Project Management Institute, Inc. (PMI) defines project management as "the application of knowledge, skills, tools and techniques to a broad range of activities in order to meet the requirements of a particular project." The process of directing and controlling a project from start to finish may be further divided into 5 basic phases:
project management, documenting architect This involves the documentation of your Studio Vl Architectural Design Project, to apply the principles learned in
Assignment 1 to your final project. Students from Design Studio lV or V will use their design in Studio lV or V for
the study Your task is to document your own Design Studio Project from the point of view of an Architect, commissioned to
undertake this project.
project management, documenting architect This involves the documentation of your Studio Vl Architectural Design Project, to apply the principles learned in
Assignment 1 to your final project. Students from Design Studio lV or V will use their design in Studio lV or V for
the study Your task is to document your own Design Studio Project from the point of view of an Architect, commissioned to
undertake this project.
The webinar covers:
• Why ISO 21500?
• What is PRINCE2 and the New Agile version of it.
• What are the advantages and value of each of the above?
• How do they both complement each other?
Presenter:
This webinar was presented by Orlando Odejide. He is an Enterprise Architect and Programme Director with over 15 years’ experience in the field of Computing and Information Technology Consulting. He has also trained over 2, 000 Professionals on (ITIL, TOGAF, Business Analysis, COBIT, CMMI, XBRL, ISO 20000, ISO 27001 and ISO 22301).
Link of the recorded session published on YouTube: https://youtu.be/ZML5eTxsEF8
This Booklet provide a high-level summery for PMBOK Knowledge area(s) , objective to support whom study PMP or willing to get a helicopter view for Project management Knowledge.
“It’s a way to knowledge simplification”.
We are providing the assignment help for all the subjects Globally. Our task specialists realize the fear that you experience when it comes to your Assignment Help For All Subjects. We providing solutions, PPTs, excel sheets and many more.
Visit our website:
https://www.moodlemonkey.com/
https://www.moodlemonkey.com/solution/
https://www.moodlemonkey.com/power-point-presentation/
https://www.moodlemonkey.com/about-us/
Concept of Particles and Free Body Diagram
Why FBD diagrams are used during the analysis?
It enables us to check the body for equilibrium.
By considering the FBD, we can clearly define the exact system of forces which we must use in the investigation of any constrained body.
It helps to identify the forces and ensures the correct use of equation of equilibrium.
Note:
Reactions on two contacting bodies are equal and opposite on account of Newton's III Law.
The type of reactions produced depends on the nature of contact between the bodies as well as that of the surfaces.
Sometimes it is necessary to consider internal free bodies such that the contacting surfaces lie within the given body. Such a free body needs to be analyzed when the body is deformable.
Physical Meaning of Equilibrium and its essence in Structural Application
The state of rest (in appropriate inertial frame) of a system particles and/or rigid bodies is called equilibrium.
A particle is said to be in equilibrium if it is in rest. A rigid body is said to be in equilibrium if the constituent particles contained on it are in equilibrium.
The rigid body in equilibrium means the body is stable.
Equilibrium means net force and net moment acting on the body is zero.
Essence in Structural Engineering
To find the unknown parameters such as reaction forces and moments induced by the body.
In Structural Engineering, the major problem is to identify the external reactions, internal forces and stresses on the body which are produced during the loading. For the identification of such parameters, we should assume a body in equilibrium. This assumption provides the necessary equations to determine the unknown parameters.
For the equilibrium body, the number of unknown parameters must be equal to number of available parameters provided by static equilibrium condition.
Concept of Particles and Free Body Diagram
Why FBD diagrams are used during the analysis?
It enables us to check the body for equilibrium.
By considering the FBD, we can clearly define the exact system of forces which we must use in the investigation of any constrained body.
It helps to identify the forces and ensures the correct use of equation of equilibrium.
Note:
Reactions on two contacting bodies are equal and opposite on account of Newton's III Law.
The type of reactions produced depends on the nature of contact between the bodies as well as that of the surfaces.
Sometimes it is necessary to consider internal free bodies such that the contacting surfaces lie within the given body. Such a free body needs to be analyzed when the body is deformable.
