KHALED MOHAMED IBRAHIM
Mob No.:+966-549922984
Nationality: Egyptian
DOB: 03.July.1967
kh_m_ibrahim@yahoo.com
Mechanical Engineer
Professional Mechanical Engineer, Over 17 Year Experience in Oil and gas, Petrochemical,
Industrial, as well as Water Treatment for the Following Area Of expertise,
 Project Management  Construction management
 Material Control  Design
 Inspection  Cost Estimation &Tender Pricing
 Quantity Surveying  invoicing
 Procurement  Shutdown
 Shop Drawing  Inspection
 Instillation and Commissioning  Presentation
Education
• Bachelor of Mechanical Power Engineering
, 1996, Alexandria University, Egypt
Technical skills
 AutoCAD -2D,2007  MS Office
 Primavera P6  Training Course ASME 31.3
Experience
► Jan. 2012- Till Date Sr. Mechanical Design Engineer for Arab Steel Company
(ALTUWARIQI), Dammam, KSA
 Perform engineering Stress calculations for pipelines According To International Codes and
standards
 Perform engineering for procurement, including preparing material specifications, material
and purchase requisitions
 Produce in house Detail Design Document, General Arrangement DWGs ,Piping Plan ,Piping
Isometric, Equipment Selection, Equipment and Piping Material Data Sheet, Piping Class
 Generate Concept Design , Identified Problem & Solution
 Support The Construction Field Requirements
 Prepare / Review Cooling Water And Media Demand And Hydraulic Calculation
 Prepare / Review PFD ,P&ID
 Provide Heat Balance and Mass Balance Calculation and Propose Design Modification
To Optimized Existing System Operation and Running Cost
 Perform Design Calculation For Degusting System Along With Equipment Selection And
2
Supported DWGs
 Produce/ check material quantity take-offs
 Review Vendor Print and Design Calculation
► Aug. 2011-Jan.2012 Project manager, ITS Group Egypt
Project Description, EPC Contract for Fountains and Swimming Pools
 Carry out Site Mobilization ,Organization and Resource Utilization
 Attending Progress , Safety Meeting With Client
 Carry Out Correspondence ,Communication With Client and Supplier
 Coordination of Technical Submittal and Drawing Approval
 Prepare Various Documentation Including, Project Schedule, Method of statement, Reports,
Cost Estimation, etc.
 Ensuring all materials used and work performed are as per Contract specifications
 Overseeing the selection and requisition of materials
 Overseeing quality control, health and safety matters on site
 Produce and Follow up Invoices , Payment and Variation Order
 Monitor ,Review the work progress
- Project Name: Sharm El Sheikh Resort
Client: MEP Contractor Drake & Scull, Main Contractor: CCC, Owner: Qatari Diar
► Aug. 2009-Aug.2010, Sr. Project Engineer, AES Arabia, RIYADH, KSA
Project Description, Chemical Injection Skid, RO &Sewage Treatment Plant Fountains and
Swimming Pools
 Handle the Kick off Meeting for All Project
 Produce Project Schedule
 Review Engineering Document and Drawing
 Manage Engineering Activity
 Prepare Technical Submittal and Get Client Approval
 Manage Procurement Activity
 Manage QC Activity and Coordinate PIM (Pre Inspection Meeting)
 Manage Installation and Commissioning Activity
 Communication with Client and Inside Company
 Cost Control and Prepare Invoice
 Prepare Project Final Dossiers
 Prepare Material Data Sheet and Guide Material Selection
 Communicate With Supplier for Local and Off Shore Material
- Project Name
- Chemical Injection System (Manifa Gas Facilities), Saudi Aramco
- Acid Neutralization System (Corporate Data Center), Saudi Aramco
- Demulisifier Injection Skids (Manifa Upstream Offshore Pipe Line), Saudi Aramco
- Scale Inhibitor and Corrosion Inhibitor dosing skids, Saudi Aramco
- STP (Sewage Treatment Plant (MBR)) & RO Plants (GOSI Office Park),GOSI
- STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger
3
- STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger
- Fountain and Swimming Pool (Ayhar Villa), Saudi Oger.
- Fountain and Swimming Pool (Yamama Family Villas), Saudi Oger.
► Aug. 2004-July 2009, Site Manager, Trading and Agency Services LTD. (Trags),
Doha, Qatar
 Managed a team of 150 people, and assigning them task
 Liaised and assist contract manager in order to ascertain the cost for the construction
work
 Quantity surveying for (Piping, Steel Structure, Equipment, Painting, Scaffolding,
Insulation, RT, PWHT, PMI,)
 Dealing with day to day contract and site issue for construction
 Plan, control and monitor the work progress, quantity and quality of the construction
work to ensure Compliance to design specification
 Identified necessary corrective action and prepare the technical query
