Major Observations
1. Use of modules: Who is responsible for preparing the training module? Conduct
Module development training as an intervention measure
2. DAR ATP should categorize the pool of trainers based on their specialization.
This approach would make it easier to identify trainers to handle the requested
training based on their expertise.
3. DAR mostly subsidizes funding sources. It is important to prioritize micro and
small coops for subsidy. For medium and large coops, you have counterparts or
share funds to conduct training activities.
4. Encourage medium and large companies to use their CETF to sponsor micro
small coops under the Big Brother Small Brother Program.
5. Review CDA MC 2020 -23 on CETF and Utilization, Allocation and remittance
6. DAR ATP should have a file of PowerPoint presentations ready, especially for
the mandatory training, to be used by their pool of trainers. They are allowed to
enhance or modify presentations according to the needs of their cooperators.
7. Reading materials should also be made available for reproduction and printing,
or consider the possibility of selling the materials at cost.
8. Resources like demand letters, collection letters, follow-up collection letters, and
subscription forms should be available for easy access (electronically).
9. Describe specific activities for mentoring and coaching.
10.DAR ATP trainers should train their pool to prepare a suitable PowerPoint
Presentation (Skills enhancements).
11.Consider the action plan as the output with timelines and deliverables of the
training for effective M&E.
12.During your evaluation review, consider what went wrong. Review strategies and
policies that are still effective and relevant and identify what went right to be
retained as best practices.
13.Other presenters mentioned sustainability, but what are your indicators of
sustainability?
14.How do you know if the cooperative is successful? Use impact evaluations
through a review of literature and studies.
15.Incase of power failure or instant brownouts
Teaching without electricity or during brownouts requires the creative use of non-
digital and low-tech teaching instruments. Here are some effective tools and methods to
use in such situations:
1. Printed Materials
 Textbooks and Workbooks: Use printed textbooks, workbooks, and handouts
for reading, exercises, and activities.
 Charts and Posters: Display information on charts, posters, and diagrams to
illustrate concepts visually.
 Flashcards: Use flashcards for vocabulary, definitions, or quick reviews of key
concepts.
2. Whiteboards and Chalkboards
 Whiteboards: Utilize whiteboards with markers for writing and drawing. They can
be easily wiped clean and reused.
 Chalkboards: Use chalkboards for writing, drawing diagrams, and illustrating
problems.
3. Printed Guides and Manuals
 Lesson Plans: Prepare and use printed lesson plans to guide instruction.
 Instructional Manuals: Provide students with printed instructional manuals or
guides relevant to the subject matter.
4. Physical Manipulatives
 Models and Prototypes: Use physical models or prototypes to demonstrate
concepts, especially in science or engineering subjects.
 Objects and Props: Utilize real-world objects or props to illustrate practical
examples and applications of the material being taught.
5. Interactive Activities
 Group Work: Engage students in group activities, discussions, and collaborative
problem-solving.
 Role-Playing: Implement role-playing exercises to explore concepts and
scenarios.
 Games and Quizzes: Use board games, card games, or oral quizzes to make
learning interactive and fun.
6. Analog Tools
 Calculators: Use basic calculators for math exercises and problem-solving.
 Timers: Use kitchen timers or stopwatches for timing activities or games.
7. Handouts and Worksheets
 Worksheets: Distribute worksheets for practice exercises, assessments, or
classwork.
 Handouts: Provide handouts with summaries, key points, or additional readings.
8. Books and Reading Materials
 Reading Assignments: Assign reading from books or articles that students can
work on during class or as homework.
 Literature: Use novels, stories, or poems to facilitate reading and discussion.
9. Discussion and Lecture
 Verbal Instruction: Rely on oral explanations, lectures, and discussions to
convey information.
 Debates: Organize debates or discussions to explore different perspectives on a
topic.
10. Visual Aids
 Diagrams and Flowcharts: Draw diagrams or flowcharts on whiteboards or
chalkboards to explain processes and relationships.
 Maps and Charts: Use printed maps and charts to support geography or data
analysis lessons.
Preparation Tips
 Plan Ahead: Prepare materials in advance and have a backup plan for power
outages.
 Engage Students: Make use of interactive and hands-on activities to keep
students engaged and motivated.
 Flexibility: Be adaptable and ready to switch between different teaching
methods depending on the available resources.
By using these teaching instruments and methods, you can effectively continue
instruction and keep students engaged, even in the absence of electricity.
Advisories, Critiques, Comments and Recommendations
1. Presenter 1 Leadership and Value Reorientation
Leadership
Training Description: This course delves into the theories and practices of
effective leadership within various organizational contexts. It emphasizes the
development of essential leadership skills, including strategic thinking, decision-
making, communication, and team building. Through case studies, simulations,
and practical exercises, students will explore different leadership styles, the
dynamics of power and influence, and the role of ethics in leadership. The course
also focuses on the challenges and opportunities of leading diverse teams in a
globalized world. By the end of this course, students will be equipped to lead with
vision, inspire others, and drive organizational success.
Values Re-Orientation: This course is designed to instill and reinforce core
cooperative values among members and leaders of cooperative organizations. It
covers the principles of cooperation, mutual aid, democratic governance, and
social responsibility. Students will engage in discussions and activities
highlighting the importance of these values in fostering a strong cooperative
culture. The course also addresses contemporary challenges cooperatives face
and provides strategies for aligning cooperative practices with foundational
values. Emphasis is placed on ethical decision-making, member engagement,
and sustainable development. Upon completion, students will have a deeper
understanding of the cooperative identity and be better prepared to promote and
uphold cooperative values in their organizations
Room for improvement
 Reading notes in toto (word for word)
 Glance at your audience, eye level
 Brief articulation of your slide presentation
Recommendations
 Core values include ICA Core Values and Ethical Values as well as the
coop values agreed upon by the coop,
 Get the commitment List of officers and follow-up commitment of leadership
 Post Values in a conspicuous place
 Recite Vision, Mission, and Values during convocation, alternately assign
someone to elaborate on the V-M and values for internalization
 Re echo training
 Remind them to integrate values in the operation of cooperatives and
dealing with members and other stockholders
Presenter 2 Basic Accounting for Non-Accountants
Training Objectives for Basic Accounting for Non-Accountants for Cooperatives
1. Understand Basic Accounting Principles:
o Grasp the fundamental concepts and principles of accounting, including
the accounting equation, double-entry bookkeeping, and the accrual basis
of accounting.
2. Identify and Record Financial Transactions:
o Learn to identify different types of financial transactions and accurately
record them in the appropriate accounts.
3. Prepare Basic Financial Statements:
o Develop the skills to prepare essential financial statements such as the
balance sheet, income statement, and cash flow statement.
4. Analyze Financial Statements:
o Gain the ability to interpret and analyze financial statements to assess the
financial health and performance of the cooperative.
5. Understand the Role of Accounting in Cooperatives:
o Recognize the unique accounting needs and practices of cooperatives,
including member equity, patronage refunds, and the distribution of
surplus.
6. Develop Budgeting Skills:
o Learn the basics of budgeting, including how to create and manage
budgets to ensure financial sustainability and support decision-making.
7. Implement Internal Controls:
o Understand the importance of internal controls and learn basic procedures
to safeguard assets, ensure accurate financial reporting, and prevent
fraud.
8. Enhance Financial Decision-Making:
o Equip participants with the knowledge to use financial information for
making informed management decisions that align with the cooperative’s
goals and values.
9. Comply with Legal and Regulatory Requirements:
o Gain awareness of the legal and regulatory requirements related to
accounting and financial reporting for cooperatives.
10.Improve Financial Communication:
o Develop the ability to communicate financial information effectively to non-
financial stakeholders, including cooperative members, board members,
and management.
11.Use Accounting Software:
o Get introduced to basic accounting software tools that can help streamline
the accounting process for cooperatives.
12.Promote Ethical Financial Practices:
o Emphasize the importance of ethical behavior and integrity in accounting
and financial management within the cooperative context.
These objectives aim to provide non-accountant members of cooperatives with the
essential accounting knowledge and skills necessary to contribute to the financial well-
being and governance of their organizations.
Room for Improvement
1. Try to glance at your audience from time to time
2. Provide brief articulation/explanation of topics
3. Rationale state result of TNA, Legal basis, and relevance and importance of
the training
4. 24 hrs ( 3 days)
Expected Outputs for Basic Accounting for Non-Accountants for Cooperatives
1. Enhanced Financial Literacy:
o Participants demonstrate a solid understanding of basic accounting
principles and terminology.
2. Accurate Financial Record-Keeping:
o Participants are able to accurately identify, record, and classify financial
transactions using double-entry bookkeeping methods.
3. Preparation of Financial Statements:
o Participants can prepare fundamental financial statements, including the
balance sheet, income statement, and cash flow statement.
4. Financial Analysis Skills:
o Participants can analyze financial statements to assess the cooperative’s
financial health, identifying trends and making informed decisions.
5. Application of Cooperative Accounting Practices:
o Participants understand and apply accounting practices specific to
cooperatives, such as handling member equity, patronage refunds, and
surplus distribution.
6. Budgeting Proficiency:
o Participants can create and manage budgets, forecasting revenues and
expenses to ensure financial sustainability.
7. Implementation of Internal Controls:
o Participants implement basic internal control measures to safeguard
assets and ensure accurate financial reporting.
8. Informed Financial Decision-Making:
o Participants use financial information to support strategic planning and
decision-making processes within the cooperative.
9. Compliance with Legal Requirements:
o Participants demonstrate awareness and adherence to legal and
regulatory requirements related to cooperative accounting and financial
reporting.
10.Effective Financial Communication:
o Participants improve their ability to communicate financial information
clearly and effectively to non-financial stakeholders, including cooperative
members and board members.
11.Proficiency in Accounting Software (If applicable)
o Participants gain basic proficiency in using accounting software tools to
streamline financial processes.
12.Ethical Financial Management:
o Participants commit to ethical behavior and integrity in their accounting
and financial management practices.
13.Participant Feedback and Evaluation:
o Collect feedback from participants on the training effectiveness, identify
areas for improvement, and evaluate the training outcomes against the set
objectives.
14.Training Materials and Resources:
o Development and distribution of training materials, such as manuals,
guides, templates, and accounting software ( or hard copies) tutorials, to
support ongoing learning and application.
15.Action Plans for Implementation:
o Participants create action plans outlining how they will apply the
knowledge and skills gained in their respective cooperatives to enhance
financial management and governance.
________________
Using a Gantt chart indicating timelines and deliverables of the expected outputs. This
would facilitate M & Egh and follow throu or provide reminders
These outputs will help ensure that the training program effectively equips non-
accountant members of cooperatives with the necessary accounting knowledge and
skills to contribute meaningfully to their organization's financial health and sustainability.
Presenter 3 Financial Management Seminar
Participant: Board, Treasurer, GM, Audit Committee
Training Objectives for Financial Management Training for Cooperatives
1. Understand Financial Management Concepts:
o Grasp fundamental financial management concepts, including financial
planning, control, and decision-making processes within the cooperative
context.
2. Develop Financial Planning Skills:
o Learn to create comprehensive financial plans that align with the
cooperative’s goals and objectives, including budgeting, forecasting, and
financial projections.
3. Enhance Budgeting Techniques:
o Gain proficiency in developing, managing, and monitoring budgets to
ensure efficient allocation of resources and financial stability.
4. Improve Cash Flow Management:
o Understand and apply strategies for effective cash flow management to
maintain liquidity and meet the cooperative’s operational needs.
5. Strengthen Financial Analysis and Reporting:
o Acquire skills to analyze financial statements and reports, interpret key
financial ratios, and assess the financial performance and position of the
cooperative.
6. Optimize Funding and Investment Decisions:
o Learn to evaluate various funding sources, investment opportunities, and
capital structure decisions to support the cooperative’s growth and
sustainability.
7. Implement Effective Internal Controls:
o Understand the importance of internal controls and learn to design and
implement control mechanisms to safeguard assets and ensure accurate
financial reporting.
8. Risk Management and Mitigation:
o Identify financial risks facing the cooperative and develop strategies to
mitigate these risks through sound financial practices and risk
management techniques.
9. Enhance Financial Decision-Making:
o Equip participants with tools and methodologies for making informed
financial decisions that contribute to the cooperative’s strategic goals.
10.Promote Compliance and Ethical Practices:
o Gain awareness of legal, regulatory, and ethical requirements in financial
management and ensure compliance with relevant standards and
practices.
11.Effective Financial Communication:
o Develop skills to communicate financial information clearly and effectively
to cooperative members, board members, and other stakeholders.
12.Use of Financial Management Tools and Software:
o Get introduced to financial management tools and software that can
enhance efficiency in financial planning, analysis, and reporting.
13.Develop Long-Term Financial Strategies:
o Learn to formulate and implement long-term financial strategies that
ensure the cooperative’s sustainability and competitiveness.
14.Participant Feedback and Evaluation:
o Gather feedback from participants on the training program, assess its
effectiveness, and identify areas for improvement.
15.Create Action Plans for Implementation:
o Encourage participants to develop action plans detailing how they will
apply the financial management skills and knowledge acquired in their
cooperatives.
Good Points:
1. With profiling, gap analysis.
2. Training Implementation
3. Methodology – with Critiquing
----------------------
These objectives aim to equip cooperative members and managers with the
essential financial management skills needed to ensure their organizations' financial
health, sustainability, and strategic growth.
Recommendations:
1. State source/s of funds
2. Include contingency for uncontrollable events (like additional guests)
3. With partner/s (MOU, MOA)
4. What about the CETF of the Coop?
Presenter 4 Basic Computer Literacy (Microsoft Word and Excel)
Training Objectives for Basic Computer Literacy (Microsoft Word and Excel) for Micro
Cooperatives
Microsoft Word
1. Understand the Basics of Microsoft Word:
o Gain a foundational understanding of Microsoft Word, including the user
interface, basic navigation, and common functionalities.
2. Create and Format Documents:
o Learn how to create, save, and open documents. Understand basic
formatting techniques, such as adjusting fonts, paragraphs, and styles to
produce professional-looking documents.
3. Insert and Manage Text, Images, and Tables:
o Develop the skills to insert and manipulate text, images, tables, and other
objects within a document to enhance readability and presentation.
4. Utilize Templates and Styles:
o Learn to use built-in templates and styles to standardize documents and
improve efficiency in document creation.
5. Implement Document Review and Collaboration Features:
o Understand how to track changes, add comments, and use other
collaboration tools to facilitate teamwork and document reviews.
Microsoft Excel
6. Understand the Basics of Microsoft Excel:
o Gain a foundational understanding of Microsoft Excel, including the user
interface, basic navigation, and common functionalities.
7. Create and Format Spreadsheets:
o Learn how to create, save, and open spreadsheets. Understand basic
formatting techniques, such as adjusting cell styles, fonts, and alignment.
8. Utilize Basic Formulas and Functions:
o Develop skills to use basic formulas and functions to perform calculations
and analyze data effectively.
9. Create and Manage Data Lists:
o Learn to create, sort, filter, and manage data lists to organize information
efficiently.
10.Generate Charts and Graphs:
o Understand how to create and format charts and graphs to visually
represent data and support decision-making.
Integrated Objectives
11.Enhance Administrative Efficiency:
o Use Microsoft Word and Excel to streamline administrative tasks, such as
creating reports, managing records, and tracking cooperative activities.
12.Improve Financial Record-Keeping:
o Learn to use Excel for basic financial record-keeping, budgeting, and
simple financial analysis.
13.Facilitate Communication and Reporting:
o Develop skills to create clear and professional documents and reports
using Word and Excel, enhancing communication within the cooperative.
14.Promote Data Accuracy and Integrity:
o Understand the importance of accuracy and integrity in data entry and
document creation, and learn best practices to maintain high standards.
15.Encourage Continuous Learning and Skill Development:
o Foster a culture of continuous learning by encouraging participants to
explore advanced features and additional training resources for Word and
Excel.
These objectives aim to equip members of micro cooperatives with essential
computer literacy skills, enhancing their productivity, efficiency, and ability to manage
cooperative activities effectively using Microsoft Word and Excel.
Room for Improvement:
1. Glance at your audience
2. The Rationale came later.
3. Follow topic sequencing
Expected Outputs from Participants for Basic Computer Literacy (Microsoft Word
and Excel) for Micro Cooperatives
Microsoft Word
1. Professional Documents:
o Participants produce well-formatted documents such as meeting minutes,
reports, letters, and memos that adhere to professional standards.
