SlideShare a Scribd company logo
Egypt, Cairo, 122 Street from El-Watania Street, Building No 5.
Mobile: 00201221055826
E - mail : mahmoud.allam3@gmail.com
Dr. Eng. Mahmoud Abd El-Rahman
General
Multiple Skills and Highly Qualified QA/QC, Welding and Metallurgical Engineer With 17 Years’ Experience in
Welding, Quality Control and Quality Assurance Related to Fabrication and Erection of Power Boilers Components,
Pressure Vessels, Power and Process Piping, and Storage Tanks, Plate Work, and Steel Structure.
Personal Information
Marital status : Married
Nationality : Egyptian
Date of Birth : 9/8/1976
Military Status : Exempted
Skills
• Implementation of Total Quality Management
Concepts, and Conducting All Activities of
Quality Control and Quality Assurance Related
to Steel Fabrication and Erection Sector (Steel
Structure, Plate Work, and Piping, Pressure
Vessels and Tanks).
• Preparation, Renewal and Audit for ISO 9001,
14001, and OHSAS 18001 Systems.
• Preparation, Renewal and Audit for ASME (S, A,
PP, U, U2, NB and R Stamping), DIN 18800:7-2008
(EN 1090-1), AD 2000-Merkblatt HP 0 and EN ISO
3834-2.
• Welding (Preparation of WPS, PQR &
WPQ; Included Hard Facing and Special
Repairs), In according to different
standard (ASME, AWS, API and EN
Standards).
• Technical Research, Failure Analysis, Heat
Treatment and Material Selection.
• Training (Quality, Welding Inspection, Mechanical
Testing and NDT).
• Conducting Macro and Microstructure
Studies.
• Conducting Welding Inspection In According
to Different Standards.
• Conducting Mechanical & NDT Required for
Different Industrial Sectors and Standards
• Statistical Analysis, Planning for Top
Quality, and Conducting Six Sigma
Improvements.
• Procedures Preparation and Control for Different Protection Systems
(Pickling and Passivation, Sand Blasting and Painting, Galvanization,
and Hard Chroming Processes).
.
Education
a) Academic
2006 - 2013 Cairo University, Faculty of Engineering, El Giza, Egypt.
PhD in Metallurgical Engineering.
Research: Influence of Heat Input and Post-Weld Heat Treatment on Microstructure and Mechanical Properties of Power Boiler Steel P91
(9Cr-1Mo-V-Nb) Weld Joints.
Awarded the Best PhD Over All Departments of Faculty of Engineering of Cairo University, for Year 2013.
2000 - 2003 Cairo University, Faculty of Engineering, El Giza, Egypt.
Master Degree in Metallurgical Engineering.
Research : Effect of Heat Treatments on Mechanical Properties and Walkability of Stainless Steel X4 CrNiMo 16 5 1.
1995- 1999 Cairo University, Faculty of Engineering, El Giza, Egypt.
B. Sc. of Metallurgical Engineering.
Project: Failure Analysis of Natural Gas Cylinders, Distinction.
2003 – 2004 American University, School of Business, Economics and Communication, Institute of Quality Management, Cairo, Egypt.
Post Graduate Diploma In Total Quality Management and Quality Management Systems (Six Sigma, ISO 9000, 14000 Implementation) – TQM.
TQM Courses:
• Six Sigma Improvement.
• Statistical Quality Control.
• Managing the Quality Functions.
• Project Management.
• Planning for Top Quality.
• Quality System Standards (ISO 9001, ISO 14001 and The Baldrige Award Criteria).
TQM Implemented Projects:
• Six sigma improvement project to reduce the losses in welding process for Tersana Company.
• Preparation of NDT procedures according to ASME standard through project management concept.
• Planning for self-inspection system on piping production process for Tersana Company.
b) Certifications
1999 – 2000 Material Engineering Office. Consultancy and Inspection, Prof. Dr. Mohamed Rafaat El Koussy, El Giza, Egypt.
ASNT Level II in Nondestructive Testing Methods (UT, RT, PT and MT).
Renewal Valid Till: 2015.
st th
1 Jan. – 5 Feb. 2003 Azhar University, Faculty of Sciences, Cairo, Egypt.
Safety Course in the Use of Ionizing Radiation.
Government License for The Use Ionizing Radiation Sources.
27
th
Aug. -08
th
Sep. 2007 RIÑA S.p.A, Génova, through SGS Group Egypt Ltd, Competence Center, Marriouteya, Sakkara Rd, Harraneya,
Osman Bridge extension, Haram, El Giza, Egypt.
EN 473 and ISO 9712 Level II in Nondestructive Testing Methods (UT, RT, PT and MT) for All Industrial Sectors (Welding, Casting, Plate
work and Piping).
Renewal Valid Till: 2017
28
th
July - 08
th
Aug. 2008 TWI (Training & Examination Services), Egyptian Welding Academy, Alexandria, Egypt.
Certified Welding Inspector (CSWIP 3.1).
Valid Till: 2018.
Professional Experience
Part 1: Academic (Technical Researches & Published Papers)
19
th
- 25
th
Oct. 2002 Rakaa company, (Through material Engineering Office, Egypt), Turbans Supplying, Riyadh, Saudi Arabia, with the presence of
Saudi Electricity Company SCECO Representatives.
Conference on the Use of NDT and Failure Analysis in Power Boilers and Steel Industries.
28
th
–
th
Sep. 2003 Central Metallurgical Research and Development Institute, El Tebbin, Cairo, Egypt.
30
Egyptian – German Workshop On High Strength & Special Steels
Published Research: Effect of Post-Weld Heat Treatment on the Mechanical Properties and Microstructure of the X4CrNiMo 16-5-1 Stainless Steel.
29
th
Nov. –
st
Dec. 2004 IIW International Conference on Welding and Allied Processes, Cairo, Egypt.
1
Published Research: Effect of PWHT on the Hardness and Microstructure of Stainless Steel X4CrNiMo (16-5-1) Weldments.
March/2013 International Heat Treatment and Surface Engineering Journal (IHT), UK, Vol. 7, issue no.1, IHT311, Page 23-31.
Published Research: Influence of Heat Input And Post-Weld Heat Treatment on Boiler Steel P91.
(9Cr-1Mo-V-Nb) Weld Joints Part 1: Microstructure.
March/2013 International Heat Treatment and Surface Engineering Journal (IHT), UK, Vol. 7, issue no.1, IHT316, Page 32-37.
Published Research: Influence of Heat Input And Post-Weld Heat Treatment on Boiler Steel P91.
(9Cr-1Mo-V-Nb) Weld Joints Part 2: Mechanical Properties.
Sep./2015 Encyclopedia Program, Taylor & Francis Group, USA, Encyclopedia of Iron, Steel, and Their Alloys (EISA), Hard Facing-Heat
Treatment Regeneration, Heat Treatment-Post Weld, Page 1485-1503.
Part 2: Practical
July, 2010 – Till Now: Work With Projects Services Company, PSC, Alexandria-Cairo Desert Road, Oraby City, Alexandria, Egypt.
• QC Manager of PSC Fabrication Shop and Sites.
General:
Managing PSC "Quality" Programs and team to ensure compliance with project's contract, specification and project's special provisions,
and applicable standard and codes (API, ASME, ASTM, AWS, EN, ISO,…etc.), with respect to the applicable ASME and ISO Management
System.
a) Certifications and Renewals
Act as the team leader for the following Certification and Renewals:
• ASME S, U, A, PP and R Certifications Renewal in according to ASME Ed.2010/Add. 2011a.
Certification Body: American Society of Mechanical Engineering (ASME).
• ASME S, U, A, PP and R Certifications Renewal in according to ASME Ed 2013
Certification Body: American Society of Mechanical Engineering (ASME).
• Renewals and Surveillances for ISO 9001:2008. ISO14001:2004, OHSAS 18001:2007; PSC Cairo Branch.
Certification Body: SGS Egypt.
• Certification according to ISO9001:2008. ISO 14001:2004, OHSAS 18001:2007, PSC Qatar Branch.
Certification Body: Bureau Veritas (BV Qatar).
b) Tendering and Customers Prequalification Audits
• Participate in all tendering preparations, Customers Meetings and Prequalification Audits related to Fabrication and Erection of Power
Boilers Components, Pressure Vessels, Power and Process Piping, and Storage Tanks, Plate Work, and Steel Structure. For example, our
company become an approved supplier for NEM, ALSTOM, SAIPEM, HALIBORTON, and, ANSALDO, ENPPI, STF, DEGREMONT,
ETHYDCO, MOPCO, BAKER, SOLVAY,…etc.
c) Training:
• Conducting training sessions for PSC Quality Staff in material receiving, welding, quality, NDT, heat treatment and different protection
methods.
d) Fabrication and Erection Projects:
Project Scope
Duration/
Period
Client
Third Party or
ASME Authorized
Agency
Code Material
Beni Sueaf Combined Cycles Power
Station, 4800MW Project.
• Installation of Two Gas Turbines, Four
Heat Recovery Steam Generators, and
their Auxiliaries
Mar/2016 –
Till Now
• SIEMENC
• PSP El-
Sewedy
Electric
• EDEPC
Authorized
Inspection
Associates,LLC
ASME I,
B31.1, and
AWS D1.1
Carbon, low
alloy/alloy (P11,
P22 and P91),
austeniticstainless
steels and Ni-base
Alloys.
AL Shabab Power Station, 1500MW
and West Damietta Power
Station 750MW; Combined
Cycles Projects.
• Fabrication of twelve Low Pressure
Steam Drums with the application of
ASME S-Stamp.
Aug/2015 –
July/2016
• ANSALDO,
Italy
• EDEPC
• PGESCO
Authorized
Inspection
Associates,LLC
ASME I
Carbon Steel and
Stainless Steel
New Petroleum Refinery Plant
for Egyptian Refining
Company(ERC)
• Fabrication of Process Piping and DSD work
shop. (280000 dia/inch)
Aug/2015-
Aug/2016 DSD Client Rep: GSE ASME B31.3 Carbon Steel
Giza North Combined Cycle
Power Project-1500MW (El-
Giza, Egypt)
• Fabrication of Power Piping for Six Boilers Heat
Recovery Generators(HRSGs).
• Complete Erection of All HRSG’s Components
(Casing, Ducts, Stack, Harps, Piping and Steel
Structure.).
Dec/2012 –
Nov.2015
• STF, Italy
• CEPC
• PGESCo
• TUV Rhineland
AIA Services, LLC,
forfabrication.
• Lloyd's Register
(LR-insurance),
Italy, for erection.