 Check all of construction work package drawings (P&ID, Piping Plan, ISO DWG,
Others)
 Prepared reports for project manager
 Prepared the costing sheet for all constriction activity (piping, equipment, scaffolding,
and Steel Structure)
 Prepared the costing of material and equipment related to the construction work
 Performed Site Supervision for new modification (Equipment erection, piping
modification, Instrument and electrical Modification)
 Quantity surveying, Material Take off and cost estimation
 Measuring actual work and Produce as built drawing
 Carried out preparation of lifting plan (LP), method statement (MS) and job safety
analysis (JSA) for Equipment Installation and Piping Fabrication and Erection
 Dealing with subcontractor and supplier
 Check subcontractor invoice and submitting CWR invoices to client
 Prepare bill of material (piping, structure, instrument and electrical)
 Manage, coordinated and follow up all material controlling at site
- Project Name
-5 year unit rate maintenance contract at Qatar petrochemical Company (QAPCO)
- Replacement of ESD Generator & installation of plate exchanger during QAPCO GSD
- Replacement of quench water new air Cooler in Ethylene plant lactated at QAPCO
- July-Aug., 2005 Equipment engineer for Pul Hanin (PS 3) offshore shutdown
- May-June, 2005 Equipment engineer for Maydan Mahzan (PS 2) offshore shutdown
- Feb.-Mar., 2005 Engineer In-Charge for Boiler and gas turbine shutdown at Ras GAS -
Nov., 2004, Mechanical supervisor for train 3 shutdown at RAS GAS
- Shutdown engineer for exchangers cleaning (Hydro jetting) in Qatar Vinyl Company
(QVC)
- Piping engineer for construction of New Caustic Soda line in (QVC)
4
► Oct. 2003-july 2004, Mechanical Engineer, Porcelain International, Alexandria,
Egypt
 Provided site supervision for equipment erection (Static, Machinery, Tunnel Kiln)
 Provide site supervision for piping fabrication and erection
 Produce fabrication Procedure for Tanks, Silo
 Provided Installation supervision for piping fabrication and erection
 Maintained of fluid power system
 Planed and identified lubrication schedule
 Prepare bill of material and purchase request
► June, 2001-Nov., 2002 Project Material Controller Manager, Samsung Engineering
CO., LTD. Tabriz, Iran (ABS Plant)
 Monitor, coordinate and report on material related activities from estimates
through preparation of bill of materials, ordering, transportation, receiving,
installation and surplus disposition. Responsible for logistics, warehousing and
facility
 Verifies that the documentation on each order matches the freight description
 Maintain auditable records of receiving and issuance data, non-conformances,
shortage material and warranty necessary for documenting the material control
and warehousing processes.
 Receive all incoming shipments. Make arrangements for and oversees unloading
and handling of goods.
 Prepare warehouse requests; removes goods from storage for authorized
consumption and utilization; bags, tags, and otherwise prepares goods for
issuance; and makes the goods available at the point and time of need.
 Control issuance of equipment and goods to subcontractors.
 Identify, receive approval for, and disposes excess materials. Prepares close-out
documents at the end of projects.
► Sep. - 2000-April-2001, Equipment Engineer , Daelim Industrial CO., LTD. at El-
Ameriya, free zone, Alexandria, Egypt
 Performed Site supervision for equipment erection (Static Equipment & Machinery)
 Carried out mechanical inspection for equipment installation (Static Equipment &
Machinery)
 Implemented Mechanical Supervisor for pre-commissioning and commissioning
 Mechanical Inspector for compressor ,Turbine and pump alignment, performed the
performance test of centrifugal Pump
 Engineer in-Charge for refinery catalyst loading, and installation of structure packing
 Working with vendors supervisor During Commissioning
- Project Name
Middle East oil refinery, Midor Co., LTD.
5
► Sep., 1999-Aug., 2001, Mechanical engineer, Samsung Engineering CO., LTD. at El-
Ameriya, free zone, Alexandria, Egypt
 Unpacking inspector (inspection of construction material, equipment and spare parts)
 Material expeditor
 Prepare martial issuing plan according to site demand
 Mechanical Supervision for equipment erection
 Jointed pre-commissioning and commissioning for mechanical supervision
 Coordinate with vendor for equipment installation
 Preparation of inspection document and close out document
- Project Name
Sidi Kerir Petrochemical CO., LTD., 200,000 MT/Y polyethylene
► March, 1998-June1999, Egyptian Air Force
• Maintenance of Diesel Generator
• Maintenance of electrical distribution Panel