2. Utilization of Templates and Styles:
o Creation and use of customized templates and styles for consistent and
efficient document formatting.
3. Effective Use of Images and Tables:
o Documents incorporating relevant images, tables, and charts to enhance
clarity and presentation of information.
4. Collaborative Documents:
o Documents with tracked changes, comments, and other collaboration
features that facilitate teamwork and document reviews.
Microsoft Excel
5. Organized Spreadsheets:
o Participants create and maintain organized spreadsheets for various
cooperative tasks such as member lists, inventory tracking, and event
planning.
6. Data Analysis and Calculations:
o Use of basic formulas and functions to perform calculations, analyze data,
and generate insights relevant to cooperative operations.
7. Data Management:
o Efficient data management through the creation of sortable and filterable
data lists that help in organizing and retrieving information quickly.
8. Visual Data Representation:
o Creation of charts and graphs to visually represent data, making it easier
to understand and communicate financial and operational information.
Integrated Outputs
9. Improved Administrative Processes:
o Streamlined administrative tasks with the use of Word for document
creation and Excel for data management, resulting in increased
productivity and efficiency.
10.Accurate Financial Records:
o Basic financial records maintained in Excel, including simple budgets,
expense tracking, and financial summaries.
11.Clear and Professional Reports:
o Comprehensive reports combining data and insights from both Word and
Excel, presented in a clear and professional manner to cooperative
members and stakeholders.
12.Enhanced Communication:
o Improved internal and external communication through well-prepared
documents and presentations that effectively convey information.
13.Practical Application of Skills:
o Real-world application of learned skills in daily cooperative activities,
demonstrating an increase in confidence and competency in using Word
and Excel.
14.Action Plans for Continuous Improvement:
o Development of action plans by participants detailing how they will
continue to improve their computer literacy skills and integrate these tools
into their cooperative’s operations.
15.Participant Feedback and Evaluation:
o Collection of feedback on the training’s effectiveness, including
participants’ self-assessments of their new skills and identification of areas
for further development.
Prepare a Gantt chart with timelines and expected deliverables for your M and E.
Ask participants about their doable deliverables. Do not expect all outputs in one cycle;
Set program deliverables for Year 1, Year 2, etc. Transition for one step at a time. Do
not do everything in one setting.
_____________________
These outputs indicate that participants have not only gained essential computer
literacy skills but are also applying them effectively to enhance the operations and
management of their micro cooperatives
Presenter 5 Financial Management Seminar
Participant: Board, Treasurer, GM, Audit Committee
Training Objectives for Financial Management Training for Cooperatives
1. Understand Financial Management Concepts:
a. Grasp fundamental financial management concepts, including financial
planning, control, and decision-making processes within the cooperative
context.
2. Develop Financial Planning Skills:
a. Learn to create comprehensive financial plans that align with the
cooperative’s goals and objectives, including budgeting, forecasting, and
financial projections.
3. Enhance Budgeting Techniques:
a. Gain proficiency in developing, managing, and monitoring budgets to
ensure efficient allocation of resources and financial stability.
4. Improve Cash Flow Management:
a. Understand and apply strategies for effective cash flow management to
maintain liquidity and meet the cooperative’s operational needs.
5. Strengthen Financial Analysis and Reporting:
a. Acquire skills to analyze financial statements and reports, interpret key
financial ratios, and assess the financial performance and position of the
cooperative.
6. Optimize Funding and Investment Decisions:
a. Learn to evaluate various funding sources, investment opportunities, and
capital structure decisions to support the cooperative’s growth and
sustainability.
7. Implement Effective Internal Controls:
a. Understand the importance of internal controls and learn to design and
implement control mechanisms to safeguard assets and ensure accurate
financial reporting.
8. Risk Management and Mitigation:
a. Identify financial risks facing the cooperative and develop strategies to
mitigate these risks through sound financial practices and risk
management techniques.
9. Enhance Financial Decision-Making:
a. Equip participants with tools and methodologies for making informed
financial decisions that contribute to the cooperative’s strategic goals.
10.Promote Compliance and Ethical Practices:
a. Gain awareness of legal, regulatory, and ethical requirements in financial
management and ensure compliance with relevant standards and
practices.
11.Effective Financial Communication:
a. Develop skills to communicate financial information clearly and effectively
to cooperative members, board members, and other stakeholders.
12.Use of Financial Management Tools and Software:
a. Get introduced to financial management tools and software that can
enhance efficiency in financial planning, analysis, and reporting.
13.Develop Long-Term Financial Strategies:
a. Learn to formulate and implement long-term financial strategies that
ensure the cooperative’s sustainability and competitiveness.
14.Participant Feedback and Evaluation:
a. Gather feedback from participants on the training program, assess its
effectiveness, and identify areas for improvement.
15.Create Action Plans for Implementation:
a. Encourage participants to develop action plans detailing how they will
apply the financial management skills and knowledge acquired in their
cooperatives.
Good Points:
o With profiling, gap analysis.
o Training Implementation
o Methodology – with Critiquing
----------------------
These objectives aim to equip cooperative members and managers with the
essential financial management skills needed to ensure their organizations' financial
health, sustainability, and strategic growth.
Recommendations:
o State source/s of funds
o Include contingency for uncontrollable events (like additional guests)
o With partner/s (MOU, MOA)
o What about the CETF of the Coop?
Presenter 6 Training Objectives for Fundamentals of Cooperatives Based on CDA
MC 2025-09
Understanding Cooperative Principles and Philosophy
1. Comprehend Cooperative Identity:
o Understand the definition, nature, and distinct characteristics of
cooperatives, including their values, principles, and philosophy.
2. Grasp the Cooperative Principles:
o Learn the seven internationally recognized cooperative principles that
guide cooperative organizations: voluntary and open membership,
democratic member control, member economic participation, autonomy
and independence, education, training and information, cooperation
among cooperatives, and concern for community.
Legal Framework and Governance
3. Familiarize with the Legal Basis:
o Gain knowledge about the Cooperative Development Authority (CDA)
regulations, specifically MC 2025-09, and other relevant laws and policies
governing cooperatives in the Philippines.
4. Understand Governance Structures:
o Learn about the governance structures of cooperatives, including the roles
and responsibilities of the general assembly, board of directors,
committees, and management.
5. Compliance and Reporting:
o Understand the compliance requirements and reporting obligations for
cooperatives as mandated by the CDA, including annual reports, audits,
and other regulatory submissions.
Organizational Management and Development
6. Establish Cooperative Formation and Registration:
o Learn the procedures for forming and registering a cooperative, including
the preparation of necessary documents and requirements set by the
CDA.
7. Develop Strategic Planning Skills:
o Gain skills in strategic planning and goal-setting to help cooperatives
achieve their mission and objectives effectively.
8. Enhance Member Engagement and Participation:
o Understand the importance of member engagement and learn techniques
to encourage active participation and commitment from cooperative
members.
Financial Management and Sustainability
9. Basic Cooperative Financial Management:
o Acquire fundamental financial management skills tailored to cooperatives,
including budgeting, financial reporting, and resource allocation.
10.Understand Capital Formation and Allocation:
o Learn about capital formation, member contributions, and the allocation of
surplus in line with cooperative principles and legal requirements.
11.Promote Economic Sustainability:
o Understand strategies to ensure the economic sustainability of
cooperatives, including income-generating activities, investment options,
and prudent financial management.
Education, Training, and Information
12.Implement Education and Training Programs:
o Learn the importance of continuous education and training for members,
leaders, and staff to enhance their skills, knowledge, and capacity.
13.Utilize Information and Communication Technologies:
o Gain awareness of the role of information and communication
technologies (ICT) in improving cooperative operations, communication,
and member engagement.
Social Responsibility and Community Development
14.Promote Social Responsibility:
o Understand the cooperative’s role in promoting social responsibility and
ethical practices within the community.
15.Engage in Community Development:
o Learn about the cooperative’s involvement in community development
activities and initiatives that contribute to the welfare and development of
the community.
16.Cooperation Among Cooperatives:
o Emphasize the importance of cooperation among cooperatives at local,
national, and international levels to strengthen the cooperative movement.
Evaluation and Continuous Improvement
17.Evaluate Cooperative Performance:
o Learn methods for evaluating the performance and impact of cooperatives
to identify areas for improvement and ensure continuous development.
18.Adopt Best Practices:
o Gain insights into best practices in cooperative management and
operations to enhance the efficiency and effectiveness of cooperative
activities.
These objectives aim to provide a comprehensive understanding of the fundamentals of
cooperatives based on CDA MC 2025-09, equipping participants with the knowledge
and skills needed to effectively manage and sustain their cooperative organizations.
Evaluation Tools for Fundamentals of Cooperatives Based on CDA MC 2025-09
Pre-Training Assessment
1. Baseline Knowledge Survey:
o A survey or quiz administered before the training begins to assess
participants' initial understanding of cooperative principles, legal
frameworks, governance structures, financial management, and other key
areas.
During Training Evaluation
2. Interactive Quizzes:
o Short quizzes at the end of each module to assess immediate
comprehension and retention of the material covered.
3. Group Discussions and Activities:
o Facilitate group discussions and activities to encourage peer learning and
assess participants' ability to apply concepts in real-world scenarios.
4. Case Studies:
o Use case studies relevant to cooperatives to evaluate participants’
analytical and problem-solving skills.
5. Practical Exercises:
o Hands-on exercises, such as drafting strategic plans or preparing financial
statements, to assess practical application of the skills learned.
Post-Training Evaluation
6. Post-Training Knowledge Assessment:
o A comprehensive test similar to the pre-training assessment to measure
the improvement in participants' knowledge and understanding after the
training.
7. Participant Feedback Survey:
o A survey to collect participants’ feedback on the training content, delivery,
and overall experience. This helps in evaluating the training’s
effectiveness and areas for improvement.
8. Action Plan Development:
o Have participants develop action plans on how they will apply the
knowledge and skills gained in their cooperatives. Review and evaluate
these action plans for feasibility and relevance.
Long-Term Evaluation
9. Follow-Up Surveys and Interviews:
o Conduct follow-up surveys and interviews a few months after the training
to assess how participants are applying their new knowledge and skills in
their cooperative roles.
10.Performance Metrics:
o Track key performance indicators (KPIs) within the cooperatives, such as
membership growth, financial performance, compliance with CDA
regulations, and member engagement, to evaluate the training’s long-term
impact.
11.Observation and Reporting:
o Trainers or cooperative leaders observe and report on participants'
implementation of best practices and improved processes within their
cooperatives.
12.Peer Reviews:
o Organize peer review sessions where participants can share their
experiences and provide feedback on each other’s implementation of the
training concepts.
13.Case Study Follow-Up:
o Revisit initial case studies or introduce new ones to assess ongoing
problem-solving abilities and the application of cooperative principles in
new scenarios.
14.Documentation Review:
o Review documentation and records maintained by participants’
cooperatives, such as meeting minutes, financial statements, and strategic
plans, to ensure adherence to training principles.
Evaluation Reporting
15.Evaluation Report:
o Compile a comprehensive evaluation report summarizing the findings from
various evaluation tools, highlighting areas of success and areas needing
improvement. This report can guide future training programs and ongoing
support initiatives.
By using these evaluation tools, trainers can effectively measure the impact of the
Fundamentals of Cooperatives training based on CDA MC 2025-09, ensuring that
participants gain the necessary knowledge and skills to strengthen their cooperative
organizations.
Note: This is just advisory. Your actions should be based on the circumstances in the
cooperative, the culture of the organization, fund consideration, and available and
capacity of human resources.
Suggestion:
Provide materials for your participants for them to re-read and guide them in doing their
duties and obligations
Presenter 7. Training on Policy Formulation
Room for Improvement
o Glancing at the audience
o Try to have eye contact with audience
o There must be critiquing of your workshop output
Training Outcome for Policy Formulation for Cooperatives
Objective: Equip participants with the knowledge, skills, and tools necessary to
effectively formulate, analyze, and implement policies that enhance the growth and
sustainability of cooperatives.
Learning Outcomes:
1. Understanding Policy Frameworks:
o Knowledge: Participants will understand the fundamental principles and
frameworks that underpin policy formulation for cooperatives.
o Skills: Ability to critically analyze existing policy frameworks and identify
their strengths and weaknesses.
o Attitude: Develop an appreciation for the role of effective policy in the
success of cooperatives.
2. Policy Analysis and Research:
o Knowledge: Participants will gain knowledge of various research
methodologies used in policy analysis.
o Skills: Ability to conduct comprehensive policy research, including data
collection, analysis, and interpretation.
o Attitude: Foster a culture of evidence-based policy-making within
cooperative organizations.
3. Stakeholder Engagement:
o Knowledge: Understand the importance of engaging stakeholders in the
policy formulation process.
o Skills: Develop skills in stakeholder analysis, communication, and
consensus-building.
o Attitude: Cultivate an inclusive approach to policy development that
considers the perspectives of all relevant stakeholders.
4. Drafting and Formulating Policies:
o Knowledge: Learn the components and structure of effective policy
documents.
o Skills: Ability to draft clear, concise, and actionable policy documents
tailored to the needs of cooperatives.
o Attitude: Emphasize the importance of clarity, precision, and feasibility in
policy drafting.
5. Policy Implementation and Evaluation:
o Knowledge: Understand the processes involved in the implementation
and evaluation of policies.
o Skills: Develop strategies for effective policy implementation and
mechanisms for monitoring and evaluation.
o Attitude: Promote a results-oriented approach to policy implementation
and continuous improvement.
6. Ethics and Governance:
o Knowledge: Learn about the ethical considerations and governance
issues related to policy formulation for cooperatives.
o Skills: Ability to integrate ethical principles and good governance
practices into policy development.
o Attitude: Encourage a commitment to ethical behavior and transparency
in policy-making processes.
Assessment Methods:
 Case studies and policy analysis reports.
 Group projects on drafting policy documents.
 Role-playing exercises for stakeholder engagement.
 Quizzes and exams to test theoretical knowledge.
 Practical assignments on policy implementation plans.
Resources:
 Academic articles and textbooks on policy formulation.
 Case studies of successful cooperative policies.
 Access to policy research databases.
 Workshops and seminars with policy experts and practitioners.
By the end of this training, participants should be able to design and implement policies
that effectively address the unique challenges and opportunities faced by cooperatives,
contributing to their long-term sustainability and impact.
Note: choose learning outcomes based on the feasibility and applicability to
cooperatives
Presenter 8. Credit Management
Room for Improvement:
o Use case analysis in your methodology
o In your rationale, kindly mention the result of gap analysis conducted as the basis
for the conduct credit management
Training Outcome for Policy Formulation for Cooperatives
Objective: Equip participants with the knowledge, skills, and tools necessary to
effectively formulate, analyze, and implement policies that enhance the growth and
sustainability of cooperatives.
Learning Outcomes:
1. Understanding Policy Frameworks:
o Knowledge: Participants will understand the fundamental principles and
frameworks that underpin policy formulation for cooperatives.
o Skills: Ability to critically analyze existing policy frameworks and identify
their strengths and weaknesses.
o Attitude: Develop an appreciation for the role of effective policy in the
success of cooperatives.
2. Policy Analysis and Research:
o Knowledge: Participants will gain knowledge of various research
methodologies used in policy analysis.
o Skills: Ability to conduct comprehensive policy research, including data
collection, analysis, and interpretation.
o Attitude: Foster a culture of evidence-based policy-making within
cooperative organizations.
3. Stakeholder Engagement:
o Knowledge: Understand the importance of engaging stakeholders in the
policy formulation process.
o Skills: Develop skills in stakeholder analysis, communication, and
consensus-building.
o Attitude: Cultivate an inclusive approach to policy development that
considers the perspectives of all relevant stakeholders.
4. Drafting and Formulating Policies:
o Knowledge: Learn the components and structure of effective policy
documents.
o Skills: Ability to draft clear, concise, and actionable policy documents
tailored to the needs of cooperatives.
o Attitude: Emphasize the importance of clarity, precision, and feasibility in
policy drafting.
5. Policy Implementation and Evaluation:
o Knowledge: Understand the processes involved in the implementation
and evaluation of policies.
o Skills: Develop strategies for effective policy implementation and
mechanisms for monitoring and evaluation.
o Attitude: Promote a results-oriented approach to policy implementation
and continuous improvement.
6. Ethics and Governance:
o Knowledge: Learn about the ethical considerations and governance
issues related to policy formulation for cooperatives.
o Skills: Ability to integrate ethical principles and good governance
practices into policy development.
o Attitude: Encourage a commitment to ethical behavior and transparency
in policy-making processes.
