Personal Data
Date of birth 24/10/1980
Nationality Egyptian
Marital Status married
Military Status Exempted
Driving License: yes
Gender Male
Education &Graduation
Obtained the degree of Bachelor in Mechanical Engineering. (Production Dept.)
Faculty : Engineering
University: Helwan
Graduation year : May 2006
Graduation degree : Accepted
Project degree : Excellent
Courses: PMP -project management professional (AUC preparation course).
Summary of qualifications
sllikS retupooC
e
.-:and ApplicationsOperating Systemse
-Windows- Internet.
-Microsoft Office (Word, Excel).
-Microsoft office project
-Systems:Programming
-AutoCAD 2D
-plate &sheet
Laskkik etupooC
e
Arabic mother tongue.e
Very Good command of spoken and writing English.
Eng. Eslam Soliman Abd ElGhaffar Aly Oraby
Address :Egypt -Cairo- Helwan– 2 Mostafa Fahmy st.
Mobile: +966 544790332
+966 597842334
E-mail: eslam_arescomj@hotmail.com
1- From 20-10-2015 till now :
Working at (DNGO CONTRACTING SAUDI COMPANI KSA)
Construction of treated water transmission lines to the project of king Abdullah
for Waad Al Shamal city development and associated ground works.
Job Title: senior mechanical project engineer
Tasks:-
i.Evaluate construction methods and determine cost-effectiveness of plans
ii.Plan, organize, and direct activities concerned with the construction and
maintenance of structures.
iii.Study job specifications to determine appropriate construction methods
iv.Direct and supervise workers.
v.Obtain all necessary permits and licenses
vi.Determine labor requirements and dispatch workers to construction sites.
vii.Take actions to deal with the results of delays, bad weather, or emergencies
at construction site
viii.Requisition supplies and materials to complete construction projects.
ix.Reviewing fabrication &erection drawings for the project
x.Preparing & releasing project work breakdown structure W.B.S
xi.Supervision on equipment cold run test , commissioning
& Performance test
Work Experiencee
2-From 1-6-2011 till 1-10-215:
Working at (polyserve fertilizer &chemicals -TRIDEX for industrial project co.)
Job Title: construction & upgrade site manager
Tasks:-
xii.Evaluate construction methods and determine cost-effectiveness of plans
xiii.Plan, organize, and direct activities concerned with the construction and
maintenance of structures.
xiv.Study job specifications to determine appropriate construction methods
xv. responsible for the onsite control and coordination of all activities on site
and for ensuring follow through on the scope of works, applicable
procedures and method statement
xvi.Control of compliance with HSE(Health, Safety and Environmental)
requirements during all delivery, assembly and erection activities on
site
xvii.Direct and supervise workers.
xviii.Obtain all necessary permits and licenses
xix.Prepare contracts and negotiate revisions, changes and additions to
contractual agreements with consultants, clients, suppliers and
subcontractors
xx.Determine labor requirements and dispatch workers to construction sites.
xxi.Schedule the project in logical steps and budget time required to meet
deadlines
xxii.Confer with supervisory personnel, owners, contractors, and design
professionals to discuss and resolve matters such as work procedures,
and construction problems
xxiii.Take actions to deal with the results of delays, bad weather, or emergencies
at construction site
xxiv.Prepare and submit budget estimates and progress and cost reports.
xxv.Requisition supplies and materials to complete construction projects.