AWS D1.1,
ASME I and
ASME B31.1
Carbon, low
alloy/alloy (P11,
P22 and P91),
austeniticstainless
steels and Ni-base
Alloys.
PSP POWER SYSTEMS
PROJECTS, Attaqa, Egypt
• Fabrication of steel structure for four units of
MBV Lube Oil Cooling Set and MPR Generator
Cooling Set.
Mar-
May/2015
GEA N/A EN Standard Carbon Steel
Ethylene and Derivatives
Complex Project; at ETHYDCO
PetrochemicalPlant.
• Fabrication of Steel Structure for different
Buildings through the Plant.
Jan –
Aug./2015
ETHYDCO.
TOYO-ENPPI
N/A AWS D1.1 Carbon Steel
Alexandria Sodium Hydroxide
Plant; Phase I & II Expansion
Project (Alexandria, Egypt).
• Installation of a group of towers and pressure
vessels.
o Concentration Column and Outlet Gas
Condenser,
o Distillation Tower & LER Heater/Scrubber,
o Prelimer, Distillation Gas Cooler,
Heater/Condenser, Drop Cyclone, Gas
Separator and Agitator.
o SHT Scrubber, S1/2a Tank, Distillation
Tank, Filter Wash Water, Distillation
Individual Flashing Tank, Existing New
Skirt.
• Fabrication and Erection of Power and Process
Piping and ducts; including Pickling and
Passivation.
Jan/2012 –
April/2014
SOLVAY,
France
Third Party:
Engineering
ConsultantsGroup
(ECG), Egypt
ASME VIII-1,
ASME I,
ASME B31.1,
ASME B31.3
Carbon steel,
austenitic and
duplex stainless
steels.
TCI Sanmmar Ethylene
Production Plant (Common
Utilities and offsite Plant
Project) (Port Said, Egypt).
• Fabrication and erection of one Ethylene
Double wall Tank of 36m diameter with floating
roof, in according to API 620 standard.
• Fabrication and erection of three Storage
Tanks (One Ethanol storage tank of 36m
diameter, one Ethanol storage tank of 8.5m
diameter and one water storage tank of 6m
diameter)
July/2010 –
July/2011
Feb./2013 –
Mar./2014
TCI-Sanmar/IBI
Chematur,
India
Lloyd's Register (LR-
insurance).
N/A
API 620
API 650
9% Ni-steel,
Stainless steel and
Carbon Steel.
Carbon steel.
Near Zero Liquid Discharge
Project at MOPCO
PetrochemicalPlant.
• Fabrication of Seven ASME U-Stamped
Pressure Vessels (Four Multimedia filters and
Two Carbone filters)
Oct/2013 –
Jan/2014
MOPCO &
VEOLIA
TUV Rhineland AIA
Services, LLC
ASME VIII,
Div.1
Carbon Steel
Ethylene and Derivatives
Complex Project; at ETHYDCO
PetrochemicalPlant.
• Modification of three Amine Stripper Re-
boilers.
Oct./2014
ETHYDCO.
TOYO-ENPPI
N/A
ASME VIII,
Div.1
Carbon Steel
Baker Hughes Cement Silos
Project.
• Design, Supply and Fabrication of 2x 1500
CU.FT Skid Mounted Cement Silos.
• Design, Supply and Fabrication of Chemical
Filter Unit, (Skid with Two Stainless Pressure
Vessels, ASME U-Stamped).
Oct-
Dec./2013
&
Sep-
Nov/2014
Baker Hughes
& IOS
TUV Rhineland AIA
Services, LLC
ASME VIII,
Div.1
Carbon Steel
Carbon/Stainless
316L
Tanta Oncology Hospital
Project (Tanta, Egypt).
• Fabrication of four ASME U-Stamped Pressure
Vessels (Two Multimedia filters and Two
Softener filters).
Nov./2013
– Dec/2013
IETOS, Egypt.
TUV Rhineland AIA
Services, LLC
ASME VIII,
Div.1
Carbon Steel
ORYX GTL, QP-SASOL Joint
Venture, Project (Ras Lafan,
Qatar).
• Modification of ATR (120-VR-105 & 120-VR-
205) Skirt to increase natural air circulation for
two Pressure Vessels, 2010/2011a; by
fabrication and installation of 144 new nozzles.
Jan. /2013-
Mar./2013
ORYX GTL,
Qatar
TUV Rheinland AIA
Services, LLC
&
Bureau Veritas (BV
Egypt).
NATIONAL
BOARD
(NBIC)
&
ASME VIII-
Div.2
Carbon Steel
Ethylene and Derivatives
Complex Project; at ETHYDCO
PetrochemicalPlant.
• Fabrication of Two ASME U-Stamped Pressure
Vessels (Two Multimedia filters).
Aug/2013 –
Oct./2013
ETHYDCO.
TOYO-ENPPI
IETOS
TUV Rhineland AIA
Services, LLC
ASME VIII,
Div.1
Stainless S316L
Banha Power Station 750 MW
Combined Cycle Project
(Egypt).
• Fabrication of One ASME U-Stamped Pressure
Vessels (Closed Cooling Chemical Addition
Tank).
• Fabrication of Three Tanks (Lube Oil, Potable
Water Storage Tanks and Closed Cooling Water
Head Tank). Pickling and Passivation have been
conducted to the stainless tank.
Jan /2013-
Mar./2013
Hitachi,
MDEPC and
PGESCO.
TUV Rhineland AIA
Services, LLC
N/A
ASME VIII,
Div.1
API 650
Carbon Steel
Carbon Steel and
Stainless 304L.
VENICE New Ceramic Factory
Project (Alexandria, Egypt).
• Fabrication and Erection of Factory Buildings
SteelStructure.
May/2013
– July/2013
VENICE, Egypt N/A AWS D1.1 Carbon Steel
Egyptian Company for Food
Industries (Egyfood) Extension
Project (El-Giza, Egypt).
• Fabrication of seven ASME U-Stamped
Pressure Vessels (Media Filters of different
sizes.
• Repair of three ASME U-Stamped Pressure
Vessels (Media Filters) with the application of
R-Stamp.
Nov. /2012
–Jan/2013
IETOS
TUV Rhineland AIA
Services, LLC
ASME VIII,
Div.1
Carbon Steel
Alexandria East Wastewater
Treatment Plant (EWTP),
Phase 1, Project; and Phase 2,
the New Plant Project (Egypt).
• Fabrication and Erection of all required steel
structure, piping, ducts and different
mechanical equipment parts required for
Phase 1; and for the new plant and new twelve
wastewater treatment tanks, with emersion
pickling and passivation for stainless steel
fabricated items, and circulation pickling and
passivation for erected pipe lines.
July/2010 –
Aug/2013
DEGREMONT,
France
Bureau Veritas (BV
Egypt)
EN Standards
ASME B31.3.
Carbon steel,
Stainless steel,
Duplex, and
Aluminum
Halliburton Katamia and Ras
Shukare Yards, Tanks and
Mechanical Equipment
Project (Egypt).
Through several orders during this period:
• Fabrication of seven ASME U-Stamped
Pressure Vessels (Dry Bulk Silo Tanks) in
according to ASME VIII, Div.1, Ed 2007/Add
2009.
• Fabrication of Supply Tank and Structure Base
in according to ASME VIII, Div.1, Ed 2007/Add
2009 and AWS D1.1.
• Repair of three ASME U-Stamped Pressure
Vessels (Dry Bulk Silo Tanks) in according to
the National Board Standard (NBIC 2011), and
with the application of R-Stamp.
• Fabrication of Twenty Liquid Storage tanks (Six
of 78m3 and Fourteen of
• 117m3 capacity) in according to API 650, 11th
Ed. Add 2.
• Fabrication of Two Mixing Tanks (40m3) in
according to API 650 Standard.
• Fabrication of Two Hoppers Underground
Tanks in according to API 650 Standard.
• Fabrication of Sixty five cutting boxes in
according to API 650 Standard.
• Fabrication of Steel structure of three transfer
augers in according to AWS D1.1.
May/2011-
Mar./2013
Halliburton
and
International
Oil Services
Co. (IOS),
Egypt.
Lloyd's Register (LR-
insurance), Egypt
ASME VIII,
Div.1,
API 650, AWS
D1.1,
&
National
Board
Carbon Steel
Kafr El-Dawar Power Station
Project (Alexandria, Egypt).
• Fabrication of HCL Storage Tanks internally hot
lined with special rubber.
Nov./2012-
Dec./2012
PWT & IOS N/A
ASME VIII,
Div.1
Carbon Steel
ELNG Waste Heat Recovery
Extension Project (Idku,
Egypt).
• Fabrication and Erection of Pipe Rack and
Replacement Steel Structure.
• Fabrication of Crane Girder.
Dec/2010 –
Feb./2011
and
Jun./2012 –
Sep./2012
ELNG & EMC
Bureau Veritas (BV
Egypt)
AWS D1.1. Carbon Steel
EPIC Alexandria Free Zone,
Tanks and Mechanical
Equipment Project (Egypt).
• Fabrication of Six Liquid Storage Tanks (78m3).
• Fabrication of Skids for centrifuge.
Oct./2012-
Dec./2012
EPIC & IOS
• Lloyd's Register
(LR-insurance),
Egypt.
• N/A
API 650
AWS D1.1
Carbon Steel
Alexandria Mineral and Oils
Company (AMOC) Plant; Lube
Oil Extension Project (Egypt).
• Alteration for an ASME U-Stamped Steam
Drum in according to National Board Standard
with the application of R-Stamp.
• Repair for three ASME U-Stamped Towers in
according to National Board Standard with the
application of R-Stamp.
Nov./2010
&
Dec./2012
AMOC, Egypt
• Lloyd's Register
(LR-insurance),
Italy,
• TUV Rhineland
AIA Services, LLC
ASME VIII,
Div.1 &
National
Board
Carbon steel
Nile City Moll Project (Cairo,
Egypt).
• Fabrication and Erection of Moll Building Steel
Structure.
Dec/2010 –
Feb./2011
Al Rebat and El
Anwar
Company,
Egypt
N/A AWS D1.1. Carbon Steel
Sidi Krir Power Station,
Project - Unit 3 &4, 2x340
MW (Alexandria, Egypt).
• Erection of steel structure, mechanical part and
piping systems for two Heat Recovery
generators Boilers (HRSG).
July/2010 –
Nov./2010
(Close out
Phase Only)
NEM
WDEPC
PGESCO
Bureau Veritas (BV
Egypt)
AWS D1.1,
ASME I and
ASME B31.1.
Carbon, low
alloy/alloy (P11,
P22 and P91),
austeniticstainless
steels and Ni-base
Alloys.
Abu Qir Thermal Power Plant
Unit (6&7) Project
(Alexandria, Egypt).
• Fabrication of ten ASME U stamped pressure
vessels (Intermediate blow down tanks,
Condensate tanks, blow down tanks and
Nitrogen tanks)
July/2010 –
Dec./2010
ANSALDO,
AEPC
PGESCO
Lloyd's Register (LR-
insurance), Egypt.
ASME VIII,
Div.1
Carbon Steel
Mar, 2009 - Feb. 2010: DSD-Ferrometalco, SAE, (The Egyptian German Company for Metal Industries), Ismailia Road,
Industrial Zone, Cairo, Egypt.
• OA Manager for All DSD Work Shops (Heliopolis & Belbeis) and Sites.
General:
Managing DSD "QA" Program to ensure compliance with project's contract, project's specification and project's special provisions, and
applicable codes, including ISO 9001, ISO 14001. OHSAS 18001, DIN 18800-7, AD 2000-Merkblatt HP 0, EN ISO 3834-2 and ASME S, U, U2 &
R stamps.
a) Certifications and Renewals
The following Renewals and Surveillances have been done for both workshops:
• ASME S, U, U2, and R Certifications Renewal in according to ASME Ed.2007/Add. 2009a.
