INTRODUCTION






PROJECT – consists of a temporary
endeavor undertaken to create
a unique product, service or
results or sometimes to
improve.

DEVELOPMENT – stages to go through
DESIGN – is the creation of a plan or
convention for the construction of
an object or a system
PROJECT FORMULATION








Taking a first look carefully or critically at
the project idea.
Carefully weighing its various components
Assessment of the various aspects of an
investment
It is an important stage in the preinvestment phase.
STAGES OF PROJECT
FORMULATION
1. Feasibility Analysis
2. Techno – Economic Analysis
3. Project Design and Network
Analysis
4. Input Analysis
5. Financial Analysis
6. Cost – Benefit Analysis
7. Pre – Investment Analysis
1. FEASIBILITY ANALYSIS
-First stage in project formulation
-Examination to see whether to go in for a detailed
investment proposal or not
-Screening for internal and external constraints
Conclusion could be;
•
The project idea seems to be feasible
•
The project idea is not a feasible one
•
Unable to arrive at a conclusion for want of
adequate data
2. TECHO-ECONOMIC
ANALYSIS
Screens the idea to
Estimate of potential of the demand of the
goods/services choice of optimal technology
This analysis gives the project platform for
the preparation of detailed project design
3. PROJECT DESIGN AND
NETWORK ANALYSIS
-

It is the heart of the project entity

-

It defies the sequence of events of the project

-

Time is allotted to for each activity

-

It is presented in a form of a network drawing

-

It helps to identify project inputs, finance needed
and benefit profile of the project
4. INPUT ANALYSIS
-Its assesses the input requirements during the
construction and operation of the project.
-It defies the inputs required for each activity

-Inputs include materials, human resource
-It evaluates the feasibility of the project from the
point of view of the availability of necessary
resources
-This aids in accessing project cost
5. FINANCIAL ANALYSIS










It involves estimates the project cost,
operating cost and fund requirements
It helps in comparing various project
proposals on a common scale
Analytical tools used are discounted cash
flow, cost volume profit relationship and
ratio analysis
Investment decision involve commitment
of resources in future, with a long time
horizon
It needs caution and foresight in
developing financial forecast
6. COST BENEFIT ANALYSIS






The overall worth of a project is
considered
The project design forms the basis of
evaluation

It considers costs that all entities
have to bear and the benefit
connected to it
7. PRE INVESTMENT
ANALYSIS




The results obtained in previous
stages are consolidated
Helps the project-sponsoring, the
project implementing body and the
external consulting agencies to
accept/reject the proposal
PREPARATION OF FULL-BLOWN
PROJECT FEASIBILITY STUDY
What is Feasibility?




As the name implies, a feasibility study is
an analysis of the viability of an idea.
The feasibility study focuses on helping
answer the essential question of “should
we proceed with the proposed project
idea?”
FEASIBILTY ANALYSIS




Feasibility study is an analytical
tool used during the project
planning process, shows how a
business would operate under an
explicitly stated set of
assumptions.
These assumptions include the
technology used (the facilities,
types of equipment,
manufacturing process, etc.) and
the financial aspects of the project
(capital needs, volume, cost of
goods, wages etc.)
TYPES OF FEASIBILITY

Market
Environmental

Political
Safety
Social
Cultural
Financial
Economic

Managerial

Technical
TYPES OF FEASIBILITY
1. Technical Feasibility




This area reviews the engineering
feasibility of the project, including
structural, civil and other relevant
engineering aspects necessitated by the
project design.
The technical capabilities of the
personnel as well as the capability of the
projected technologies to be used in the
project are considered.
TYPES OF FEASIBILITY
2. Managerial Feasibility




Demonstrated management
capability and availability,
employee involvement, and
commitment are key elements
required to ascertain managerial
feasibility
This addresses the management
and organizational structure of
the project, ensuring that the
proponent’s structure is as
described in the submittal and is
well suited to the type of
operation undertaken.
TYPES OF FEASIBILITY
3. Economic Feasibility

This involves the feasibility of the
proposed project to generate
economic benefits.
 A benefit-cost analysis (addressing
a problem or need in the manner
proposed by the project compared
to other, the cost of other
approaches to the same or similar
problem) is required.
A breakeven analysis when
appropriate is also a required aspect
of evaluating the economic
feasibility of a project. (This
addresses fixed and variable costs
and utilization/sales forecasts).

TYPES OF FEASIBILTY
4. Financial Feasibility




Financial feasibility should be
distinguished from economic
feasibility.