Assessment Methods:
 Case studies and policy analysis reports.
 Group projects on drafting policy documents.
 Role-playing exercises for stakeholder engagement.
 Quizzes and exams to test theoretical knowledge.
 Practical assignments on policy implementation plans.
Resources:
 Academic articles and textbooks on policy formulation.
 Case studies of successful cooperative policies.
 Access to policy research databases.
 Workshops and seminars with policy experts and practitioners.
By the end of this training, participants should be able to design and implement
policies that effectively address the unique challenges and opportunities faced by
cooperatives, contributing to their long-term sustainability and impact.
Training Outcome for Credit Management for Cooperatives
Objective: Equip participants with the knowledge, skills, and tools necessary to
effectively manage credit within cooperatives, ensuring financial stability and growth.
Learning Outcomes:
1. Understanding Credit Management Principles:
o Knowledge: Participants will understand the fundamental principles and
concepts of credit management in the context of cooperatives.
o Skills: Ability to apply these principles to real-world situations within
cooperatives.
o Attitude: Develop an appreciation for the importance of effective credit
management in maintaining financial health.
2. Credit Risk Assessment:
o Knowledge: Gain knowledge of methods and techniques for assessing
credit risk.
o Skills: Ability to conduct thorough credit risk assessments, including
analyzing financial statements and credit histories.
o Attitude: Foster a cautious and diligent approach to evaluating
creditworthiness.
3. Credit Policy Development:
o Knowledge: Understand the components and importance of a
comprehensive credit policy.
o Skills: Ability to develop and implement credit policies that align with the
cooperative’s objectives and risk tolerance.
o Attitude: Promote the adoption of clear and fair credit policies.
4. Credit Approval and Disbursement:
o Knowledge: Learn the procedures for credit approval and disbursement
within cooperatives.
o Skills: Ability to manage the credit approval process efficiently and ensure
timely disbursement of funds.
o Attitude: Emphasize the importance of due diligence and accuracy in the
credit approval process.
5. Credit Monitoring and Collection:
o Knowledge: Understand the processes involved in monitoring credit and
managing collections.
o Skills: Develop strategies for effective credit monitoring and timely
collection of outstanding debts.
o Attitude: Encourage a proactive approach to credit monitoring and a firm
but fair approach to collections.
6. Financial Analysis and Reporting:
o Knowledge: Learn techniques for financial analysis and reporting related
to credit management.
o Skills: Ability to generate and interpret financial reports to inform credit
decisions and policy adjustments.
o Attitude: Promote transparency and accuracy in financial reporting.
7. Legal and Ethical Considerations:
o Knowledge: Understand the legal and ethical considerations in credit
management.
o Skills: Ability to navigate legal requirements and integrate ethical
practices into credit management processes.
o Attitude: Encourage adherence to legal standards and ethical principles
in all credit management activities.
Assessment Methods:
 Case studies and credit risk assessment reports.
 Group projects on developing credit policies.
 Role-playing exercises for credit approval and collection scenarios.
 Quizzes and exams to test theoretical knowledge.
 Practical assignments on financial analysis and reporting.
Resources:
 Academic articles and textbooks on credit management.
 Case studies of successful credit management practices in cooperatives.
 Access to financial analysis software and credit assessment tools.
 Workshops and seminars with credit management experts and practitioners.
By the end of this training, participants should be able to effectively manage credit
within cooperatives, contributing to their financial stability and sustainable growth.
Note: choose learning outcomes based on the feasibility and applicability to
cooperatives
Presenter 9 Gender Awareness Training for Masaganang Baroro MPC
Good point:
o With TNA
o Generated data
o Analysis of the data generated
o Basis for Training Design
o Output action planning basis for implementation. Use MC 2017-04 for your M & E
o MC 2017 -04 Tools assessing Progress in gender equality
o Creative PowerPoint presentation with animation
Rationale
Sequence: UN SDG, PDP, TNA and legal basis
Training Outcomes for Gender Awareness Training
Objective: Equip participants with the knowledge, skills, and attitudes necessary to
understand and address gender issues, promoting gender equality and inclusivity in
their personal and professional lives.
Learning Outcomes:
1. Understanding Gender Concepts and Terminology:
o Knowledge: Participants will understand key gender concepts,
terminology, and the distinction between sex and gender.
o Skills: Ability to accurately use and explain gender-related terminology.
o Attitude: Develop an appreciation for the complexity and diversity of
gender identities.
2. Recognizing Gender Stereotypes and Bias:
o Knowledge: Learn about common gender stereotypes and biases and
their impact on individuals and society.
o Skills: Ability to identify and challenge gender stereotypes and biases in
various contexts.
o Attitude: Foster a critical mindset towards stereotypes and a commitment
to reducing bias.
3. Exploring Gender Equality and Equity:
o Knowledge: Understand the principles of gender equality and equity
NOTE: Study what learning outcomes are doable and applicable to coops
Presenter 10 Factors in Preparing the Right and Environment Conducive for Learning
Good Points
o With eye contact with his audience
o Creative and innovative presentation
o With brief articulation per slide
o Condensed presentation within the prescribed timeframe
o Conducted survey as the basis for his training proposal
Below is the listing of what to consider, however, the budget has a bearing on your
training proposal.
1. Physical Environment:
o Comfortable Seating: Ensure that chairs and desks are ergonomic to
maintain comfort during long periods of study.
o Lighting: Adequate lighting, preferably natural light, helps reduce eye
strain and increases alertness.
o Temperature Control: Maintain a comfortable room temperature to
ensure students are neither too hot nor too cold.
o Cleanliness and Organization: A clean, well-organized space minimizes
distractions and promotes focus.
o Accessibility: Ensure that the learning space is accessible to all students,
including those with disabilities.
2. Technological Resources:
o Up-to-date Technology: Provide access to modern technology, such as
computers, projectors, and internet access.
o Technical Support: Ensure that technical support is readily available to
address any issues quickly.
o Software and Tools: Provide necessary software and tools relevant to
the learning material.
3. Learning Materials and Resources:
o Diverse Materials: Use a variety of learning materials, such as textbooks,
multimedia, and online resources, to cater to different learning styles.
o Availability: Ensure that all necessary materials are readily available and
easy to access.
4. Psychological Environment:
o Supportive Atmosphere: Foster an atmosphere of mutual respect and
support where students feel safe to express their ideas and ask questions.
o Positive Reinforcement: Use positive reinforcement to encourage
participation and effort.
o Mindfulness and Well-being: Incorporate practices that promote mental
well-being, such as mindfulness exercises or stress management
techniques.
5. Instructional Strategies:
o Active Learning: Implement teaching methods that involve active
participation, such as group discussions, hands-on activities, and problem-
solving tasks.
o Feedback: Provide timely and constructive feedback to help students
understand their progress and areas for improvement.
o Differentiated Instruction: Tailor teaching methods to meet the diverse
needs of students, taking into account different learning styles and
abilities.
6. Cultural and Social Considerations:
o Inclusive Environment: Promote an inclusive environment that respects
and values diversity.
o Cultural Sensitivity: Be aware of and sensitive to the cultural
backgrounds and perspectives of all students.
o Collaboration and Interaction: Encourage collaborative learning and
peer interactions to build a sense of community and shared learning.
7. Engagement and Motivation:
o Relevant Content: Ensure that the learning material is relevant and
engaging to the students’ interests and future goals.
o Goal Setting: Help students set achievable goals and track their
progress.
o Autonomy: Provide opportunities for students to make choices about their
learning to increase their sense of ownership and motivation.
8. Teacher Preparedness:
o Professional Development: Ensure that teachers are well-trained and
up-to-date with the latest educational practices and technologies.
o Preparation and Planning: Teachers should thoroughly plan lessons and
be prepared to adapt to the needs of the students.
o Communication Skills: Effective communication is crucial for delivering
content clearly and engaging students.
By addressing these factors, you can create an environment that is conducive to
learning, fostering both academic success and personal growth
Presenter 11 Technical Support in Records Management
Good Points
o With confidence
o Clear presentation
o With audience impact
o Creative presentation
o Methodology – role play, exercise, skills demonstration
For information and further study, consider short term plan (annual) , mid range
(3 years) and long term plans (5 years)
Effective technical support in records management is crucial for maintaining accurate,
secure, and accessible records. Here are some insights into the types of technical
support that can be provided:
1. Software and System Support:
 Electronic Records Management Systems (ERMS): Provide support for
software that organizes, stores, and retrieves electronic records.
 Document Management Systems (DMS): Assist with systems that manage
document creation, storage, and control throughout their lifecycle.
 Database Management: Ensure databases are maintained for efficient storage,
retrieval, and manipulation of records.
2. Data Security and Privacy:
 Access Control: Implement and manage user permissions to ensure that only
authorized personnel can access certain records.
 Encryption: Use encryption to protect sensitive data both in transit and at rest.
 Backup and Recovery: Regularly back up records and provide support for data
recovery in case of data loss or system failures.
3. Compliance and Legal Support:
 Regulatory Compliance: Ensure that records management practices comply
with relevant laws and regulations, such as data protection laws and industry-
specific standards.
 Audit Trails: Maintain audit trails to track who accessed or modified records and
when these actions occurred.
4. Technical Training and Education:
 User Training: Provide training sessions and materials for staff to effectively use
records management systems.
 Ongoing Support: Offer continuous support and refresher courses to keep staff
updated on new features and best practices.
5. System Integration and Automation:
 Integration with Other Systems: Ensure that records management systems
integrate smoothly with other enterprise systems like ERP, CRM, and HR
systems.
 Automation: Implement automated workflows for record creation, approval,
archiving, and deletion to improve efficiency and reduce manual errors.
6. Technical Documentation and Resources:
 User Manuals and Guides: Provide comprehensive manuals and guides to help
users navigate the records management system.
 FAQs and Help Desks: Maintain a knowledge base with frequently asked
questions and provide help desk support for immediate assistance.
7. Data Migration and Conversion:
 Migration Support: Assist with the migration of records from legacy systems to
new records management systems.
 Data Conversion: Provide support for converting records into different formats
as needed for compatibility or compliance.
8. Monitoring and Maintenance:
 System Monitoring: Continuously monitor the records management systems for
performance issues, security breaches, and other potential problems.
 Regular Maintenance: Schedule regular maintenance tasks to ensure systems
are running smoothly and updates are applied.
9. Custom Development and Enhancement:
 Customization: Develop custom features or modifications to the records
management system to meet specific organizational needs.
 System Enhancements: Provide support for adding new functionalities and
improving existing ones based on user feedback and technological
advancements.
10. Support for Physical Records Management:
 Digitization: Provide technical support for scanning and converting physical
records into digital formats.
 Barcode and RFID Systems: Implement and maintain systems for tracking
physical records using barcodes or RFID tags.
11. Disaster Recovery Planning:
 Disaster Recovery Plans: Develop and support disaster recovery plans to
ensure that records are protected and can be restored in the event of a disaster.
 Offsite Storage: Provide solutions for offsite storage of backups to safeguard
against local disasters.
By providing comprehensive technical support in these areas, organizations can ensure
that their records management processes are efficient, secure, and compliant with all
relevant standards and regulations.
Presenter 12 Cooperative Management and Governance
Room for Improvement
o Endeavor to get your audience participation
o Set eye contact with them
Recommendation:
o Be guided by CDA MA 2015 on the revised guidelines for mandatory training
Possible training outcomes and learning outcomes where applicable and relevant
Insights on Cooperative Governance and Management
1. Collaborative Decision-Making:
o Inclusivity: Involves multiple stakeholders, ensuring that diverse
perspectives contribute to more comprehensive and effective decisions.
o Shared Power: Power is distributed among participants, promoting
democratic principles and collective ownership of decisions.
2. Transparency and Accountability:
o Open Processes: Actions and decisions are transparent, building trust
among stakeholders and reducing the potential for corruption.
o Clear Accountability: Mechanisms are in place to hold individuals and
groups accountable, ensuring responsibility for actions taken.
3. Capacity Building:
o Skill Development: Enhances the abilities of stakeholders to participate
effectively in governance and management processes.
o Resource Allocation: Ensures that resources are allocated efficiently and
equitably to support collaborative efforts.
4. Conflict Resolution:
o Mediation and Negotiation: Establishes processes for resolving conflicts
amicably, promoting a culture of cooperation and mutual respect.
o Consensus Building: Encourages finding common ground and reaching
agreements that satisfy all parties involved.
5. Sustainable Practices:
o Long-term Focus: Emphasizes sustainable development and practices
that consider the long-term impact on communities and the environment.
o Ethical Considerations: Promotes ethical behavior and decisions that
align with the values and principles of cooperative governance.
Learning Outcomes for Cooperative Governance and Management
1. Understanding Collaborative Frameworks:
o Students will be able to explain the principles and practices of cooperative
governance and management.
o Students will understand the roles and responsibilities of various
stakeholders in collaborative decision-making processes.
2. Developing Transparent and Accountable Systems:
o Students will design governance structures that ensure transparency and
accountability.
o Students will implement mechanisms to monitor and evaluate the
effectiveness of governance processes.
3. Enhancing Stakeholder Capacities:
o Students will develop programs to build the capacity of stakeholders to
engage in cooperative governance.
o Students will allocate resources effectively to support stakeholder
participation and collaboration.
4. Facilitating Conflict Resolution:
o Students will apply mediation and negotiation techniques to resolve
conflicts within governance structures.
o Students will develop strategies to build consensus and foster a
cooperative environment.
5. Promoting Sustainable and Ethical Practices:
o Particioants will integrate sustainable practices into governance and
management processes.
o Participants will adhere to ethical principles in decision-making and
governance activities.
By achieving these learning outcomes, students will be well-equipped to contribute to
and lead in environments that prioritize cooperative governance and management,
ensuring that diverse perspectives are valued and that decisions are made
transparently and responsibly
Presenter 13 Credit Management and Delinquency Control
Good points
o Nice PowerPoint presentation with animation
o Creative
o Slides not crowded with words, ideal font size
Please refer to presenter no 8 for your training outcome and learning outcomes
Presenter 14 Policy Formulation on Loom Weaving under VLFFEP
Suggestions
o Conduct write-shop to get ideas
o Critiquing of policy formulate
Policy formulation for projects like woom weaving involves several key considerations.
Here’s a structured approach to developing effective policies for such projects:
1. Understand the Project Context
 Project Goals: Define what the project aims to achieve. Is it to preserve
traditional weaving techniques, boost local economies, or promote sustainable
practices?
 Stakeholders: Identify who will be affected by or involved in the project. This
might include artisans, local communities, government agencies, NGOs, and
potential consumers.
2. Needs Assessment
 Current State: Assess the current state of woom weaving, including techniques,
materials used, and existing infrastructure.
 Challenges and Opportunities: Identify key challenges (e.g., skill gaps, market
access) and opportunities (e.g., tourism, export potential).
3. Policy Objectives
 Support and Incentives: Develop objectives that provide support to weavers
and incentivize quality production. This could include financial aid, training
programs, or marketing support.
 Sustainability: Ensure that the policy promotes sustainable practices in both the
environment and the economy.
4. Regulatory Framework
 Standards and Quality Control: Establish standards for quality and safety to
ensure that products meet certain criteria and are competitive in the market.
 Intellectual Property: Consider protections for traditional designs and
techniques to prevent exploitation and ensure fair recognition for artisans.
5. Implementation Strategies
 Training and Capacity Building: Design training programs to enhance skills
and knowledge among artisans.
 Infrastructure Development: Invest in necessary infrastructure, such as
weaving centers or supply chains for materials.
 Marketing and Promotion: Develop strategies for promoting woom weaving
products, including branding and market access.
6. Monitoring and Evaluation
 Metrics: Establish metrics to measure the success of the policy, such as
increased income for weavers, higher quality products, or expanded market
reach.
 Feedback Mechanisms: Create channels for feedback from stakeholders to
continuously improve the policy and address emerging issues.
7. Integration with Broader Policies
 Cultural Preservation: Align with broader cultural preservation policies to
ensure that the project supports and enhances traditional practices.
 Economic Development: Integrate with economic development policies to
maximize the economic benefits of the project.
8. Community Engagement
 Involvement: Engage the local community in the policy development process to
ensure it meets their needs and gains their support.
 Awareness: Raise awareness about the value of woom weaving and the
benefits of the policy to foster broader community and stakeholder engagement.
By focusing on these areas, you can create a comprehensive and effective policy for
supporting and developing projects like woom weaving.
