PROJECT : PROPOSED URBAN FARMING CENTER, ON PASAR SENI PARKING LOT,
JALAN HANG KASTURI, KUALA LUMPUR.
00 CONTENT
01	INTRODUCTION
1.1	PROJECT	INTRODUCTION
1.2	CLIENT
02	PROPOSED	PROGRAMME
2.1	URBAN	FARMING	CENTER
2.2	OBJECTIVE
03	SITE	INTRODUCTION
3.1	INTRODUCTION
3.2	SWOT	ANALYSIS
3.3	PESTLE	ANALYSIS
04	PROGRAMME	VIABILITY
4.1	PROGRAM	OBJECTIVE
4.2	PROGRAM	GOALS
4.3	SUCCESS	CRITERIA
4.4	STAKEHOLDERS
05	DESIGN	STRATEGY
5.1	KEY	FEATURES
5.2	SPATIAL	PROGRAMMING	
06	MAINTENANCE	STRATEGY
07	RISK	ANALYSIS
08	WORK	BREAKDOWN	STRUCTURE
09	GANTT	CHART
01 INTRODUCTION
The design brief calls for a proposal of an Urban Farming Center,
along Jalan Tun Tan Cheng Lock, in Kuala Lumpur. The site is located
right next to Central Market- hence the aim of the design is to build
an extension of the building, which was originally a wet market, in
hopes of reactivating the space by pulling in local communities to
run the center. The project also aims to reshape the city, in hopes of
reducing the heat island effect, as well as changing lives by
introducing small scale farms to reduce carbon footprint and change
the unsustainable lifestyle of the local people. It will also apply the
hydroponic planting system, which utilizes water from the river and
discharges clean water back into it. The main program of the
building should consist of urban farms and a marketspace that
distributes its produce to the community. Supplementary programs
include a farm to table themed restaurant, as well as offices and a
workshop for visitors.
Basic	requirements	from	the	client	;	
• Openness	and	transparency,	to	allow	the	activities	within	the	
building	to	reach	out	to	the	public	
• Visual	permeability	and	walkability	to	Central	Market	not	
disrupted.	
• Lightweight	structure,	and	open	plan	concept	
• Smooth	accessibility	and	circulation	between	farms	and	
distribution	centers	
• Replace	existing	plaza	from	the	site	to	allow	public	activities	to	
take	place.	
• Connectivity	to	the	Klang River	
• 20-30	parking	spaces	for	visitors	
1 . 1 P R O J E C T I N T R O D U C T I O N 1 . 2 C L I E N T
The Kha Seng Group Sdn Bhd is a privately owned conglomerate of
companies that has acquired a few notable properties in the area of Kuala
Lumpur. They began venturing into property development when they first
acquired the Central Market building in 2004 – which completely
transformed the fate of the world heritage site. The biggest impact of the
acquisition is the transformation of the building into a world renowned
tourist attraction and shopping destination, without compromising the
original purpose of the building, which was to hold the nations art, culture
and heritage.
02 PROPOSED PROGRAMME
The over commercialization and development of the area results in
the loss of sense of space. The over-reliance on tourism therefore
makes it almost irrelevant to the local people. What was once a
market that served the people are now not even being used by the
local community. The lack of greenery in the area also creates an
issue of comfort and walkability. The loss of sense of space also
stems from the decreasing number of locals in the city. The absence
of the local community results to the lack of attachment to the city,
therefore creating more of a visitor center, rather than a livable
city.
The idea is to bring in farms into the city in order to create a more
self sustaining/liveable city. It acts as a center for the production
and distribution of local fruits and vegetables, and an education
platform for the future generation.
The introduction of urban farming into the city also creates a sense
of awareness in sustaining the environment. The major role of the
center is to also educate visitors, locals, tourists and especially
children the importance of leading a sustainable lifestyle in order to
ensure the future of the city.
2 . 1 U R B A N F A R M I N G C E N T E R 2 . 2 O B J E C T I V E
• To	revamp	the	area	of	Central	Market	and	reinstill the	sense	of	
belonging	in	the	area.
• To	expand	the	role	of	Central	Market	by	introducing	new	programs	
which	is	both	interactive	and	educational	to	attract	people	to	the	area.
• To	provide	a	public	space	that	further	encourages	interaction	between	
communities.
• To	transform	Central	Market	into	a	one	stop	center	that	meets	the	
peoples	needs.
03 SITE INTRODUCTION
The proposed site is located directly in front of Central Market, which is currently
an open air carpark, approximately 3852 sqm after setback. The Klang River flows
on the west of the site which then overlook high rise buildings such as Daya Bumi
and an upcoming City Point. The traffic along Jalan Tun Tan Cheng Lock is
exceptionally busy during peak hours and is even more congested sue to on going
construction activities. The area also has a high percentage of pedestrians travelling
from the Pasar Seni LRT station to nearby attractions such as Petaling Street, Pudu
and Dataran Merdeka.
3 . 1 C E N T R A L M A R K E T, K U A L A L U M P U R
3 . 2 S W O T A N A LY S I S
WEAKNESS
• Located	right	in	front	of	Central	Market	
which	may	potentially	block	its	frontage.
• LRT	lines	blocking	connectivity	to	the	
river
• Highly	congested	traffic	
STRENGTH
• Highly	accessible	by	all	modes	of	
transportation
• Strategically	located	along	a	prominent	
road	that	is	highly	visible	to	public
• Good	vantage	point	to	other	parts	of	
Kuala	Lumpur
OPPORTUNITIES
• Potentially	create	a	proper	
connection	from	Central	Market	to	
the	Klang River
• Introduction	of	green	spaces	that	
acts	a	stopping	point/major	node
THREATS
• Numerous	on	going	construction	
may	disrupt	the	comfort	of	users	
on	site
• River	are	prone	to	flooding,	flood	
prevention	methods	to	be	
considered
03 SITE INTRODUCTION
3 . 3 P E S T L E A N A LY S I S
ECONOMICAL
The main source of income of Central Market mainly depends on the
tourists that visits the area, as it has less attachment t the local
community. Located on a prime site, rental rates have sky rocketed due
to the increasing value of the site. Over dependency on tourism may
eventually hamper the development of Central Market as it is not being
supported by the local people.
POLITICAL
Uncoordinated development in the area that is not properly monitored
by the government is a major issue that affects the quality of space in
general. Authorities such as DBKL, and companies like AECOM, ROL,
PEMANDU and Think City are not working hand in hand in carrying out
future developments of the area.
SOCIOLOGICAL
The area is made up of a very diverse community. Locals, tourists,
foreign workers are all congesting the area with very little control. With
high traffic also comes problems pertaining social issues and security.
TECHNOLOGY
The use of technology is of utmost importance in developing the area
further. Technological advancement is needed to clean and utilize the
river properly.
ENVIRONMENTAL
Pollution of the river is one of the biggest issue faced by the city. The
lack of awareness of the people and the increase in construction works
in the area is also contributing to a lot of existing environmental
problems.
LEGAL
