SlideShare a Scribd company logo
1 of 6
Ashraf M.Yassin
Mobile : 0 02 01222936544
E-mail : aboyassin65@yahoo.com
Personal Data
Name : Ashraf Mohamed Yassin
Date of Birth : Feb.1965
Experience : painting & coating Engineer
+2 01222936544
Nationality : Egyptian
Military Status : Completed
Languages : Arabic (Mother Tongue), English (Written & Spoken: Fluent)
Education : B.Sc. Mechanical-Power Dep.1987 Suez canal University.
BGAS-CSWIP Painting Inspector Gr2
Qualification
I have been responsible for the application painting procedures, ITP, specification
and international codes relevant to gas, oil industry and petrochemicals.
For the past (20) years ago from (1993 – 2014) working as a painting & coating inspector
Last six years in United Arab Emirates
Follow all quality activities (Q.C) done in site such as blasting by(sand, garnet, grit &aluminum
silicate) painting systems applied onshore such tanks (internal / external paint), pipes, steel
structure and vessels. Estimated the cost & consumption of project required (paint material).
Offshore platforms applied many painting system such (Top side, decks, Splash zone, under
splash zone, offshore pipe lines & Risers).
Also working as a coating inspector applied many wrapping system such concrete, polyethylene,
F.B.E coating & shrink sleeves, polypropylene and under ground paint.
Follow all required tests during and after application
J
JOB Experience
June 2012.Up to date.
Company name: - Aegean oil Terminal, UAE, New Fuel Oil Tank Farm
Consultant: - Germanischer Lloyd Offshore and Industrial Services
Project name: Independent Third Party Certification & Inspection Services.
Title: - Coating &painting Engineer
Place of Inspection Fujairah, UAE
Duties : - Witness and Review all painting and coating activity done in plant
- Onshore pipe line 6, 8, 12&16" diameter follow coating activity in filed weld and
applied all required inspection tests according to project spec. such as pull-off test & holiday test
- Witness surface preparation and painting application done in internal & external tanks, above &
underground pipes carbon steel, stainless steel & duplex and steel structure.
Follow project specification, ITP, International codes and standards.
Sep.2011– June 2012.
Company name: - Leighton Offshore Ltd (LO)
Consultant: - Germanischer Lloyd Offshore and Industrial Services
Project name: Third Party Certification & Inspection Services - (SEALINE Project)
1
Title: - Coating &painting Engineer
Manufacturer PSL contractor
Place of Inspection PSL work shop, Hamriyah Free Zone, Sharjah, UAE
Duties : -
Follow coating activity in pipe line 12&16″ applied all required inspection tests
• Witness of the Production of 3 layer polyethylene coating
• Witness the Production of the Concrete coating
• Inspection / Witness of the painting for the onshore piping
• Review and Endorsing the Test Reports
• Issuing the Inspection Report
Aug.2010 – Sep.2011.
Company name: - Abu Dhabi Marine Operating Company (ADMA-OPCO)
Consultant: - Germanischer Lloyd Offshore and Industrial Services
Project name: - Integrated Gas Development Project- Offshore Facilities (IGD-HAP)
46” diameter from HAP platform to Das island approximately39KM
Title: - Coating &painting Engineer
Contractor: - (NPCC) National petroleum construction company DLB-750 barge
Duties : - Follow coating activity in field weld and applied all required inspection tests
according to project spec. such as salts test, pull-off test &holiday test…
Training course in (HUET) helicopter under water escape training &sea survival
Aug.2009 –Sep. 2010
Owner: - international petroleum investment company (IPIC)
Client: - china petroleum engineering construction& corporation (CPECC)
Consultant: - Germanischer Lloyd Offshore and Industrial Services