Physical Meaning of Equilibrium and its essence in Structural Application
The state of rest (in appropriate inertial frame) of a system particles and/or rigid bodies is called equilibrium.
A particle is said to be in equilibrium if it is in rest. A rigid body is said to be in equilibrium if the constituent particles contained on it are in equilibrium.
The rigid body in equilibrium means the body is stable.
Equilibrium means net force and net moment acting on the body is zero.
Essence in Structural Engineering
To find the unknown parameters such as reaction forces and moments induced by the body.
In Structural Engineering, the major problem is to identify the external reactions, internal forces and stresses on the body which are produced during the loading. For the identification of such parameters, we should assume a body in equilibrium. This assumption provides the necessary equations to determine the unknown parameters.
For the equilibrium body, the number of unknown parameters must be equal to number of available parameters provided by static equilibrium condition.
Concept of Particles and Free Body Diagram
Why FBD diagrams are used during the analysis?
It enables us to check the body for equilibrium.
By considering the FBD, we can clearly define the exact system of forces which we must use in the investigation of any constrained body.
It helps to identify the forces and ensures the correct use of equation of equilibrium.
Note:
Reactions on two contacting bodies are equal and opposite on account of Newton's III Law.
The type of reactions produced depends on the nature of contact between the bodies as well as that of the surfaces.
Sometimes it is necessary to consider internal free bodies such that the contacting surfaces lie within the given body. Such a free body needs to be analyzed when the body is deformable.
Physical Meaning of Equilibrium and its essence in Structural Application
The state of rest (in appropriate inertial frame) of a system particles and/or rigid bodies is called equilibrium.
A particle is said to be in equilibrium if it is in rest. A rigid body is said to be in equilibrium if the constituent particles contained on it are in equilibrium.
The rigid body in equilibrium means the body is stable.
Equilibrium means net force and net moment acting on the body is zero.
Essence in Structural Engineering
To find the unknown parameters such as reaction forces and moments induced by the body.
In Structural Engineering, the major problem is to identify the external reactions, internal forces and stresses on the body which are produced during the loading. For the identification of such parameters, we should assume a body in equilibrium. This assumption provides the necessary equations to determine the unknown parameters.
For the equilibrium body, the number of unknown parameters must be equal to number of available parameters provided by static equilibrium condition.
Concept of Particles and Free Body Diagram
Why FBD diagrams are used during the analysis?
It enables us to check the body for equilibrium.
By considering the FBD, we can clearly define the exact system of forces which we must use in the investigation of any constrained body.
It helps to identify the forces and ensures the correct use of equation of equilibrium.
Note:
Reactions on two contacting bodies are equal and opposite on account of Newton's III Law.
The type of reactions produced depends on the nature of contact between the bodies as well as that of the surfaces.
Sometimes it is necessary to consider internal free bodies such that the contacting surfaces lie within the given body. Such a free body needs to be analyzed when the body is deformable.
Physical Meaning of Equilibrium and its essence in Structural Application
The state of rest (in appropriate inertial frame) of a system particles and/or rigid bodies is called equilibrium.
A particle is said to be in equilibrium if it is in rest. A rigid body is said to be in equilibrium if the constituent particles contained on it are in equilibrium.
The rigid body in equilibrium means the body is stable.
Equilibrium means net force and net moment acting on the body is zero.
Essence in Structural Engineering
To find the unknown parameters such as reaction forces and moments induced by the body.
In Structural Engineering, the major problem is to identify the external reactions, internal forces and stresses on the body which are produced during the loading. For the identification of such parameters, we should assume a body in equilibrium. This assumption provides the necessary equations to determine the unknown parameters.
For the equilibrium body, the number of unknown parameters must be equal to number of available parameters provided by static equilibrium condition.
Concept of Particles and Free Body Diagram
Why FBD diagrams are used during the analysis?
It enables us to check the body for equilibrium.
By considering the FBD, we can clearly define the exact system of forces which we must use in the investigation of any constrained body.
It helps to identify the forces and ensures the correct use of equation of equilibrium.