Besides the basic regulations set out by DBKL, new regulations are also
being imposed in parallel with the River of Life project. Standardization
of signage, pathway finishes and building façade are some of the
requirements that should be taken into consideration.
04 PROGRAMME VIABILITY
4 . 1 P R O J E C T O B E C T I V E S
• To	ensure	the	quality	of	the	project	and	fulfil	the	clients	brief	
• To	ensure	smooth	management	of	the	project	
• To	reduce	the	risks	of	the	project	throughout	the	given	timeframe	
• To	ensure	the	project	will	be	delivered	on	time,	within	given	budget	
and	of	the	best	quality	
4 . 2 P R O J E C T G O A L S
• To	aid	client	in	ensuring	smooth	management	of	the	project,	with	
established	and	highly	experienced	team	members.
• To	ensure	the	consistency	of	the	operation	of	the	proposed	building,	
with	consistent	production	and	distribution	of	fruits	and	vegetables	to	
the	public
• To	encourage	the	community	to	adopt	a	healthier	lifestyle	through	
education	that	takes	place	within	the	program	proposed	and	further	
impact	the	food	industry	of	the	nation.
4 . 3 S U C C E S S C R I T E R I A
QUALITY
The final product should meet the requirement of the client, but at the
same time do not compromise the architecture values of the building. It
should also be completed within the timeframe and budget allocated
without compromising it’s quality. Due to the sensitivity of the program in
dealing with plants and living beings, it is crucial to observe and control the
quality of the building materials to ensure the success of the program upon
completion of the project.
TIME
The time frame given for the project is within a period of 16 months, from
1st of May 2017 to 9th of September 2018. The given time is sufficient as
the proposed project utilizes prefabricated structures and materials. The
entire project will be executed according to the work breakdown structure
and Gantt chart laid out to ease and ensure smooth flow of the project.
COST
The budget allocated for the proposed project is RM5 million, fully funded
by Kha Seng Group Sdn Bhd. It encompasses pre construction costs,
construction costs and building operation and maintenance. Locally sourced
materials are an important element to ensure that the project effective.
Besides that, the implementation of natural design strategies are also used
to reduce the cost of building operation in the future.
04 PROGRAMME VIABILITY
4 . 4 S T A K E H O L D E R S
DEWAN BANDARAYA KUALA LUMPUR
The Kuala Lumpur City Hall is the city council that administers the city of
Kuala Lumpur. It ensures the the development of the city which covers
aspects relating to cleanliness, public transportation, city beutification,
public housings, public amenities, legislations, etc.
THINK CITY
Think City is a wholly-owned subsidiary of Khazanah Nasional Berhad. It
works closely with local governments, international agencies and various
local communities, building effective partnerships and enhancing
capacity along the way.
RIVER OF LIFE
The River of Life Public Outreach Programme (ROL-POP) is a programme
to foster partnerships and to improve attitudes and behaviours of target
groups to reduce pollution in the Klang River, Malaysia. The main
objective of ROL-POP is towards river care and preservation in order to
improve water quality and reduce pollution within the project area
KHA SENG GROUP (CENTRAL MARKET)
a privately owned conglomerate of companies that has acquired a few
notable properties in the area of Kuala Lumpur. They began venturing
into property development when they first acquired the Central Market
building in 2004 – which completely transformed the fate of the world
heritage site.
LOCAL	COMMUNITY
The	local	community	in	the	area	merely	pass	through	
Central	Market	to	get	to	other	areas	and	has	very	little	
attachment	to	the	existing	site.	
TOURIST	COMMUNITY
The	site	highly	depends	on	the	tourist	community	to	
ensure	generation	of	profit.
VENDORS/STALL	OWNERS
The	stalls	parked	outside	of	Central	Market	attracts	a	
significant	number	of	visitors	from	the	building	and	in	
the	area.
TAXI
The	taxi	point	outside	of	Central	Market		is	a	prominent	
feature	as	their	main	target	users	are	mostly	tourists.
05 DESIGN STRATEGY
5 . 1 K E Y F E A T U R E S
PUBLIC REALMS
One of the main aim of the building is to also expand its architecture
the public realm. The building was elevated to free up the ground
space in order to give back to the community. Plazas were also inserted
to reach out to its surrounding areas of Kasturi Walk and the river of
Life. Open floor plan systems are adopted to give a sense of
transparency to the building, allowing users to freely explore the
spaces.
GREEN SPACES
The entire building functions as a huge plot of green space that is
lacking in the city. The introduction of farms and green spaces will
reduce the heat island effect of the city and naturally cool down the
area. A public park on the ground floor allow users to gather and
socialize while still being educated about the purpose of the building
and the importance of farming.
LIGHTWEIGHT STRUCTURE
The absence of solid walls allows visual permeability to Central Market.
The lightweight structure of the building also poses an inviting feeling
to visitors and allows the activities inside to be seen to public on the
streets.
Green	spaces	utilized	to	cool	
down	the	building
Farms	orientated	to	maximize	
sun	exposure
Loose	floor	plan	encourages	
cross	ventilation
Water	recycling	system	from	
Klang River
05 DESIGN STRATEGY
5 . 2 S P A T I A L P R O G R A M M I N G
The	programs	are	separated	vertically	according	to	its	function	and	user	groups.	The	privacy	of	the	building	increasing	as	it progresses	upwards,	
however	the	transparency	of	the	building	remains	the	same.	The	ground	floor	intends	to	serve	the	public,	as	an	open	park	that can	be	used	by	
passersby	in	the	area.	The	first	floor	opens	up	to	a	commercial	space,	consisting	of	markets	and	an	organic	restaurant.	The	second	floor	consists	of	
management	and	handles	the	operational	aspects	of	the	building.	Finally,	the	top	most	floor	acts	as	the	core	of	the	building, which	holds	a	majority	of	
the	farms,	overlooking	the	public	activities	below.	
FIRST	FLOOR,	NTS SECOND	FLOOR,	NTS THIRD	FLOOR,	NTS
06 MAINTENANCE STRATEGY
6 . 1 P R O G R A M M E M A I N T E N A N C E
ELEMENTS FREQUENCY STRATERGY
FARMS
• Farming	structures
• Farming	equipment
• Tools	and	machinery
• Living	plants
• Quarterly
• Monthly
• Quarterly
• Daily
• To	ensure	farming	structures are	durable	and	safe	to	be	used
• To	ensure	farming	equipment	are	safe	to	be	used	and	to	be	replaced	when	
necessary.
• To	ensure	tools	and	machinery	are	well	functioning	and	safe	to	be	used
• To	ensure	the	quality	of	produce	by	closely	monitoring	the	quality	of	plants.
MANAGEMENT
• Office	equipment
• Furniture
• Quarterly
• Annually
• To	ensure equipment	such	as	computers	and	printers	are	well	maintained.
• To	ensure	furniture	are	of	good	condition	and	are	comfortable	to	be	used.
RESTAURANT
• Kitchen equipment
• Tools	and	machinery
• Furniture
• Quarterly
• Quarterly
• Annually
• To	ensure equipment	such	as	computers	and	printers	are	well	maintained.