Project name: - Abu Dhabi crude oil pipe line project habshan-fujairah
Title: - Coating &painting Engineer
Contractor: Belleli energy - Global Suhami
-Follow coating activity in field weld of pipe line (42) inch 3 layers poly propylene and applied all
required inspection tests according to project spec. such as pull-off test & holiday test.
-Follow all painting & coating activities done in plant (8 nos.) Crude Oil Storage Tank Double Deck
Floating Roof 110 M Diameter x 21.7M Height in ADCOP Project, Fujairah, U.A.E.
Applied many Paint system on tanks such as Internal & external and GER.LINING (Fiber Glass)
Follow Project specification, ITP, International codes and standards
Sep.2008 –Aug.2009.
Company name: - Abu Dhabi Marine Operating Company (ADMA-OPCO)
Consultant: - Germanischer Lloyd Offshore and Industrial Services
Project name: - Replacement of 24 nos. water injection offshore pipe lines
In Zakum & Umm Shaif fields (pipe lines& risers).
Title: - Coating Engineer
Contractor: - (NPCC) National petroleum construction company DLB-750&SEP-150 barges
Duties : - Follow coating activity in field weld and applied all required inspection tests
according to project spec. such as pull-off test & holiday test
Painting system (extension decks, Splash zone, above splash zone, Off shore pipe lines & Risers).
Nov.2006 –Aug.2008
Company name: - GUPCO. Joints venture with Bp Company.
Consultant: - E.M.C (Egyptian Maintenance Company)
Title: - Senior painting inspector
2
Contractor: - PMS (BARGE 12) &Petrojet.
Project name: - Saqqara Project
Training courses in Arabic academy for science and technology.
(HUET) helicopter under water escape training, sea survival and fire fighting courses.
Duties:
Coating field joints offshore pipe line 12km.length 16"diameter from Saqqara platform to Ras
Shuker by canusa GTS-PP shrink sleeve (120C°) and add infill flowmax fj-3000(concrete) PU +
aggregate.
- Installed Saqqara jacket and paint repair for splash zone, atmospheric zone.
- Saqqara project (Ras Shuker onshore plant)
- Onshore pipe line 16" diameter follow coating activity in filed weld and applied all required
inspection tests according to project spec. such as pull-off test & holiday test
- Follow all painting & coating activities done in plant such as internal & external tanks, above &
underground pipes carbon steel, stainless steel & duplex and steel structure.
Follow KBR specification, International codes and standards.
Mar. 2004 – Oct.2006
Company Name: - Khalda petroleum co. (K.P.C.) Joint venture with Apache.
Project Name: - Qasr gas development project
Title: - Senior painting inspector
Follow all coating activities done in
- First line (18 inch from shams to Obayied 42km) 3 layer poly propylene.
- Second line (18 inch from shams to Tarek gas plant 62 km) 3 layer poly propylene.
- Third line (24 inch from shams to Qasr 40 km) 3 layer poly propylene.
Using polypropylene coating for main lines and CanUsa wrapped KLNN for weld joints.
- Follow lowering activity and checked the under ground pipes before laying such as pull-off
test, holiday test, impact and elongation test.
- Also follow all painting activities done on Obayied, Qasr & Tarek areas according to JP Kenny
& Apache specification steel structure, above ground pipes and tanks.
- Estimated the project required quantities of coating & paint material.
-Follow wrapping of weld joints in Umbarka/Meleha flow line (8 inches) nearly 60 km by
KLNN shrink sleeve, applied all required test pull-off, holiday, impact and elongation tests.
- Inspection blasting & painting activity done in Salam new work shop building
Sep. 2003 –Feb. 2004
Company name: - GUPCO. Joints venture with Bp Company.
Project location: -Ras Shuker (offshore fields)
Akhen platform (port-said offshore fields).
Title: - Senior painting inspector