Certification Body: American Society of Mechanical Engineering (ASME).
• Renewals and Surveillances for ISO 9001:2008. ISO14001:2004, OHSAS 18001:2007.
Certification Body: SGS Egypt.
• Renewal for Quality Management System for fusion welding of metallic materials, Certificates in according to
AD 2000-Merkblatt HP 0 and EN ISO 3834-2.
Certification Body: TÜV United Kingdom.
• Renewal for DIN 18800-7:2008-11, Qualification of the Manufacturer for welding Steel Structure, Certificate Class E.
Certification Body: SLV, German.
b) DSD Internal Audits and Customers Prequalification Audits
• Lead and Participate in DSD internal Audits and Prequalification Audits related to Fabrication and Erection of Power Boilers Components,
Pressure Vessels, Power and Process Piping, and Storage Tanks, Plate Work, and Steel Structure. For example, prequalification Audits
conducted by ARAMCO, TECHNIP, ALSTOM, and ANSALDO, SLV, …etc.
c) Participate for the Control of Some Critical QA/QC Activities as per QA/QC Manager Directive
• Preparation of all required Quality Documents and Procedures with follow up till final approval by ASME Authorized Inspector
and Client Rep., conducting all required audits with Client Rep, and coordination and preparation for smooth fabrication and
Erection activities of:
o Fabrication and Erection of Steel structure and Pressure parts of Abu Qir Thermal Power Plants Project, Unit 6 &7; 2 X
650 MW GAS/OIL Fired Units.
Client: ANSALDO CALDAIE, SPA. S-ASME Stamp Project.
ASME Authorized Agency: Lloyd's Register (LR-insurance), Egypt.
o Fabrication of Pressure vessels for Ammonia Pressure Storage & Conditioning Tentative Plot Plant.
Client: Engineering Development Contracting Group. U-ASME Stamp Project.
ASME Authorized Agency: Lloyd's Register (LR-insurance) Egypt.
Feb.-2007 - Feb.-2009: SGS Group Egypt Ltd, Industrial Services, Competence Center, Marriouteya, Sakkara Rd, Harraneya,
Osman Brige extension, Haram, El Giza, Egypt.
• Senior QC Engineer and Deputy of SGS/DSD QC Manager in DSD Belbeis Work Shop.
General: Scope
Duration/
Period
Client
Third Party or
ASME Authorized
Agency
Code Material
Shoaiba Oil-Fried Power Plant, Saudi
Arabia.
• Fabrication of Power Piping (External
Piping) for two units of Oil-Fired Power
Plant. S-ASME Stamp Project.
Feb –
April/2007
ANSALDO
CALDAIE, SPA,
N/A
ASME I & ASME
B31.1
Carbon Steel
SRT Project, Sardinia Radio
Telescopic 64m Diameter, Italy.
• Fabrication and trail assembly
structure steel and all mechanical
components.
May/2007-
Feb/2009
MT-
Mechatronics
GmbH.
SLV, Germany
DIN 18800-7:
2008-11
Carbon Steel
New Fertilizer Complex Project,
Egyptian Agrium Nitrogen Products
Co. SAE (EAgrium), Egypt.
• Fabrication of two Primary Reformers;
steel structure, ducts and stacks.
Jan-
May./2008
Udhe GmbH N/A
AD 2000-
Merkblatt
Carbon Steel
PDH/PP Complex Project, Egyptian
Propylene& Polypropylene Company
(EPPC), Port Said, Egypt.
• Fabrication of two Star Reformers,
steel structure, ducts and stacks.
Jan-
May./2008
Udhe GmbH N/A
AD 2000-
Merkblatt
Carbon Steel
Nov.-2005 - Feb.-2007: El-Maimani Group for Industrial and Treading, Madina, Saudi Arabia.
• Nov. 2005 – Mar. 2006 Assigned as Fabrication and Erection Engineer for Red Bricks Factory-3, Kiln and Dryer Modification
Project.
• Mar. 2006 - Feb. 2007 Assigned as the Manager of Steel Fabrication, Re-manufacturing (Hard facing & special repairs) and Hard
Chrome Plating Departments; to facilitate and handle all fabrication, re-manufacturing and hard chroming requests issued by
different departments within El-Maimani Group of factories (Red Bricks, Water, Rockwool, Polystyrene, and Dates Packing
Factories).
Jan-2000 - Oct.-2005: Material Engineering Office, Consultancy and Inspection, Prof. Dr. Mohamed Rafaat El Koussy, El
Giza, Egypt. (From 2000-2001 Part Time)
• Quality Control, NDT, Welding Engineer and Trainer
Project MyResponsibilities
Duration/
Period
Client
Third Party or
ASME Authorized
Agency
Code Material
OBAJANA CEMENT PLC, NIGERIA.
(Fabrication of Steel Structure
Buildings and Mechanical
Equipment at Arab Contractors
Company, and eight workshops of
itssubcontractors).
Leading a Group of Quality Engineers and
Technicians for the Following Activities:
• Consultancy on All Fabrication
Activities.
• Conducting VT, PT. RT and UT and
other In-process Inspection Activities.
• Witness o n M e c h a n i c a l
T e s t i n g for ReceivedMaterials.
• Quality Documentation and Review.
• Pre- Assembly and Final Dimension
Check.
• Troubleshooting for Technical
Problems.
• PaintingInspection.
Dec/2004 -
Nov. /2005
Arab
Contactors
Company
N/A AWS D1.1 Carbon Steel
Erection of Damietta New Delta
Lock at Kanater Site, Egypt.
• Consultancy on Erection Activities.
• Conducting VT, PT, RT and UT Site
Inspection.
• Welding and Mechanical Installation
control.
• DimensionChecks.
• Troubleshooting for Technical
Problems.
• QualityDocumentation.
• PaintingInspection.
• Witness of commissioning activities.
July -2003 -
Sep 2004
ALSTOM
&
AL-Tersana
Company,
Embaba, Egypt
N/A
AWS D1.1 & EN
Standard.
Carbon Steel
and Stainless
Steel.
Damietta LNG, Egypt
• Mar.-April/2003 Witnessing of all
Welding Procedures Qualification
Activities for the Project WPS's
Conducted by Dodsal Pte. Ltd., Dubai,
United Arab Emirates
• April - Sep./2003 Conducted Ultrasonic
Inspection on Welds of Piles for
Damietta New Port, Manufactured by
NSF Company.
• NDT Engineer (Part of the Month) at
Damietta LNG Site.
Mar.-
Sep./2003
SGS N/A
ASME IX &
B31.3
Carbon and
Stainless Steel.
Ediko-Damietta Gas Pipe Line
(Inspection on 10,000 Pipes),
Alexandria, Egypt
• As a Third Party and Representative of
Cairo University, Conducting Visual
and Ultrasonic Inspection on the
Supplied Pipes in According to API 5L
Standard.
April-
Aug./2002
GASCO N/A API 5L Carbon Steel
Fabrication of Damietta New Delta
Lock Components (Main Gates,
Culvert Gates, main and culvert stop
logs ,…etc.), at Tersana Work Shop,
Egypt.
• Consultancy on Fabrication Activities.
• Conducting VT, PT, RT and UT
Inspection.
• Welding control.
• DimensionChecks.
• Troubleshooting for Technical
Problems.
• QualityDocumentation.
• PaintingInspection.
• Conducting Training Sessions for
Tersana Quality Team (NDE, Welding
Inspection and Material Receiving).
May /2000
– July/2003
ALSTOM
&
AL-Tersana
Company,
Embaba, Egypt
N/A
AWS D1.1 & EN
Standard.
Carbon Steel
and Stainless
Steel.
Mobarak Pump Station, Toshka,
Egypt.
Supporting the quality department of
Kahromika for the following activities:
• Welding Inspection (VT, PT, RT and
UT).
• Dimension Check before and after
welding.
• Cross Check on the implementation of
welding procedures during site
welding.
Jan-
April/2000
Kahromika &
Hitachi
N/A ASME V & IX Carbon Steel
1998 – 2001 Cairo University, Faculty of Engineering, Center of Manufacturing Studies. Mechanical Testing Laboratory, El
Giza, Egypt
• Mechanical Testing Engineer and Lab Manager
1998 - 1999 Working part time for the follow up of test samples selection and preparation.
1999 - 2001 Manager of the Lab Under the Supervision of Prof. Dr. Mohamed Rafaat El Koussy, Professor of Metallurgical Engineering,
Cairo University, Faculty of Engineering, El Giza.
• Conducting and Witness of Mechanical Testing
• Deal with Customers and Their Supervisors.
• Lab Documentation.
• Conducting Macro and Microstructure Investigations.
• Conducting Failure Analysis Investigations
• Conducting welding procedure and welders qualifications
• Conducting NDT on incoming welded items and materials.
• Training for the New Technicians and Students of the Metallurgical Engineering Department on all of the above.
Work done for many companies like, Petrojet, Kahromica, PPC. Balaiem Petroleum Company. NSF, Enppi. Gasco, GAPCO and others using
different Codes and Standards, for example, ASME, ASTM, EN, ISO, BS, API and JIS.
Languages
Read Write Speak
Second Language English Very Good Very Good Very Good
April- 2010 American University, School of Continuing Education, Educational Testing and Assessment Division, Cairo, Egypt
Score of TOEFL Exam is 598.
Computer Literacy
Good User of Ready Made Software, for Example: Word, Excel , Power Point, AutoCAD, PVEilet for Pressure Vessels Design, and SigmaXL for
statistical analysis and others.
Driving Licenses
• Egypt. Valid.
• Qatar. Expired
• Saudi Arabia. Expired
References
• Original Certificates. (Copy will be issued upon request).
• Prof. Dr. Mohamed Rafaat El-Koussy. Professor of Metallurgical Engineering, Cairo University. Faculty of Engineering, El Giza, Egypt.
For Contact, Mobile Phone: 00201227340591.
E-Mail: matengoffice@yahoo.com
• Prof. Dr. Iman El-Mahalawi. Professor of Metallurgical Engineering, Cairo University, Faculty of Engineering, El Giza, Egypt.
Professor of Metallurgical Engineering, British University, Faculty of Engineering, El Giza, Egypt.
For Contact, Mobile Phone: 00201006044661.
E-Mail: ielmahallawi@Bue.edu.eg
• Eng. Ibrahim El-Desoky, ASME Authorized Inspector and NDT Level III, Authorized Inspection Associates (AIA), LLC, Houston, USA.
Chairman and Manager of Cairo Inspection Company (CIC), AWS and API Authorized Inspection and Training Center, Cairo, Egypt.
For Contact, Mobile Phone: 00201147464749.
E-Mail: i.desoky@cic-egypt.com
idesoky@hotmail.com