• To	ensure	tools	and	machinery	in	the	kitchen	are	safe	to	be	used
• To	ensure	furniture	are	of	good	condition	and	are	comfortable	to	be	used.
MARKET
• Stalls
• Market	equipment
• Daily
• Monthly
• To	ensure	the	cleanliness of	the	stalls	for	the	comfort	of	the	user
• To	ensure	equipment	such	as	trolleys	and	storage	boxes	are	well	maintained	and	
safe	to	be	used.
PARK
• Planter	box
• Pavement/walkway
• Pond
• Benches/seating	areas
• Living	Plants
• Monthly
• Weekly
• Weekly
• Annually
• Daily
• To	ensure	planter	box are	still	usable	and	are	to	be	replaced	if	damaged
• To	ensure	the	cleanliness	of	the	pavements	and	the	walkway
• To	ensure	the	cleanliness	of	the	pond	by	having	weekly	clean	ups
• To	ensure	park	equipment	are	safe	to	be	used	by	the	public
• To	ensure	the	quality	of	the	plants	by	monitoring	the	daily
The	main	program	of	the	building	consists	of	vegetable	farms,	which	needs	proper	care	and	maintenance	to	ensure	the	quality	of	its	produce.	Other	
major	spaces	such	as	markets	and	communal	dining	needs	frequent	maintenance	as	it	is	expected	to	be	a	high	traffic	area.
06 MAINTENANCE STRATEGY
6 . 2 B U I L D I N G M A I N T E N A N C E
Frequent	maintenance	is	required	in	order	to	ensure	smooth	operation	of	the	building.	Mechanical	system	needs	to	be	monitored regularly	and	public	
spaces	should	be	regularly	cleaned	and	equipment	to	be	replaced	when	necessary.
ELEMENTS FREQUENCY STRATERGY
SERVICES
• Mechanical	ventilation	system
• Water	Pump	system
• Piping	utilities
• Lifts
• Refuse	chamber
• Quarterly
• Monthly
• Annually
• Bi-annually
• Monthly
• To	ensure	mechanical	systems	are	running	smoothly	for	the	comfort	of	the	people.
• To	ensure	the	quality	of	the	water	by	frequently	monitoring	the	water	pump.
• To	ensure	no	defects	or	leakages	are	present.
• To	ensure	smooth	and	safe	operation	of	the	lifts
• To	ensure	the	cleanliness	and	hygiene	of	the	refuse	chamber
BUILDING
• Building fenestration
• Green	wall
• External	walls
• Flooring
• Annually
• Weekly
• Annually
• Daily
• To	ensure the	fenestration	is	well	maintained	and	to	be	replaced	when	necessary
• To	ensure	the	quality	of	the	living	plants	on	the	wall	by	closely	monitoring	it
• To	ensure	the	cleanliness	and	maintenance	of	the		external	walls
• To	ensure	the	cleanliness	of	the	floors	for	the	comfort	of	the	people
07 RISK ANALYSIS
RISK	NAME LIKELI-
HOOD
SEVERITY EFFECT MITIGATION CONTIGENCY
PROJECT	DESIGN	PHASE
Design	proposal	not	
approved	by	client
Medium Medium Constant	amendments	with	the	
proposal will	cause	clients	to	lose	
interest,	and	affect	reputation
Really	take	into	consideration	of
the	clients	requirements	and	
negotiate	when	necessary
Provide	multiple	proposals to	allow	
client	to	have	options
Client is	indecisive	and	
keep	changing	design	
scheme
Medium Medium Constant	amendments	with	the	
proposal will	delay	the	project,	due	
to	the	inability	to	finalize	design	
scheme
Set	a	specific timeframe	on	when	
to	stop	making	amendments	to	
the	design	scheme
Project manager	to	ensure that	the	
client	is	aware	and	is	on	track	of	the	
project	schedule	and	the	current	
progress	of	the	project
Preliminary	drawings	not	
approved	by	authority
Medium High Delay in	project	schedule	due	to	the	
inability	to	proceed	to	construction	
phase
Ensure	that	all	drawings	sent	for	
approval	are	thoroughly	checked	
and fulfill	all	the	requirements	by	
the	authority
Revise	preliminary	drawings	and	
make	amendments	when	necessary	
to comply	with	DBKL	requirements
CONSTRUCTION	PHASE
Delay	in	construction
works	due	to	weather	
conditions
High High Delay in	construction	works	will	
prolong	the	the	time	of	the	
completion	of	the	project,	which	will	
also	affect	the	cost
Apply for	permit	to	prolong	
working	hours	to	compensate	for	
the	rain and	increase	manpower	
when	necessary
Project	manager	to	keep	track	of	
the	project schedule	and	inform	the	
client	if	there	is	a	need	for	an	
extension	of	time
Affect existing	parking	
space	of	Central	market
High High The	entire	existing	parking	space	will	
be	taken	up	by	the	construction	site,
leaving	no	parking	space	for	Central	
Market	visitors.
Give	notification	of	
closure/partial closure	of	parking	
space	prior	to	construction	works	
and provide	alternative	parking	
spots	nearby
Project	manager	to	ensure that	the	
client	is	aware	of	the	notice	and	will	
be	able	to	help	in	dealing	with	
upcoming	issues/problems
Shortage	of	material	due	
to	wastage/improper	
planning
Medium Medium Addition	of	cost	to	cover	up	for	
insufficient	material
Ensure	that	there	are	sufficient	
materials	ready	on	site,	with	
formal	agreement	with	supplier	
to	ensure	the	consistency	of	
material	prices.	
Project	manager	to	regularly	check	
the	inventory	to	ensure	materials	
are	not	being	wasted
7 . 1 R I S K A N A LY S I S & M I T I G A T I O N S T R A T E G Y
07 RISK ANALYSIS
RISK	NAME LIKELI-
HOOD
SEVERITY EFFECT MITIGATION CONTIGENCY
BUILDING	OPERATION	&	MAINTENANCE
Poor	maintenance of	
planting	systems	and	
landscape
Medium High Objective	of	the	program will	fail	and	
it	will	distribute	produce	of	low	
quality
Regularly	maintain	planting	
systems	and	create	a	weekly	
schedule	to	ensure	the	
cleanliness	and	quality	of	space.
Building management	to	closely	
monitor	and	ensure	the	schedule	
created	is	enforced
Openness of	the	building	
may	invite	unwanted	
visitors
High High Security and	privacy	of	users	
inhabiting	the	space	will	be	
threatened
Enforced	a 9am	- 6pm	operation	
hour	and	increase	security	
system	during	closing	hours.	
Building management	to	work	
together	with	the	auxiliary	police	in	
the	area	to	make	regular	rounds.
Program	fails	to	attract	
targeted	visitors
Medium High Building	wont	be	able	to	generate	
enough	income	to	sustain
Actively	reach	out	to	the	public	
and	frequently introduce	new	
programs	to	bring	in	people
Building management	to	analyze	
target	user	groups	and	carefully	
plan	out	proposed	weekly	programs
7 . 1 R I S K A N A LY S I S & M I T I G A T I O N S T R A T E G Y
08 WORK BREAKDOWN STRUCTURE
U R B A N F A R M I N G C E N T E R , K U A L A L U M P U R
CONSTRUCTION	PHASE
POST-
CONSTRUCTION	PHASE
PRELIMINARY
Mobilization
Dilapidation	
Survey
Setting	Out
Site	Levelling
Hoarding	&	
Signboard
FOUNDATION
Soil	Excavation
Piling	of	
foundation
Insertion	of	RC	
footing	
STRUCTURAL
Ground	Floor	to	
Third	Floor
Steel	Beam,	
Columns
Composite	Decking	
Slab	
Staircase
Load	Bearing	Brick	
Wall
Steel	Roofing	
Structure
RC	Lift	Core
Internal	Walls	&	
Partition
Installation	of	Doors	
and	Windows
ROOFING
Gutter	&	
Drainage	
System
M&E	SERVICES
Lift	Installation
Fan	&	Air	
Conditioning
Earthing System
Fusebox
Installation
Telephone	&	
Data	System
Light	Fitting
Lighting	
Protection
CCTV	
Installation
Fire	Protection
BUILDING	
FINISHES
Door	Installation
Window	
Installation
Floor	Finishes
Staircase	
Finishes
Sanitary	Finishes
Wall	Finishes
Ceiling	Finishes
EXTERNAL/
LANDSCAPE
Surface	Water	
Drainage
External	M&E	
Work
Landscape	
Pathway
Landscape	
Vegetation
Turfing
Signage
Miscellaneous
PAHSE	OUT
Final	Cleaning
Inspection	and	
Handing	Over
Issuance	of	CCC
09 GANTT CHART
09 GANTT CHART