Note:
Reactions on two contacting bodies are equal and opposite on account of Newton's III Law.
The type of reactions produced depends on the nature of contact between the bodies as well as that of the surfaces.
Sometimes it is necessary to consider internal free bodies such that the contacting surfaces lie within the given body. Such a free body needs to be analyzed when the body is deformable.
Physical Meaning of Equilibrium and its essence in Structural Application
The state of rest (in appropriate inertial frame) of a system particles and/or rigid bodies is called equilibrium.
A particle is said to be in equilibrium if it is in rest. A rigid body is said to be in equilibrium if the constituent particles contained on it are in equilibrium.
The rigid body in equilibrium means the body is stable.
Equilibrium means net force and net moment acting on the body is zero.
Essence in Structural Engineering
To find the unknown parameters such as reaction forces and moments induced by the body.
In Structural Engineering, the major problem is to identify the external reactions, internal forces and stresses on the body which are produced during the loading. For the identification of such parameters, we should assume a body in equilibrium. This assumption provides the necessary equations to determine the unknown parameters.
For the equilibrium body, the number of unknown parameters must be equal to number of available parameters provided by static equilibrium condition.
Concept of Particles and Free Body Diagram
Why FBD diagrams are used during the analysis?
It enables us to check the body for equilibrium.
By considering the FBD, we can clearly define the exact system of forces which we must use in the investigation of any constrained body.
It helps to identify the forces and ensures the correct use of equation of equilibrium.
Note:
Reactions on two contacting bodies are equal and opposite on account of Newton's III Law.
The type of reactions produced depends on the nature of contact between the bodies as well as that of the surfaces.
Sometimes it is necessary to consider internal free bodies such that the contacting surfaces lie within the given body. Such a free body needs to be analyzed when the body is deformable.
Physical Meaning of Equilibrium and its essence in Structural Application
The state of rest (in appropriate inertial frame) of a system particles and/or rigid bodies is called equilibrium.
A particle is said to be in equilibrium if it is in rest. A rigid body is said to be in equilibrium if the constituent particles contained on it are in equilibrium.
The rigid body in equilibrium means the body is stable.
Equilibrium means net force and net moment acting on the body is zero.
Essence in Structural Engineering
To find the unknown parameters such as reaction forces and moments induced by the body.
In Structural Engineering, the major problem is to identify the external reactions, internal forces and stresses on the body which are produced during the loading. For the identification of such parameters, we should assume a body in equilibrium. This assumption provides the necessary equations to determine the unknown parameters.
For the equilibrium body, the number of unknown parameters must be equal to number of available parameters provided by static equilibrium condition.
Radioactive waste is waste that contains radioactive material. Radioactive waste is usually a by-product of nuclear power generation and other applications of nuclear fission or nuclear technology, such as research and medicine. Radioactive waste is hazardous to all forms of life and the environment, and is regulated by government agencies in order to protect human health and the environment.
Radioactivity naturally decays over time, so radioactive waste has to be isolated and confined in appropriate disposal facilities for a sufficient period until it no longer poses a threat. The time radioactive waste must be stored for depends on the type of waste and radioactive isotopes. Current approaches to managing radioactive waste have been segregation and storage for short-lived waste, near-surface disposal for low and some intermediate level waste, and deep burial or partitioning / transmutation for the high-level waste.
A summary of the amounts of radioactive waste and management approaches for most developed countries are presented and reviewed periodically as part of the International Atomic Energy Agency (IAEA) Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management.[1]
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
1. Project : is a temporary endeavor involving : 1-connected sequence of activate 2- range of resources
Which is designed to achieve : 1- unique outcome 2-which operate in time 3-cost &quality constrain
Info about project :
1-project is : temporary / unique / need leadership
2- project : 1-have cost & time & quality constrain
2- establish to achieve specific out come
3- outcome : can be achieved only by accomplish variety activity
4-project progress :require different type of resources
5- they always bring about change some king
There is four levels of project by (association for project management recognize) ?
1-in-house project involving : 1-single disciplinary team 2-multidisciplinary team
2- multicompany multidisciplinary project
3- multicountry multicompany multidisciplinary project
Project manager coordinate people effort , these people is ?