More Related Content

What's hot

cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 newRamez Nasr
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
MOHAMED DAOWOD
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolio
Mohamed Farouk
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher
 
Cv(resume)
Cv(resume)Cv(resume)
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
MOHAMMED ZUBAIR
 
Jijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )docJijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )doc
JIJO ANTONY
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
Simon Lawrence
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1Mohamed Hashim
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineerAhmed Hamdy
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
ahmedsgs
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Wael Mahmoud alkilany
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVGhulam Hassan
 

What's hot (20)

Alaa CV
Alaa CVAlaa CV
Alaa CV
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 new
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolio
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
Cv(resume)
Cv(resume)Cv(resume)
Cv(resume)
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
Jijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )docJijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )doc
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 
Johns resume
Johns resumeJohns resume
Johns resume
 
Muhammed RAFI 2016 SD
Muhammed RAFI 2016 SDMuhammed RAFI 2016 SD
Muhammed RAFI 2016 SD
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
Lead Inspection Engineer CV
Lead Inspection Engineer CVLead Inspection Engineer CV
Lead Inspection Engineer CV
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CV
 

Viewers also liked

Hanna
HannaHanna
Hanna
BeckyM1
 
The role of new information and communication technologies in information and...
The role of new information and communication technologies in information and...The role of new information and communication technologies in information and...
The role of new information and communication technologies in information and...
Christina Pikas
 
Social Media to Support Your Organization Workshop
Social Media to Support Your Organization WorkshopSocial Media to Support Your Organization Workshop
Social Media to Support Your Organization Workshop
Laura Pasquini
 
Andrew goodwin
Andrew goodwinAndrew goodwin
Andrew goodwin
Samuel McNamara
 
Everything You Ever Wanted To Know About Your Child's Nutrition
Everything You Ever Wanted To Know About Your Child's NutritionEverything You Ever Wanted To Know About Your Child's Nutrition
Everything You Ever Wanted To Know About Your Child's Nutrition
Summit Health
 
2004 map reduce simplied data processing on large clusters (mapreduce)
2004 map reduce simplied data processing on large clusters (mapreduce)2004 map reduce simplied data processing on large clusters (mapreduce)
2004 map reduce simplied data processing on large clusters (mapreduce)
anh tuan
 
Education & role of technology in iran
Education & role of technology in iranEducation & role of technology in iran
Education & role of technology in iran
Matinsa
 
Graph based Semi Supervised Learning V1
Graph based Semi Supervised Learning V1Graph based Semi Supervised Learning V1
Graph based Semi Supervised Learning V1Neeta Pande
 
Advanced media portfolio Evaluation Guidance
Advanced media portfolio Evaluation GuidanceAdvanced media portfolio Evaluation Guidance
Advanced media portfolio Evaluation Guidance
Naamah Hill
 
Institutional regulations new
Institutional regulations newInstitutional regulations new
Institutional regulations new
kristylai__
 
BI.004.03.Presentation.Coupon Redemption - Power to Predict Valued Shoppers
BI.004.03.Presentation.Coupon Redemption - Power to Predict Valued ShoppersBI.004.03.Presentation.Coupon Redemption - Power to Predict Valued Shoppers
BI.004.03.Presentation.Coupon Redemption - Power to Predict Valued ShoppersKuldeep Ahir
 
Cbct sialography
Cbct sialographyCbct sialography
Cbct sialography
Indu Krishna
 
CV of Ahmed Mahmoud
CV of Ahmed Mahmoud CV of Ahmed Mahmoud
CV of Ahmed Mahmoud Ahmed Mahmoud
 
Maha mahmoud.cv
Maha mahmoud.cvMaha mahmoud.cv
Maha mahmoud.cv
MàĦà ḾäĦmøūd
 
Development environments in the AWS cloud - Vancouver PHP Meetup
Development environments in the AWS cloud - Vancouver PHP MeetupDevelopment environments in the AWS cloud - Vancouver PHP Meetup
Development environments in the AWS cloud - Vancouver PHP Meetup
vanphp
 

Viewers also liked (20)

Hanna
HannaHanna
Hanna
 
The role of new information and communication technologies in information and...
The role of new information and communication technologies in information and...The role of new information and communication technologies in information and...
The role of new information and communication technologies in information and...
 