More Related Content

What's hot

Affordable Housing in India
Affordable Housing in IndiaAffordable Housing in India
Affordable Housing in India
Siddhi Vakharia
 
Sir Patrick Geddes
Sir Patrick GeddesSir Patrick Geddes
Sir Patrick Geddes
Andhra University
 
EVOLUTION OF SHAH-JAHANABAD
EVOLUTION OF SHAH-JAHANABAD EVOLUTION OF SHAH-JAHANABAD
EVOLUTION OF SHAH-JAHANABAD
sonali parashar
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUP
Keshav Seewraz
 
46721953 magarpatta-city
46721953 magarpatta-city46721953 magarpatta-city
46721953 magarpatta-cityBhairavi Gupta
 
Urban infill
Urban infillUrban infill
Urban infill
Sarkawt Jalal
 
Thee Urban Vision's Placemaking Program
Thee Urban Vision's Placemaking ProgramThee Urban Vision's Placemaking Program
Thee Urban Vision's Placemaking Program
www.theurbanvision.com
 
Waterfront Development Principles
Waterfront Development PrinciplesWaterfront Development Principles
Waterfront Development Principles
Nicholas Socrates
 
Real Estate Investment in India - Pune Township Project
Real Estate Investment in India - Pune Township ProjectReal Estate Investment in India - Pune Township Project
Real Estate Investment in India - Pune Township Project
Venture Advisors
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
Ar. M. Senthil [ senthilmani ]
 
Satellite town planning
Satellite town planningSatellite town planning
Satellite town planning
Anuj Kumar
 
M.Plan First Semester Integrated Brochure - School of Planning and Architecture
M.Plan First Semester Integrated Brochure - School of Planning and ArchitectureM.Plan First Semester Integrated Brochure - School of Planning and Architecture
M.Plan First Semester Integrated Brochure - School of Planning and Architecture
Lakshman R
 
Copenhagen City, Denmark
Copenhagen City, DenmarkCopenhagen City, Denmark
Copenhagen City, Denmark
Andhra University
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
Ho Yen Liang
 
Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...
Tan Jaden
 
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
Tulika Kumar
 
Dissertation-Minimalism in Architecture
Dissertation-Minimalism in ArchitectureDissertation-Minimalism in Architecture
Dissertation-Minimalism in Architecture
Kriti Bafna
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
Angeline KH
 
HOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPERHOUSING & HOUSING POLICY ,HABITAT III PAPER

What's hot (20)

Affordable Housing in India
Affordable Housing in IndiaAffordable Housing in India
Affordable Housing in India
 
Sir Patrick Geddes
Sir Patrick GeddesSir Patrick Geddes
Sir Patrick Geddes
 
EVOLUTION OF SHAH-JAHANABAD
EVOLUTION OF SHAH-JAHANABAD EVOLUTION OF SHAH-JAHANABAD
EVOLUTION OF SHAH-JAHANABAD
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUP
 
46721953 magarpatta-city
46721953 magarpatta-city46721953 magarpatta-city
46721953 magarpatta-city
 
Urban infill
Urban infillUrban infill
Urban infill
 
Thee Urban Vision's Placemaking Program
Thee Urban Vision's Placemaking ProgramThee Urban Vision's Placemaking Program
Thee Urban Vision's Placemaking Program
 
Waterfront Development Principles
Waterfront Development PrinciplesWaterfront Development Principles
Waterfront Development Principles
 
Real Estate Investment in India - Pune Township Project
Real Estate Investment in India - Pune Township ProjectReal Estate Investment in India - Pune Township Project
Real Estate Investment in India - Pune Township Project
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
 
Satellite town planning
Satellite town planningSatellite town planning
Satellite town planning
 
M.Plan First Semester Integrated Brochure - School of Planning and Architecture
M.Plan First Semester Integrated Brochure - School of Planning and ArchitectureM.Plan First Semester Integrated Brochure - School of Planning and Architecture
M.Plan First Semester Integrated Brochure - School of Planning and Architecture
 
Copenhagen City, Denmark
Copenhagen City, DenmarkCopenhagen City, Denmark
Copenhagen City, Denmark
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...
 
Ahmedabad srfdcl
Ahmedabad srfdclAhmedabad srfdcl
Ahmedabad srfdcl
 
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
 
Dissertation-Minimalism in Architecture
Dissertation-Minimalism in ArchitectureDissertation-Minimalism in Architecture
Dissertation-Minimalism in Architecture
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
 
HOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPERHOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPER
 

Similar to PROJECT MANAGEMENT PROJECT 2 REPORT

Project 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized ProjectProject 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized Project
Bryan Yeoh
 
Yihui's pm final
Yihui's pm finalYihui's pm final
Yihui's pm final
Chong Yi Hui
 
Project Management Documentation: Medium-Sized Project
Project Management Documentation: Medium-Sized ProjectProject Management Documentation: Medium-Sized Project
Project Management Documentation: Medium-Sized Project
Joe Onn Lim
 
Sem 6 studio report
Sem  6 studio reportSem  6 studio report
Sem 6 studio report
Chong Chin Pin
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
zerospaces_
 
Project management (3)
Project management (3)Project management (3)
Project management (3)
Benjamin Tan
 
Project management
Project management Project management
Project management
Jing Fan Koh
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
Carmen Chan
 