Presenter 15 Training on the Submission of Required Reports (E CoopRIS and
CAIS)
Room for Improvement
o Rationale condense to 2-3 paragraphs, cite legal basis
Recommendations
o Request CDA to assist the cooperatives in updating their information using the
Electronic Cooperative Registration Information System (E-CoopRIS), for those
who have not accessed it yet, and to be able to proceed to the encoding and
submitting their mandatory reports for the issuance of Certificate of Compliance
(COC).
o CDA also creates awareness for the cooperatives that the Offline Mode is
available to help coops with difficulties in network connection in their areas.
o The workshop will focus on orientations on both the online and offline modes,
hands-on applications including accessing, account creation for the online
mode, downloading for the offline mode, encoding, and submission of the
reports.
o
Presenter 16 Credit Management and Delinquency Control
Good Points
o Nice presentation
o Clear voice with modulation
o Condensed presentation
Room for improvement
o No eye contact with audience
o Budget no contingency fund for uncontrollable events
Please refer to presenter no 8 for your training outcome and learning outcomes
Presenter 17 Parliamentary Procedures
Good Points
o With good voice, with modulation
o Can relate with his audience
Training on parliamentary procedures for conducting meetings, especially within
cooperatives, is crucial for ensuring meetings are efficient, democratic, and productive.
Here's a breakdown of the training outcomes and learning outcomes for such a
program:
Training Outcomes
1. Enhanced Understanding of Parliamentary Procedure
o Participants will have a solid grasp of the rules and principles of
parliamentary procedure, including Robert's Rules of Order or other
relevant procedural guides.
o They will understand the purpose and benefits of parliamentary procedure
in fostering orderly and fair meetings.
2. Improved Meeting Management Skills
o Participants will be able to effectively chair meetings, manage discussions,
and maintain order.
o They will develop skills in setting agendas, managing time, and ensuring
all members have an opportunity to contribute.
3. Increased Ability to Facilitate Participation
o Participants will be adept at encouraging and managing member
participation, ensuring that all voices are heard and considered.
o They will understand how to handle disruptions and disagreements
constructively.
4. Enhanced Decision-Making Processes
o Participants will be able to guide the group through decision-making
processes, including making motions, debating, and voting.
o They will learn how to document decisions and actions accurately.
5. Effective Conflict Resolution
o Participants will acquire skills in resolving conflicts and managing
contentious issues in a meeting context.
o They will be prepared to address and mediate conflicts in a way that
respects all members and adheres to procedural norms.
Learning Outcomes
1. Knowledge of Key Parliamentary Concepts
o Participants will be able to define and explain key parliamentary terms and
concepts, such as motions, amendments, quorum, and voting procedures.
o They will understand the roles and responsibilities of different meeting
participants (e.g., chair, secretary, members).
2. Application of Parliamentary Rules
o Participants will demonstrate the ability to apply parliamentary rules to
various meeting scenarios, including making and seconding motions,
conducting debates, and handling procedural issues.
o They will be able to draft and use meeting agendas and minutes
effectively.
3. Practical Skills in Conducting Meetings
o Participants will practice and refine their skills in chairing and participating
in meetings, including managing discussion flows and enforcing rules.
o They will learn to use parliamentary tools and techniques to enhance
meeting efficiency and effectiveness.
4. Understanding of Cooperative Dynamics
o Participants will gain insight into the specific dynamics and governance
structures of cooperatives and how parliamentary procedure can support
cooperative principles.
o They will learn to adapt parliamentary procedures to fit the cooperative
context and address unique challenges.
5. Ability to Implement Best Practices
o Participants will be able to identify and implement best practices for
conducting effective and inclusive meetings.
o They will learn how to evaluate and improve meeting processes and
outcomes based on feedback and observations.
Evaluation and Assessment
To ensure that training outcomes and learning outcomes are achieved, consider
including the following assessment methods:
 Quizzes and Tests: To evaluate knowledge of parliamentary procedures and
concepts.
 Role-Playing Exercises: To practice conducting meetings and applying
parliamentary rules in simulated scenarios.
 Case Studies: To analyze real-world examples and discuss how parliamentary
procedures can be applied or adapted.
 Feedback Surveys: To gather feedback from participants on the effectiveness of
the training and identify areas for improvement.
By focusing on these outcomes and assessments, the training program can help
cooperatives conduct their meetings more effectively and ensure that democratic
processes and member participation are upheld.
NOTE: Adopt what is practical, doables, and applicable to the circumstances
surrounding the cooperative
Presenter 18 Leadership and Personality Development
Room for Improvement
o Include the importance of Leadership and Personality Development
o Discuss what are leadership projects
o Focus on the two thematic themes in your training proposal
Effectiveness in leadership roles and their overall personal growth. Here’s a structured
approach to defining training outcomes and learning outcomes for such a program:
Training Outcomes
1. Enhanced Leadership Skills
o Participants will develop the ability to lead and inspire teams effectively,
making strategic decisions and setting clear, achievable goals.
o They will gain skills in communication, motivation, and delegation to
enhance team performance and cohesion.
2. Improved Self-Awareness and Emotional Intelligence
o Participants will increase their self-awareness and understand how their
behaviors, emotions, and decisions impact themselves and others.
o They will improve their emotional intelligence, including empathy, self-
regulation, and social skills.
3. Strengthened Problem-Solving and Decision-Making Abilities
o Participants will enhance their problem-solving skills, learning to approach
complex issues with critical thinking and creativity.
o They will become more adept at making informed decisions and managing
risks effectively.
4. Increased Confidence and Assertiveness
o Participants will develop greater self-confidence and assertiveness in their
leadership roles and personal interactions.
o They will learn to express their ideas clearly and assertively while
respecting others' opinions.
5. Effective Conflict Resolution and Team Management
o Participants will acquire skills in managing and resolving conflicts within
teams constructively.
o They will learn techniques for building and maintaining effective team
dynamics and addressing issues that arise.
Learning Outcomes
1. Understanding of Leadership Theories and Styles
o Participants will be able to identify and explain various leadership theories
(e.g., transformational, transactional) and styles (e.g., democratic,
autocratic).
o They will understand how to apply different leadership approaches
depending on the situation and team needs.
2. Application of Leadership Skills
o Participants will demonstrate the ability to apply leadership skills in
practical scenarios, including setting goals, motivating team members, and
making strategic decisions.
o They will be able to create and execute action plans to address leadership
challenges.
3. Development of Self-Awareness and Emotional Intelligence
o Participants will show an increased awareness of their own personality
traits, strengths, and areas for improvement.
o They will be able to use emotional intelligence skills to manage their own
emotions and effectively interact with others.
4. Enhanced Communication and Interpersonal Skills
o Participants will demonstrate effective communication skills, including
active listening, clear articulation of ideas, and constructive feedback.
o They will develop interpersonal skills to build relationships, influence
others, and navigate social dynamics.
5. Effective Problem-Solving and Decision-Making
o Participants will apply problem-solving frameworks and decision-making
techniques to real-world challenges.
o They will be able to evaluate options, anticipate potential outcomes, and
make decisions that align with organizational goals.
6. Conflict Resolution and Team Building
o Participants will demonstrate skills in resolving conflicts through
negotiation and mediation techniques.
o They will be able to build and sustain high-performing teams by fostering a
collaborative and supportive environment.
Evaluation and Assessment
To measure the effectiveness of the training and the achievement of learning outcomes,
consider the following assessment methods:
 Self-Assessments and Reflection: Encourage participants to assess their own
leadership styles and personality traits, and reflect on their development over the
course of the training.
 Behavioral Observations: Observe participants during role-playing exercises,
group discussions, and practical tasks to evaluate their application of leadership
skills and personality development.
 Feedback from Peers and Mentors: Collect feedback from peers, subordinates,
and mentors to gain insights into the participants’ leadership effectiveness and
personal growth.
 Performance Metrics: Use specific performance metrics, such as team
productivity, conflict resolution effectiveness, and decision-making quality, to
assess improvements.
 Action Plans and Follow-Up: Have participants create and implement action
plans for personal and professional development, and conduct follow-up
sessions to review progress and adjust strategies as needed.
By focusing on these training and learning outcomes, you can help participants develop
the skills and attributes necessary for effective leadership and personal growth
Presenter 19: Training on Basic Literacy, Digital Communication and
Collaboration Tools
Good Points:
o Nice PowerPoint presentation
Suggestions
o Hands–on with specific output. No output no certificate
o Intro to Google products
Training on basic literacy, digital communication, and collaboration tools is crucial for
ensuring that participants are equipped to thrive in today’s digitally driven environment.
Here's a structured overview of the training outcomes and learning outcomes for such a
program:
Training Outcomes
1. Improved Basic Literacy Skills
o Participants will gain proficiency in reading, writing, and basic arithmetic,
which are essential for everyday tasks and further learning.
o They will develop the ability to understand and create simple documents,
follow written instructions, and perform basic calculations.
2. Enhanced Digital Communication Skills
o Participants will learn to use various digital communication tools
effectively, including email, instant messaging, and video conferencing
platforms.
o They will develop skills in crafting clear, concise, and professional digital
messages and using digital platforms to engage with others.
3. Effective Use of Collaboration Tools
o Participants will become adept at using collaboration tools such as shared
documents, project management software, and online workspaces.
o They will learn to collaborate efficiently with others, manage and track
tasks, and contribute to team projects using these tools.
4. Increased Confidence in Digital Environments
o Participants will build confidence in navigating and using digital platforms
and tools for various personal and professional purposes.
o They will develop a proactive approach to learning and adapting to new
technologies as they emerge.
5. Enhanced Problem-Solving and Critical Thinking
o Participants will develop skills in problem-solving and critical thinking by
using digital tools to analyze information, collaborate on solutions, and
make informed decisions.
o They will learn to troubleshoot common issues related to digital
communication and collaboration tools.
Learning Outcomes
1. Basic Literacy Proficiency
o Reading: Participants will demonstrate the ability to read and comprehend
simple texts, including instructions, narratives, and informational materials.
o Writing: Participants will be able to write clear and coherent sentences,
paragraphs, and basic documents, including emails and memos.
o Arithmetic: Participants will apply basic arithmetic operations (addition,
subtraction, multiplication, division) to solve everyday problems.
2. Effective Digital Communication
o Email Communication: Participants will compose and send professional
emails, including using proper etiquette, formatting, and attachments.
o Messaging Platforms: Participants will effectively use instant messaging
and chat platforms for real-time communication, including managing
conversations and group chats.
o Video Conferencing: Participants will use video conferencing tools to
schedule and conduct meetings, share screens, and interact with remote
participants.
3. Proficiency in Collaboration Tools
o Document Sharing: Participants will use tools like Google Drive or
Dropbox to share, edit, and manage documents collaboratively.
o Project Management: Participants will use project management software
(e.g., Asana, Trello) to create, assign, and track tasks and deadlines.
o Online Workspaces: Participants will navigate and utilize online
workspaces (e.g., Microsoft Teams, Slack) for team communication, file
sharing, and project coordination.
4. Navigating Digital Platforms
o Tool Familiarity: Participants will be familiar with the basic functions of
commonly used digital tools and platforms, including troubleshooting
common issues.
o Adaptability: Participants will demonstrate the ability to quickly learn and
adapt to new digital tools and technologies as needed.
5. Application of Digital Skills
o Problem-Solving: Participants will use digital tools to address and solve
real-world problems, such as managing a project or coordinating with a
team.
o Critical Thinking: Participants will analyze information, evaluate options,
and make informed decisions using digital resources and tools.
Evaluation and Assessment
To measure the effectiveness of the training and ensure learning outcomes are
achieved, consider the following assessment methods:
 Pre- and Post-Training Assessments: Conduct assessments before and after
the training to measure improvements in basic literacy, digital communication,
and collaboration skills.
 Practical Exercises: Use practical exercises and simulations to evaluate
participants’ ability to apply digital tools and communication skills in real-world
scenarios.
 Assignments and Projects: Assign tasks and projects that require participants
to use digital tools and collaboration platforms, and assess their performance and
outcomes.
 Feedback Surveys: Collect feedback from participants on their confidence and
proficiency with digital tools and communication skills before and after the
training.
 Peer and Self-Assessment: Incorporate peer and self-assessment to gauge
participants’ understanding and application of digital communication and
collaboration tools.
By focusing on these training and learning outcomes, you can help participants
build the essential skills needed for effective digital communication and collaboration,
while also enhancing their basic literacy and problem-solving abilities.
Presenter 20 Strategic Development Planning Workshop
Room improvement
o Not looking at her audience
o Soft voice
Recommendation
o SP presentation
o V-M-G and values are initial drafts from participants. The outputs should be
presented to the members for further consultation/enhancement.
A Strategic Development Planning Workshop for cooperatives focuses on
equipping participants with the knowledge and skills to create and implement effective
strategic plans that drive the growth and success of their cooperative. Here’s a detailed
outline of the training outcomes and learning outcomes for such a workshop:
Training Outcomes
1. Enhanced Strategic Planning Skills
o Participants will be able to develop comprehensive strategic plans that
align with their cooperative’s mission, vision, and goals.
o They will gain skills in conducting SWOT (Strengths, Weaknesses,
Opportunities, Threats) analyses and using other strategic planning tools
effectively.
2. Improved Understanding of Cooperative Dynamics
o Participants will understand the unique characteristics and challenges of
cooperatives and how to address them through strategic planning.
o They will learn how to align strategic plans with cooperative principles and
values.
3. Strengthened Ability to Set and Achieve Goals
o Participants will develop skills in setting SMART (Specific, Measurable,
Achievable, Relevant, Time-bound) goals and objectives.
o They will learn to create actionable plans and milestones to track progress
and achieve strategic goals.
4. Increased Capacity for Strategic Decision-Making
o Participants will improve their decision-making abilities by analyzing data,
forecasting trends, and evaluating strategic options.
o They will gain skills in prioritizing initiatives and allocating resources
effectively.
5. Enhanced Collaboration and Communication
o Participants will develop skills in collaborating with stakeholders,
communicating strategic plans, and engaging members in the planning
process.
o They will learn to build consensus and manage conflicts related to
strategic decisions.
Learning Outcomes
1. Understanding Strategic Planning Concepts
o Strategic Planning: Participants will be able to explain the fundamental
concepts of strategic planning, including its purpose, benefits, and key
components.
o SWOT Analysis: Participants will understand how to conduct and
interpret a SWOT analysis to inform strategic decision-making.
2. Development of Strategic Plans
o Mission and Vision Statements: Participants will learn to articulate and
refine their cooperative’s mission and vision statements to guide strategic
planning.
o Goal Setting: Participants will be able to define SMART goals and
objectives that align with the cooperative’s strategic direction.
3. Application of Strategic Tools and Techniques
o Strategic Frameworks: Participants will demonstrate the ability to use
strategic frameworks (e.g., PESTEL analysis, Porter’s Five Forces) to
assess the external environment and inform strategy.
o Action Planning: Participants will create detailed action plans that outline
steps, timelines, responsibilities, and resources required to achieve
strategic goals.
4. Effective Strategic Decision-Making
o Data Analysis: Participants will be able to analyze and interpret data
relevant to strategic planning, including market trends, financial
performance, and member feedback.
o Scenario Planning: Participants will learn to use scenario planning
techniques to anticipate future challenges and opportunities.
5. Implementation and Evaluation
o Implementation Strategies: Participants will develop strategies for
implementing their strategic plans, including resource allocation, timeline
management, and stakeholder engagement.
o Monitoring and Evaluation: Participants will understand how to set up
monitoring and evaluation systems to track progress, measure success,
and make adjustments as needed.
6. Enhanced Stakeholder Engagement
o Communication: Participants will learn effective communication
techniques to present strategic plans to stakeholders and members.
o Collaboration: Participants will develop strategies for engaging members
in the planning process and building consensus around strategic
initiatives.
Evaluation and Assessment
To assess the effectiveness of the workshop and the achievement of learning
outcomes, consider using the following methods:
 Pre- and Post-Workshop Surveys: Assess participants’ knowledge and skills
before and after the workshop to measure improvements.
 Case Studies and Simulations: Use case studies and simulations to evaluate
participants’ ability to apply strategic planning concepts and tools in practical
scenarios.
 Action Plan Development: Have participants develop and present a draft
strategic plan or action plan for their cooperative, and provide feedback on its
comprehensiveness and feasibility.
 Group Discussions and Role Plays: Facilitate group discussions and role-
playing exercises to assess participants’ collaboration and decision-making skills.