Financial feasibility involves the
capability of the project
organization to raise the
appropriate funds needed to
implement the proposed project
TYPES OF FEASIBILITY
5. Cultural Feasibility






Cultural feasibility deals with the
compatibility of the proposed project
with the cultural environment of the
project.
In labor-intensive projects, planned
functions must be integrated with the
local cultural practices and beliefs.
For example, religious beliefs may
influence what an individual is willing
to do or not do.
TYPES OF FEASIBILITY
6. Social Feasibility
 Social feasibility addresses the
influences that a proposed
project may have on the social
system in the project
environment.
 The ambient social structure
may be such that certain
categories of workers may be in
short supply or nonexistent.
TYPES OF FEASIBILITY
7. Safety Feasibility
 Safety feasibility is another important
aspect that should be considered in
project planning.
 Safety feasibility refers to an analysis of
whether the project is capable of being
implemented and operated safely with
minimal adverse effects on the
environment.
TYPES OF FEASIBILITY
8.






Political Feasibility
Political consideratons often dictate
directions for a proposed project.
This is particularly true for large
projects with significant visibility that
may have significant government
inputs and political implications.
For example, political necessity may
be a source of support for a project
regardless of the project's merits.
TYPES OF FEASIBILITY
9. Environmental Feasibility




Often a killer of projects through
long, drawn-out approval
processes and outright active
opposition by those claiming
environmental concerns.
This is an aspect worthy of real
attention in the very early stages
of a project
TYPES OF FEASIBILITY
10. Market Feasibility
 This area should not be confused
with the Economic Feasibility.
The market needs analysis to
view the potential impacts of
market demand, competitive
activities, etc. and market share
available.
 Possible competitive activities by
competitors, whether local,
regional, national or international
DETAILED PROJECT DESIGN
What’s your own Project Design?
PROJECT DESIGN
Before you begin writing you should be able to
answer the following questions:
• Why are you doing this project?
• What will you be doing?
• How will you be doing it?
• Who will be doing it?
• Where will it be done?
• How long will it take?
PROJECT PROPOSAL
Project proposals - are documents designed
to present a plan of action, outline the
reasons why the action is necessary

The guidelines usually identify five key
components or sections of any project
proposal: the introduction, background,
strategy, budgeting or financing, and
outcome
Images by