xxvi.Select, contract, and oversee workers who complete specific pieces of the
project, such as painting or insulation work
xxvii.Supervision on Inspection for exist equipment
xxviii.Releasing spare part lists for rehabilitation Process
xxix.Technical evaluation for spare parts offers
xxx.Reviewing fabrication &erection drawings for the project
xxxi.Technical support for fab. ,erection &maintenance activities
xxxii.Preparing & releasing project work breakdown structure W.B.S
xxxiii.Reviewing & technical evaluation for estimation study
xxxiv.Supervision on equipment cold run test , commissioning
& Performance test
-Fabrication &erection UAN- 32% tank
(Liquid fertilizer tank according API 650)
(Fab. &erection UAN 32% seamless pipes lines ASTM A106 Grade B &pumps)
(LIQUIFERT EGYPT for fertilizer &chemical company)
-fabrication &erection sulphuric acid tanks according API 650
(Fab. &erection h2so4 sulfuric acid seamless pipes lines ASTM A106 Grade B
&pumps)
(Abu Zaabal fertilizer &Chemicals Company)
-steam turbine (28 MW) upgrade:
Revamping for:-
-steam &condensate pipe lines
-Turbine impeller &coupling
-cooling tower
- Water tube boiler
- Re tubing super heater coils
(Abu Zaabal fertilizer &Chemicals Company)
-water treatment plant upgrade:
Fabrication &Erection for:-
- Seamless pipes lines ASTM A106 Grade C Process water pipe lines
- Seam welding cooling tower pipe lines
-Sand filters
(Abu Zaabal fertilizer &Chemicals Company)
-Kiln &EP filter fan Rehabilitation:-
Civil work, mechanical erection for fan &dedusting line fabrication &erection
(National Cement Company)
-NPk, SSP,GSSP fertilizer plants upgrades:-
Rehabilitation for Rotary dryer, rotary cooler, crusher, vibrators, fans, belt
conveyors, scrubbers &dedusting lines
-fabrication &erection firefighting pipe lines
(Abu Zaabal fertilizer &Chemicals Company)
-coating plant:
Fabrication& erection for: -
Rotary coater, belts conveyors, vibrators, additives tank &feeding hoppers
(Abu Zaabal fertilizer &Chemicals Company)
- GSSP Granulation fertilizer plant up grades:-
Rehabilitation for Rotary dryer, rotary cooler, crusher, vibrators, fans, belt
conveyors, scrubbers & dedusting lines
(LIQUIFERT EGYPT fertilizer &Chemicals Company)
3-From 1-10-2010 till 1-6-2011:-
Working at (polyservegroup TRIDEX for industrial project co.)
As a site manager for H2so4 plant upgrade
Rehabilitation for:
-Water tube boiler,
- Heat exchanger
-Fabrication & erection acid towers.
-Re tubing Heat exchanger
Fabrication &Erection for:
-Cold Heat exchanger,
- Filtered tank,
-intensive tank,
- Acid and steam piping line.
-Firefighting pipe lines
-stem heating coils
(Abu Zaabal fertilizer &Chemicals Company)
4-from 1-4-2010 until 1-10-2010
Installation a cement plant at BeniSwief
Working at (ASEC for manufacturing and industrial projects (ARESCO)
As Area manager engineer:-
Erection for:-
-Homo silo: - utilities, aeration, steel structure, buckets elevator
Air-slides
-bag housing filters (Readecam)
(ASEC Aresco EGYPT South Valley cement project)
5-from January 2009 until 1-3-2010
Installation a cement plant at SUDAN-ATBARA
Working at (ASEC for manufacturing and industrial projects (ARESCO)
As Area manager: - (limestone crusher site)
**erection &maintenance for:-
-Limestone O &K TITAN Crusher (2 hammer rotors).
-Drag chain conveyor (hydraulic motor drive)
-Apron feeder conveyor (hydraulic motor drive)
-Belt conveyors.
-Hopper building.
-Crusher building Plate forms& steel structure fabrication.
-Change hammers, hammers axis, grate bars &grate basket.
-Change anvil.
- Erection overhead crane 10&20 ton.
- Erection 2bag filters (Scuch filter)
-commissioning work:
For hammer crusher, apron feeder, drag chain, hydraulic motors, and belt
conveyors
-cold run & performance test
(ASEC Aresco Sudan El Shamal cement co.)
6-from April 2007 until January 2009
Installation a cement plant at SUDAN-ATBARA
Working at (ASEC for manufacturing and industrial projects (ARESCO)
As a Mechanical Erection Engineer:
**Revamping, maintenance &assembly for:-
- Bag house filters.
-Reclaimers & Stalker.
-Clay dryer.
- Dynamic separator.
- Limestone crusher steel structure fabrication.
AS a Mechanical Site Engineer: -
(Raw mill area)
-Erection& maintenance for:-
-2 horizontal raw mills (ball mill).
-2 Dynamic separators.
- 2hammers mill TITAN Crusher.
- 2vibrating screens.
-2 buckets elevators
(ASEC Aresco Sudan El Shamal cement co.)
7-from august 2006 to April 2007
Working at (Kahromika Company)
As a Mechanical Site Engineer:
Erection for:-
-Steam turbine.
-Extraction tower.
(Nubaria Sugar Company)
-Training in (Egypt for Iron & Steel Company).