 Feedback and Reflections: Collect feedback from participants on the
workshop’s content, delivery, and applicability, and encourage reflections on their
learning experiences and future applications.
By focusing on these training and learning outcomes, the workshop can help
cooperatives develop effective strategic plans, enhance their strategic decision-making,
and improve their overall organizational performance
Presenter 21 Policy Development
Room for Improvement
o Soft voice. More volume to emphasize your point
o Improve your audience impact
o Workshop outputs need critiquing
o Review of old policies for their relevance to the present situation then revised to
be responsive to the present situation
Policy development consists of phases. Formulating, implementing, and reviewing
policies for cooperatives involves a structured approach to ensure that policies are
effective, relevant, and aligned with the cooperative’s goals and values. Here’s a
detailed overview of each phase:
1. Policy Formulation
a. Identify Needs and Objectives:
 Assess Needs: Determine the specific needs of the cooperative that require
policy development. This could include areas such as governance, financial
management, membership, or operational procedures.
 Set Objectives: Define the goals the policy aims to achieve. Ensure they align
with the cooperative’s mission, vision, and strategic plan.
b. Research and Analysis:
 Benchmarking: Research best practices and policies from other cooperatives or
organizations in similar sectors.
 Legal and Regulatory Compliance: Ensure the policy complies with relevant
laws, regulations, and cooperative principles.
 Stakeholder Input: Engage with members, board members, and other
stakeholders to gather input and perspectives.
c. Drafting the Policy:
 Clear Language: Write the policy in clear, concise, and understandable
language.
 Structure: Include key components such as purpose, scope, definitions,
responsibilities, procedures, and enforcement.
 Alignment: Ensure the policy aligns with existing policies and procedures to
avoid conflicts.
d. Review and Approval:
 Internal Review: Have the draft policy reviewed by key stakeholders and experts
for feedback and revisions.
 Approval Process: Submit the policy draft to the cooperative’s board or
governing body for approval.
 Communication: Communicate the new policy to all members and stakeholders,
explaining its purpose and implications.
2. Policy Implementation
a. Develop an Implementation Plan:
 Action Steps: Outline the steps required to implement the policy, including
timelines, resources, and responsibilities.
 Training: Provide training and resources to members and staff to ensure they
understand and can comply with the new policy.
b. Assign Responsibilities:
 Roles: Designate individuals or teams responsible for implementing different
aspects of the policy.
 Support: Provide support and resources to those responsible for enforcing and
adhering to the policy.
c. Integrate with Operations:
 Procedures: Update or create procedures to align with the new policy. Ensure
they are integrated into daily operations.
 Monitoring: Set up monitoring mechanisms to track the implementation process
and identify any issues.
d. Communication and Support:
 Information Dissemination: Clearly communicate the policy details and its
impact to all members and staff.
 Support Systems: Establish support systems for addressing questions,
concerns, or issues related to the policy.
3. Policy Review
a. Regular Monitoring:
 Performance Metrics: Define and track performance metrics to assess the
effectiveness of the policy.
 Feedback Mechanisms: Collect feedback from members and stakeholders on
the policy’s impact and effectiveness.
b. Review and Evaluation:
 Periodic Review: Schedule regular reviews of the policy (e.g., annually or
biannually) to ensure it remains relevant and effective.
 Evaluation Criteria: Evaluate the policy based on its ability to meet objectives,
compliance with regulations, and overall impact.
c. Revise and Update:
 Identify Changes: Based on the review, identify areas for improvement or
necessary changes to the policy.
 Update Policy: Revise the policy as needed and follow the same process for
review and approval as in the formulation phase.
d. Document and Communicate Changes:
 Documentation: Document any changes or updates to the policy.
 Communication: Inform all members and stakeholders of the changes and
provide updated versions of the policy.
Key Considerations:
 Inclusivity: Ensure that the policy development process is inclusive and
considers the diverse needs and perspectives of all stakeholders.
 Compliance: Stay up-to-date with changes in laws and regulations that may
affect the policy.
 Transparency: Maintain transparency throughout the policy formulation,
implementation, and review processes to build trust and ensure buy-in from
members.
 Flexibility: Be prepared to adapt policies as the cooperative evolves and
external conditions change.
By following these guidelines, cooperatives can develop, implement, and review
policies effectively, ensuring they support the cooperative’s objectives and contribute to
its overall success.
Presenter 21 Skills Training on Cassava Processing
Good points
o Good voice
Rationale
Benefits that can be derived from the training
Room for improvement
o Use of printed materials for lecturer presentation in case no power
o Make sure to have confirmation from the targeted participants
Skills training on cassava processing is essential for enhancing the efficiency and
quality of cassava-based products. This type of training typically covers various aspects
of cassava processing, including production, handling, and product development. Here’s
a detailed outline of the training outcomes and learning outcomes for such a program:
Training Outcomes
1. Enhanced Processing Skills
o Participants will gain practical skills in various methods of cassava
processing, including peeling, grating, drying, and milling.
o They will learn to operate and maintain processing equipment effectively.
2. Improved Quality and Safety Standards
o Participants will understand and implement quality control and safety
standards in cassava processing to ensure high-quality products.
o They will learn best practices for handling and storing cassava to minimize
contamination and spoilage.
3. Increased Product Knowledge
o Participants will be able to produce a range of cassava-based products,
such as flour, chips, and fermented products.
o They will understand the nutritional and economic benefits of different
cassava products.
4. Enhanced Economic Viability
o Participants will develop skills to improve the economic viability of cassava
processing, including cost management, pricing strategies, and market
analysis.
o They will learn to identify and capitalize on market opportunities for
cassava products.
5. Strengthened Problem-Solving and Innovation
o Participants will enhance their problem-solving skills to address common
challenges in cassava processing.
o They will be encouraged to innovate and develop new products or
processes based on market needs and technological advancements.
Learning Outcomes
1. Understanding Cassava Processing Techniques
o Basic Processing: Participants will be able to explain and perform basic
cassava processing techniques, including peeling, washing, grating, and
milling.
o Advanced Techniques: Participants will learn advanced processing
techniques such as fermentation, baking, and producing high-value
products like cassava flour and starch.
2. Application of Quality Control Measures
o Quality Standards: Participants will understand and apply quality control
measures to ensure the consistency and safety of processed cassava
products.
o Safety Protocols: Participants will implement food safety protocols to
prevent contamination and ensure compliance with relevant health
regulations.
3. Product Development and Innovation
o Product Variety: Participants will develop and produce various cassava-
based products, including snacks, flour, and beverages.
o Market Trends: Participants will learn to assess market trends and
consumer preferences to guide product development and innovation.
4. Economic and Financial Management
o Cost Analysis: Participants will perform cost analysis and budgeting for
cassava processing to ensure economic sustainability.
o Pricing and Marketing: Participants will develop pricing strategies and
marketing plans to effectively promote and sell cassava products.
5. Practical Application and Troubleshooting
o Hands-On Skills: Participants will gain hands-on experience in operating
processing equipment and handling cassava.
o Problem-Solving: Participants will demonstrate the ability to troubleshoot
common issues in the processing chain, such as equipment malfunctions
or product quality problems.
6. Sustainability and Environmental Impact
o Sustainable Practices: Participants will learn about sustainable practices
in cassava processing, including waste management and resource
conservation.
o Environmental Impact: Participants will understand the environmental
impact of cassava processing and ways to mitigate it.
Evaluation and Assessment
To measure the effectiveness of the training and ensure the learning outcomes are
achieved, consider the following assessment methods:
 Practical Demonstrations: Evaluate participants’ ability to perform processing
tasks and operate equipment through hands-on demonstrations and practical
exercises.
 Product Quality Assessment: Assess the quality of cassava products produced
by participants, including texture, taste, and appearance.
 Knowledge Tests: Use quizzes or tests to evaluate participants’ understanding
of processing techniques, quality control, and market strategies.
 Feedback Surveys: Collect feedback from participants on the training’s content,
delivery, and applicability, and gather suggestions for improvement.
 Project Assignments: Have participants complete projects, such as developing
a new cassava product or creating a business plan for a cassava processing
venture, and assess their performance.
By focusing on these training and learning outcomes, participants can acquire the
skills and knowledge needed to enhance their cassava processing operations, improve
product quality, and achieve economic success.
NOTE, Conserve what is doable and applicable training and learning outcomes
for your cooperative.
Presenter 23: Governance and Management of Cooperatives
Room for Improvement
o What is the output per module
o Who is responsible in the preparation of modules?
o Use of simple case study as part of the methodology
Recommendation:
o Be guided by CDA MA 2015 on the revised guidelines for mandatory training
o Refer to Presenter No. 12
Presenter 24 Strengthening the Conduct Mediation and Conciliation Through Barangay
Agrarian Reform Committee
Room for improvement
o Soft voice. More volume when you want to emphasize your point and get the
attention of your audience
o Identify possible opportunities to strengthen the conduct of mediation and
conciliation through surveys, Focus Group Discussions, and benchmarking with
other Barangay Agrarian Reform Committee
Alternative Solution
o Activate the Med Com of the cooperative for internal disputes /issues
Training on strengthening mediation and conciliation through Barangay Agrarian
Reform Committees (BARCs) aims to enhance the effectiveness of these committees in
resolving agrarian disputes and promoting peaceful community relations. This type of
training is essential for improving conflict resolution skills and ensuring fair and effective
processes in agrarian reform contexts. Here’s an outline of the training outcomes and
learning outcomes for such a program:
Training Outcomes
1. Enhanced Mediation and Conciliation Skills
o Participants will develop advanced skills in mediation and conciliation to
effectively handle disputes related to agrarian reform.
o They will learn techniques to facilitate dialogue, build consensus, and
reach fair agreements among conflicting parties.
2. Improved Understanding of Legal and Policy Frameworks
o Participants will gain a thorough understanding of the legal and policy
frameworks governing agrarian reform and the role of BARCs in the
mediation process.
o They will learn to navigate and apply relevant laws and regulations in
resolving disputes.
3. Strengthened Conflict Resolution Capabilities
o Participants will enhance their ability to identify, analyze, and address the
root causes of agrarian disputes.
o They will develop strategies to manage conflicts constructively and
prevent escalation.
4. Increased Capacity for Community Engagement
o Participants will improve their skills in engaging with community members
and stakeholders, fostering trust and collaboration.
o They will learn to communicate effectively and sensitively with diverse
groups involved in agrarian reform issues.
5. Enhanced Procedural and Administrative Skills
o Participants will acquire skills in managing the procedural and
administrative aspects of mediation and conciliation processes.
o They will learn to document and report on mediation outcomes and follow
up on agreements effectively.
Learning Outcomes
1. Understanding Mediation and Conciliation Processes
o Concepts and Techniques: Participants will be able to explain key
concepts and techniques of mediation and conciliation, including active
listening, negotiation, and conflict resolution strategies.
o Process Stages: Participants will understand the stages of the mediation
and conciliation process, from initiation to agreement implementation.
2. Application of Legal and Policy Knowledge
o Legal Framework: Participants will demonstrate knowledge of the legal
and policy frameworks relevant to agrarian reform and BARC functions.
o Policy Implementation: Participants will be able to apply legal and policy
guidelines effectively in mediation and conciliation scenarios.
3. Conflict Identification and Analysis
o Root Cause Analysis: Participants will be able to identify and analyze the
root causes of agrarian disputes and assess their impact on the
community.
o Resolution Strategies: Participants will develop and implement strategies
to address the underlying issues and achieve fair and sustainable
resolutions.
4. Effective Communication and Engagement
o Dialogue Facilitation: Participants will practice facilitating constructive
dialogues between conflicting parties, ensuring all voices are heard and
respected.
o Community Interaction: Participants will improve their ability to engage
with community members and stakeholders in a manner that fosters trust
and cooperation.
5. Procedural and Administrative Management
o Documentation: Participants will learn to document mediation and
conciliation processes, including recording agreements, tracking progress,
and preparing reports.
o Follow-Up: Participants will develop skills for monitoring the
implementation of agreements and addressing any issues that arise post-
resolution.
6. Ethical and Professional Conduct
o Ethics: Participants will understand the ethical standards and professional
conduct expected in mediation and conciliation roles.
o Impartiality: Participants will demonstrate the ability to remain impartial
and ensure fairness throughout the mediation process.
Evaluation and Assessment
To assess the effectiveness of the training and the achievement of learning outcomes,
consider using the following methods:
 Role-Playing Exercises: Use role-playing scenarios to evaluate participants’
mediation and conciliation skills in simulated agrarian disputes.
 Case Studies: Analyze real-world case studies to assess participants’
understanding of legal frameworks, conflict resolution strategies, and community
engagement.
 Knowledge Tests: Conduct quizzes or tests to measure participants’ knowledge
of mediation techniques, legal guidelines, and procedural management.
 Feedback and Reflection: Collect feedback from participants on the training’s
content and delivery, and encourage reflections on their learning experiences
and applications.
 Performance Reviews: Observe participants’ performance in handling actual
mediation cases or mock scenarios, and provide constructive feedback on their
skills and approaches.
By focusing on these training and learning outcomes, the program can help
strengthen the capabilities of BARCs in effectively mediating and conciliating agrarian
disputes, ultimately contributing to more equitable and peaceful agrarian reform
processes.
Presenter 25 Cooperative Governance and Management
Room for improvement
o Don’t skip Rationale
o State the expected outputs of your training
Recommendation:
o Be guided by CDA MA 2015 on the revised guidelines for mandatory training
o Refer to Presenter No. 12
Presenter 26 Pre Membership Education Program
Good Points
o Good voice for lecturing
o With a sense of humor
o Use of vernacular
Point of Order:
PMES is a training conducted by the Education and Training Committee or
designated personnel. It is not the responsibility of a DAR trainer or facilitator to
conduct PMES. Remember Principles on autonomous and independence.
Recommendations for ETC
o Assist would-be members in filling up forms such as subscription forms,
applications for membership
o Get a receipt of their contribution
o Assist in getting BIR TIN
o Discuss the duties and responsibilities of membership
The Pre-Membership Education Program (PMEP) for cooperatives is designed to
educate prospective members about the principles, values, and operations of
cooperatives before they join. This program ensures that new members are well-
informed and prepared to contribute effectively to the cooperative’s success. Here’s an
outline of the training outcomes and learning outcomes for such a program:
Training Outcomes
1. Enhanced Understanding of Cooperative Principles and Values
o Participants will gain a thorough understanding of the fundamental
principles and values of cooperatives, including democracy, equality, and
mutual assistance.
o They will appreciate how these principles guide the cooperative’s
operations and decision-making processes.
2. Improved Knowledge of Cooperative Structure and Governance
o Participants will learn about the structure of cooperatives, including the
roles and responsibilities of the board of directors, management, and
members.
o They will understand the governance processes and decision-making
mechanisms within the cooperative.
3. Increased Awareness of Member Rights and Responsibilities
o Participants will be aware of their rights and responsibilities as cooperative
members, including voting rights, financial obligations, and participation in
meetings and activities.
o They will understand the importance of active involvement in the
cooperative to contribute to its success.
4. Strengthened Understanding of Cooperative Operations and Services
o Participants will gain insight into the cooperative’s operations, including
how services and products are delivered and managed.
o They will learn about the cooperative’s business model, financial
management, and service offerings.
5. Enhanced Readiness for Active Membership
o Participants will be prepared to engage actively in the cooperative,
including attending meetings, participating in committees, and fulfilling
their membership obligations.
o They will develop the skills needed to contribute effectively to the
cooperative’s activities and goals.
Learning Outcomes
1. Understanding Cooperative Principles and Values
o Cooperative Principles: Participants will be able to explain the seven
cooperative principles (e.g., voluntary and open membership, democratic
member control, member economic participation).
o Core Values: Participants will understand core cooperative values such
as self-help, self-responsibility, democracy, equality, equity, and solidarity.
2. Knowledge of Cooperative Structure and Governance
o Organizational Structure: Participants will be able to describe the
organizational structure of the cooperative, including the roles of the board
of directors, management, and members.
o Governance Mechanisms: Participants will understand the governance
mechanisms, such as elections, annual meetings, and decision-making
processes.
3. Awareness of Member Rights and Responsibilities
o Member Rights: Participants will know their rights as cooperative
members, including the right to vote, stand for election, and access
information.
o Member Responsibilities: Participants will understand their
responsibilities, such as paying dues, attending meetings, and
participating in cooperative activities.