1-do not : 1-speak the same language
2-understan each other role
2- are working with different : 1-culture & legal framework
2- organization
3-are geographically distant
what a major type of construction project ?
1- residential house constriction 2- specialized industrial building construction
3- institutional & commercial building construction 4- infrastructure & heavy construction
What is the origins of project management ?
Origin lie in world war 2 when military authorities used (techniques of operational research ) to plan optimum
use of resources
About plan share in 1961 US navy :
1- developed in Polaris programme
2- claimed this plan save 2 years through using (project management)
3- called (programme evaluation & review technique ) ‘’PERT’’
Critical path method : it about same time & similar technique describe by du point , large us chemical
corporation
What caused to developed modern technique of project management ?
Need to achieve results quickly
Project management : the application of collection of (tool & technique) to :
1-direct the use of diverse recourses
2-toward accomplishment of unique, complex
3- cost & quality constrain ,one time task within time
2. Project manager tools ?
1- build a schedules & other document to monitor the progress of the project
2- plan optimum use of resources
3- organize (component task) in most logical order
Role must project manager has to fulfill ? planner / controller / leader /communicator
planning project require ?
1- knowledge : 1-of project management technique
2- special in area of work
2-attention to detail / people skill / ability to take overview
3- understanding : of organizational structure & culture
Controlling project require ?
1- knowledge : 1-of project management technique
2- special in area of work
2-attention to detail / ability to take overview / flexibility
3- organizational & data-handling skill
4-the ability to find creative solution
Leading project require ?
The ability to : 1-adopt range of leader ship style
2- to pick appropriate style of leadership in any situation
Communication in project require ?
1- competence : in range of communication style
2-understanding : basic principle of communication
people project manager content with him ?
1-Client 2-suppliers 3-legal 4-finance 5-system architect 6-projecty team
Stage of project ?
1- start the project 2- organize & preparing the project
3- carrying out the project work (phases most cost) 4-closing the project
Project management output ?
1-project : 1-charter
2- management plan
2- accepted deliverables
4-archived project document
ص رسمات افتح20.21
Stakeholders : * include 1-all member of project team
2-intersted entities are (internal or external ) to the organization
* Organization or individual : who think will lose or gain as project result
Example of stakeholders ? 1-sponser 2-client 3-team work on project 6-contractor 5-supplier
6-local pressure group
3. Primary & secondary stakeholder map ?
1-sponser , society ,government
2- staff collaborators , supplier & contractor
3- local communities , interest group
4- funders shareholders
What should we do with stakeholder ?
1-identify stakeholder 3-communicate with them
2-determine all of their : 1-requirment 2-expectation 4-manage their influence
Project stake holder management ?
Identify stakeholder gather information identify stakeholder mission determine stakeholder strength
&weakness predict behavior implement stake holder management strategy
Competence of effective project manager ?
1- knowledge : refer what project manager know about project management
2-performance : refer what project manager able to do or accomplish while applying his knowledge in project
management
3-personal : refer what project behaves when performance the project or related activity
personal effectiveness encompasses ? attitudes , core personality characteristics , leadership
interpersonal skill project manager ?
1-coaching , conflict management , communication
2- team building , trust building
3- negotiation , motivation , leadership
4- influencing , decision making
5- political & culture awareness
Project constrain ? scope , quality , schedule , budget ,resources , risks
project management process categories into five group ?