-Prepare a Final graduation Project powder metallurgy in
(Central Metallurgical Research and Development Institute)
-Steam turbine erection in Hawamdya Sugar Company.
(Cairo Tec. Company)
-PMP project management professional (AUC preparation course)
Training & Courses Experience

Eslam cv final 2016

  • 1.
    Personal Data Date ofbirth 24/10/1980 Nationality Egyptian Marital Status married Military Status Exempted Driving License: yes Gender Male Education &Graduation Obtained the degree of Bachelor in Mechanical Engineering. (Production Dept.) Faculty : Engineering University: Helwan Graduation year : May 2006 Graduation degree : Accepted Project degree : Excellent Courses: PMP -project management professional (AUC preparation course). Summary of qualifications sllikS retupooC e .-:and ApplicationsOperating Systemse -Windows- Internet. -Microsoft Office (Word, Excel). -Microsoft office project -Systems:Programming -AutoCAD 2D -plate &sheet Laskkik etupooC e Arabic mother tongue.e Very Good command of spoken and writing English. Eng. Eslam Soliman Abd ElGhaffar Aly Oraby Address :Egypt -Cairo- Helwan– 2 Mostafa Fahmy st. Mobile: +966 544790332 +966 597842334 E-mail: eslam_arescomj@hotmail.com
  • 2.
    1- From 20-10-2015till now : Working at (DNGO CONTRACTING SAUDI COMPANI KSA) Construction of treated water transmission lines to the project of king Abdullah for Waad Al Shamal city development and associated ground works. Job Title: senior mechanical project engineer Tasks:- i.Evaluate construction methods and determine cost-effectiveness of plans ii.Plan, organize, and direct activities concerned with the construction and maintenance of structures. iii.Study job specifications to determine appropriate construction methods iv.Direct and supervise workers. v.Obtain all necessary permits and licenses vi.Determine labor requirements and dispatch workers to construction sites. vii.Take actions to deal with the results of delays, bad weather, or emergencies at construction site viii.Requisition supplies and materials to complete construction projects. ix.Reviewing fabrication &erection drawings for the project x.Preparing & releasing project work breakdown structure W.B.S xi.Supervision on equipment cold run test , commissioning & Performance test Work Experiencee
  • 3.
    2-From 1-6-2011 till1-10-215: Working at (polyserve fertilizer &chemicals -TRIDEX for industrial project co.) Job Title: construction & upgrade site manager Tasks:- xii.Evaluate construction methods and determine cost-effectiveness of plans xiii.Plan, organize, and direct activities concerned with the construction and maintenance of structures. xiv.Study job specifications to determine appropriate construction methods xv. responsible for the onsite control and coordination of all activities on site and for ensuring follow through on the scope of works, applicable procedures and method statement xvi.Control of compliance with HSE(Health, Safety and Environmental) requirements during all delivery, assembly and erection activities on site xvii.Direct and supervise workers. xviii.Obtain all necessary permits and licenses xix.Prepare contracts and negotiate revisions, changes and additions to contractual agreements with consultants, clients, suppliers and subcontractors xx.Determine labor requirements and dispatch workers to construction sites. xxi.Schedule the project in logical steps and budget time required to meet deadlines xxii.Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, and construction problems xxiii.Take actions to deal with the results of delays, bad weather, or emergencies at construction site xxiv.Prepare and submit budget estimates and progress and cost reports. xxv.Requisition supplies and materials to complete construction projects. xxvi.Select, contract, and oversee workers who complete specific pieces of the project, such as painting or insulation work xxvii.Supervision on Inspection for exist equipment xxviii.Releasing spare part lists for rehabilitation Process xxix.Technical evaluation for spare parts offers xxx.Reviewing fabrication &erection drawings for the project xxxi.Technical support for fab. ,erection &maintenance activities xxxii.Preparing & releasing project work breakdown structure W.B.S xxxiii.Reviewing & technical evaluation for estimation study xxxiv.Supervision on equipment cold run test , commissioning & Performance test
  • 4.