Duties:- Follow re-sandblast & re-paint many offshore petroleum platforms such
(October filed, Morgan field…) heli decks & boat landings, re-coated many of riser pipes (6, 8)
inches by interzone coating according to Gupco Spec’s.
Abu El-Garadek & EL-Razak plants follow sandblast & paint some pipes, steel pipe racks,
vessels as maintenance.
Mar. 2001 – Aug. 2003
3
Company name: - Dabetco. (El-Tunisia)
Title: - senior painting inspector
Project name: - Second & third stages
Duties: - Follow all painting activities done on site 6 no. of oil tanks (capacity 20,000),
Two oil tanks (capacity 12,000) & two water tanks (internal / external paint).
Wrapping many flow lines have different size (6, 8, 12, and 16) inches from wells to the plant
using many types of coating (Recham, Canusa, U.B.E,) also follow all inspection tests.
Oct.2000 – Jun. 2001
Company name: - Geisum oil co.
Project location: - PETROJET coating plant
Title: - Coating inspector
Duties:- Inspection & supervision the (F.B.E.) coating for the 8” flow line 26 km follow
all quality activity (QC) such as:-
-Surface preparation according to I so 8501 – 1, surface profile, atmospheric condition, pipe
temp., pre-heating, applied rough primer, thickness of primer, cut back, cooling tower & internal
blast and painting.
Conductivity (Holiday Test) peel off Test, etc…..
Follow the approved procedures, specification & international codes.
August 1998 – May 2000
Company name: - Badr Petroleum Company joint venture with shell
Project name: - (El–Obayied project)
Consultant: - Brown & Root limited Co.
Title: - painting &coating inspector
Shot & grit blast applied in steel structure & piping before paint Internal & external blasting and
painting done in potable water, oil, chemical & condensate tanks
- 8 applicant subcontractor to (PTJ) working on project.
- 4 paint supplier (Hemple, Sigma and Jotun & International).
- Fire proofing (concrete) applied on pipe races beams and columns.
- New flow lines from 9-well heads to plant follow wrapping and tested before lying.
Dec 1997 – Agues 1998
Company name: - Badr Petroleum Company joint venture with shell
Project location: - (BED-1, 2&3).
Title: - painting & coating inspector
- Maintenance job re-sandblast & re-paint pipelines, tanks, vessels & steel structure
- Bed 2/3 pre-compression project (Extension to bed -3 plant) piping, pipe racks & vessels.
- Wrapping new flow line from bed-2 to bed-3 and checked before lying.
- Fire proofing for steel structure (concrete)
- Hot & cold insulation applied on pipes and vessels.
Company name: - Petrobel co. joint venture with AGIP.
Feb. 1987 – Mar. 1994
Company name: - port-said engineering workers (P.S.E.W)
Title: - painting supervisor
During this period through port-said engineering workers
As a painting supervisor follow the activity done in:-
4
- Sodium salpht from Qarun lake project in Fayoum city through Mannesmann co.
- El-yamen project with can-oxy (USA Company)
- PORTSAID marine yard follow sandblasting & painting for cargo vessels maintenance
- Many bridges in Egypt as first stage from el- Kabbary Bridge & el- Marg Bridge.
- PORTSAID coating plant follow sand blasting &wrapping activities many types of coating
such as polypropylene, polyethylene, concrete, F.B. E.
Thanks & Best Regards
Ashraf Yassin
5
- Sodium salpht from Qarun lake project in Fayoum city through Mannesmann co.
- El-yamen project with can-oxy (USA Company)
- PORTSAID marine yard follow sandblasting & painting for cargo vessels maintenance
- Many bridges in Egypt as first stage from el- Kabbary Bridge & el- Marg Bridge.
- PORTSAID coating plant follow sand blasting &wrapping activities many types of coating
such as polypropylene, polyethylene, concrete, F.B. E.
Thanks & Best Regards
Ashraf Yassin
5