1- initiating process group 4- monitoring & controlling process group
2-planning process group 5- closing process group
3-executing process group
Initiating process group : performed to define new project or new phase of existing project by obtain
authorization to start the project or phase
Planning process group : those process require to : 1- establish group project 2- refine objective
3- define of course action require to achieve objective project
Executing process group : process performed to complete work in project management plan to satisfy project
specification
Monitoring & controlling process group : those process require to :
1- track , review ,regulate ,progress & performance of project
2- identify any area in which change to the plan are required 3-initiate the corresponding change
((shapes page 31,32,35,36))
4. The knowledge area ? ( project _________ management )
1-stakeholer , scope 2-communication ,cost 3- integration ,time
4- quality ,human 5- risk , procurement
Info :
1-contract document consist of : 1-drawing 2-project manual
2- the drawing define : 1-quntity of the work the length 2-the width of area & volume
3- project manual : 1- include specification 2-define quality of the work
Contract document :
1-drawing : civil , architectural , mechanical , electrical ,structural
2-project manual : bidding document, agreement ,general condition
supplementary condition , technical specification
(ICE) : institute of civil engineering
(FIDIC) : federation international des ingenieure-conseils
(4th 1987 edition) condition for works of ‘’civil engineering construction’’ comprises :
part 1 : general condition with form of ( tender, agreement)
part 2 : ‘’ condition of particular application with guideline ‘’ for preparation of part 2 clauses
info :
1- owner make decision regard type of project delivery
Which type of contract to use depend on ? 1-type of project 2-amount of risk
4 type of construction contract ?
1- unit cost , cost-plus-fee 2- guaranteed maximum price 3-lump-sum
About Lump-sum contract ?
1-most common type in building construction
2- contractor accept to complete work specified for single fixed amount of money
About contract: Cost-plus-fee ?
1- refer to time & material
2- owner paid all actual cost of the project with fixed fee for contract
About contract : guaranteed maximum price ?
1-contain features of (lump-sum & cost-plus-fee)
2-there is maximum price owner can pay & in same time owner obligated to pay actual cost plus fee
3- owner benefit of any realized saving
About unit price contract ?
1- used when : you can’t measure time to finish project
2- common in : heavy civil & highway
3- its difficult to estimate quantities
( صفحة االمثلة44,43,45 (
5. Info about request for information (RFI) ?
1-written for : classified detail presented in plan
2- subcontractor made this request through general contractor to architect
How to submittal RFI ?
data , detail , sample ,color require by contractor to present it to architect
To give approve prior order & installing
Official payment request : it assemble of 3 document : 1- schedules of value 2-pay request continuation sheet
3- application for payment
info about schedule value ?
1-budget template : establish early in project
2-progress payment are measured
3- schedule summarize: cost project by various divisions of work
(shape page 54 )
Info :
1- do not extra work without receiving written order to do by owner or architect
2- substantial completion : when owner start occupying facility while contractor do final touches
3- only CPM (critical path method) : can prove or disprove delay claim
Claim: issue that occurring through construction & remain unresolved after complete construction
what causes caused construction claim?
1-disagreemnt regard term of the contract
2-defective contract document
3-unresolved change order
4- denied time extension (caused by contract control)
5-deffiring site condition result extra cost to contract
Why contractor need to calculate the start and end specific activates ?
ألنهخاص انتباه تتطل الخاصة النشاطاتواالدوات المواد وتوصيل طلب مثل
لتوصيلها طويل وقت تتطل معين نوع من ادوات المشروع صاحب طلب حال في
شهور عدة قبل تنسيق تتطلب ثقيلة مواد طلب او
coordinate among trade and subcontractor :
والدهان القصارة مثل يخلص ما قبل بعده بال تبلش بتقدر وما شغل عندك يكون لما الحالة لهاي مثال
Why contractor need project scheduling ?
1-calculate : 1-the project completion date
2- the start and end specific activates
2-coordinate ‘’among trade’’ and ‘’subcontractor’’
3-predict & calculate cash flow
4-improve work efficiency
6-serve effective project control tool 7- evaluate effect of change 8-prove delay claim
6. Why project owner & developers need scheduling ?
1-time : 1-get idea on project expected finish date 2- ensure contractor planning timely finish
3- verify delay claim
2-effect : 1- serve effective project manager tool 2- evaluate effect of change
3- predict & calculate cash flow
Generic type of software ?? 1-spreadsheet 2-word processors
3 type of knowledge that scheduler must have ?
1-knowledge : computer software
2-knowledge : principle of scheduling & project control
3-knowledge : of the specific technical field
Certification for project scheduling ?
1- AACE international planning & schedule professional (psp)
2- PMI scheduling professional (PMI-SP)
Tripod of good scheduling system ?
1- the human factor 2-the technology 3-the management