  1. 1. Sabarmati River Front Development Project Sabarmati Riverfront Development Corporation Ltd, Ahmedabad Ahmedabad Municipal Corporation
  2. 2. Sabarmati has been an integral part in the life of Ahmedabad… •It is an important source of water for the city •A space for cultural and recreational activities
  3. 3. Project Objectives 1.Reconnect the city to the river 2.Create a conducive urban environment 3.Create an identity for the city
  4. 4. Key aspects of the Project 1. Overall environmental improvement 2. Creating high quality public open spaces 3. Providing adequate public access to the river 4. Rehabilitating the slums 5. Creating vibrant urban neighborhoods 6. Providing city level infrastructure
  5. 5. SPV to Execute Sabarmati River Front Development • Ahmedabad Municipal Corporation (AMC) constituted a SPV in 1997 Sabarmati River Front Development Corporation Ltd (SRFDCL) a Company under the Companies Act. • Chairman: Municipal Commissioner • Board of Directors : – Mayor, Chairman Standing Committee, Leader Opposition (AMC), Technical Experts, Collector- Ahmedabad, ED HUDCO, Deputy Commissioner-AMC
  6. 6. Financing of the PROJECT • Estimated Cost (2005 price) Phase-1= Rs. 824.24 cr. (under construction) Phase-2 = Rs. 462.93 cr. • Equity of AMC = Rs. 75 cr. • Loan from HUDCO = Rs. 550 cr. • Loan tenure 3 yr moratorium + 8 years • Loan servicing being done by AMC • Source of Revenue: 20% of the reclaimed land to be allotted for commercial development
  7. 7. Project area 10.5 kms stretch Railway Bridge Vasna Barrage The area is delineated based on • Current extents of the city • Future potentials of the area
  8. 8. Study of Sabarmati River Basin ☺ ☺ ☺ ☺ DATUM DATUM RLINMETERS E2-41.621 E3-42.390 E4-41.439 E1-43.28 E9-39.783 E8-40.338 E5-40.715 E11-39.525 E10-40.963 E6-42.900 E7-42.735 Analysis •Hydrology review of the Sabarmati river catchments Study of river hydraulics by NIH Roorkie, IIT Roorkie, M/s. CC Patel Associates
  9. 9. ☺ 0 0 123456789101112131416 15 1 2 3 4 5 6 7 8 9 10 ☺ 100 - 120m 100 - 120m275m 30m 30m275m •Water retention study •Optimal width of water is 275 mts Analysis
  10. 10. Construction Work • Diaphragm wall, Anchor slab & Ghaats • Earthfilling • Retaining wall • Diversion of Sewer
  11. 11. Sardar Bridge to Vasna Barrage (West)7 U/s Of Subhash Bridge to AEC in West & Cantonment in East9 & 10 Gandhi Bridge to Ellis Bridge- East4 Ellis Bridge to Sardar Bridge- East & West5 & 6 Sardar Bridge to Vasna Barrage (East)8 Dudheshwar to Gandhi Bridge- East3 Subhash Bridge to Gandhi Bridge -West2 Gandhi Bridge to Ellis Bridge – West1 LocationStretch
  12. 12. Aerial view after proposed construction of Level-1
  13. 13. Infrastructure Main trunk sewer Provision of an integrated storm water and sewage drainage system • Diversion of sewers connecting all sewage outfalls •A main trunk sewer connecting all such outfalls to the STP •Pumping stations at regular intervals Pumping station To Sewage treatment plant West bank East Bank
  14. 14. Based on Hydrological Study by NIH Roorkie and IIT Roorkie the clearance height of bridges will be increased by 1 mtr.