Social Media to Support Your Organization Workshop
Social Media to Support Your Organization WorkshopSocial Media to Support Your Organization Workshop
Social Media to Support Your Organization Workshop
 
Andrew goodwin
Andrew goodwinAndrew goodwin
Andrew goodwin
 
Everything You Ever Wanted To Know About Your Child's Nutrition
Everything You Ever Wanted To Know About Your Child's NutritionEverything You Ever Wanted To Know About Your Child's Nutrition
Everything You Ever Wanted To Know About Your Child's Nutrition
 
2004 map reduce simplied data processing on large clusters (mapreduce)
2004 map reduce simplied data processing on large clusters (mapreduce)2004 map reduce simplied data processing on large clusters (mapreduce)
2004 map reduce simplied data processing on large clusters (mapreduce)
 
Education & role of technology in iran
Education & role of technology in iranEducation & role of technology in iran
Education & role of technology in iran
 
NR506_W3_Edwards,N_Policy_Priority_Issue_Paper
NR506_W3_Edwards,N_Policy_Priority_Issue_PaperNR506_W3_Edwards,N_Policy_Priority_Issue_Paper
NR506_W3_Edwards,N_Policy_Priority_Issue_Paper
 
CV-DDL (2015 January)
CV-DDL (2015 January)CV-DDL (2015 January)
CV-DDL (2015 January)
 
Graph based Semi Supervised Learning V1
Graph based Semi Supervised Learning V1Graph based Semi Supervised Learning V1
Graph based Semi Supervised Learning V1
 
Advanced media portfolio Evaluation Guidance
Advanced media portfolio Evaluation GuidanceAdvanced media portfolio Evaluation Guidance
Advanced media portfolio Evaluation Guidance
 
Institutional regulations new
Institutional regulations newInstitutional regulations new
Institutional regulations new
 
BI.004.03.Presentation.Coupon Redemption - Power to Predict Valued Shoppers
BI.004.03.Presentation.Coupon Redemption - Power to Predict Valued ShoppersBI.004.03.Presentation.Coupon Redemption - Power to Predict Valued Shoppers
BI.004.03.Presentation.Coupon Redemption - Power to Predict Valued Shoppers
 
Cbct sialography
Cbct sialographyCbct sialography
Cbct sialography
 
Descon Presentation
Descon PresentationDescon Presentation
Descon Presentation
 
MADYAN C.V L (1) (1)
MADYAN C.V L (1) (1)MADYAN C.V L (1) (1)
MADYAN C.V L (1) (1)
 
CV of Ahmed Mahmoud
CV of Ahmed Mahmoud CV of Ahmed Mahmoud
CV of Ahmed Mahmoud
 
Maha mahmoud.cv
Maha mahmoud.cvMaha mahmoud.cv
Maha mahmoud.cv
 
Mahmoud Arafat CV
Mahmoud Arafat CVMahmoud Arafat CV
Mahmoud Arafat CV
 
Development environments in the AWS cloud - Vancouver PHP Meetup
Development environments in the AWS cloud - Vancouver PHP MeetupDevelopment environments in the AWS cloud - Vancouver PHP Meetup
Development environments in the AWS cloud - Vancouver PHP Meetup
 

Similar to CV of Dr Eng Mahmoud Allam 2016

CV.... (Osman new
CV....  (Osman  newCV....  (Osman  new
CV.... (Osman newOsman Agamy
 
Ahmed Ismail (Sr. Welding & Piping) LAST
Ahmed Ismail (Sr. Welding & Piping) LASTAhmed Ismail (Sr. Welding & Piping) LAST
Ahmed Ismail (Sr. Welding & Piping) LASTAhmed Esmail
 
Final cv 1 9-2014
Final cv 1 9-2014Final cv 1 9-2014
Final cv 1 9-2014
mahmoud ayead
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expVijay Raghavan
 
LeopkaringattilCV Jan-16F
LeopkaringattilCV Jan-16FLeopkaringattilCV Jan-16F
LeopkaringattilCV Jan-16FLeo Karingattil
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.Vali ibrahim
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
ali ibrahim
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding Inspector
Asad Ahsan
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
Arunkumar M A
 
B.SAKTHEVEL CV GPS
B.SAKTHEVEL CV GPSB.SAKTHEVEL CV GPS
B.SAKTHEVEL CV GPSSakthi Vel
 
AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Wael Mahmoud alkilany
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Wael Mahmoud alkilany
 
QA/QC Mechanical engineer ,Plant inspector or welding inspector
QA/QC Mechanical engineer ,Plant inspector or welding inspector QA/QC Mechanical engineer ,Plant inspector or welding inspector
QA/QC Mechanical engineer ,Plant inspector or welding inspector
Wael Mahmoud alkilany
 

Similar to CV of Dr Eng Mahmoud Allam 2016 (20)

CV.... (Osman new
CV....  (Osman  newCV....  (Osman  new
CV.... (Osman new
 
Ahmed Ismail (Sr. Welding & Piping) LAST
Ahmed Ismail (Sr. Welding & Piping) LASTAhmed Ismail (Sr. Welding & Piping) LAST
Ahmed Ismail (Sr. Welding & Piping) LAST
 
Final cv 1 9-2014
Final cv 1 9-2014Final cv 1 9-2014
Final cv 1 9-2014
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
 
Venkat-CV
Venkat-CVVenkat-CV
Venkat-CV
 
LINGAM
LINGAMLINGAM
LINGAM
 
CV Yasin
CV YasinCV Yasin
CV Yasin
 
ANSAL
ANSALANSAL
ANSAL
 
LeopkaringattilCV Jan-16F
LeopkaringattilCV Jan-16FLeopkaringattilCV Jan-16F
LeopkaringattilCV Jan-16F
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding Inspector
 
Mohamed Saleh Arafat
Mohamed Saleh ArafatMohamed Saleh Arafat
Mohamed Saleh Arafat
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
CV ENG Ahmed
CV ENG AhmedCV ENG Ahmed
CV ENG Ahmed
 
B.SAKTHEVEL CV GPS
B.SAKTHEVEL CV GPSB.SAKTHEVEL CV GPS
B.SAKTHEVEL CV GPS
 
AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
 
QA/QC Mechanical engineer ,Plant inspector or welding inspector
QA/QC Mechanical engineer ,Plant inspector or welding inspector QA/QC Mechanical engineer ,Plant inspector or welding inspector
QA/QC Mechanical engineer ,Plant inspector or welding inspector
 