More Related Content

What's hot (19)

CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
CIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssssCIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssss
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolio
 
Tushar resume
Tushar resumeTushar resume
Tushar resume
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
 
Gurunathan resume
Gurunathan resumeGurunathan resume
Gurunathan resume
 
Ismael_Lopez-Lara_Aug16
Ismael_Lopez-Lara_Aug16Ismael_Lopez-Lara_Aug16
Ismael_Lopez-Lara_Aug16
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Curriculum Vitae - Rama Narayana Murty
Curriculum Vitae - Rama Narayana MurtyCurriculum Vitae - Rama Narayana Murty
Curriculum Vitae - Rama Narayana Murty
 
wsa
wsawsa
wsa
 
wsa
wsawsa
wsa
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
wsa
wsawsa
wsa
 
wsa
wsawsa
wsa
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 

Viewers also liked

"Progetto ascolto" nelle scuole. Riflessioni su una ricerca presso il Comune ...
"Progetto ascolto" nelle scuole. Riflessioni su una ricerca presso il Comune ..."Progetto ascolto" nelle scuole. Riflessioni su una ricerca presso il Comune ...
"Progetto ascolto" nelle scuole. Riflessioni su una ricerca presso il Comune ...Catina Feresin
 
Student Care Presentation
Student Care PresentationStudent Care Presentation
Student Care PresentationJaime Butler
 
Feresin Catina and Agostini Tiziano (2007)
Feresin Catina and Agostini Tiziano (2007)Feresin Catina and Agostini Tiziano (2007)
Feresin Catina and Agostini Tiziano (2007)Catina Feresin
 
Depth interaction between inclined and slanted surfaces in vertical and horiz...
Depth interaction between inclined and slanted surfaces in vertical and horiz...Depth interaction between inclined and slanted surfaces in vertical and horiz...
Depth interaction between inclined and slanted surfaces in vertical and horiz...Catina Feresin
 
6 tips to help you float through a depressive episode
6 tips to help you float through a depressive episode6 tips to help you float through a depressive episode
6 tips to help you float through a depressive episodeJocelyn Steffen
 
ICTFKIPUNSRI_SUWANTO
ICTFKIPUNSRI_SUWANTOICTFKIPUNSRI_SUWANTO
ICTFKIPUNSRI_SUWANTOsuwanto23
 
The Statue of Liberty in New York is Symbol of Friendship
The Statue of Liberty in New York is Symbol of FriendshipThe Statue of Liberty in New York is Symbol of Friendship
The Statue of Liberty in New York is Symbol of Friendshipgreedycabin1256
 

Viewers also liked (16)

"Progetto ascolto" nelle scuole. Riflessioni su una ricerca presso il Comune ...
"Progetto ascolto" nelle scuole. Riflessioni su una ricerca presso il Comune ..."Progetto ascolto" nelle scuole. Riflessioni su una ricerca presso il Comune ...
"Progetto ascolto" nelle scuole. Riflessioni su una ricerca presso il Comune ...
 
richardjohnz
richardjohnzrichardjohnz
richardjohnz
 
harley-davidson-apparel-uagintl
harley-davidson-apparel-uagintlharley-davidson-apparel-uagintl
harley-davidson-apparel-uagintl
 
CDL resume2
CDL resume2CDL resume2
CDL resume2
 
UAG ORIENTAL SCARVES
UAG ORIENTAL SCARVESUAG ORIENTAL SCARVES
UAG ORIENTAL SCARVES
 
Pdf obezzarazhivanie
Pdf obezzarazhivaniePdf obezzarazhivanie
Pdf obezzarazhivanie
 
Student Care Presentation
Student Care PresentationStudent Care Presentation
Student Care Presentation
 
Feresin Catina and Agostini Tiziano (2007)
Feresin Catina and Agostini Tiziano (2007)Feresin Catina and Agostini Tiziano (2007)
Feresin Catina and Agostini Tiziano (2007)
 
тренинг
тренингтренинг
тренинг
 
Depth interaction between inclined and slanted surfaces in vertical and horiz...
Depth interaction between inclined and slanted surfaces in vertical and horiz...Depth interaction between inclined and slanted surfaces in vertical and horiz...
Depth interaction between inclined and slanted surfaces in vertical and horiz...
 
SUBSTANTIVOS (Learning portuguese)
SUBSTANTIVOS (Learning portuguese)SUBSTANTIVOS (Learning portuguese)
SUBSTANTIVOS (Learning portuguese)
 
Strata2015
Strata2015Strata2015
Strata2015
 
Percezione 3 D
Percezione 3 DPercezione 3 D
Percezione 3 D
 
6 tips to help you float through a depressive episode
6 tips to help you float through a depressive episode6 tips to help you float through a depressive episode
6 tips to help you float through a depressive episode
 
ICTFKIPUNSRI_SUWANTO
ICTFKIPUNSRI_SUWANTOICTFKIPUNSRI_SUWANTO
ICTFKIPUNSRI_SUWANTO
 
The Statue of Liberty in New York is Symbol of Friendship
The Statue of Liberty in New York is Symbol of FriendshipThe Statue of Liberty in New York is Symbol of Friendship
The Statue of Liberty in New York is Symbol of Friendship
 