  15. 15. •Bring back focus to the centre city •Reconnect the city to the river The riverfront holds great potential…
  16. 16. Public access to the riverfront Establishing and strengthening accessibility to and along the riverfront •Improved pedestrian and bicycle circulation •New transportation systems along the river •Opening up visual vistas West bank East Bank East River street
  17. 17. Slum rehabilitation and informal activities Rehabilitation of Sunday Market New rehabilitation housing New rehabilitation housing Informal market New rehabilitation housing Informal market Accommodating the project affected section in the overall plan •Reorganizing the existing informal markets and creating new opportunities along the river •Provide new housing as a part of slum rehabilitation West bank East Bank
  18. 18. New urban neighborhoods Creating opportunities for new developments by integrating with the existing •Creating a business district •Commercial / Retail •Residential West bank East Bank Commercial Business district Residential Residential Commercial
  19. 19. River Promenade 11 meter wide pedestrian lower promenade
  20. 20. 6 meter wide pedestrian lower promenade 15 meter wide upper promenade River Promenade
  21. 21. View of Lower promenade
  22. 22. View of public park
  23. 23. Sabarmati River FrontSabarmati River Front DevelopmentDevelopment •• Progress of ExecutionProgress of Execution
  24. 24. DIAPHRAGM WALL & ANCHOR SLAB U/s of Subhash Bridge (East & West) Sardar Bridge to Vasna Barrage (East) Sardar Bridge to Vasna Barrage (West) Ellis Bridge to Sardar Bridge (E & W) Gandhi Bridge to Ellis Bridge (East) Dudheshwar to Gandhi Bridge (East) Subhash Bridge to Gandhi Bridge (West) Gandhi Bridge to Ellis Bridge (West) Location in progress Started Started @ completion @ completion @ completion @ completion @ completion Status 8 9 & 10 7 5 & 6 4 3 2 1 Stretch
  25. 25. DIAPHRAGM WALL & ANCHOR SLAB Stretch 1 - Gandhi Bridge to Ellis Bridge (West) • Agency : ITD Cementation India Limited • Project Cost: Rs. 22.95 crores • Start Date: 07/02/2005 100.001797RMTAnchor Slab 100.002065RMTDiaphragm wall 88.88665000CMTEarth filling % work doneQuantityUnitDescription
  26. 26. DIAPHRAGM WALL & ANCHOR SLAB Stretch 2 – Subhash Bridge to Gandhi Bridge (West) • Agency : ITD Cementation India Limited • Project Cost: Rs. 25 crores • Start Date: 07/02/2005 100.002648RMTAnchor Slab 100.003029RMTDiaphragm wall 97.12280000CMTEarth filling % work doneQuantityUnitDescription
  27. 27. DIAPHRAGM WALL & ANCHOR SLAB Stretch 3 – Dudheshwar to Gandhi Bridge (East) • Agency : Gammon India Limited • Project Cost: Rs. 20.16 crores • Start Date: 07/04/2005 100.001968RMTAnchor Slab 100.002176RMTDiaphragm wall 89.92200000CMTEarth filling % work doneQuantityUnitDescription
  28. 28. DIAPHRAGM WALL & ANCHOR SLAB Stretch 4 –Gandhi Bridge to Ellis Bridge (East) • Agency : Gammon India Limited • Project Cost: Rs. 20.60 crores • Start Date: 07/04/2005 100.001724RMTAnchor Slab 100.001974RMTDiaphragm wall 80.20200000CMTEarth filling % work doneQuantityUnitDescription
  29. 29. DIAPHRAGM WALL & ANCHOR SLAB Stretch 5 & 6 –Ellis Bridge to Sardar Bridge (East & West) • Agency : ITD Cementation India Limited • Project Cost: Rs. 33.18 crores • Start Date: 07/02/2006 97.602248RMTAnchor Slab 100.002525RMTDiaphragm wall 86.45947000CMTEarth filling % work doneQuantityUnitDescription
  30. 30. DIAPHRAGM WALL & ANCHOR SLAB Stretch 7 - Sardar Bridge to Vasna Barrage (West) • Agency : ITD Cementation India Limited • Project Cost: Rs. 45.06 crores • Start Date: 28/05/2007 0.003000RMTAnchor Slab 23.203000RMTDiaphragm wall 57.63495362CMTEarth filling % work doneQuantityUnitDescription
  31. 31. DIAPHRAGM WALL & ANCHOR SLAB Stretch 8 Sardar Bridge to Vasna Barrage (East) • Agency : ITD Cementation India Limited • Project Cost: Rs. 42.27 crores • Start Date: 28/05/2007 0.003000RMTAnchor Slab 3.203000RMTDiaphragm wall 28.85424352CMTEarth filling % work doneQuantityUnitDescription
  32. 32. DIVERSION OF SEWER RAILWAY BRIDGE TO ELLIS BRIDGE (WEST) • Agency : Alcock Cement Pipes & Concrete Works • Project Cost: Rs. 5.65 crores • Start Date: 15/01/2006 67.456375RMTLaying of Pipeline % work doneQuantityUnitDescription
  33. 33. DIVERSION OF SEWER RAILWAY BRIDGE TO ELLIS BRIDGE (EAST) • Agency : Ramky Infrastructure Limited • Project Cost: Rs. 8.22 crores • Start Date: 15/04/2006 40.986100RMTLaying of Pipeline % work doneQuantityUnitDescription
  34. 34. DIVERSION OF SEWER ELLIS BRIDGE TO SARDAR BRIDGE (EAST & WEST) • Agency : Alcock Cement Pipes & Concrete Works • Project Cost: Rs. 6.08 crores • Start Date: 01/03/2007 37.152530RMTLaying of Pipeline % work doneQuantityUnitDescription
  35. 35. Thank you Sabarmati Riverfront Development Corporation Ltd. Ahmedabad

×