CV of Dr Eng Mahmoud Allam 2016

  • 1. Egypt, Cairo, 122 Street from El-Watania Street, Building No 5. Mobile: 00201221055826 E - mail : mahmoud.allam3@gmail.com Dr. Eng. Mahmoud Abd El-Rahman General Multiple Skills and Highly Qualified QA/QC, Welding and Metallurgical Engineer With 17 Years’ Experience in Welding, Quality Control and Quality Assurance Related to Fabrication and Erection of Power Boilers Components, Pressure Vessels, Power and Process Piping, and Storage Tanks, Plate Work, and Steel Structure. Personal Information Marital status : Married Nationality : Egyptian Date of Birth : 9/8/1976 Military Status : Exempted Skills • Implementation of Total Quality Management Concepts, and Conducting All Activities of Quality Control and Quality Assurance Related to Steel Fabrication and Erection Sector (Steel Structure, Plate Work, and Piping, Pressure Vessels and Tanks). • Preparation, Renewal and Audit for ISO 9001, 14001, and OHSAS 18001 Systems. • Preparation, Renewal and Audit for ASME (S, A, PP, U, U2, NB and R Stamping), DIN 18800:7-2008 (EN 1090-1), AD 2000-Merkblatt HP 0 and EN ISO 3834-2. • Welding (Preparation of WPS, PQR & WPQ; Included Hard Facing and Special Repairs), In according to different standard (ASME, AWS, API and EN Standards). • Technical Research, Failure Analysis, Heat Treatment and Material Selection. • Training (Quality, Welding Inspection, Mechanical Testing and NDT). • Conducting Macro and Microstructure Studies. • Conducting Welding Inspection In According to Different Standards. • Conducting Mechanical & NDT Required for Different Industrial Sectors and Standards • Statistical Analysis, Planning for Top Quality, and Conducting Six Sigma Improvements. • Procedures Preparation and Control for Different Protection Systems (Pickling and Passivation, Sand Blasting and Painting, Galvanization, and Hard Chroming Processes). . Education a) Academic 2006 - 2013 Cairo University, Faculty of Engineering, El Giza, Egypt. PhD in Metallurgical Engineering. Research: Influence of Heat Input and Post-Weld Heat Treatment on Microstructure and Mechanical Properties of Power Boiler Steel P91 (9Cr-1Mo-V-Nb) Weld Joints. Awarded the Best PhD Over All Departments of Faculty of Engineering of Cairo University, for Year 2013. 2000 - 2003 Cairo University, Faculty of Engineering, El Giza, Egypt. Master Degree in Metallurgical Engineering. Research : Effect of Heat Treatments on Mechanical Properties and Walkability of Stainless Steel X4 CrNiMo 16 5 1. 1995- 1999 Cairo University, Faculty of Engineering, El Giza, Egypt. B. Sc. of Metallurgical Engineering. Project: Failure Analysis of Natural Gas Cylinders, Distinction.
  • 2. 2003 – 2004 American University, School of Business, Economics and Communication, Institute of Quality Management, Cairo, Egypt. Post Graduate Diploma In Total Quality Management and Quality Management Systems (Six Sigma, ISO 9000, 14000 Implementation) – TQM. TQM Courses: • Six Sigma Improvement. • Statistical Quality Control. • Managing the Quality Functions. • Project Management. • Planning for Top Quality. • Quality System Standards (ISO 9001, ISO 14001 and The Baldrige Award Criteria). TQM Implemented Projects: • Six sigma improvement project to reduce the losses in welding process for Tersana Company. • Preparation of NDT procedures according to ASME standard through project management concept. • Planning for self-inspection system on piping production process for Tersana Company. b) Certifications 1999 – 2000 Material Engineering Office. Consultancy and Inspection, Prof. Dr. Mohamed Rafaat El Koussy, El Giza, Egypt. ASNT Level II in Nondestructive Testing Methods (UT, RT, PT and MT). Renewal Valid Till: 2015. st th 1 Jan. – 5 Feb. 2003 Azhar University, Faculty of Sciences, Cairo, Egypt. Safety Course in the Use of Ionizing Radiation. Government License for The Use Ionizing Radiation Sources. 27 th Aug. -08 th Sep. 2007 RIÑA S.p.A, Génova, through SGS Group Egypt Ltd, Competence Center, Marriouteya, Sakkara Rd, Harraneya, Osman Bridge extension, Haram, El Giza, Egypt. EN 473 and ISO 9712 Level II in Nondestructive Testing Methods (UT, RT, PT and MT) for All Industrial Sectors (Welding, Casting, Plate work and Piping). Renewal Valid Till: 2017 28 th July - 08 th Aug. 2008 TWI (Training & Examination Services), Egyptian Welding Academy, Alexandria, Egypt. Certified Welding Inspector (CSWIP 3.1). Valid Till: 2018. Professional Experience Part 1: Academic (Technical Researches & Published Papers) 19 th - 25 th Oct. 2002 Rakaa company, (Through material Engineering Office, Egypt), Turbans Supplying, Riyadh, Saudi Arabia, with the presence of Saudi Electricity Company SCECO Representatives. Conference on the Use of NDT and Failure Analysis in Power Boilers and Steel Industries. 28 th – th Sep. 2003 Central Metallurgical Research and Development Institute, El Tebbin, Cairo, Egypt. 30 Egyptian – German Workshop On High Strength & Special Steels Published Research: Effect of Post-Weld Heat Treatment on the Mechanical Properties and Microstructure of the X4CrNiMo 16-5-1 Stainless Steel. 29 th Nov. – st Dec. 2004 IIW International Conference on Welding and Allied Processes, Cairo, Egypt. 1 Published Research: Effect of PWHT on the Hardness and Microstructure of Stainless Steel X4CrNiMo (16-5-1) Weldments.
  • 3. March/2013 International Heat Treatment and Surface Engineering Journal (IHT), UK, Vol. 7, issue no.1, IHT311, Page 23-31. Published Research: Influence of Heat Input And Post-Weld Heat Treatment on Boiler Steel P91. (9Cr-1Mo-V-Nb) Weld Joints Part 1: Microstructure. March/2013 International Heat Treatment and Surface Engineering Journal (IHT), UK, Vol. 7, issue no.1, IHT316, Page 32-37. Published Research: Influence of Heat Input And Post-Weld Heat Treatment on Boiler Steel P91. (9Cr-1Mo-V-Nb) Weld Joints Part 2: Mechanical Properties. Sep./2015 Encyclopedia Program, Taylor & Francis Group, USA, Encyclopedia of Iron, Steel, and Their Alloys (EISA), Hard Facing-Heat Treatment Regeneration, Heat Treatment-Post Weld, Page 1485-1503. Part 2: Practical July, 2010 – Till Now: Work With Projects Services Company, PSC, Alexandria-Cairo Desert Road, Oraby City, Alexandria, Egypt. • QC Manager of PSC Fabrication Shop and Sites. General: Managing PSC "Quality" Programs and team to ensure compliance with project's contract, specification and project's special provisions, and applicable standard and codes (API, ASME, ASTM, AWS, EN, ISO,…etc.), with respect to the applicable ASME and ISO Management System. a) Certifications and Renewals Act as the team leader for the following Certification and Renewals: • ASME S, U, A, PP and R Certifications Renewal in according to ASME Ed.2010/Add. 2011a. Certification Body: American Society of Mechanical Engineering (ASME). • ASME S, U, A, PP and R Certifications Renewal in according to ASME Ed 2013 Certification Body: American Society of Mechanical Engineering (ASME). • Renewals and Surveillances for ISO 9001:2008. ISO14001:2004, OHSAS 18001:2007; PSC Cairo Branch. Certification Body: SGS Egypt. • Certification according to ISO9001:2008. ISO 14001:2004, OHSAS 18001:2007, PSC Qatar Branch. Certification Body: Bureau Veritas (BV Qatar). b) Tendering and Customers Prequalification Audits • Participate in all tendering preparations, Customers Meetings and Prequalification Audits related to Fabrication and Erection of Power Boilers Components, Pressure Vessels, Power and Process Piping, and Storage Tanks, Plate Work, and Steel Structure. For example, our company become an approved supplier for NEM, ALSTOM, SAIPEM, HALIBORTON, and, ANSALDO, ENPPI, STF, DEGREMONT, ETHYDCO, MOPCO, BAKER, SOLVAY,…etc. c) Training: • Conducting training sessions for PSC Quality Staff in material receiving, welding, quality, NDT, heat treatment and different protection methods. d) Fabrication and Erection Projects: Project Scope Duration/ Period Client Third Party or ASME Authorized Agency Code Material Beni Sueaf Combined Cycles Power Station, 4800MW Project. • Installation of Two Gas Turbines, Four Heat Recovery Steam Generators, and their Auxiliaries Mar/2016 – Till Now • SIEMENC • PSP El- Sewedy Electric • EDEPC Authorized Inspection Associates,LLC ASME I, B31.1, and AWS D1.1 Carbon, low alloy/alloy (P11, P22 and P91), austeniticstainless steels and Ni-base Alloys. AL Shabab Power Station, 1500MW and West Damietta Power Station 750MW; Combined Cycles Projects. • Fabrication of twelve Low Pressure Steam Drums with the application of ASME S-Stamp. Aug/2015 – July/2016 • ANSALDO, Italy • EDEPC • PGESCO Authorized Inspection Associates,LLC ASME I Carbon Steel and Stainless Steel