Project management report document a medium size project.
Project management report document a medium size project. Project management report document a medium size project.
Project management report document a medium size project.
Weng Chuan
 
Project 2: Documentation of a Medium-Sized Project
Project 2: Documentation of a Medium-Sized ProjectProject 2: Documentation of a Medium-Sized Project
Project 2: Documentation of a Medium-Sized Project
kimberleyee95
 
Project 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECT
Project 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECTProject 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECT
Project 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECT
Ken Wong
 
Final
FinalFinal
Final
kerneng
 
Project Management
Project Management Project Management
Project Management
jernjack
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)
AwZhiXuan
 
Canal Oriented Development Concept as a tool for Canal: A case of Ugat canal,...
Canal Oriented Development Concept as a tool for Canal: A case of Ugat canal,...Canal Oriented Development Concept as a tool for Canal: A case of Ugat canal,...
Canal Oriented Development Concept as a tool for Canal: A case of Ugat canal,...
IRJET Journal
 
Project management final - KSHV SZ
Project management final - KSHV SZProject management final - KSHV SZ
Project management final - KSHV SZ
Keshav Seewraz
 
Pm assignment-2-report
Pm assignment-2-reportPm assignment-2-report
Pm assignment-2-report
Chong Yu Xuan
 
project management
project managementproject management
project management
WC Yan
 
Project management
Project managementProject management
Project management
kimberlywjs
 
Urban renewal
Urban renewalUrban renewal
Urban renewal
Julia ariffin
 

Similar to PROJECT MANAGEMENT PROJECT 2 REPORT (20)

Project 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized ProjectProject 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized Project
 
Yihui's pm final
Yihui's pm finalYihui's pm final
Yihui's pm final
 
Project Management Documentation: Medium-Sized Project
Project Management Documentation: Medium-Sized ProjectProject Management Documentation: Medium-Sized Project
Project Management Documentation: Medium-Sized Project
 
Sem 6 studio report
Sem  6 studio reportSem  6 studio report
Sem 6 studio report
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
 
Project management (3)
Project management (3)Project management (3)
Project management (3)
 
Project management
Project management Project management
Project management
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
 
Project management report document a medium size project.
Project management report document a medium size project. Project management report document a medium size project.
Project management report document a medium size project.
 
Project 2: Documentation of a Medium-Sized Project
Project 2: Documentation of a Medium-Sized ProjectProject 2: Documentation of a Medium-Sized Project
Project 2: Documentation of a Medium-Sized Project
 
Project 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECT
Project 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECTProject 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECT
Project 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECT
 
Final
FinalFinal
Final
 
Project Management
Project Management Project Management
Project Management
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)
 
Canal Oriented Development Concept as a tool for Canal: A case of Ugat canal,...
Canal Oriented Development Concept as a tool for Canal: A case of Ugat canal,...Canal Oriented Development Concept as a tool for Canal: A case of Ugat canal,...
Canal Oriented Development Concept as a tool for Canal: A case of Ugat canal,...
 
Project management final - KSHV SZ
Project management final - KSHV SZProject management final - KSHV SZ
Project management final - KSHV SZ
 
Pm assignment-2-report
Pm assignment-2-reportPm assignment-2-report
Pm assignment-2-report
 
project management
project managementproject management
project management
 
Project management
Project managementProject management
Project management
 
Urban renewal
Urban renewalUrban renewal
Urban renewal
 

More from Adibah Awang

ARCHITECTURE DESIGN PROJECT SITE ANALYSIS
ARCHITECTURE DESIGN PROJECT SITE ANALYSISARCHITECTURE DESIGN PROJECT SITE ANALYSIS
ARCHITECTURE DESIGN PROJECT SITE ANALYSIS
Adibah Awang
 
ARCHITECTURE DESIGN REPORT SEM 6
ARCHITECTURE DESIGN REPORT SEM 6ARCHITECTURE DESIGN REPORT SEM 6
ARCHITECTURE DESIGN REPORT SEM 6
Adibah Awang
 
Theories of Architecture & Urbanism : Synopsis 1
Theories of Architecture & Urbanism : Synopsis 1Theories of Architecture & Urbanism : Synopsis 1
Theories of Architecture & Urbanism : Synopsis 1
Adibah Awang
 
Theories of Architecture & Urbanism : Synopsis 2
Theories of Architecture & Urbanism : Synopsis 2Theories of Architecture & Urbanism : Synopsis 2
Theories of Architecture & Urbanism : Synopsis 2
Adibah Awang
 
Theories of Urbanism Project 3 : Comparative Analysis
Theories of Urbanism Project 3 : Comparative AnalysisTheories of Urbanism Project 3 : Comparative Analysis
Theories of Urbanism Project 3 : Comparative Analysis
Adibah Awang
 
In Adaptation Project 2 : Observing the Everyday
In Adaptation Project 2 : Observing the EverydayIn Adaptation Project 2 : Observing the Everyday
In Adaptation Project 2 : Observing the Everyday
Adibah Awang
 
Building Science 2 Project 2 : Integration
Building Science 2 Project 2 : Integration Building Science 2 Project 2 : Integration
Building Science 2 Project 2 : Integration
Adibah Awang
 
Building Science Project 1 : Lighting & Acoustic Performance Evaluation & Design
Building Science Project 1 : Lighting & Acoustic Performance Evaluation & DesignBuilding Science Project 1 : Lighting & Acoustic Performance Evaluation & Design
Building Science Project 1 : Lighting & Acoustic Performance Evaluation & Design
Adibah Awang
 
Building Services : Subang Parade
Building Services : Subang ParadeBuilding Services : Subang Parade
Building Services : Subang Parade
Adibah Awang
 
Case Study Paper : Lantern Hotel
Case Study Paper : Lantern HotelCase Study Paper : Lantern Hotel
Case Study Paper : Lantern Hotel
Adibah Awang
 
Methods of Documentation and Measured Drawings
Methods of Documentation and Measured DrawingsMethods of Documentation and Measured Drawings
Methods of Documentation and Measured Drawings
Adibah Awang
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 Report
Adibah Awang
 
Building Construction - Foundation
Building Construction - FoundationBuilding Construction - Foundation
Building Construction - Foundation
Adibah Awang
 
Villa Mairea
Villa MaireaVilla Mairea
Villa Mairea
Adibah Awang
 
ESD Reflective Essay
ESD Reflective EssayESD Reflective Essay
ESD Reflective EssayAdibah Awang
 
STUDIO 2A : SITE ANALYSIS
STUDIO 2A : SITE ANALYSISSTUDIO 2A : SITE ANALYSIS
STUDIO 2A : SITE ANALYSIS
Adibah Awang
 
business class assignment
business class assignmentbusiness class assignment
business class assignmentAdibah Awang
 
business plan assignment
business plan assignment business plan assignment
business plan assignment Adibah Awang
 
Kingdom of heaven report
Kingdom of heaven reportKingdom of heaven report
Kingdom of heaven reportAdibah Awang
 