4. Understanding Cooperative Operations and Services
o Operations: Participants will be familiar with the cooperative’s operational
procedures, including how services are provided and managed.
o Financial Management: Participants will learn about the cooperative’s
financial structure, including how funds are raised and allocated.
5. Preparation for Active Membership
o Engagement: Participants will demonstrate an understanding of how to
engage in cooperative activities, including attending meetings,
volunteering, and participating in committees.
o Contribution: Participants will be prepared to contribute to the
cooperative’s success by fulfilling their roles and responsibilities
effectively.
Evaluation and Assessment
To assess the effectiveness of the PMEP and ensure learning outcomes are
achieved, consider the following methods:
 Knowledge Tests: Use quizzes or tests to evaluate participants’ understanding
of cooperative principles, structure, and member rights and responsibilities.
 Case Studies and Scenarios: Analyze case studies or scenarios to assess
participants’ ability to apply their knowledge in practical situations related to
cooperative operations and governance.
 Role-Playing Exercises: Use role-playing to simulate cooperative meetings or
decision-making processes and assess participants’ readiness for active
membership.
 Feedback Surveys: Collect feedback from participants on the program’s
content, delivery, and applicability, and gather suggestions for improvement.
 Participation Assessment: Evaluate participants’ engagement and involvement
in program activities and discussions to gauge their preparedness for active
membership.
By focusing on these training and learning outcomes, the PMEP can effectively
prepare prospective members to understand and engage with the cooperative,
contributing to its overall success and sustainability.
Presenter 27: Boosting Agricultural Productivity With Civil Engineering
Solutions for Cooperatives
Suggestions
o Survey or Focal group discussions to gather data on Civil Engineering Solutions
for Cooperatives
o identify simple infra projects feasible for their needs such as Maintenance/repair
of irrigation, Water impounding, Rain water harvesting, etc.
o On your raining methodology, show a local picture of infra that is suited for your
targeted beneficiaries
Training on boosting agricultural productivity with civil engineering solutions for
cooperatives focuses on integrating civil engineering techniques and technologies to
enhance agricultural practices. This type of training aims to improve agricultural
productivity through infrastructure development, water management, and land
optimization. Here’s an outline of the training outcomes and learning outcomes for such
a program:
Training Outcomes
1. Enhanced Understanding of Civil Engineering Applications in Agriculture
o Participants will gain knowledge of how civil engineering solutions can be
applied to agricultural settings, including irrigation systems, soil erosion
control, and infrastructure development.
o They will learn to integrate civil engineering practices into agricultural
projects to improve productivity.
2. Improved Infrastructure Planning and Management Skills
o Participants will develop skills in planning, designing, and managing
agricultural infrastructure projects, such as farm roads, storage facilities,
and irrigation systems.
o They will learn to assess and address infrastructure needs to support
agricultural activities.
3. Increased Proficiency in Water Management Techniques
o Participants will acquire skills in designing and implementing effective
water management systems, including irrigation and drainage solutions, to
optimize water use in agriculture.
o They will understand how to manage water resources to enhance crop
yield and sustainability.
4. Strengthened Land Optimization and Erosion Control Skills
o Participants will learn techniques for land optimization and soil
conservation to prevent erosion and improve land productivity.
o They will develop strategies for effective land use planning and
management.
5. Enhanced Capacity for Implementing Engineering Solutions
o Participants will gain hands-on experience in applying civil engineering
solutions to real-world agricultural challenges.
o They will learn to evaluate the effectiveness of engineering solutions and
make necessary adjustments.
Learning Outcomes
1. Understanding Civil Engineering Concepts for Agriculture
o Engineering Principles: Participants will be able to explain key civil
engineering principles and their relevance to agricultural productivity.
o Application Areas: Participants will understand various areas where civil
engineering can be applied in agriculture, such as irrigation, drainage, and
infrastructure development.
2. Planning and Designing Agricultural Infrastructure
o Infrastructure Needs: Participants will identify infrastructure needs for
agricultural projects, including roads, storage facilities, and irrigation
systems.
o Design Skills: Participants will be able to plan and design agricultural
infrastructure that meets the needs of the cooperative and enhances
productivity.
3. Water Management Techniques
o Irrigation Systems: Participants will design and implement efficient
irrigation systems, including surface, drip, and sprinkler irrigation.
o Drainage Solutions: Participants will learn to design and manage
drainage systems to prevent waterlogging and erosion.
4. Land Optimization and Soil Conservation
o Erosion Control: Participants will understand and apply techniques for
controlling soil erosion, such as terracing, contour plowing, and use of
cover crops.
o Land Use Planning: Participants will be able to plan and manage land
use to optimize productivity and prevent degradation.
5. Implementation and Evaluation of Engineering Solutions
o Hands-On Experience: Participants will gain practical experience in
implementing civil engineering solutions in agricultural settings.
o Effectiveness Evaluation: Participants will learn to assess the
effectiveness of engineering solutions and make improvements as
needed.
Evaluation and Assessment
To assess the effectiveness of the training and ensure that learning outcomes are
achieved, consider the following methods:
 Practical Exercises: Conduct hands-on exercises where participants design and
implement civil engineering solutions for agricultural projects.
 Case Studies: Use case studies to evaluate participants’ ability to apply
engineering principles to real-world agricultural challenges.
 Knowledge Tests: Administer quizzes or tests to measure participants’
understanding of civil engineering concepts, infrastructure planning, and water
management techniques.
 Project Assignments: Have participants complete projects, such as designing
an irrigation system or planning infrastructure for a cooperative farm, and assess
their performance.
 Feedback Surveys: Collect feedback from participants on the training’s content,
delivery, and applicability, and gather suggestions for improvement.
By focusing on these training and learning outcomes, the program can help
cooperatives enhance their agricultural productivity through effective civil engineering
solutions, improving infrastructure, water management, and land optimization.
Presenter 28 Cooperative Governance and Management Course
Good Points
o Good motivator to engage participants
o Can relate to her audience
o Use of FGD in gathering initial data
o With articulation per slide
o Methodologies suggested like case study, role playing
Recommendations
o Every five years or earlier, officers need to have a refresher course to enhance
their knowledge and skills
o Redirection of the training course based on present circumstances (Upskilling
and reskilling of the duties and responsibilities of the Officers/staff/members)
o Review of GM Performance – What went right? And what went wrong?
o Find a solution to improve the governance and management of the cooperative
o Conduct SWOT Analysis
o Always be guided by the universal principles and practices of the cooperative
Recommendation:
o Be guided by CDA MA 2015 on the revised guidelines for mandatory training
o Refer to presenter no,12 for more details
NOTE: Possible training outcomes and learning outcomes where applicable and
relevant
Presenter 29 Records Management for Financial Transactions
Good Points
o Good voice
o Good pronunciation
o
Room for Improvement
o Rationale at least 2-3 paragraphs
o Coverage of the mentoring and coaching sessions
Training on records management for financial transactions focuses on equipping
participants with the skills and knowledge to effectively manage and maintain accurate
records of financial activities. This training is crucial for ensuring financial integrity,
compliance, and efficient operation of financial systems. Here’s a detailed outline of the
training outcomes and learning outcomes for such a program:
Training Outcomes
1. Enhanced Skills in Financial Records Management
o Participants will develop advanced skills in managing and organizing
financial records, including documentation, storage, and retrieval.
o They will learn best practices for maintaining accurate and comprehensive
financial records.
2. Improved Understanding of Compliance and Regulatory Requirements
o Participants will gain a thorough understanding of compliance
requirements related to financial records, including relevant laws,
regulations, and standards.
o They will be able to apply these requirements to ensure that financial
records are managed in accordance with legal and regulatory frameworks.
3. Increased Proficiency in Using Records Management Systems
o Participants will become proficient in using records management systems
and software for tracking and managing financial transactions.
o They will learn to implement and utilize digital tools for efficient records
management.
4. Strengthened Ability to Ensure Data Accuracy and Integrity
o Participants will learn techniques to ensure the accuracy and integrity of
financial records, including error detection and correction methods.
o They will develop skills to safeguard financial data from unauthorized
access and tampering.
5. Enhanced Capacity for Audits and Financial Reporting
o Participants will acquire skills to prepare for audits and generate accurate
financial reports based on well-maintained records.
o They will learn to organize and present financial data in a manner that
supports transparency and accountability.
Learning Outcomes
1. Understanding Records Management Principles
o Fundamentals: Participants will be able to explain the fundamental
principles of records management, including the importance of
documentation, storage, and retrieval.
o Best Practices: Participants will understand best practices for maintaining
financial records, including regular updates and proper categorization.
2. Compliance and Regulatory Knowledge
o Legal Requirements: Participants will be able to identify and understand
the legal and regulatory requirements related to financial records
management.
o Application: Participants will demonstrate the ability to apply these
requirements to ensure compliance in their financial record-keeping
practices.
3. Proficiency in Records Management Systems
o Software Usage: Participants will be proficient in using records
management systems and software for tracking financial transactions.
o System Implementation: Participants will learn how to implement and
utilize digital tools to streamline records management processes.
4. Ensuring Accuracy and Integrity of Financial Records
o Data Accuracy: Participants will learn techniques to ensure the accuracy
of financial records, including methods for detecting and correcting errors.
o Data Security: Participants will understand and apply measures to
safeguard financial data from unauthorized access and ensure its integrity.
5. Preparation for Audits and Reporting
o Audit Readiness: Participants will develop skills to prepare financial
records for audits, including organizing and presenting data in an audit-
friendly manner.
o Financial Reporting: Participants will learn to generate and present
financial reports that reflect accurate and comprehensive data.
Evaluation and Assessment
To assess the effectiveness of the training and ensure the achievement of learning
outcomes, consider the following methods:
 Practical Exercises: Conduct hands-on exercises where participants manage
financial records, use records management systems, and prepare financial
reports.
 Case Studies: Use case studies to evaluate participants’ ability to apply records
management principles and compliance requirements in real-world scenarios.
 Knowledge Tests: Administer quizzes or tests to measure participants’
understanding of records management principles, compliance requirements, and
system usage.
 Project Assignments: Have participants complete projects, such as creating a
records management plan or preparing for an audit, and assess their
performance.
 Feedback Surveys: Collect feedback from participants on the training’s content,
delivery, and applicability, and gather suggestions for improvement.
By focusing on these training and learning outcomes, the program can help
participants effectively manage financial records, ensuring accuracy, compliance, and
efficiency in financial transactions.
Presenter 30 Basic Computer Literacy of Lingsat Saranay Cooperative
Good Points
o Training was based on the TNA conducted
o Nice PowerPoint presentation
Recommendations
o Make sure you have desks tops or laptops for your exercises
o Stable internet connectivity
o Please refer to Presenter 19: Training on Basic Literacy, Digital Communication
and Collaboration Tools
Presenter 31 Basic Coop Course
Room for Improvement
o Establish eye contact with your audience
o Change title to fundamental of Cooperatives in compliance with MC 2004 -01,
MC 2021 -04, MC 2020-28, MC 2015-09
o Increase the use of fonts that is readable to all
Good Point
o Added miscellaneous expenses in the proposed budget
Areas for Improvement
o Evaluation method
o Follow up
o Refer to Presenter 6 Training Objectives for Fundamentals of Cooperatives
Based on CDA MC 2025-09 for more details
Presenter 32 Basic Accounting for Non-Accountants
Good points
o Good PowerPoint presentation
o Creative and innovative
o Study the use of font color – dark background use white. light background use
black
o With articulation with e payment like Gcash, e BIR
o She specialized on the Training Proposed
o Refer to Presenter 2 got more details
Presenter 33 Governance and Management of cooperatives
Good Points
o With eye contact with audience
o Pleasing personality
o Use story telling
o Rationale based on TNA with legal basis
o She realized that the copp has leveled/transformed to another status thus the
officers, and staff need retooling, upskilling and reskilling to match their present
circumstances
o Refer to Presenter 12
Presenter 34 Policy Development
Good Points
o Good voice
o TNA integrated in the rationale
o Use of participatory approach
o Frevisit old policies and revised according to the present circumstances on the
cooperative
Recommendations
o Prior to the conduct of the training, advise board to review past policies
formulated to assess its relevance and effectiveness vis-à-vis performance and
culture of the organization
o Get inputs fro officers/staff/ key members for their inputs in the revision
o You may conduct benchmarking with same category cooperative to learn from
their practices
Training on policy development for cooperatives aims to equip participants with the
skills and knowledge necessary to create effective policies that guide cooperative
operations and decision-making. Here’s an outline of the training outcomes and learning
outcomes for such a program:
Training Outcomes
1. Enhanced Policy Development Skills
o Participants will develop the ability to formulate, draft, and implement
policies that address the needs and goals of the cooperative.
o They will learn to use structured approaches to policy development,
including research, stakeholder consultation, and impact assessment.
2. Improved Understanding of Cooperative Governance and Compliance
o Participants will gain a thorough understanding of the principles of
cooperative governance and the legal and regulatory requirements for
policy development.
o They will learn to ensure that policies are compliant with relevant laws and
regulations.
3. Increased Proficiency in Stakeholder Engagement
o Participants will learn to engage effectively with stakeholders, including
members, board members, and external partners, to gather input and
build support for policies.
o They will develop skills in facilitating discussions and addressing concerns
during the policy development process.
4. Strengthened Ability to Evaluate and Monitor Policies
o Participants will acquire skills to evaluate the effectiveness of policies and
monitor their implementation.
o They will learn to adjust and refine policies based on feedback and
performance data.
5. Enhanced Capacity for Policy Communication and Training
o Participants will learn to communicate policies clearly and effectively to all
stakeholders.
o They will develop skills to train others in understanding and implementing
policies.
Learning Outcomes
1. Understanding Policy Development Process
o Policy Formulation: Participants will be able to explain the process of
policy formulation, including the steps involved in drafting and reviewing
policies.
o Research and Analysis: Participants will understand how to conduct
research and analyze information to inform policy development.
2. Knowledge of Cooperative Governance and Compliance
o Governance Principles: Participants will be able to describe the
principles of cooperative governance and their impact on policy
development.
o Legal Requirements: Participants will understand the legal and
regulatory requirements for policy development and ensure policies are
compliant.
3. Proficiency in Stakeholder Engagement
o Engagement Techniques: Participants will demonstrate techniques for
engaging stakeholders, including conducting consultations and facilitating
discussions.
o Feedback Integration: Participants will learn to integrate stakeholder
feedback into policy development.
4. Evaluation and Monitoring of Policies
o Policy Evaluation: Participants will be able to assess the effectiveness of
policies through evaluation techniques and performance metrics.
o Monitoring: Participants will understand how to monitor policy
implementation and make necessary adjustments based on feedback and
data.
5. Effective Communication and Training
o Policy Communication: Participants will be able to communicate policies
clearly and effectively to members and stakeholders.
o Training Others: Participants will develop skills to train others on policy
understanding and implementation.
Evaluation and Assessment
To assess the effectiveness of the training and ensure the achievement of learning
outcomes, consider the following methods:
 Practical Exercises: Conduct exercises where participants draft and review
sample policies, incorporating stakeholder feedback and compliance
requirements.
 Case Studies: Use case studies to evaluate participants’ ability to apply policy
development principles and address real-world scenarios.
 Knowledge Tests: Administer quizzes or tests to measure participants’
understanding of policy development processes, governance principles, and
compliance requirements.
 Project Assignments: Have participants complete projects, such as developing
a policy proposal or creating a policy implementation plan, and assess their
performance.
 Feedback Surveys: Collect feedback from participants on the training’s content,
delivery, and applicability, and gather suggestions for improvement.
By focusing on these training and learning outcomes, the program can help participants
effectively develop and implement policies that support the success and governance of
cooperatives.