  • 4. New Petroleum Refinery Plant for Egyptian Refining Company(ERC) • Fabrication of Process Piping and DSD work shop. (280000 dia/inch) Aug/2015- Aug/2016 DSD Client Rep: GSE ASME B31.3 Carbon Steel Giza North Combined Cycle Power Project-1500MW (El- Giza, Egypt) • Fabrication of Power Piping for Six Boilers Heat Recovery Generators(HRSGs). • Complete Erection of All HRSG’s Components (Casing, Ducts, Stack, Harps, Piping and Steel Structure.). Dec/2012 – Nov.2015 • STF, Italy • CEPC • PGESCo • TUV Rhineland AIA Services, LLC, forfabrication. • Lloyd's Register (LR-insurance), Italy, for erection. AWS D1.1, ASME I and ASME B31.1 Carbon, low alloy/alloy (P11, P22 and P91), austeniticstainless steels and Ni-base Alloys. PSP POWER SYSTEMS PROJECTS, Attaqa, Egypt • Fabrication of steel structure for four units of MBV Lube Oil Cooling Set and MPR Generator Cooling Set. Mar- May/2015 GEA N/A EN Standard Carbon Steel Ethylene and Derivatives Complex Project; at ETHYDCO PetrochemicalPlant. • Fabrication of Steel Structure for different Buildings through the Plant. Jan – Aug./2015 ETHYDCO. TOYO-ENPPI N/A AWS D1.1 Carbon Steel Alexandria Sodium Hydroxide Plant; Phase I & II Expansion Project (Alexandria, Egypt). • Installation of a group of towers and pressure vessels. o Concentration Column and Outlet Gas Condenser, o Distillation Tower & LER Heater/Scrubber, o Prelimer, Distillation Gas Cooler, Heater/Condenser, Drop Cyclone, Gas Separator and Agitator. o SHT Scrubber, S1/2a Tank, Distillation Tank, Filter Wash Water, Distillation Individual Flashing Tank, Existing New Skirt. • Fabrication and Erection of Power and Process Piping and ducts; including Pickling and Passivation. Jan/2012 – April/2014 SOLVAY, France Third Party: Engineering ConsultantsGroup (ECG), Egypt ASME VIII-1, ASME I, ASME B31.1, ASME B31.3 Carbon steel, austenitic and duplex stainless steels. TCI Sanmmar Ethylene Production Plant (Common Utilities and offsite Plant Project) (Port Said, Egypt). • Fabrication and erection of one Ethylene Double wall Tank of 36m diameter with floating roof, in according to API 620 standard. • Fabrication and erection of three Storage Tanks (One Ethanol storage tank of 36m diameter, one Ethanol storage tank of 8.5m diameter and one water storage tank of 6m diameter) July/2010 – July/2011 Feb./2013 – Mar./2014 TCI-Sanmar/IBI Chematur, India Lloyd's Register (LR- insurance). N/A API 620 API 650 9% Ni-steel, Stainless steel and Carbon Steel. Carbon steel. Near Zero Liquid Discharge Project at MOPCO PetrochemicalPlant. • Fabrication of Seven ASME U-Stamped Pressure Vessels (Four Multimedia filters and Two Carbone filters) Oct/2013 – Jan/2014 MOPCO & VEOLIA TUV Rhineland AIA Services, LLC ASME VIII, Div.1 Carbon Steel Ethylene and Derivatives Complex Project; at ETHYDCO PetrochemicalPlant. • Modification of three Amine Stripper Re- boilers. Oct./2014 ETHYDCO. TOYO-ENPPI N/A ASME VIII, Div.1 Carbon Steel Baker Hughes Cement Silos Project. • Design, Supply and Fabrication of 2x 1500 CU.FT Skid Mounted Cement Silos. • Design, Supply and Fabrication of Chemical Filter Unit, (Skid with Two Stainless Pressure Vessels, ASME U-Stamped). Oct- Dec./2013 & Sep- Nov/2014 Baker Hughes & IOS TUV Rhineland AIA Services, LLC ASME VIII, Div.1 Carbon Steel Carbon/Stainless 316L Tanta Oncology Hospital Project (Tanta, Egypt). • Fabrication of four ASME U-Stamped Pressure Vessels (Two Multimedia filters and Two Softener filters). Nov./2013 – Dec/2013 IETOS, Egypt. TUV Rhineland AIA Services, LLC ASME VIII, Div.1 Carbon Steel ORYX GTL, QP-SASOL Joint Venture, Project (Ras Lafan, Qatar). • Modification of ATR (120-VR-105 & 120-VR- 205) Skirt to increase natural air circulation for two Pressure Vessels, 2010/2011a; by fabrication and installation of 144 new nozzles. Jan. /2013- Mar./2013 ORYX GTL, Qatar TUV Rheinland AIA Services, LLC & Bureau Veritas (BV Egypt). NATIONAL BOARD (NBIC) & ASME VIII- Div.2 Carbon Steel Ethylene and Derivatives Complex Project; at ETHYDCO PetrochemicalPlant. • Fabrication of Two ASME U-Stamped Pressure Vessels (Two Multimedia filters). Aug/2013 – Oct./2013 ETHYDCO. TOYO-ENPPI IETOS TUV Rhineland AIA Services, LLC ASME VIII, Div.1 Stainless S316L Banha Power Station 750 MW Combined Cycle Project (Egypt). • Fabrication of One ASME U-Stamped Pressure Vessels (Closed Cooling Chemical Addition Tank). • Fabrication of Three Tanks (Lube Oil, Potable Water Storage Tanks and Closed Cooling Water Head Tank). Pickling and Passivation have been conducted to the stainless tank. Jan /2013- Mar./2013 Hitachi, MDEPC and PGESCO. TUV Rhineland AIA Services, LLC N/A ASME VIII, Div.1 API 650 Carbon Steel Carbon Steel and Stainless 304L.
  • 5. VENICE New Ceramic Factory Project (Alexandria, Egypt). • Fabrication and Erection of Factory Buildings SteelStructure. May/2013 – July/2013 VENICE, Egypt N/A AWS D1.1 Carbon Steel Egyptian Company for Food Industries (Egyfood) Extension Project (El-Giza, Egypt). • Fabrication of seven ASME U-Stamped Pressure Vessels (Media Filters of different sizes. • Repair of three ASME U-Stamped Pressure Vessels (Media Filters) with the application of R-Stamp. Nov. /2012 –Jan/2013 IETOS TUV Rhineland AIA Services, LLC ASME VIII, Div.1 Carbon Steel Alexandria East Wastewater Treatment Plant (EWTP), Phase 1, Project; and Phase 2, the New Plant Project (Egypt). • Fabrication and Erection of all required steel structure, piping, ducts and different mechanical equipment parts required for Phase 1; and for the new plant and new twelve wastewater treatment tanks, with emersion pickling and passivation for stainless steel fabricated items, and circulation pickling and passivation for erected pipe lines. July/2010 – Aug/2013 DEGREMONT, France Bureau Veritas (BV Egypt) EN Standards ASME B31.3. Carbon steel, Stainless steel, Duplex, and Aluminum Halliburton Katamia and Ras Shukare Yards, Tanks and Mechanical Equipment Project (Egypt). Through several orders during this period: • Fabrication of seven ASME U-Stamped Pressure Vessels (Dry Bulk Silo Tanks) in according to ASME VIII, Div.1, Ed 2007/Add 2009. • Fabrication of Supply Tank and Structure Base in according to ASME VIII, Div.1, Ed 2007/Add 2009 and AWS D1.1. • Repair of three ASME U-Stamped Pressure Vessels (Dry Bulk Silo Tanks) in according to the National Board Standard (NBIC 2011), and with the application of R-Stamp. • Fabrication of Twenty Liquid Storage tanks (Six of 78m3 and Fourteen of • 117m3 capacity) in according to API 650, 11th Ed. Add 2. • Fabrication of Two Mixing Tanks (40m3) in according to API 650 Standard. • Fabrication of Two Hoppers Underground Tanks in according to API 650 Standard. • Fabrication of Sixty five cutting boxes in according to API 650 Standard. • Fabrication of Steel structure of three transfer augers in according to AWS D1.1. May/2011- Mar./2013 Halliburton and International Oil Services Co. (IOS), Egypt. Lloyd's Register (LR- insurance), Egypt ASME VIII, Div.1, API 650, AWS D1.1, & National Board Carbon Steel Kafr El-Dawar Power Station Project (Alexandria, Egypt). • Fabrication of HCL Storage Tanks internally hot lined with special rubber. Nov./2012- Dec./2012 PWT & IOS N/A ASME VIII, Div.1 Carbon Steel ELNG Waste Heat Recovery Extension Project (Idku, Egypt). • Fabrication and Erection of Pipe Rack and Replacement Steel Structure. • Fabrication of Crane Girder. Dec/2010 – Feb./2011 and Jun./2012 – Sep./2012 ELNG & EMC Bureau Veritas (BV Egypt) AWS D1.1. Carbon Steel EPIC Alexandria Free Zone, Tanks and Mechanical Equipment Project (Egypt). • Fabrication of Six Liquid Storage Tanks (78m3). • Fabrication of Skids for centrifuge. Oct./2012- Dec./2012 EPIC & IOS • Lloyd's Register (LR-insurance), Egypt. • N/A API 650 AWS D1.1 Carbon Steel Alexandria Mineral and Oils Company (AMOC) Plant; Lube Oil Extension Project (Egypt). • Alteration for an ASME U-Stamped Steam Drum in according to National Board Standard with the application of R-Stamp. • Repair for three ASME U-Stamped Towers in according to National Board Standard with the application of R-Stamp. Nov./2010 & Dec./2012 AMOC, Egypt • Lloyd's Register (LR-insurance), Italy, • TUV Rhineland AIA Services, LLC ASME VIII, Div.1 & National Board Carbon steel Nile City Moll Project (Cairo, Egypt). • Fabrication and Erection of Moll Building Steel Structure. Dec/2010 – Feb./2011 Al Rebat and El Anwar Company, Egypt N/A AWS D1.1. Carbon Steel Sidi Krir Power Station, Project - Unit 3 &4, 2x340 MW (Alexandria, Egypt). • Erection of steel structure, mechanical part and piping systems for two Heat Recovery generators Boilers (HRSG). July/2010 – Nov./2010 (Close out Phase Only) NEM WDEPC PGESCO Bureau Veritas (BV Egypt) AWS D1.1, ASME I and ASME B31.1. Carbon, low alloy/alloy (P11, P22 and P91), austeniticstainless steels and Ni-base Alloys. Abu Qir Thermal Power Plant Unit (6&7) Project (Alexandria, Egypt). • Fabrication of ten ASME U stamped pressure vessels (Intermediate blow down tanks, Condensate tanks, blow down tanks and Nitrogen tanks) July/2010 – Dec./2010 ANSALDO, AEPC PGESCO Lloyd's Register (LR- insurance), Egypt. ASME VIII, Div.1 Carbon Steel