Similar to Ashraf-cv

Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.Vali ibrahim
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016Subhash Dhiman
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016Rolando Garcia
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEERnader rizq
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CVManish Ray
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa Omar
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2 Alaa Ammar
 
Arafat Syed Rashid Latest Updated 20.04.2015
Arafat Syed Rashid  Latest Updated 20.04.2015Arafat Syed Rashid  Latest Updated 20.04.2015
Arafat Syed Rashid Latest Updated 20.04.2015rashid Arafat
 

Similar to Ashraf-cv (20)

Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Antony_Joy_CV.DOC
Antony_Joy_CV.DOCAntony_Joy_CV.DOC
Antony_Joy_CV.DOC
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
Updated Moh. C.V.
Updated Moh. C.V.Updated Moh. C.V.
Updated Moh. C.V.
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
mpshcv - Copy
mpshcv - Copympshcv - Copy
mpshcv - Copy
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 
CV
CVCV
CV
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
MCV
MCVMCV
MCV
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
Arafat Syed Rashid Latest Updated 20.04.2015
Arafat Syed Rashid  Latest Updated 20.04.2015Arafat Syed Rashid  Latest Updated 20.04.2015
Arafat Syed Rashid Latest Updated 20.04.2015
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 

Ashraf-cv

  • 1. Ashraf M.Yassin Mobile : 0 02 01222936544 E-mail : aboyassin65@yahoo.com Personal Data Name : Ashraf Mohamed Yassin Date of Birth : Feb.1965 Experience : painting & coating Engineer +2 01222936544 Nationality : Egyptian Military Status : Completed Languages : Arabic (Mother Tongue), English (Written & Spoken: Fluent) Education : B.Sc. Mechanical-Power Dep.1987 Suez canal University. BGAS-CSWIP Painting Inspector Gr2 Qualification I have been responsible for the application painting procedures, ITP, specification and international codes relevant to gas, oil industry and petrochemicals. For the past (20) years ago from (1993 – 2014) working as a painting & coating inspector Last six years in United Arab Emirates Follow all quality activities (Q.C) done in site such as blasting by(sand, garnet, grit &aluminum silicate) painting systems applied onshore such tanks (internal / external paint), pipes, steel structure and vessels. Estimated the cost & consumption of project required (paint material). Offshore platforms applied many painting system such (Top side, decks, Splash zone, under splash zone, offshore pipe lines & Risers). Also working as a coating inspector applied many wrapping system such concrete, polyethylene, F.B.E coating & shrink sleeves, polypropylene and under ground paint. Follow all required tests during and after application J JOB Experience June 2012.Up to date. Company name: - Aegean oil Terminal, UAE, New Fuel Oil Tank Farm Consultant: - Germanischer Lloyd Offshore and Industrial Services Project name: Independent Third Party Certification & Inspection Services. Title: - Coating &painting Engineer Place of Inspection Fujairah, UAE Duties : - Witness and Review all painting and coating activity done in plant - Onshore pipe line 6, 8, 12&16" diameter follow coating activity in filed weld and applied all required inspection tests according to project spec. such as pull-off test & holiday test - Witness surface preparation and painting application done in internal & external tanks, above & underground pipes carbon steel, stainless steel & duplex and steel structure. Follow project specification, ITP, International codes and standards. Sep.2011– June 2012. Company name: - Leighton Offshore Ltd (LO) Consultant: - Germanischer Lloyd Offshore and Industrial Services Project name: Third Party Certification & Inspection Services - (SEALINE Project) 1