More Related Content

What's hot (20)

Manimaran
ManimaranManimaran
Manimaran
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Muhammed RAFI 2016 SD
Muhammed RAFI 2016 SDMuhammed RAFI 2016 SD
Muhammed RAFI 2016 SD
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh Hai
 
Hossam CV-FEB2016
Hossam CV-FEB2016Hossam CV-FEB2016
Hossam CV-FEB2016
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
 
Abhishek
AbhishekAbhishek
Abhishek
 
TARIQUE ALSTOM
TARIQUE ALSTOMTARIQUE ALSTOM
TARIQUE ALSTOM
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTIL
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
03 Mohamed_fathi
03 Mohamed_fathi03 Mohamed_fathi
03 Mohamed_fathi
 

Viewers also liked

Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Mahdy Hammad
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 
Resume of Meramat Anak Tajak
Resume of Meramat Anak TajakResume of Meramat Anak Tajak
Resume of Meramat Anak Tajakmeramat tajak
 
Manuel E. Bautista Jr.(october 19, 2015)
Manuel E. Bautista  Jr.(october 19, 2015)Manuel E. Bautista  Jr.(october 19, 2015)
Manuel E. Bautista Jr.(october 19, 2015)Manuel Bautista Jr.
 
السيره الذاتيه محدثه الى شهر أكتوبر _ 2016
السيره الذاتيه محدثه الى شهر أكتوبر  _  2016السيره الذاتيه محدثه الى شهر أكتوبر  _  2016
السيره الذاتيه محدثه الى شهر أكتوبر _ 2016Mohamed Wanan
 
Instrumentation Engineer.
Instrumentation Engineer.Instrumentation Engineer.
Instrumentation Engineer.guest3235c24
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrGovinda Raman
 

Viewers also liked (17)

resume_Mr_
resume_Mr_resume_Mr_
resume_Mr_
 
RAJENDRA JAIN CV+
RAJENDRA JAIN CV+RAJENDRA JAIN CV+
RAJENDRA JAIN CV+
 
updated_ashishmalhotra
updated_ashishmalhotraupdated_ashishmalhotra
updated_ashishmalhotra
 
new CV Rehan
new CV Rehannew CV Rehan
new CV Rehan
 
Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015
 
CURRENT PROFILE 1_2016
CURRENT PROFILE 1_2016CURRENT PROFILE 1_2016
CURRENT PROFILE 1_2016
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
oooo
oooooooo
oooo
 
Resume of Meramat Anak Tajak
Resume of Meramat Anak TajakResume of Meramat Anak Tajak
Resume of Meramat Anak Tajak
 
Manuel E. Bautista Jr.(october 19, 2015)
Manuel E. Bautista  Jr.(october 19, 2015)Manuel E. Bautista  Jr.(october 19, 2015)
Manuel E. Bautista Jr.(october 19, 2015)
 
السيره الذاتيه محدثه الى شهر أكتوبر _ 2016
السيره الذاتيه محدثه الى شهر أكتوبر  _  2016السيره الذاتيه محدثه الى شهر أكتوبر  _  2016
السيره الذاتيه محدثه الى شهر أكتوبر _ 2016
 
sherif saad cv
sherif saad cvsherif saad cv
sherif saad cv
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
Atique - Copy
Atique - CopyAtique - Copy
Atique - Copy
 
Instrumentation Engineer.
Instrumentation Engineer.Instrumentation Engineer.
Instrumentation Engineer.
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation Engr
 

Similar to cv (20)

CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Saw Qualification1
Saw Qualification1Saw Qualification1
Saw Qualification1
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
adrian cv
adrian cvadrian cv
adrian cv
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
Copy of Eng.OMARA CV
Copy of Eng.OMARA CVCopy of Eng.OMARA CV
Copy of Eng.OMARA CV
 
Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Sameer CV-DC
Sameer CV-DCSameer CV-DC
Sameer CV-DC
 
