUTION INTEGRATD SERVICES (TS) Project
From 9/2006 to 4/2011
Key of responsibilities & duties
Study of client’s specifications and developing the technical procedure
according to the Standards and requirements specified, attending the pre-job conference and the
Periodical meetings along with the project, technical submittals to/from concerned Parties
Preparing detail design engineering
The Shop drawing for Construction and field Piping system including system limit on P&ID
and Piping Isometrics & Material takeoff for the project and test packages.
Preparing bidding, That includes developing a the cost break down (budget) evaluating of
Subcontractors Previous experience, equipment, labor, economy of a subcontractor offer
Execution and supervising project management
Field erection Construction & piping pre-commissioning activities, inspection, pressure testing,
mechanical Completion system, nondestructive, examination and post weld of piping
Preparing the daily work schedule and the weekly work plan,
That includes man power, equipment, materials, and working hours.
Carrying out evaluation tests systems proposed by suppliers for a new Project, that
includes review of products data sheets, carrying out actual site application of products,
through site and tests as per standards specified.
commissioning and Pre-Commissioning requirements for the project
The Quality Control tasks, safety health and environment rules
CODES/STANDARDS FAMILIAR WITH:
ASTM, (API-650, API-652, API-653, API- 2015) British standard EN
12079,EN 7072
in Petrolift &TotalsolutionesProject
lExxonMobi-
. Terminal in Alex
. Fabrication and installation a new pipe line& pipe rack from tank of solar to loading station
. Remove old bottom and Fabrication a new bottom for tank of solar
. Fabrication and installation a new fire fighting system for tank of solar
. Fabrication and installation a new foam system for tank of solar
.sand blast & coating for a new bottom for tank of solar
. Pipe line modification inlet &outlet for pump stations
. Terminal in Suez
. Repair and maintenance old tank
.Demolition the old wall of tank and remove the tank using cutting flam lump& using scaffolding
.Construction and installation new tanks according to API-650 Capacity 5,848,500 lit
Cairo. Terminal in
. Remove the old tank using cutting flam lump and demolition the civil work for
The base of the tank
3. Saipem–
. Steel structures works & pipe racks for Vinking Barge in Alex (abokier port)
. Fabrication of sea fastening grillage
. Sea fasting grillage offshore (Bourbon) in Alex (abokier port)
. Fabrication of lifting frame.
. Fabrication of antenna platform.
. Fabrication of A frame.
. Fabrication of ROV platform.
. Fabrication of floating buoyancy.
. Fabrication of basket &container
BP EGYPT-
.Cargo carrying units 250 pieces equal 400 ton
.Container &drum rack
.Water tank
.Basket 40 ft
Schlumberger-
.Overhead crane to testing area
. Fabrication of drum cables & tools skid
. Fabrication of off shore baskets
. Fabrication of Banker box&onan frame
. Fabrication of Dst container & mdt
Transocean-
. Fabrication 50 pieces of various CCU.
. Personnel baskets and various containers
. Fabrication of various sizes of oxygen and acetylene racks
. Fabrication of drum baskets containers
(P&G)Procter&Gambly-
pipetputou&inputand install3
200mbaseV-Rstorage tanksteel ss304Stainless.
Isolation the tank and pipe and install pump &valves
. Steel structure for backing area
. Structure integrity for tower steel structure retrofits
. Stainless steel ss304 storage tank r-v base 150m3
. Steel structure for duct burner platform
. Steel structure for new building cornflake
.install for HVAC duct system for cornflake
. Install pipe line 316L and install pump &valves
. Steel structure for new compressor room &transfer room
MI SWACO-
. Toti tank
Damien Offshoer-
.spreader beam
.Lifting frame
.container &basket
.engine room container
Halliburton-
. Fabrication of offshore baskets
. Fabrication of cement tank
. Fabrication of open top container
Orascom
Spreader beam
4. Pride-
. Fabrication of marine locker
. Fabrication of container & basket
. Fabrication of Gas rack& drum rack
Brolos gas company-
. Fabrication of 8 pressure vessel for methanol transportation
. Fabrication of office container
Pico company-
. Equipments modification includes fabrication of frames
.Storage tanks
.Frame of heater
Weatherford-
.Fabrication & install sling rack in Weatherford yard.
.Basket 12m
of Egypt (Safola)yUnited Suger Compan-
.Vapor condensate tank (stainless steel SS316)
Sea drill-
. Fabrication of movable workshop
. Fabrication of 37 pieces of CCU
Hess-
.Cargo carrying units 180 pieces
.Container &drum rack
.Spreader beam 30ton
. Lug lifting
Baker atlas-
.Fabrication of baskets
GUPO-
. Fabrication of Container & gas rack
. Fabrication of baskets
EDC-
. Fabrication of Bop test stump skid
. Fabrication of Bop lifting frame
Deep tech-
. Fabrication of workshop container
. Fabrication of Tool basket
GOVS-
. Fabrication of Cutting box
Intermoore-
. Fabrication of Steel reel
. Fabrication of workshop container
Alastom-
. Fabrication of Overhead crane
5. Other PREVIOUS EMPLOYMENTS HISTORY
Technical office engineer
Misr co. for Mechanical&Eelectrical projects (KAHROMIKA)-
From 7/2006 to 9/2006
Technical office engineer
. Design &work shop drawing for Fabrication
. Steel structure and industrial buildings
. Transmission and communication towers
I.C.G)GROUP (INTEGRATD CONSULTING-
From 7/2005 to 7/2006
Site engineer
. Supervising on the execution of hotel in Nasr city for pipe&duct system
.Supervising on the execution of financial authority for pump water system
Technical office engineer
. Design &work shop drawing for HVAC system of
. Air force hospital New Cairo
. Royal city– 6th of October City
. Gardenia villas– 6th of October City
- Goldi (Ahmed Baget Group)
From 4/2005 to 7/2005
Quality control engineer
Professional memberships
-Egyptian Engineers Syndicate.
- Egyptian Private Driving License
- Computer Skills:
. AutoCAD
. Microsoft Office Project
. Windows. Ms-Office
. Internet
. Knowledge about Computer Hardware, Installing, collecting and maintenance
Training:-
.The petroleum projects and technical consultation company (Petrojet).
. Badr petroleum company (BAPETCO)
. Gulf of Suez petroleum company (GUPCO).
. The petroleum of gas (PETROGAS)
. Wadehoaf power station
. Misr for aluminum (EGYPTALM)
. Egypt Air
. Kader factor
- Language:
. Arabic (native language)
. English (very good)
. Dutch (medium)
Appreciate Considering my Application for an Interview, and looking forward to Hear from you
soon,
Thanks in Advance
Ali Ibrahim