  • 2. Title: - Coating &painting Engineer Manufacturer PSL contractor Place of Inspection PSL work shop, Hamriyah Free Zone, Sharjah, UAE Duties : - Follow coating activity in pipe line 12&16″ applied all required inspection tests • Witness of the Production of 3 layer polyethylene coating • Witness the Production of the Concrete coating • Inspection / Witness of the painting for the onshore piping • Review and Endorsing the Test Reports • Issuing the Inspection Report Aug.2010 – Sep.2011. Company name: - Abu Dhabi Marine Operating Company (ADMA-OPCO) Consultant: - Germanischer Lloyd Offshore and Industrial Services Project name: - Integrated Gas Development Project- Offshore Facilities (IGD-HAP) 46” diameter from HAP platform to Das island approximately39KM Title: - Coating &painting Engineer Contractor: - (NPCC) National petroleum construction company DLB-750 barge Duties : - Follow coating activity in field weld and applied all required inspection tests according to project spec. such as salts test, pull-off test &holiday test… Training course in (HUET) helicopter under water escape training &sea survival Aug.2009 –Sep. 2010 Owner: - international petroleum investment company (IPIC) Client: - china petroleum engineering construction& corporation (CPECC) Consultant: - Germanischer Lloyd Offshore and Industrial Services Project name: - Abu Dhabi crude oil pipe line project habshan-fujairah Title: - Coating &painting Engineer Contractor: Belleli energy - Global Suhami -Follow coating activity in field weld of pipe line (42) inch 3 layers poly propylene and applied all required inspection tests according to project spec. such as pull-off test & holiday test. -Follow all painting & coating activities done in plant (8 nos.) Crude Oil Storage Tank Double Deck Floating Roof 110 M Diameter x 21.7M Height in ADCOP Project, Fujairah, U.A.E. Applied many Paint system on tanks such as Internal & external and GER.LINING (Fiber Glass) Follow Project specification, ITP, International codes and standards Sep.2008 –Aug.2009. Company name: - Abu Dhabi Marine Operating Company (ADMA-OPCO) Consultant: - Germanischer Lloyd Offshore and Industrial Services Project name: - Replacement of 24 nos. water injection offshore pipe lines In Zakum & Umm Shaif fields (pipe lines& risers). Title: - Coating Engineer Contractor: - (NPCC) National petroleum construction company DLB-750&SEP-150 barges Duties : - Follow coating activity in field weld and applied all required inspection tests according to project spec. such as pull-off test & holiday test Painting system (extension decks, Splash zone, above splash zone, Off shore pipe lines & Risers). Nov.2006 –Aug.2008 Company name: - GUPCO. Joints venture with Bp Company. Consultant: - E.M.C (Egyptian Maintenance Company) Title: - Senior painting inspector 2
  • 3. Contractor: - PMS (BARGE 12) &Petrojet. Project name: - Saqqara Project Training courses in Arabic academy for science and technology. (HUET) helicopter under water escape training, sea survival and fire fighting courses. Duties: Coating field joints offshore pipe line 12km.length 16"diameter from Saqqara platform to Ras Shuker by canusa GTS-PP shrink sleeve (120C°) and add infill flowmax fj-3000(concrete) PU + aggregate. - Installed Saqqara jacket and paint repair for splash zone, atmospheric zone. - Saqqara project (Ras Shuker onshore plant) - Onshore pipe line 16" diameter follow coating activity in filed weld and applied all required inspection tests according to project spec. such as pull-off test & holiday test - Follow all painting & coating activities done in plant such as internal & external tanks, above & underground pipes carbon steel, stainless steel & duplex and steel structure. Follow KBR specification, International codes and standards. Mar. 2004 – Oct.2006 Company Name: - Khalda petroleum co. (K.P.C.) Joint venture with Apache. Project Name: - Qasr gas development project Title: - Senior painting inspector Follow all coating activities done in - First line (18 inch from shams to Obayied 42km) 3 layer poly propylene. - Second line (18 inch from shams to Tarek gas plant 62 km) 3 layer poly propylene. - Third line (24 inch from shams to Qasr 40 km) 3 layer poly propylene. Using polypropylene coating for main lines and CanUsa wrapped KLNN for weld joints. - Follow lowering activity and checked the under ground pipes before laying such as pull-off test, holiday test, impact and elongation test. - Also follow all painting activities done on Obayied, Qasr & Tarek areas according to JP Kenny & Apache specification steel structure, above ground pipes and tanks. - Estimated the project required