Presenter 35 Orientation on SPLIT Policy guidelines and Other Related Issuances for
DAR Implementers
Room for Improvement
o Increase volume of your voice. It soft
o Rationale condensed to 2-3 paragraphs
Presenter 36 Basic Accounting for Non-Accountants
Good Points
o Creative and innovative Presentation
o With TNA
Recommendations
o M & E
Presenter 37 Credit Risk and Delinquency Control
Good point
o Training implementation
Recommendations
o Do not use red font preferred font color is black or blue. You may use red to
emphasize your point
o Discuss fully what is PBD lawyering and how it can impact the credit risk and
delinquency control of the cooperative
o Discuss coverage of mentoring and coaching
o Include Mediation and conciliation committee in your selection of participants
o Include KPI in your Action Plan, including metrics
Presenter 38 Gender and Development Seminar
Recommendation
o Use CDA MCs re GAD Organization,
o Create GAD Committee to oversee the GAD Plan
o Use CDA MC 2017 -04 tool to assess Progress in gender Equality
o Action Plan to implement MCs
o Provide Miscellaneous expense for uncontrollable events
Presenter 39 Training Workshop on Gender Analysis and GA Tools
Good Points
o Creative presentation
Recommendations
o Rationale 2-3 paragraghs
o Use CDA MC 2017 -04 tool to assess Progress in gender Equality
o Discuss your outputs (plans and Programs) to address gender mainstreaming in
the DAR
Presenter 40 Digital Literacy Training
Room for Improvement
o Use TNA as the basis for your training proposal
o Individual hands-on activity to get a certificate of attendance or participation
Presenter 41 Training on Records Management
Good Points
o Creative with good presentation
o Provision of sample records
Recommendations
o Officers and staff should be included in the proposed training
o Provide contingency expenses to cover uncontrollable events
o Output will be an action plan with timelines and deliverables so that it would be
easy for you top monitor progress in managing their records
o State sources of funds to cover the training expenses
Presenter 42 Risk Management Seminar
Good points
o With good voice
Recommendations
o Gather data to come up with a risk registry
o Measure the severity of the risk and occurrence
o Consult Officers/Staff about possible intervention measures to reduce or
eliminate risk
o Monitor reduction risk and occurrence
o If its increasing despite intervention, change your strategies if found ineffective
o Risk interventions should be funded
Presenter 43 Conduct of training on Technical Assistance on Credit Availment of Micro
Cooperatives
Good point
o With TNA
o Nice presentation - colorful
o With list of agencies providing financial assistance
Recommendations
o Study further possible sources of funds
o Ask funders to discuss requirements for availment
o Evaluation methods
o Follow Up
Presenter 44 Financial Literacy Training
Good Point
o With minimal articulation
Recommendations
o Invite resource person from cooperatives (University of Experience) with a good
track record on financial literacy
o Or a resource person from DTI
A financial literacy seminar for cooperatives focuses on equipping members with
essential financial knowledge and skills to manage their personal and cooperative
finances effectively. This training aims to enhance financial decision-making, improve
financial management practices, and support the overall financial health of the
cooperative. Here’s an outline of the training outcomes and learning outcomes for such
a seminar:
Training Outcomes
1. Enhanced Understanding of Financial Concepts
o Participants will gain a comprehensive understanding of fundamental
financial concepts and terminology.
o They will learn the importance of financial literacy for personal and
cooperative financial health.
2. Improved Personal Financial Management Skills
o Participants will develop skills in budgeting, saving, and managing
personal debt.
o They will learn strategies for financial planning and goal setting.
3. Increased Proficiency in Cooperative Financial Management
o Participants will gain knowledge in managing cooperative finances,
including budgeting, financial reporting, and cash flow management.
o They will learn to interpret financial statements and make informed
financial decisions for the cooperative.
4. Strengthened Ability to Evaluate Financial Products and Services
o Participants will learn to evaluate different financial products and services,
such as loans, insurance, and investment options.
o They will understand how to select appropriate financial products that
meet their personal and cooperative needs.
5. Enhanced Capacity for Financial Decision-Making
o Participants will develop critical thinking skills to analyze financial
information and make sound financial decisions.
o They will learn to assess the financial risks and benefits associated with
various financial options.
Learning Outcomes
1. Understanding Financial Concepts
o Basic Concepts: Participants will be able to explain fundamental financial
concepts, including income, expenses, savings, investments, and debt.
o Financial Literacy Importance: Participants will understand the
significance of financial literacy for achieving personal financial goals and
ensuring cooperative sustainability.
2. Personal Financial Management
o Budgeting: Participants will learn to create and manage personal budgets
to track income and expenses.
o Saving and Debt Management: Participants will understand the
importance of saving and strategies for managing and reducing personal
debt.
3. Cooperative Financial Management
o Financial Reporting: Participants will learn to read and interpret financial
statements, such as income statements, balance sheets, and cash flow
statements.
o Budgeting and Cash Flow: Participants will be able to develop and
manage budgets for the cooperative and understand cash flow
management.
4. Evaluating Financial Products
o Product Comparison: Participants will learn to compare different financial
products and services, including loans, insurance policies, and investment
opportunities.
o Appropriate Selection: Participants will understand how to choose
financial products that align with their financial goals and the cooperative’s
needs.
5. Financial Decision-Making
o Analyzing Financial Information: Participants will develop skills to
analyze financial data and assess the implications of financial decisions.
o Risk Assessment: Participants will learn to evaluate the risks and
benefits of different financial options and make informed decisions.
Evaluation and Assessment
To assess the effectiveness of the training and ensure the achievement of learning
outcomes, consider the following methods:
 Practical Exercises: Conduct exercises where participants create personal and
cooperative budgets, interpret financial statements, and evaluate financial
products.
 Case Studies: Use case studies to evaluate participants’ ability to apply financial
concepts and decision-making skills in real-world scenarios.
 Knowledge Tests: Administer quizzes or tests to measure participants’
understanding of financial concepts, personal financial management, and
cooperative financial management.
 Role-Playing: Use role-playing scenarios to assess participants’ skills in
discussing financial options, making decisions, and presenting financial plans.
 Feedback Surveys: Collect feedback from participants on the seminar’s content,
delivery, and applicability, and gather suggestions for improvement.
By focusing on these training and learning outcomes, the financial literacy seminar
can help cooperative members manage their finances more effectively, make informed
financial decisions, and contribute to the financial stability and growth of their
cooperative.
Presenter 45 Computer Literacy for Beginners
Good point
o Good training content
o Learning outcomes were mentioned
Recommendation
o Use TNA as the basis for your training proposal although trending is also
accepted provide you have the data
o Choose a venue with strong internet connectivity with competent IT staff to assist
o Who will prepare for the module to be distributed to participants
o Introduce other Google products especially google sheet
o Participants should bring their laptops for the hands-on activity
o All participants must complete exercises before they can receive their certificate
of attendance or participation
o Please refer to previous presenters with the same training proposal
Presenter 46 Governance and Management of Cooperatives
Recommendation
o State the category of coops in compliance to the conduct of mandatory/optional
trainings
o Include in the rationale the legal basis and result of your TNA analysis
o Provide miscellaneous expenses in your budget to cover uncontrollable events
o State sources of funds including sharing if funding will come from outside of the
coops
o Please refer to previous presenters with the same training proposal
Presenter 47 Effective Cooperative Management and Entrepreneurship
Recommendations
o Determine topics for coop management and topics for entrepreneurship
o As you have two themes in your training proposal
Training in Cooperative Management and Entrepreneurship aims to equip
participants with the knowledge and skills necessary to manage cooperatives effectively
and foster entrepreneurial thinking. This training helps enhance the overall
performance, sustainability, and growth potential of cooperatives. Here’s an outline of
the training outcomes and learning outcomes for such a program:
Training Outcomes
1. Enhanced Understanding of Cooperative Principles and Practices
o Participants will gain comprehensive knowledge of cooperative principles,
values, and practices.
o They will learn the roles and responsibilities of cooperative members and
leaders.
2. Improved Cooperative Management Skills
o Participants will develop skills in strategic planning, governance, and
operational management.
o They will learn techniques for effective decision-making, conflict
resolution, and member engagement.
3. Increased Knowledge of Financial Management for Cooperatives
o Participants will gain proficiency in financial planning, budgeting, and
financial reporting for cooperatives.
o They will understand how to manage cooperative finances, including
revenue generation, expense control, and financial sustainability.
4. Strengthened Entrepreneurial Skills
o Participants will develop entrepreneurial skills, including opportunity
identification, innovation, and risk management.
o They will learn to create and implement business plans that support
cooperative growth and diversification.
5. Enhanced Capacity for Marketing and Business Development
o Participants will learn strategies for marketing cooperative products and
services.
o They will develop skills in customer relationship management, sales, and
business development.
Learning Outcomes
1. Understanding Cooperative Principles and Practices
o Cooperative Principles: Participants will be able to explain the seven
cooperative principles and their importance in cooperative management.
o Roles and Responsibilities: Participants will understand the roles and
responsibilities of cooperative members, leaders, and managers.
2. Cooperative Management Skills
o Strategic Planning: Participants will learn to develop and implement
strategic plans that align with cooperative goals and objectives.
o Governance and Operations: Participants will be able to establish
effective governance structures and manage day-to-day operations
efficiently.
o Decision-Making and Conflict Resolution: Participants will understand
decision-making processes and conflict resolution techniques to ensure
smooth cooperative functioning.
3. Financial Management for Cooperatives
o Financial Planning and Budgeting: Participants will learn to create
financial plans and budgets that support cooperative sustainability and
growth.
o Financial Reporting: Participants will be able to prepare and interpret
financial statements, including income statements, balance sheets, and
cash flow statements.
o Revenue and Expense Management: Participants will understand how to
manage cooperative finances, focusing on revenue generation and
expense control.
4. Entrepreneurial Skills
o Opportunity Identification: Participants will learn to identify and evaluate
new business opportunities for the cooperative.
o Innovation and Risk Management: Participants will develop skills in
fostering innovation and managing risks associated with entrepreneurial
activities.
o Business Planning: Participants will be able to create comprehensive
business plans that outline strategies for growth and diversification.
5. Marketing and Business Development
o Marketing Strategies: Participants will learn to develop and implement
marketing strategies that promote cooperative products and services.
o Customer Relationship Management: Participants will understand the
importance of building and maintaining strong customer relationships.
o Sales and Business Development: Participants will develop skills in
sales techniques and business development to expand the cooperative’s
market presence.
Evaluation and Assessment
To assess the effectiveness of the training and ensure the achievement of learning
outcomes, consider the following methods:
 Practical Exercises: Conduct exercises where participants develop strategic
plans, financial budgets, business plans, and marketing strategies.
 Case Studies: Use case studies to evaluate participants’ ability to apply
cooperative management and entrepreneurial concepts in real-world scenarios.
 Knowledge Tests: Administer quizzes or tests to measure participants’
understanding of cooperative principles, financial management, and
entrepreneurial skills.
 Role-Playing: Use role-playing scenarios to assess participants’ skills in
decision-making, conflict resolution, customer engagement, and sales
techniques.
 Feedback Surveys: Collect feedback from participants on the training’s content,
delivery, and applicability, and gather suggestions for improvement.
By focusing on these training and learning outcomes, the Cooperative
Management and Entrepreneurship program can help cooperative members and
leaders enhance their management capabilities, foster entrepreneurial thinking, and
drive the cooperative’s success and growth.
Presenter 48 Parliamentary Procedures
Room for improvement
o Rationale 2-3 paragraphs will suffice
o Who will prepare for the modules
o State sources of funds and counterparts (sharing schemes)
o MOU for fund sharing
Please refer to previous presenters with the same training proposal
Presenter 49 Conflict Management
Good points
o Creative presentation
o Font use readable to all participants
o Good voice
o With elaboration on age and gender and its relationship to conflict management
Recommendations
o Categorize conflicts if major and minor.
o Categorize if urgent or not, this way you can make your decision on what to
prioritized based on urgency and capacity of your MC Committee
o Empower Mediation and Conciliation Committee to resolve conflicts within the
cooperatives
o Come up with a policy with procedures after a series conduct of consultations
Training on Conflict Management for cooperatives is essential to ensure smooth
operations, enhance cooperation among members, and foster a positive working
environment. Effective conflict management can lead to better decision-making,
increased productivity, and a more harmonious cooperative. Here’s an outline of the
training outcomes and learning outcomes for a conflict management program:
Training Outcomes
1. Enhanced Understanding of Conflict Dynamics
o Participants will gain a comprehensive understanding of the nature, types,
and causes of conflicts within cooperatives.
o They will learn the impact of unresolved conflicts on cooperative
operations and member relationships.
2. Improved Conflict Resolution Skills
o Participants will develop skills in identifying, addressing, and resolving
conflicts effectively.
o They will learn various conflict resolution techniques and strategies
suitable for different types of conflicts.
3. Increased Ability to Foster a Positive Cooperative Culture
o Participants will learn to create an environment that promotes open
communication, mutual respect, and collaboration.
o They will understand how to implement practices that prevent conflicts and
encourage cooperative problem-solving.
4. Strengthened Communication Skills
o Participants will enhance their communication skills, including active
listening, empathy, and assertiveness.
o They will learn to facilitate constructive dialogues and mediate disputes
among members.
5. Enhanced Capacity for Developing Conflict Management Policies
o Participants will gain knowledge in formulating and implementing conflict
management policies and procedures.
o They will learn to establish systems for reporting, addressing, and
resolving conflicts within the cooperative.
Learning Outcomes
1. Understanding Conflict Dynamics
o Nature of Conflict: Participants will be able to explain the nature and
dynamics of conflicts, including their types and causes.
o Impact of Conflict: Participants will understand the negative impact of
unresolved conflicts on cooperative effectiveness and member
relationships.
2. Conflict Resolution Skills
o Identifying Conflicts: Participants will learn to recognize early signs of
conflicts and understand their underlying causes.
o Resolution Techniques: Participants will be able to apply various conflict
resolution techniques, such as negotiation, mediation, and arbitration, to
resolve disputes.
3. Fostering a Positive Cooperative Culture
o Open Communication: Participants will learn to promote open
communication and transparency within the cooperative.
o Preventive Measures: Participants will understand how to implement
preventive measures that reduce the likelihood of conflicts.
4. Communication Skills
o Active Listening: Participants will develop active listening skills to
understand different perspectives and emotions during conflicts.
o Empathy and Assertiveness: Participants will learn to communicate
empathetically and assertively to address conflicts without escalating
them.
o Facilitating Dialogue: Participants will be able to facilitate constructive
dialogues and mediate disputes to reach mutually acceptable solutions.
5. Conflict Management Policies
o Policy Development: Participants will learn to develop conflict
management policies and procedures tailored to the cooperative’s needs.
o Implementation and Monitoring: Participants will understand how to
implement these policies effectively and monitor their impact on conflict
resolution.
Evaluation and Assessment
To assess the effectiveness of the training and ensure the achievement of learning
outcomes, consider the following methods:
 Practical Exercises: Conduct exercises where participants identify conflicts,
apply resolution techniques, and practice communication skills in simulated
scenarios.
 Case Studies: Use case studies to evaluate participants’ ability to analyze
conflicts, understand their dynamics, and apply appropriate resolution strategies.
 Knowledge Tests: Administer quizzes or tests to measure participants’
understanding of conflict dynamics, resolution techniques, and communication
skills.
 Role-Playing: Use role-playing scenarios to assess participants’ skills in
mediating disputes, facilitating dialogues, and implementing conflict management
policies.
 Feedback Surveys: Collect feedback from participants on the training’s content,
delivery, and applicability, and gather suggestions for improvement.
By focusing on these training and learning outcomes, the Conflict Management
training program can help cooperative members and leaders effectively manage
conflicts, foster a positive cooperative culture, and enhance overall cooperative
performance.
Resources:
o RA 9520
o CDA MCs and advisories
o Chatgpt

Training for Trainers DMMMSU Open University Batch 9 Comments- critiques-recommendations.docx

  • 1.
    Major Observations 1. Useof modules: Who is responsible for preparing the training module? Conduct Module development training as an intervention measure 2. DAR ATP should categorize the pool of trainers based on their specialization. This approach would make it easier to identify trainers to handle the requested training based on their expertise. 3. DAR mostly subsidizes funding sources. It is important to prioritize micro and small coops for subsidy. For medium and large coops, you have counterparts or share funds to conduct training activities. 4. Encourage medium and large companies to use their CETF to sponsor micro small coops under the Big Brother Small Brother Program. 5. Review CDA MC 2020 -23 on CETF and Utilization, Allocation and remittance 6. DAR ATP should have a file of PowerPoint presentations ready, especially for the mandatory training, to be used by their pool of trainers. They are allowed to enhance or modify presentations according to the needs of their cooperators. 7. Reading materials should also be made available for reproduction and printing, or consider the possibility of selling the materials at cost. 8. Resources like demand letters, collection letters, follow-up collection letters, and subscription forms should be available for easy access (electronically). 9. Describe specific activities for mentoring and coaching. 10.DAR ATP trainers should train their pool to prepare a suitable PowerPoint Presentation (Skills enhancements). 11.Consider the action plan as the output with timelines and deliverables of the training for effective M&E. 12.During your evaluation review, consider what went wrong. Review strategies and policies that are still effective and relevant and identify what went right to be retained as best practices. 13.Other presenters mentioned sustainability, but what are your indicators of sustainability? 14.How do you know if the cooperative is successful? Use impact evaluations through a review of literature and studies. 15.Incase of power failure or instant brownouts Teaching without electricity or during brownouts requires the creative use of non- digital and low-tech teaching instruments. Here are some effective tools and methods to use in such situations: 1. Printed Materials  Textbooks and Workbooks: Use printed textbooks, workbooks, and handouts for reading, exercises, and activities.