Instrument Engineer
Instrument EngineerInstrument Engineer
Instrument Engineer
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
balaji cv
balaji cvbalaji cv
balaji cv
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 

cv

  • 1. 1 KHALED MOHAMED IBRAHIM Mob No.:+966-549922984 Nationality: Egyptian DOB: 03.July.1967 kh_m_ibrahim@yahoo.com Mechanical Engineer Professional Mechanical Engineer, Over 17 Year Experience in Oil and gas, Petrochemical, Industrial, as well as Water Treatment for the Following Area Of expertise,  Project Management  Construction management  Material Control  Design  Inspection  Cost Estimation &Tender Pricing  Quantity Surveying  invoicing  Procurement  Shutdown  Shop Drawing  Inspection  Instillation and Commissioning  Presentation Education • Bachelor of Mechanical Power Engineering , 1996, Alexandria University, Egypt Technical skills  AutoCAD -2D,2007  MS Office  Primavera P6  Training Course ASME 31.3 Experience ► Jan. 2012- Till Date Sr. Mechanical Design Engineer for Arab Steel Company (ALTUWARIQI), Dammam, KSA  Perform engineering Stress calculations for pipelines According To International Codes and standards  Perform engineering for procurement, including preparing material specifications, material and purchase requisitions  Produce in house Detail Design Document, General Arrangement DWGs ,Piping Plan ,Piping Isometric, Equipment Selection, Equipment and Piping Material Data Sheet, Piping Class  Generate Concept Design , Identified Problem & Solution  Support The Construction Field Requirements  Prepare / Review Cooling Water And Media Demand And Hydraulic Calculation  Prepare / Review PFD ,P&ID  Provide Heat Balance and Mass Balance Calculation and Propose Design Modification To Optimized Existing System Operation and Running Cost  Perform Design Calculation For Degusting System Along With Equipment Selection And
  • 2. 2 Supported DWGs  Produce/ check material quantity take-offs  Review Vendor Print and Design Calculation ► Aug. 2011-Jan.2012 Project manager, ITS Group Egypt Project Description, EPC Contract for Fountains and Swimming Pools  Carry out Site Mobilization ,Organization and Resource Utilization  Attending Progress , Safety Meeting With Client  Carry Out Correspondence ,Communication With Client and Supplier  Coordination of Technical Submittal and Drawing Approval  Prepare Various Documentation Including, Project Schedule, Method of statement, Reports, Cost Estimation, etc.  Ensuring all materials used and work performed are as per Contract specifications  Overseeing the selection and requisition of materials  Overseeing quality control, health and safety matters on site  Produce and Follow up Invoices , Payment and Variation Order  Monitor ,Review the work progress - Project Name: Sharm El Sheikh Resort Client: MEP Contractor Drake & Scull, Main Contractor: CCC, Owner: Qatari Diar ► Aug. 2009-Aug.2010, Sr. Project Engineer, AES Arabia, RIYADH, KSA Project Description, Chemical Injection Skid, RO &Sewage Treatment Plant Fountains and Swimming Pools  Handle the Kick off Meeting for All Project  Produce Project Schedule  Review Engineering Document and Drawing  Manage Engineering Activity  Prepare Technical Submittal and Get Client Approval  Manage Procurement Activity  Manage QC Activity and Coordinate PIM (Pre Inspection Meeting)  Manage Installation and Commissioning Activity  Communication with Client and Inside Company  Cost Control and Prepare Invoice  Prepare Project Final Dossiers  Prepare Material Data Sheet and Guide Material Selection  Communicate With Supplier for Local and Off Shore Material - Project Name - Chemical Injection System (Manifa Gas Facilities), Saudi Aramco - Acid Neutralization System (Corporate Data Center), Saudi Aramco - Demulisifier Injection Skids (Manifa Upstream Offshore Pipe Line), Saudi Aramco - Scale Inhibitor and Corrosion Inhibitor dosing skids, Saudi Aramco - STP (Sewage Treatment Plant (MBR)) & RO Plants (GOSI Office Park),GOSI - STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger
  • 3. 3 - STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger - Fountain and Swimming Pool (Ayhar Villa), Saudi Oger. - Fountain and Swimming Pool (Yamama Family Villas), Saudi Oger. ► Aug. 2004-July 2009, Site Manager, Trading and Agency Services LTD. (Trags), Doha, Qatar  Managed a team of 150 people, and assigning them task  Liaised and assist contract manager in order to ascertain the cost for the construction work  Quantity surveying for (Piping, Steel Structure, Equipment, Painting, Scaffolding, Insulation, RT, PWHT, PMI,)  Dealing with day to day contract and site issue for construction  Plan, control and monitor the work progress, quantity and quality of the construction work to ensure Compliance to design