quantities of coating & paint material. -Follow wrapping of weld joints in Umbarka/Meleha flow line (8 inches) nearly 60 km by KLNN shrink sleeve, applied all required test pull-off, holiday, impact and elongation tests. - Inspection blasting & painting activity done in Salam new work shop building Sep. 2003 –Feb. 2004 Company name: - GUPCO. Joints venture with Bp Company. Project location: -Ras Shuker (offshore fields) Akhen platform (port-said offshore fields). Title: - Senior painting inspector Duties:- Follow re-sandblast & re-paint many offshore petroleum platforms such (October filed, Morgan field…) heli decks & boat landings, re-coated many of riser pipes (6, 8) inches by interzone coating according to Gupco Spec’s. Abu El-Garadek & EL-Razak plants follow sandblast & paint some pipes, steel pipe racks, vessels as maintenance. Mar. 2001 – Aug. 2003 3
  • 4. Company name: - Dabetco. (El-Tunisia) Title: - senior painting inspector Project name: - Second & third stages Duties: - Follow all painting activities done on site 6 no. of oil tanks (capacity 20,000), Two oil tanks (capacity 12,000) & two water tanks (internal / external paint). Wrapping many flow lines have different size (6, 8, 12, and 16) inches from wells to the plant using many types of coating (Recham, Canusa, U.B.E,) also follow all inspection tests. Oct.2000 – Jun. 2001 Company name: - Geisum oil co. Project location: - PETROJET coating plant Title: - Coating inspector Duties:- Inspection & supervision the (F.B.E.) coating for the 8” flow line 26 km follow all quality activity (QC) such as:- -Surface preparation according to I so 8501 – 1, surface profile, atmospheric condition, pipe temp., pre-heating, applied rough primer, thickness of primer, cut back, cooling tower & internal blast and painting. Conductivity (Holiday Test) peel off Test, etc….. Follow the approved procedures, specification & international codes. August 1998 – May 2000 Company name: - Badr Petroleum Company joint venture with shell Project name: - (El–Obayied project) Consultant: - Brown & Root limited Co. Title: - painting &coating inspector Shot & grit blast applied in steel structure & piping before paint Internal & external blasting and painting done in potable water, oil, chemical & condensate tanks - 8 applicant subcontractor to (PTJ) working on project. - 4 paint supplier (Hemple, Sigma and Jotun & International). - Fire proofing (concrete) applied on pipe races beams and columns. - New flow lines from 9-well heads to plant follow wrapping and tested before lying. Dec 1997 – Agues 1998 Company name: - Badr Petroleum Company joint venture with shell Project location: - (BED-1, 2&3). Title: - painting & coating inspector - Maintenance job re-sandblast & re-paint pipelines, tanks, vessels & steel structure - Bed 2/3 pre-compression project (Extension to bed -3 plant) piping, pipe racks & vessels. - Wrapping new flow line from bed-2 to bed-3 and checked before lying. - Fire proofing for steel structure (concrete) - Hot & cold insulation applied on pipes and vessels. Company name: - Petrobel co. joint venture with AGIP. Feb. 1987 – Mar. 1994 Company name: - port-said engineering workers (P.S.E.W) Title: - painting supervisor During this period through port-said engineering workers As a painting supervisor follow the activity done in:- 4
  • 5. - Sodium salpht from Qarun lake project in Fayoum city through Mannesmann co. - El-yamen project with can-oxy (USA Company) - PORTSAID marine yard follow sandblasting & painting for cargo vessels maintenance - Many bridges in Egypt as first stage from el- Kabbary Bridge & el- Marg Bridge. - PORTSAID coating plant follow sand blasting &wrapping activities many types of coating such as polypropylene, polyethylene, concrete, F.B. E. Thanks & Best Regards Ashraf Yassin 5
  • 6. - Sodium salpht from Qarun lake project in Fayoum city through Mannesmann co. - El-yamen project with can-oxy (USA Company) - PORTSAID marine yard follow sandblasting & painting for cargo vessels maintenance - Many bridges in Egypt as first stage from el- Kabbary Bridge & el- Marg Bridge. - PORTSAID coating plant follow sand blasting &wrapping activities many types of coating such as polypropylene, polyethylene, concrete, F.B. E. Thanks & Best Regards Ashraf Yassin 5