    -Fabrication &erection UAN-32% tank (Liquid fertilizer tank according API 650) (Fab. &erection UAN 32% seamless pipes lines ASTM A106 Grade B &pumps) (LIQUIFERT EGYPT for fertilizer &chemical company) -fabrication &erection sulphuric acid tanks according API 650 (Fab. &erection h2so4 sulfuric acid seamless pipes lines ASTM A106 Grade B &pumps) (Abu Zaabal fertilizer &Chemicals Company) -steam turbine (28 MW) upgrade: Revamping for:- -steam &condensate pipe lines -Turbine impeller &coupling -cooling tower - Water tube boiler - Re tubing super heater coils (Abu Zaabal fertilizer &Chemicals Company) -water treatment plant upgrade: Fabrication &Erection for:- - Seamless pipes lines ASTM A106 Grade C Process water pipe lines - Seam welding cooling tower pipe lines -Sand filters (Abu Zaabal fertilizer &Chemicals Company) -Kiln &EP filter fan Rehabilitation:- Civil work, mechanical erection for fan &dedusting line fabrication &erection (National Cement Company) -NPk, SSP,GSSP fertilizer plants upgrades:- Rehabilitation for Rotary dryer, rotary cooler, crusher, vibrators, fans, belt conveyors, scrubbers &dedusting lines -fabrication &erection firefighting pipe lines (Abu Zaabal fertilizer &Chemicals Company) -coating plant: Fabrication& erection for: - Rotary coater, belts conveyors, vibrators, additives tank &feeding hoppers (Abu Zaabal fertilizer &Chemicals Company)
  • 5.
    - GSSP Granulationfertilizer plant up grades:- Rehabilitation for Rotary dryer, rotary cooler, crusher, vibrators, fans, belt conveyors, scrubbers & dedusting lines (LIQUIFERT EGYPT fertilizer &Chemicals Company) 3-From 1-10-2010 till 1-6-2011:- Working at (polyservegroup TRIDEX for industrial project co.) As a site manager for H2so4 plant upgrade Rehabilitation for: -Water tube boiler, - Heat exchanger -Fabrication & erection acid towers. -Re tubing Heat exchanger Fabrication &Erection for: -Cold Heat exchanger, - Filtered tank, -intensive tank, - Acid and steam piping line. -Firefighting pipe lines -stem heating coils (Abu Zaabal fertilizer &Chemicals Company) 4-from 1-4-2010 until 1-10-2010 Installation a cement plant at BeniSwief Working at (ASEC for manufacturing and industrial projects (ARESCO) As Area manager engineer:- Erection for:- -Homo silo: - utilities, aeration, steel structure, buckets elevator Air-slides -bag housing filters (Readecam) (ASEC Aresco EGYPT South Valley cement project)
  • 6.
    5-from January 2009until 1-3-2010 Installation a cement plant at SUDAN-ATBARA Working at (ASEC for manufacturing and industrial projects (ARESCO) As Area manager: - (limestone crusher site) **erection &maintenance for:- -Limestone O &K TITAN Crusher (2 hammer rotors). -Drag chain conveyor (hydraulic motor drive) -Apron feeder conveyor (hydraulic motor drive) -Belt conveyors. -Hopper building. -Crusher building Plate forms& steel structure fabrication. -Change hammers, hammers axis, grate bars &grate basket. -Change anvil. - Erection overhead crane 10&20 ton. - Erection 2bag filters (Scuch filter) -commissioning work: For hammer crusher, apron feeder, drag chain, hydraulic motors, and belt conveyors -cold run & performance test (ASEC Aresco Sudan El Shamal cement co.) 6-from April 2007 until January 2009 Installation a cement plant at SUDAN-ATBARA Working at (ASEC for manufacturing and industrial projects (ARESCO) As a Mechanical Erection Engineer: **Revamping, maintenance &assembly for:- - Bag house filters. -Reclaimers & Stalker. -Clay dryer. - Dynamic separator. - Limestone crusher steel structure fabrication. AS a Mechanical Site Engineer: - (Raw mill area) -Erection& maintenance for:- -2 horizontal raw mills (ball mill). -2 Dynamic separators. - 2hammers mill TITAN Crusher. - 2vibrating screens. -2 buckets elevators (ASEC Aresco Sudan El Shamal cement co.)
  • 7.
    7-from august 2006to April 2007 Working at (Kahromika Company) As a Mechanical Site Engineer: Erection for:- -Steam turbine. -Extraction tower. (Nubaria Sugar Company) -Training in (Egypt for Iron & Steel Company). -Prepare a Final graduation Project powder metallurgy in (Central Metallurgical Research and Development Institute) -Steam turbine erection in Hawamdya Sugar Company. (Cairo Tec. Company) -PMP project management professional (AUC preparation course) Training & Courses Experience