specification  Identified necessary corrective action and prepare the technical query  Check all of construction work package drawings (P&ID, Piping Plan, ISO DWG, Others)  Prepared reports for project manager  Prepared the costing sheet for all constriction activity (piping, equipment, scaffolding, and Steel Structure)  Prepared the costing of material and equipment related to the construction work  Performed Site Supervision for new modification (Equipment erection, piping modification, Instrument and electrical Modification)  Quantity surveying, Material Take off and cost estimation  Measuring actual work and Produce as built drawing  Carried out preparation of lifting plan (LP), method statement (MS) and job safety analysis (JSA) for Equipment Installation and Piping Fabrication and Erection  Dealing with subcontractor and supplier  Check subcontractor invoice and submitting CWR invoices to client  Prepare bill of material (piping, structure, instrument and electrical)  Manage, coordinated and follow up all material controlling at site - Project Name -5 year unit rate maintenance contract at Qatar petrochemical Company (QAPCO) - Replacement of ESD Generator & installation of plate exchanger during QAPCO GSD - Replacement of quench water new air Cooler in Ethylene plant lactated at QAPCO - July-Aug., 2005 Equipment engineer for Pul Hanin (PS 3) offshore shutdown - May-June, 2005 Equipment engineer for Maydan Mahzan (PS 2) offshore shutdown - Feb.-Mar., 2005 Engineer In-Charge for Boiler and gas turbine shutdown at Ras GAS - Nov., 2004, Mechanical supervisor for train 3 shutdown at RAS GAS - Shutdown engineer for exchangers cleaning (Hydro jetting) in Qatar Vinyl Company (QVC) - Piping engineer for construction of New Caustic Soda line in (QVC)
  • 4. 4 ► Oct. 2003-july 2004, Mechanical Engineer, Porcelain International, Alexandria, Egypt  Provided site supervision for equipment erection (Static, Machinery, Tunnel Kiln)  Provide site supervision for piping fabrication and erection  Produce fabrication Procedure for Tanks, Silo  Provided Installation supervision for piping fabrication and erection  Maintained of fluid power system  Planed and identified lubrication schedule  Prepare bill of material and purchase request ► June, 2001-Nov., 2002 Project Material Controller Manager, Samsung Engineering CO., LTD. Tabriz, Iran (ABS Plant)  Monitor, coordinate and report on material related activities from estimates through preparation of bill of materials, ordering, transportation, receiving, installation and surplus disposition. Responsible for logistics, warehousing and facility  Verifies that the documentation on each order matches the freight description  Maintain auditable records of receiving and issuance data, non-conformances, shortage material and warranty necessary for documenting the material control and warehousing processes.  Receive all incoming shipments. Make arrangements for and oversees unloading and handling of goods.  Prepare warehouse requests; removes goods from storage for authorized consumption and utilization; bags, tags, and otherwise prepares goods for issuance; and makes the goods available at the point and time of need.  Control issuance of equipment and goods to subcontractors.  Identify, receive approval for, and disposes excess materials. Prepares close-out documents at the end of projects. ► Sep. - 2000-April-2001, Equipment Engineer , Daelim Industrial CO., LTD. at El- Ameriya, free zone, Alexandria, Egypt  Performed Site supervision for equipment erection (Static Equipment & Machinery)  Carried out mechanical inspection for equipment installation (Static Equipment & Machinery)  Implemented Mechanical Supervisor for pre-commissioning and commissioning  Mechanical Inspector for compressor ,Turbine and pump alignment, performed the performance test of centrifugal Pump  Engineer in-Charge for refinery catalyst loading, and installation of structure packing  Working with vendors supervisor During Commissioning - Project Name Middle East oil refinery, Midor Co., LTD.
  • 5. 5 ► Sep., 1999-Aug., 2001, Mechanical engineer, Samsung Engineering CO., LTD. at El- Ameriya, free zone, Alexandria, Egypt  Unpacking inspector (inspection of construction material, equipment and spare parts)  Material expeditor  Prepare martial issuing plan according to site demand  Mechanical Supervision for equipment erection  Jointed pre-commissioning and commissioning for mechanical supervision  Coordinate with vendor for equipment installation  Preparation of inspection document and close out document - Project Name Sidi Kerir Petrochemical CO., LTD., 200,000 MT/Y polyethylene ► March, 1998-June1999, Egyptian Air Force • Maintenance of Diesel Generator • Maintenance of electrical distribution Panel