More from Adibah Awang (20)

ARCHITECTURE DESIGN PROJECT SITE ANALYSIS
ARCHITECTURE DESIGN PROJECT SITE ANALYSISARCHITECTURE DESIGN PROJECT SITE ANALYSIS
ARCHITECTURE DESIGN PROJECT SITE ANALYSIS
 
ARCHITECTURE DESIGN REPORT SEM 6
ARCHITECTURE DESIGN REPORT SEM 6ARCHITECTURE DESIGN REPORT SEM 6
ARCHITECTURE DESIGN REPORT SEM 6
 
Theories of Architecture & Urbanism : Synopsis 1
Theories of Architecture & Urbanism : Synopsis 1Theories of Architecture & Urbanism : Synopsis 1
Theories of Architecture & Urbanism : Synopsis 1
 
Theories of Architecture & Urbanism : Synopsis 2
Theories of Architecture & Urbanism : Synopsis 2Theories of Architecture & Urbanism : Synopsis 2
Theories of Architecture & Urbanism : Synopsis 2
 
Theories of Urbanism Project 3 : Comparative Analysis
Theories of Urbanism Project 3 : Comparative AnalysisTheories of Urbanism Project 3 : Comparative Analysis
Theories of Urbanism Project 3 : Comparative Analysis
 
In Adaptation Project 2 : Observing the Everyday
In Adaptation Project 2 : Observing the EverydayIn Adaptation Project 2 : Observing the Everyday
In Adaptation Project 2 : Observing the Everyday
 
Building Science 2 Project 2 : Integration
Building Science 2 Project 2 : Integration Building Science 2 Project 2 : Integration
Building Science 2 Project 2 : Integration
 
Building Science Project 1 : Lighting & Acoustic Performance Evaluation & Design
Building Science Project 1 : Lighting & Acoustic Performance Evaluation & DesignBuilding Science Project 1 : Lighting & Acoustic Performance Evaluation & Design
Building Science Project 1 : Lighting & Acoustic Performance Evaluation & Design
 
Building Services : Subang Parade
Building Services : Subang ParadeBuilding Services : Subang Parade
Building Services : Subang Parade
 
Case Study Paper : Lantern Hotel
Case Study Paper : Lantern HotelCase Study Paper : Lantern Hotel
Case Study Paper : Lantern Hotel
 
Methods of Documentation and Measured Drawings
Methods of Documentation and Measured DrawingsMethods of Documentation and Measured Drawings
Methods of Documentation and Measured Drawings
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 Report
 
Building Construction - Foundation
Building Construction - FoundationBuilding Construction - Foundation
Building Construction - Foundation
 
Villa Mairea
Villa MaireaVilla Mairea
Villa Mairea
 
ESD Reflective Essay
ESD Reflective EssayESD Reflective Essay
ESD Reflective Essay
 
STUDIO 2A : SITE ANALYSIS
STUDIO 2A : SITE ANALYSISSTUDIO 2A : SITE ANALYSIS
STUDIO 2A : SITE ANALYSIS
 
business class assignment
business class assignmentbusiness class assignment
business class assignment
 
business plan assignment
business plan assignment business plan assignment
business plan assignment
 
Kingdom of heaven report
Kingdom of heaven reportKingdom of heaven report
Kingdom of heaven report
 
Eng
EngEng
Eng
 

Recently uploaded

Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 

Recently uploaded (20)

Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 

PROJECT MANAGEMENT PROJECT 2 REPORT

  • 1. PROJECT MANAGEMENT REPORT (MGT 60403/ ARC 3612/ ARC 3614) NAME : ADIBAH BAHIAH AWANG ID : 0316318 TUTOR : MS ALIA AHAMAD DATE : JULY 2017 Marks for 3 component : 1. ______/10 2.______/10 3.______/10 TOTAL : ______/30 PROJECT : PROPOSED URBAN FARMING CENTER, ON PASAR SENI PARKING LOT, JALAN HANG KASTURI, KUALA LUMPUR.
  • 3. 01 INTRODUCTION The design brief calls for a proposal of an Urban Farming Center, along Jalan Tun Tan Cheng Lock, in Kuala Lumpur. The site is located right next to Central Market- hence the aim of the design is to build an extension of the building, which was originally a wet market, in hopes of reactivating the space by pulling in local communities to run the center. The project also aims to reshape the city, in hopes of reducing the heat island effect, as well as changing lives by introducing small scale farms to reduce carbon footprint and change the unsustainable lifestyle of the local people. It will also apply the hydroponic planting system, which utilizes water from the river and discharges clean water back into it. The main program of the building should consist of urban farms and a marketspace that distributes its produce to the community. Supplementary programs include a farm to table themed restaurant, as well as offices and a workshop for visitors. Basic requirements from the client ; • Openness and transparency, to allow the activities within the building to reach out to the public • Visual permeability and walkability to Central Market not disrupted. • Lightweight structure, and open plan concept • Smooth accessibility and circulation between farms and distribution centers • Replace existing plaza from the site to allow public activities to take place. • Connectivity to the Klang River • 20-30 parking spaces for visitors 1 . 1 P R O J E C T I N T R O D U C T I O N 1 . 2 C L I E N T The Kha Seng Group Sdn Bhd is a privately owned conglomerate of companies that has acquired a few notable properties in the area of Kuala Lumpur. They began venturing into property development when they first acquired the Central Market building in 2004 – which completely transformed the fate of the world heritage site. The biggest impact of the acquisition is the transformation of the building into a world renowned tourist attraction and shopping destination, without compromising the original purpose of the building, which was to hold the nations art, culture and heritage.
  • 4. 02 PROPOSED PROGRAMME The over commercialization and development of the area results in the loss of sense of space. The over-reliance on tourism therefore makes it almost irrelevant to the local people. What was once a market that served the people are now not even being used by the local community. The lack of greenery in the area also creates an issue of comfort and walkability. The loss of sense of space also stems from the decreasing number of locals in the city. The absence of the local community results to the lack of attachment to the city, therefore creating more of a visitor center, rather than a livable city. The idea is to bring in farms into the city in order to create a more self sustaining/liveable city. It acts as a center for the production and distribution of local fruits and vegetables, and an education platform for the future generation. The introduction of urban farming into the city also creates a sense of awareness in sustaining the environment. The major role of the center is to also educate visitors, locals, tourists and especially children the importance of leading a sustainable lifestyle in order to ensure the future of the city. 2 . 1 U R B A N F A R M I N G C E N T E R 2 . 2 O B J E C T I V E • To revamp the area of Central Market and reinstill the sense of belonging in the area. • To expand the role of Central Market by introducing new programs which is both interactive and educational to attract people to the area. • To provide a public space that further encourages interaction between communities. • To transform Central Market into a one stop center that meets the peoples needs.
  • 5. 03 SITE INTRODUCTION The proposed site is located directly in front of Central Market, which is currently an open air carpark, approximately 3852 sqm after setback. The Klang River flows on the west of the site which then overlook high rise buildings such as Daya Bumi and an upcoming City Point. The traffic along Jalan Tun Tan Cheng Lock is exceptionally busy during peak hours and is even more congested sue to on going construction activities. The area also has a high percentage of pedestrians travelling from the Pasar Seni LRT station to nearby attractions such as Petaling Street, Pudu and Dataran Merdeka. 3 . 1 C E N T R A L M A R K E T, K U A L A L U M P U R 3 . 2 S W O T A N A LY S I S WEAKNESS • Located right in front of Central Market which may potentially block its frontage. • LRT lines blocking connectivity to the river • Highly congested traffic STRENGTH • Highly accessible by all modes of transportation • Strategically located along a prominent road that is highly visible to public • Good vantage point to other parts of Kuala Lumpur OPPORTUNITIES • Potentially create a proper connection from Central Market to the Klang River • Introduction of green spaces that acts a stopping point/major node THREATS • Numerous on going construction may disrupt the comfort of users on site • River are prone to flooding, flood prevention methods to be considered
  • 6. 03 SITE INTRODUCTION 3 . 3 P E S T L E A N A LY S I S ECONOMICAL The main source of income of Central Market mainly depends on the tourists that visits the area, as it has less attachment t the local community. Located on a prime site, rental rates have sky rocketed due to the increasing value of the site. Over dependency on tourism may eventually hamper the development of Central Market as it is not being supported by the local people. POLITICAL Uncoordinated development in the area that is not properly monitored by the government is a major issue that affects the quality of space in general. Authorities such as DBKL, and companies like AECOM, ROL, PEMANDU and Think City are not working hand in hand in carrying out future developments of the area. SOCIOLOGICAL The area is made up of a very diverse community. Locals, tourists, foreign workers are all congesting the area with very little control. With high traffic also comes problems pertaining social issues and security. TECHNOLOGY The use of technology is of utmost importance in developing the area further. Technological advancement is needed to clean and utilize the river properly. ENVIRONMENTAL Pollution of the river is one of the biggest issue faced by the city. The lack of awareness of the people and the increase in construction works in the area is also contributing to a lot of existing environmental problems. LEGAL Besides the basic regulations set out by DBKL, new regulations are also being imposed in parallel with the River of Life project. Standardization of signage, pathway finishes and building façade are some of the requirements that should be taken into consideration.
  • 7. 04 PROGRAMME VIABILITY 4 . 1 P R O J E C T O B E C T I V E S • To ensure the quality of the project and fulfil the clients brief • To ensure smooth management of the project • To reduce the risks of the project throughout the given timeframe • To ensure the project will be delivered on time, within given budget and of the best quality 4 . 2 P R O J E C T G O A L S • To aid client in ensuring smooth management of the project, with established and highly experienced team members. • To ensure the consistency of the operation of the proposed building, with consistent production and distribution of fruits and vegetables to the public • To encourage the community to adopt a healthier lifestyle through education that takes place within the program proposed and further impact the food industry of the nation. 4 . 3 S U C C E S S C R I T E R I A QUALITY The final product should meet the requirement of the client, but at the same time do not compromise the architecture values of the building. It should also be completed within the timeframe and budget allocated without compromising it’s quality. Due to the sensitivity of the program in dealing with plants and living beings, it is crucial to observe and control the quality of the building materials to ensure the success of the program upon completion of the project. TIME The time frame given for the project is within a period of 16 months, from 1st of May 2017 to 9th of September 2018. The given time is sufficient as the proposed project utilizes prefabricated structures and materials. The entire project will be executed according to the work breakdown structure and Gantt chart laid out to ease and ensure smooth flow of the project. COST The budget allocated for the proposed project is RM5 million, fully funded by Kha Seng Group Sdn Bhd. It encompasses pre construction costs, construction costs and building operation and maintenance. Locally sourced materials are an important element to ensure that the project effective. Besides that, the implementation of natural design strategies are also used to reduce the cost of building operation in the future.
  • 8. 04 PROGRAMME VIABILITY 4 . 4 S T A K E H O L D E R S DEWAN BANDARAYA KUALA LUMPUR The Kuala Lumpur City Hall is the city council that administers the city of Kuala Lumpur. It ensures the the development of the city which covers aspects relating to cleanliness, public transportation, city beutification, public housings, public amenities, legislations, etc. THINK CITY Think City is a wholly-owned subsidiary of Khazanah Nasional Berhad. It works closely with local governments, international agencies and various local communities, building effective partnerships and enhancing capacity along the way. RIVER OF LIFE The River of Life Public Outreach Programme (ROL-POP) is a programme to foster partnerships and to improve attitudes and behaviours of target groups to reduce pollution in the Klang River, Malaysia. The main objective of ROL-POP is towards river care and preservation in order to improve water quality and reduce pollution within the project area KHA SENG GROUP (CENTRAL MARKET) a privately owned conglomerate of companies that has acquired a few notable properties in the area of Kuala Lumpur. They began venturing into property development when they first acquired the Central Market building in 2004 – which completely transformed the fate of the world heritage site. LOCAL COMMUNITY The local community in the area merely pass through Central Market to get to other areas and has very little attachment to the existing site. TOURIST COMMUNITY The site highly depends on the tourist community to ensure generation of profit. VENDORS/STALL OWNERS The stalls parked outside of Central Market attracts a significant number of visitors from the building and in the area. TAXI The taxi point outside of Central Market is a prominent feature as their main target users are mostly tourists.