  • 6. Mar, 2009 - Feb. 2010: DSD-Ferrometalco, SAE, (The Egyptian German Company for Metal Industries), Ismailia Road, Industrial Zone, Cairo, Egypt. • OA Manager for All DSD Work Shops (Heliopolis & Belbeis) and Sites. General: Managing DSD "QA" Program to ensure compliance with project's contract, project's specification and project's special provisions, and applicable codes, including ISO 9001, ISO 14001. OHSAS 18001, DIN 18800-7, AD 2000-Merkblatt HP 0, EN ISO 3834-2 and ASME S, U, U2 & R stamps. a) Certifications and Renewals The following Renewals and Surveillances have been done for both workshops: • ASME S, U, U2, and R Certifications Renewal in according to ASME Ed.2007/Add. 2009a. Certification Body: American Society of Mechanical Engineering (ASME). • Renewals and Surveillances for ISO 9001:2008. ISO14001:2004, OHSAS 18001:2007. Certification Body: SGS Egypt. • Renewal for Quality Management System for fusion welding of metallic materials, Certificates in according to AD 2000-Merkblatt HP 0 and EN ISO 3834-2. Certification Body: TÜV United Kingdom. • Renewal for DIN 18800-7:2008-11, Qualification of the Manufacturer for welding Steel Structure, Certificate Class E. Certification Body: SLV, German. b) DSD Internal Audits and Customers Prequalification Audits • Lead and Participate in DSD internal Audits and Prequalification Audits related to Fabrication and Erection of Power Boilers Components, Pressure Vessels, Power and Process Piping, and Storage Tanks, Plate Work, and Steel Structure. For example, prequalification Audits conducted by ARAMCO, TECHNIP, ALSTOM, and ANSALDO, SLV, …etc. c) Participate for the Control of Some Critical QA/QC Activities as per QA/QC Manager Directive • Preparation of all required Quality Documents and Procedures with follow up till final approval by ASME Authorized Inspector and Client Rep., conducting all required audits with Client Rep, and coordination and preparation for smooth fabrication and Erection activities of: o Fabrication and Erection of Steel structure and Pressure parts of Abu Qir Thermal Power Plants Project, Unit 6 &7; 2 X 650 MW GAS/OIL Fired Units. Client: ANSALDO CALDAIE, SPA. S-ASME Stamp Project. ASME Authorized Agency: Lloyd's Register (LR-insurance), Egypt. o Fabrication of Pressure vessels for Ammonia Pressure Storage & Conditioning Tentative Plot Plant. Client: Engineering Development Contracting Group. U-ASME Stamp Project. ASME Authorized Agency: Lloyd's Register (LR-insurance) Egypt. Feb.-2007 - Feb.-2009: SGS Group Egypt Ltd, Industrial Services, Competence Center, Marriouteya, Sakkara Rd, Harraneya, Osman Brige extension, Haram, El Giza, Egypt. • Senior QC Engineer and Deputy of SGS/DSD QC Manager in DSD Belbeis Work Shop. General: Scope Duration/ Period Client Third Party or ASME Authorized Agency Code Material Shoaiba Oil-Fried Power Plant, Saudi Arabia. • Fabrication of Power Piping (External Piping) for two units of Oil-Fired Power Plant. S-ASME Stamp Project. Feb – April/2007 ANSALDO CALDAIE, SPA, N/A ASME I & ASME B31.1 Carbon Steel
  • 7. SRT Project, Sardinia Radio Telescopic 64m Diameter, Italy. • Fabrication and trail assembly structure steel and all mechanical components. May/2007- Feb/2009 MT- Mechatronics GmbH. SLV, Germany DIN 18800-7: 2008-11 Carbon Steel New Fertilizer Complex Project, Egyptian Agrium Nitrogen Products Co. SAE (EAgrium), Egypt. • Fabrication of two Primary Reformers; steel structure, ducts and stacks. Jan- May./2008 Udhe GmbH N/A AD 2000- Merkblatt Carbon Steel PDH/PP Complex Project, Egyptian Propylene& Polypropylene Company (EPPC), Port Said, Egypt. • Fabrication of two Star Reformers, steel structure, ducts and stacks. Jan- May./2008 Udhe GmbH N/A AD 2000- Merkblatt Carbon Steel Nov.-2005 - Feb.-2007: El-Maimani Group for Industrial and Treading, Madina, Saudi Arabia. • Nov. 2005 – Mar. 2006 Assigned as Fabrication and Erection Engineer for Red Bricks Factory-3, Kiln and Dryer Modification Project. • Mar. 2006 - Feb. 2007 Assigned as the Manager of Steel Fabrication, Re-manufacturing (Hard facing & special repairs) and Hard Chrome Plating Departments; to facilitate and handle all fabrication, re-manufacturing and hard chroming requests issued by different departments within El-Maimani Group of factories (Red Bricks, Water, Rockwool, Polystyrene, and Dates Packing Factories). Jan-2000 - Oct.-2005: Material Engineering Office, Consultancy and Inspection, Prof. Dr. Mohamed Rafaat El Koussy, El Giza, Egypt. (From 2000-2001 Part Time) • Quality Control, NDT, Welding Engineer and Trainer Project MyResponsibilities Duration/ Period Client Third Party or ASME Authorized Agency Code Material OBAJANA CEMENT PLC, NIGERIA. (Fabrication of Steel Structure Buildings and Mechanical Equipment at Arab Contractors Company, and eight workshops of itssubcontractors). Leading a Group of Quality Engineers and Technicians for the Following Activities: • Consultancy on All Fabrication Activities. • Conducting VT, PT. RT and UT and other In-process Inspection Activities. • Witness o n M e c h a n i c a l T e s t i n g for ReceivedMaterials. • Quality Documentation and Review. • Pre- Assembly and Final Dimension Check. • Troubleshooting for Technical Problems. • PaintingInspection. Dec/2004 - Nov. /2005 Arab Contactors Company N/A AWS D1.1 Carbon Steel Erection of Damietta New Delta Lock at Kanater Site, Egypt. • Consultancy on Erection Activities. • Conducting VT, PT, RT and UT Site Inspection. • Welding and Mechanical Installation control. • DimensionChecks. • Troubleshooting for Technical Problems. • QualityDocumentation. • PaintingInspection. • Witness of commissioning activities. July -2003 - Sep 2004 ALSTOM & AL-Tersana Company, Embaba, Egypt N/A AWS D1.1 & EN Standard. Carbon Steel and Stainless Steel.
  • 8. Damietta LNG, Egypt • Mar.-April/2003 Witnessing of all Welding Procedures Qualification Activities for the Project WPS's Conducted by Dodsal Pte. Ltd., Dubai, United Arab Emirates • April - Sep./2003 Conducted Ultrasonic Inspection on Welds of Piles for Damietta New Port, Manufactured by NSF Company. • NDT Engineer (Part of the Month) at Damietta LNG Site. Mar.- Sep./2003 SGS N/A ASME IX & B31.3 Carbon and Stainless Steel. Ediko-Damietta Gas Pipe Line (Inspection on 10,000 Pipes), Alexandria, Egypt • As a Third Party and Representative of Cairo University, Conducting Visual and Ultrasonic Inspection on the Supplied Pipes in According to API 5L Standard. April- Aug./2002 GASCO N/A API 5L Carbon Steel Fabrication of Damietta New Delta Lock Components (Main Gates, Culvert Gates, main and culvert stop logs ,…etc.), at Tersana Work Shop, Egypt. • Consultancy on Fabrication Activities. • Conducting VT, PT, RT and UT Inspection. • Welding control. • DimensionChecks. • Troubleshooting for Technical Problems. • QualityDocumentation. • PaintingInspection. • Conducting Training Sessions for Tersana Quality Team (NDE, Welding Inspection and Material Receiving). May /2000 – July/2003 ALSTOM & AL-Tersana Company, Embaba, Egypt N/A AWS D1.1 & EN Standard. Carbon Steel and Stainless Steel. Mobarak Pump Station, Toshka, Egypt. Supporting the quality department of Kahromika for the following activities: • Welding Inspection (VT, PT, RT and UT). • Dimension Check before and after welding. • Cross Check on the implementation of welding procedures during site welding. Jan- April/2000 Kahromika & Hitachi N/A ASME V & IX Carbon Steel 1998 – 2001 Cairo University, Faculty of Engineering, Center of Manufacturing Studies. Mechanical Testing Laboratory, El Giza, Egypt • Mechanical Testing Engineer and Lab Manager 1998 - 1999 Working part time for the follow up of test samples selection and preparation. 1999 - 2001 Manager of the Lab Under the Supervision of Prof. Dr. Mohamed Rafaat El Koussy, Professor of Metallurgical Engineering, Cairo University, Faculty of Engineering, El Giza. • Conducting and Witness of Mechanical Testing • Deal with Customers and Their Supervisors. • Lab Documentation. • Conducting Macro and Microstructure Investigations. • Conducting Failure Analysis Investigations • Conducting welding procedure and welders qualifications • Conducting NDT on incoming welded items and materials. • Training for the New Technicians and Students of the Metallurgical Engineering Department on all of the above. Work done for many companies like, Petrojet, Kahromica, PPC. Balaiem Petroleum Company. NSF, Enppi. Gasco, GAPCO and others using different Codes and Standards, for example, ASME, ASTM, EN, ISO, BS, API and JIS.
  • 9. Languages Read Write Speak Second Language English Very Good Very Good Very Good April- 2010 American University, School of Continuing Education, Educational Testing and Assessment Division, Cairo, Egypt Score of TOEFL Exam is 598. Computer Literacy Good User of Ready Made Software, for Example: Word, Excel , Power Point, AutoCAD, PVEilet for Pressure Vessels Design, and SigmaXL for statistical analysis and others. Driving Licenses • Egypt. Valid. • Qatar. Expired • Saudi Arabia. Expired References • Original Certificates. (Copy will be issued upon request). • Prof. Dr. Mohamed Rafaat El-Koussy. Professor of Metallurgical Engineering, Cairo University. Faculty of Engineering, El Giza, Egypt. For Contact, Mobile Phone: 00201227340591. E-Mail: matengoffice@yahoo.com • Prof. Dr. Iman El-Mahalawi. Professor of Metallurgical Engineering, Cairo University, Faculty of Engineering, El Giza, Egypt. Professor of Metallurgical Engineering, British University, Faculty of Engineering, El Giza, Egypt. For Contact, Mobile Phone: 00201006044661. E-Mail: ielmahallawi@Bue.edu.eg • Eng. Ibrahim El-Desoky, ASME Authorized Inspector and NDT Level III, Authorized Inspection Associates (AIA), LLC, Houston, USA. Chairman and Manager of Cairo Inspection Company (CIC), AWS and API Authorized Inspection and Training Center, Cairo, Egypt. For Contact, Mobile Phone: 00201147464749. E-Mail: i.desoky@cic-egypt.com idesoky@hotmail.com