Project Development

  • 1.
    PROJECT DEVELOPMENT AND DESIGN Reported by: GILBERTM. NARCISO Submitted to: JOSEFINA B. BITONIO, DPA DM 211 Project Development & Management 2nd Semester 2013-2014
  • 2.
    INTRODUCTION    PROJECT – consistsof a temporary endeavor undertaken to create a unique product, service or results or sometimes to improve. DEVELOPMENT – stages to go through DESIGN – is the creation of a plan or convention for the construction of an object or a system
  • 3.
    PROJECT FORMULATION     Taking afirst look carefully or critically at the project idea. Carefully weighing its various components Assessment of the various aspects of an investment It is an important stage in the preinvestment phase.
  • 4.
    STAGES OF PROJECT FORMULATION 1.Feasibility Analysis 2. Techno – Economic Analysis 3. Project Design and Network Analysis 4. Input Analysis 5. Financial Analysis 6. Cost – Benefit Analysis 7. Pre – Investment Analysis
  • 5.
    1. FEASIBILITY ANALYSIS -Firststage in project formulation -Examination to see whether to go in for a detailed investment proposal or not -Screening for internal and external constraints Conclusion could be; • The project idea seems to be feasible • The project idea is not a feasible one • Unable to arrive at a conclusion for want of adequate data
  • 6.
    2. TECHO-ECONOMIC ANALYSIS Screens theidea to Estimate of potential of the demand of the goods/services choice of optimal technology This analysis gives the project platform for the preparation of detailed project design
  • 7.
    3. PROJECT DESIGNAND NETWORK ANALYSIS - It is the heart of the project entity - It defies the sequence of events of the project - Time is allotted to for each activity - It is presented in a form of a network drawing - It helps to identify project inputs, finance needed and benefit profile of the project
  • 8.
    4. INPUT ANALYSIS -Itsassesses the input requirements during the construction and operation of the project. -It defies the inputs required for each activity -Inputs include materials, human resource -It evaluates the feasibility of the project from the point of view of the availability of necessary resources -This aids in accessing project cost
  • 9.
    5. FINANCIAL ANALYSIS      Itinvolves estimates the project cost, operating cost and fund requirements It helps in comparing various project proposals on a common scale Analytical tools used are discounted cash flow, cost volume profit relationship and ratio analysis Investment decision involve commitment of resources in future, with a long time horizon It needs caution and foresight in developing financial forecast
  • 10.
    6. COST BENEFITANALYSIS    The overall worth of a project is considered The project design forms the basis of evaluation It considers costs that all entities have to bear and the benefit connected to it
  • 11.
    7. PRE INVESTMENT ANALYSIS   Theresults obtained in previous stages are consolidated Helps the project-sponsoring, the project implementing body and the external consulting agencies to accept/reject the proposal
  • 12.
    PREPARATION OF FULL-BLOWN PROJECTFEASIBILITY STUDY What is Feasibility?   As the name implies, a feasibility study is an analysis of the viability of an idea. The feasibility study focuses on helping answer the essential question of “should we proceed with the proposed project idea?”
  • 13.
    FEASIBILTY ANALYSIS   Feasibility studyis an analytical tool used during the project planning process, shows how a business would operate under an explicitly stated set of assumptions. These assumptions include the technology used (the facilities, types of equipment, manufacturing process, etc.) and the financial aspects of the project (capital needs, volume, cost of goods, wages etc.)
  • 14.
  • 15.
    TYPES OF FEASIBILITY 1.Technical Feasibility   This area reviews the engineering feasibility of the project, including structural, civil and other relevant engineering aspects necessitated by the project design. The technical capabilities of the personnel as well as the capability of the projected technologies to be used in the project are considered.
  • 16.
    TYPES OF FEASIBILITY 2.Managerial Feasibility   Demonstrated management capability and availability, employee involvement, and commitment are key elements required to ascertain managerial feasibility This addresses the management and organizational structure of the project, ensuring that the proponent’s structure is as described in the submittal and is well suited to the type of operation undertaken.
  • 17.
    TYPES OF FEASIBILITY 3.Economic Feasibility This involves the feasibility of the proposed project to generate economic benefits.  A benefit-cost analysis (addressing a problem or need in the manner proposed by the project compared to other, the cost of other approaches to the same or similar problem) is required. A breakeven analysis when appropriate is also a required aspect of evaluating the economic feasibility of a project. (This addresses fixed and variable costs and utilization/sales forecasts). 
  • 18.
    TYPES OF FEASIBILTY 4.Financial Feasibility   Financial feasibility should be distinguished from economic feasibility. Financial feasibility involves the capability of the project organization to raise the appropriate funds needed to implement the proposed project
  • 19.
    TYPES OF FEASIBILITY 5.Cultural Feasibility    Cultural feasibility deals with the compatibility of the proposed project with the cultural environment of the project. In labor-intensive projects, planned functions must be integrated with the local cultural practices and beliefs. For example, religious beliefs may influence what an individual is willing to do or not do.
  • 20.
    TYPES OF FEASIBILITY 6.Social Feasibility  Social feasibility addresses the influences that a proposed project may have on the social system in the project environment.  The ambient social structure may be such that certain categories of workers may be in short supply or nonexistent.
  • 21.
    TYPES OF FEASIBILITY 7.Safety Feasibility  Safety feasibility is another important aspect that should be considered in project planning.  Safety feasibility refers to an analysis of whether the project is capable of being implemented and operated safely with minimal adverse effects on the environment.
  • 22.
    TYPES OF FEASIBILITY 8.    PoliticalFeasibility Political consideratons often dictate directions for a proposed project. This is particularly true for large projects with significant visibility that may have significant government inputs and political implications. For example, political necessity may be a source of support for a project regardless of the project's merits.
  • 23.
    TYPES OF FEASIBILITY 9.Environmental Feasibility   Often a killer of projects through long, drawn-out approval processes and outright active opposition by those claiming environmental concerns. This is an aspect worthy of real attention in the very early stages of a project
  • 24.
    TYPES OF FEASIBILITY 10.Market Feasibility  This area should not be confused with the Economic Feasibility. The market needs analysis to view the potential impacts of market demand, competitive activities, etc. and market share available.  Possible competitive activities by competitors, whether local, regional, national or international
  • 25.
    DETAILED PROJECT DESIGN What’syour own Project Design?
  • 26.
    PROJECT DESIGN Before youbegin writing you should be able to answer the following questions: • Why are you doing this project? • What will you be doing? • How will you be doing it? • Who will be doing it? • Where will it be done? • How long will it take?
  • 27.
    PROJECT PROPOSAL Project proposals- are documents designed to present a plan of action, outline the reasons why the action is necessary The guidelines usually identify five key components or sections of any project proposal: the introduction, background, strategy, budgeting or financing, and outcome
  • 28.