  • 9. 05 DESIGN STRATEGY 5 . 1 K E Y F E A T U R E S PUBLIC REALMS One of the main aim of the building is to also expand its architecture the public realm. The building was elevated to free up the ground space in order to give back to the community. Plazas were also inserted to reach out to its surrounding areas of Kasturi Walk and the river of Life. Open floor plan systems are adopted to give a sense of transparency to the building, allowing users to freely explore the spaces. GREEN SPACES The entire building functions as a huge plot of green space that is lacking in the city. The introduction of farms and green spaces will reduce the heat island effect of the city and naturally cool down the area. A public park on the ground floor allow users to gather and socialize while still being educated about the purpose of the building and the importance of farming. LIGHTWEIGHT STRUCTURE The absence of solid walls allows visual permeability to Central Market. The lightweight structure of the building also poses an inviting feeling to visitors and allows the activities inside to be seen to public on the streets. Green spaces utilized to cool down the building Farms orientated to maximize sun exposure Loose floor plan encourages cross ventilation Water recycling system from Klang River
  • 10. 05 DESIGN STRATEGY 5 . 2 S P A T I A L P R O G R A M M I N G The programs are separated vertically according to its function and user groups. The privacy of the building increasing as it progresses upwards, however the transparency of the building remains the same. The ground floor intends to serve the public, as an open park that can be used by passersby in the area. The first floor opens up to a commercial space, consisting of markets and an organic restaurant. The second floor consists of management and handles the operational aspects of the building. Finally, the top most floor acts as the core of the building, which holds a majority of the farms, overlooking the public activities below. FIRST FLOOR, NTS SECOND FLOOR, NTS THIRD FLOOR, NTS
  • 11. 06 MAINTENANCE STRATEGY 6 . 1 P R O G R A M M E M A I N T E N A N C E ELEMENTS FREQUENCY STRATERGY FARMS • Farming structures • Farming equipment • Tools and machinery • Living plants • Quarterly • Monthly • Quarterly • Daily • To ensure farming structures are durable and safe to be used • To ensure farming equipment are safe to be used and to be replaced when necessary. • To ensure tools and machinery are well functioning and safe to be used • To ensure the quality of produce by closely monitoring the quality of plants. MANAGEMENT • Office equipment • Furniture • Quarterly • Annually • To ensure equipment such as computers and printers are well maintained. • To ensure furniture are of good condition and are comfortable to be used. RESTAURANT • Kitchen equipment • Tools and machinery • Furniture • Quarterly • Quarterly • Annually • To ensure equipment such as computers and printers are well maintained. • To ensure tools and machinery in the kitchen are safe to be used • To ensure furniture are of good condition and are comfortable to be used. MARKET • Stalls • Market equipment • Daily • Monthly • To ensure the cleanliness of the stalls for the comfort of the user • To ensure equipment such as trolleys and storage boxes are well maintained and safe to be used. PARK • Planter box • Pavement/walkway • Pond • Benches/seating areas • Living Plants • Monthly • Weekly • Weekly • Annually • Daily • To ensure planter box are still usable and are to be replaced if damaged • To ensure the cleanliness of the pavements and the walkway • To ensure the cleanliness of the pond by having weekly clean ups • To ensure park equipment are safe to be used by the public • To ensure the quality of the plants by monitoring the daily The main program of the building consists of vegetable farms, which needs proper care and maintenance to ensure the quality of its produce. Other major spaces such as markets and communal dining needs frequent maintenance as it is expected to be a high traffic area.
  • 12. 06 MAINTENANCE STRATEGY 6 . 2 B U I L D I N G M A I N T E N A N C E Frequent maintenance is required in order to ensure smooth operation of the building. Mechanical system needs to be monitored regularly and public spaces should be regularly cleaned and equipment to be replaced when necessary. ELEMENTS FREQUENCY STRATERGY SERVICES • Mechanical ventilation system • Water Pump system • Piping utilities • Lifts • Refuse chamber • Quarterly • Monthly • Annually • Bi-annually • Monthly • To ensure mechanical systems are running smoothly for the comfort of the people. • To ensure the quality of the water by frequently monitoring the water pump. • To ensure no defects or leakages are present. • To ensure smooth and safe operation of the lifts • To ensure the cleanliness and hygiene of the refuse chamber BUILDING • Building fenestration • Green wall • External walls • Flooring • Annually • Weekly • Annually • Daily • To ensure the fenestration is well maintained and to be replaced when necessary • To ensure the quality of the living plants on the wall by closely monitoring it • To ensure the cleanliness and maintenance of the external walls • To ensure the cleanliness of the floors for the comfort of the people
  • 13. 07 RISK ANALYSIS RISK NAME LIKELI- HOOD SEVERITY EFFECT MITIGATION CONTIGENCY PROJECT DESIGN PHASE Design proposal not approved by client Medium Medium Constant amendments with the proposal will cause clients to lose interest, and affect reputation Really take into consideration of the clients requirements and negotiate when necessary Provide multiple proposals to allow client to have options Client is indecisive and keep changing design scheme Medium Medium Constant amendments with the proposal will delay the project, due to the inability to finalize design scheme Set a specific timeframe on when to stop making amendments to the design scheme Project manager to ensure that the client is aware and is on track of the project schedule and the current progress of the project Preliminary drawings not approved by authority Medium High Delay in project schedule due to the inability to proceed to construction phase Ensure that all drawings sent for approval are thoroughly checked and fulfill all the requirements by the authority Revise preliminary drawings and make amendments when necessary to comply with DBKL requirements CONSTRUCTION PHASE Delay in construction works due to weather conditions High High Delay in construction works will prolong the the time of the completion of the project, which will also affect the cost Apply for permit to prolong working hours to compensate for the rain and increase manpower when necessary Project manager to keep track of the project schedule and inform the client if there is a need for an extension of time Affect existing parking space of Central market High High The entire existing parking space will be taken up by the construction site, leaving no parking space for Central Market visitors. Give notification of closure/partial closure of parking space prior to construction works and provide alternative parking spots nearby Project manager to ensure that the client is aware of the notice and will be able to help in dealing with upcoming issues/problems Shortage of material due to wastage/improper planning Medium Medium Addition of cost to cover up for insufficient material Ensure that there are sufficient materials ready on site, with formal agreement with supplier to ensure the consistency of material prices. Project manager to regularly check the inventory to ensure materials are not being wasted 7 . 1 R I S K A N A LY S I S & M I T I G A T I O N S T R A T E G Y
  • 14. 07 RISK ANALYSIS RISK NAME LIKELI- HOOD SEVERITY EFFECT MITIGATION CONTIGENCY BUILDING OPERATION & MAINTENANCE Poor maintenance of planting systems and landscape Medium High Objective of the program will fail and it will distribute produce of low quality Regularly maintain planting systems and create a weekly schedule to ensure the cleanliness and quality of space. Building management to closely monitor and ensure the schedule created is enforced Openness of the building may invite unwanted visitors High High Security and privacy of users inhabiting the space will be threatened Enforced a 9am - 6pm operation hour and increase security system during closing hours. Building management to work together with the auxiliary police in the area to make regular rounds. Program fails to attract targeted visitors Medium High Building wont be able to generate enough income to sustain Actively reach out to the public and frequently introduce new programs to bring in people Building management to analyze target user groups and carefully plan out proposed weekly programs 7 . 1 R I S K A N A LY S I S & M I T I G A T I O N S T R A T E G Y
  • 15. 08 WORK BREAKDOWN STRUCTURE U R B A N F A R M I N G C E N T E R , K U A L A L U M P U R CONSTRUCTION PHASE POST- CONSTRUCTION PHASE PRELIMINARY Mobilization Dilapidation Survey Setting Out Site Levelling Hoarding & Signboard FOUNDATION Soil Excavation Piling of foundation Insertion of RC footing STRUCTURAL Ground Floor to Third Floor Steel Beam, Columns Composite Decking Slab Staircase Load Bearing Brick Wall Steel Roofing Structure RC Lift Core Internal Walls & Partition Installation of Doors and Windows ROOFING Gutter & Drainage System M&E SERVICES Lift Installation Fan & Air Conditioning Earthing System Fusebox Installation Telephone & Data System Light Fitting Lighting Protection CCTV Installation Fire Protection BUILDING FINISHES Door Installation Window Installation Floor Finishes Staircase Finishes Sanitary Finishes Wall Finishes Ceiling Finishes EXTERNAL/ LANDSCAPE Surface Water Drainage External M&E Work Landscape Pathway Landscape Vegetation Turfing Signage Miscellaneous PAHSE OUT Final Cleaning Inspection and Handing Over Issuance of CCC