  • 2.
     Charts andPosters: Display information on charts, posters, and diagrams to illustrate concepts visually.  Flashcards: Use flashcards for vocabulary, definitions, or quick reviews of key concepts. 2. Whiteboards and Chalkboards  Whiteboards: Utilize whiteboards with markers for writing and drawing. They can be easily wiped clean and reused.  Chalkboards: Use chalkboards for writing, drawing diagrams, and illustrating problems. 3. Printed Guides and Manuals  Lesson Plans: Prepare and use printed lesson plans to guide instruction.  Instructional Manuals: Provide students with printed instructional manuals or guides relevant to the subject matter. 4. Physical Manipulatives  Models and Prototypes: Use physical models or prototypes to demonstrate concepts, especially in science or engineering subjects.  Objects and Props: Utilize real-world objects or props to illustrate practical examples and applications of the material being taught. 5. Interactive Activities  Group Work: Engage students in group activities, discussions, and collaborative problem-solving.  Role-Playing: Implement role-playing exercises to explore concepts and scenarios.  Games and Quizzes: Use board games, card games, or oral quizzes to make learning interactive and fun. 6. Analog Tools  Calculators: Use basic calculators for math exercises and problem-solving.  Timers: Use kitchen timers or stopwatches for timing activities or games. 7. Handouts and Worksheets  Worksheets: Distribute worksheets for practice exercises, assessments, or classwork.  Handouts: Provide handouts with summaries, key points, or additional readings. 8. Books and Reading Materials
  • 3.
     Reading Assignments:Assign reading from books or articles that students can work on during class or as homework.  Literature: Use novels, stories, or poems to facilitate reading and discussion. 9. Discussion and Lecture  Verbal Instruction: Rely on oral explanations, lectures, and discussions to convey information.  Debates: Organize debates or discussions to explore different perspectives on a topic. 10. Visual Aids  Diagrams and Flowcharts: Draw diagrams or flowcharts on whiteboards or chalkboards to explain processes and relationships.  Maps and Charts: Use printed maps and charts to support geography or data analysis lessons. Preparation Tips  Plan Ahead: Prepare materials in advance and have a backup plan for power outages.  Engage Students: Make use of interactive and hands-on activities to keep students engaged and motivated.  Flexibility: Be adaptable and ready to switch between different teaching methods depending on the available resources. By using these teaching instruments and methods, you can effectively continue instruction and keep students engaged, even in the absence of electricity. Advisories, Critiques, Comments and Recommendations 1. Presenter 1 Leadership and Value Reorientation Leadership Training Description: This course delves into the theories and practices of effective leadership within various organizational contexts. It emphasizes the development of essential leadership skills, including strategic thinking, decision- making, communication, and team building. Through case studies, simulations, and practical exercises, students will explore different leadership styles, the dynamics of power and influence, and the role of ethics in leadership. The course also focuses on the challenges and opportunities of leading diverse teams in a globalized world. By the end of this course, students will be equipped to lead with vision, inspire others, and drive organizational success.
  • 4.
    Values Re-Orientation: Thiscourse is designed to instill and reinforce core cooperative values among members and leaders of cooperative organizations. It covers the principles of cooperation, mutual aid, democratic governance, and social responsibility. Students will engage in discussions and activities highlighting the importance of these values in fostering a strong cooperative culture. The course also addresses contemporary challenges cooperatives face and provides strategies for aligning cooperative practices with foundational values. Emphasis is placed on ethical decision-making, member engagement, and sustainable development. Upon completion, students will have a deeper understanding of the cooperative identity and be better prepared to promote and uphold cooperative values in their organizations Room for improvement  Reading notes in toto (word for word)  Glance at your audience, eye level  Brief articulation of your slide presentation Recommendations  Core values include ICA Core Values and Ethical Values as well as the coop values agreed upon by the coop,  Get the commitment List of officers and follow-up commitment of leadership  Post Values in a conspicuous place  Recite Vision, Mission, and Values during convocation, alternately assign someone to elaborate on the V-M and values for internalization  Re echo training  Remind them to integrate values in the operation of cooperatives and dealing with members and other stockholders Presenter 2 Basic Accounting for Non-Accountants Training Objectives for Basic Accounting for Non-Accountants for Cooperatives 1. Understand Basic Accounting Principles: o Grasp the fundamental concepts and principles of accounting, including the accounting equation, double-entry bookkeeping, and the accrual basis of accounting. 2. Identify and Record Financial Transactions: o Learn to identify different types of financial transactions and accurately record them in the appropriate accounts. 3. Prepare Basic Financial Statements: o Develop the skills to prepare essential financial statements such as the balance sheet, income statement, and cash flow statement. 4. Analyze Financial Statements:
  • 5.
    o Gain theability to interpret and analyze financial statements to assess the financial health and performance of the cooperative. 5. Understand the Role of Accounting in Cooperatives: o Recognize the unique accounting needs and practices of cooperatives, including member equity, patronage refunds, and the distribution of surplus. 6. Develop Budgeting Skills: o Learn the basics of budgeting, including how to create and manage budgets to ensure financial sustainability and support decision-making. 7. Implement Internal Controls: o Understand the importance of internal controls and learn basic procedures to safeguard assets, ensure accurate financial reporting, and prevent fraud. 8. Enhance Financial Decision-Making: o Equip participants with the knowledge to use financial information for making informed management decisions that align with the cooperative’s goals and values. 9. Comply with Legal and Regulatory Requirements: o Gain awareness of the legal and regulatory requirements related to accounting and financial reporting for cooperatives. 10.Improve Financial Communication: o Develop the ability to communicate financial information effectively to non- financial stakeholders, including cooperative members, board members, and management. 11.Use Accounting Software: o Get introduced to basic accounting software tools that can help streamline the accounting process for cooperatives. 12.Promote Ethical Financial Practices: o Emphasize the importance of ethical behavior and integrity in accounting and financial management within the cooperative context. These objectives aim to provide non-accountant members of cooperatives with the essential accounting knowledge and skills necessary to contribute to the financial well- being and governance of their organizations. Room for Improvement 1. Try to glance at your audience from time to time 2. Provide brief articulation/explanation of topics 3. Rationale state result of TNA, Legal basis, and relevance and importance of the training 4. 24 hrs ( 3 days) Expected Outputs for Basic Accounting for Non-Accountants for Cooperatives 1. Enhanced Financial Literacy:
  • 6.
    o Participants demonstratea solid understanding of basic accounting principles and terminology. 2. Accurate Financial Record-Keeping: o Participants are able to accurately identify, record, and classify financial transactions using double-entry bookkeeping methods. 3. Preparation of Financial Statements: o Participants can prepare fundamental financial statements, including the balance sheet, income statement, and cash flow statement. 4. Financial Analysis Skills: o Participants can analyze financial statements to assess the cooperative’s financial health, identifying trends and making informed decisions. 5. Application of Cooperative Accounting Practices: o Participants understand and apply accounting practices specific to cooperatives, such as handling member equity, patronage refunds, and surplus distribution. 6. Budgeting Proficiency: o Participants can create and manage budgets, forecasting revenues and expenses to ensure financial sustainability. 7. Implementation of Internal Controls: o Participants implement basic internal control measures to safeguard assets and ensure accurate financial reporting. 8. Informed Financial Decision-Making: o Participants use financial information to support strategic planning and decision-making processes within the cooperative. 9. Compliance with Legal Requirements: o Participants demonstrate awareness and adherence to legal and regulatory requirements related to cooperative accounting and financial reporting. 10.Effective Financial Communication: o Participants improve their ability to communicate financial information clearly and effectively to non-financial stakeholders, including cooperative members and board members. 11.Proficiency in Accounting Software (If applicable) o Participants gain basic proficiency in using accounting software tools to streamline financial processes. 12.Ethical Financial Management: o Participants commit to ethical behavior and integrity in their accounting and financial management practices. 13.Participant Feedback and Evaluation: o Collect feedback from participants on the training effectiveness, identify areas for improvement, and evaluate the training outcomes against the set objectives. 14.Training Materials and Resources: o Development and distribution of training materials, such as manuals, guides, templates, and accounting software ( or hard copies) tutorials, to support ongoing learning and application.
  • 7.
    15.Action Plans forImplementation: o Participants create action plans outlining how they will apply the knowledge and skills gained in their respective cooperatives to enhance financial management and governance. ________________ Using a Gantt chart indicating timelines and deliverables of the expected outputs. This would facilitate M & Egh and follow throu or provide reminders These outputs will help ensure that the training program effectively equips non- accountant members of cooperatives with the necessary accounting knowledge and skills to contribute meaningfully to their organization's financial health and sustainability. Presenter 3 Financial Management Seminar Participant: Board, Treasurer, GM, Audit Committee Training Objectives for Financial Management Training for Cooperatives 1. Understand Financial Management Concepts: o Grasp fundamental financial management concepts, including financial planning, control, and decision-making processes within the cooperative context. 2. Develop Financial Planning Skills: o Learn to create comprehensive financial plans that align with the cooperative’s goals and objectives, including budgeting, forecasting, and financial projections. 3. Enhance Budgeting Techniques: o Gain proficiency in developing, managing, and monitoring budgets to ensure efficient allocation of resources and financial stability. 4. Improve Cash Flow Management: o Understand and apply strategies for effective cash flow management to maintain liquidity and meet the cooperative’s operational needs. 5. Strengthen Financial Analysis and Reporting: o Acquire skills to analyze financial statements and reports, interpret key financial ratios, and assess the financial performance and position of the cooperative. 6. Optimize Funding and Investment Decisions: o Learn to evaluate various funding sources, investment opportunities, and capital structure decisions to support the cooperative’s growth and sustainability. 7. Implement Effective Internal Controls: o Understand the importance of internal controls and learn to design and implement control mechanisms to safeguard assets and ensure accurate financial reporting.
  • 8.
    8. Risk Managementand Mitigation: o Identify financial risks facing the cooperative and develop strategies to mitigate these risks through sound financial practices and risk management techniques. 9. Enhance Financial Decision-Making: o Equip participants with tools and methodologies for making informed financial decisions that contribute to the cooperative’s strategic goals. 10.Promote Compliance and Ethical Practices: o Gain awareness of legal, regulatory, and ethical requirements in financial management and ensure compliance with relevant standards and practices. 11.Effective Financial Communication: o Develop skills to communicate financial information clearly and effectively to cooperative members, board members, and other stakeholders. 12.Use of Financial Management Tools and Software: o Get introduced to financial management tools and software that can enhance efficiency in financial planning, analysis, and reporting. 13.Develop Long-Term Financial Strategies: o Learn to formulate and implement long-term financial strategies that ensure the cooperative’s sustainability and competitiveness. 14.Participant Feedback and Evaluation: o Gather feedback from participants on the training program, assess its effectiveness, and identify areas for improvement. 15.Create Action Plans for Implementation: o Encourage participants to develop action plans detailing how they will apply the financial management skills and knowledge acquired in their cooperatives. Good Points: 1. With profiling, gap analysis. 2. Training Implementation 3. Methodology – with Critiquing ---------------------- These objectives aim to equip cooperative members and managers with the essential financial management skills needed to ensure their organizations' financial health, sustainability, and strategic growth. Recommendations: 1. State source/s of funds 2. Include contingency for uncontrollable events (like additional guests) 3. With partner/s (MOU, MOA) 4. What about the CETF of the Coop?
  • 9.
    Presenter 4 BasicComputer Literacy (Microsoft Word and Excel) Training Objectives for Basic Computer Literacy (Microsoft Word and Excel) for Micro Cooperatives Microsoft Word 1. Understand the Basics of Microsoft Word: o Gain a foundational understanding of Microsoft Word, including the user interface, basic navigation, and common functionalities. 2. Create and Format Documents: o Learn how to create, save, and open documents. Understand basic formatting techniques, such as adjusting fonts, paragraphs, and styles to produce professional-looking documents. 3. Insert and Manage Text, Images, and Tables: o Develop the skills to insert and manipulate text, images, tables, and other objects within a document to enhance readability and presentation. 4. Utilize Templates and Styles: o Learn to use built-in templates and styles to standardize documents and improve efficiency in document creation. 5. Implement Document Review and Collaboration Features: o Understand how to track changes, add comments, and use other collaboration tools to facilitate teamwork and document reviews. Microsoft Excel 6. Understand the Basics of Microsoft Excel: o Gain a foundational understanding of Microsoft Excel, including the user interface, basic navigation, and common functionalities. 7. Create and Format Spreadsheets: o Learn how to create, save, and open spreadsheets. Understand basic formatting techniques, such as adjusting cell styles, fonts, and alignment. 8. Utilize Basic Formulas and Functions: o Develop skills to use basic formulas and functions to perform calculations and analyze data effectively. 9. Create and Manage Data Lists: o Learn to create, sort, filter, and manage data lists to organize information efficiently. 10.Generate Charts and Graphs: o Understand how to create and format charts and graphs to visually represent data and support decision-making. Integrated Objectives 11.Enhance Administrative Efficiency:
  • 10.
    o Use MicrosoftWord and Excel to streamline administrative tasks, such as creating reports, managing records, and tracking cooperative activities. 12.Improve Financial Record-Keeping: o Learn to use Excel for basic financial record-keeping, budgeting, and simple financial analysis. 13.Facilitate Communication and Reporting: o Develop skills to create clear and professional documents and reports using Word and Excel, enhancing communication within the cooperative. 14.Promote Data Accuracy and Integrity: o Understand the importance of accuracy and integrity in data entry and document creation, and learn best practices to maintain high standards. 15.Encourage Continuous Learning and Skill Development: o Foster a culture of continuous learning by encouraging participants to explore advanced features and additional training resources for Word and Excel. These objectives aim to equip members of micro cooperatives with essential computer literacy skills, enhancing their productivity, efficiency, and ability to manage cooperative activities effectively using Microsoft Word and Excel. Room for Improvement: 1. Glance at your audience 2. The Rationale came later. 3. Follow topic sequencing Expected Outputs from Participants for Basic Computer Literacy (Microsoft Word and Excel) for Micro Cooperatives Microsoft Word 1. Professional Documents: o Participants produce well-formatted documents such as meeting minutes, reports, letters, and memos that adhere to professional standards. 2. Utilization of Templates and Styles: o Creation and use of customized templates and styles for consistent and efficient document formatting. 3. Effective Use of Images and Tables: o Documents incorporating relevant images, tables, and charts to enhance clarity and presentation of information. 4. Collaborative Documents: o Documents with tracked changes, comments, and other collaboration features that facilitate teamwork and document reviews. Microsoft Excel
  • 11.
    5. Organized Spreadsheets: oParticipants create and maintain organized spreadsheets for various cooperative tasks such as member lists, inventory tracking, and event planning. 6. Data Analysis and Calculations: o Use of basic formulas and functions to perform calculations, analyze data, and generate insights relevant to cooperative operations. 7. Data Management: o Efficient data management through the creation of sortable and filterable data lists that help in organizing and retrieving information quickly. 8. Visual Data Representation: o Creation of charts and graphs to visually represent data, making it easier to understand and communicate financial and operational information. Integrated Outputs 9. Improved Administrative Processes: o Streamlined administrative tasks with the use of Word for document creation and Excel for data management, resulting in increased productivity and efficiency. 10.Accurate Financial Records: o Basic financial records maintained in Excel, including simple budgets, expense tracking, and financial summaries. 11.Clear and Professional Reports: o Comprehensive reports combining data and insights from both Word and Excel, presented in a clear and professional manner to cooperative members and stakeholders. 12.Enhanced Communication: o Improved internal and external communication through well-prepared documents and presentations that effectively convey information. 13.Practical Application of Skills: o Real-world application of learned skills in daily cooperative activities, demonstrating an increase in confidence and competency in using Word and Excel. 14.Action Plans for Continuous Improvement: o Development of action plans by participants detailing how they will continue to improve their computer literacy skills and integrate these tools into their cooperative’s operations. 15.Participant Feedback and Evaluation: o Collection of feedback on the training’s effectiveness, including participants’ self-assessments of their new skills and identification of areas for further development. Prepare a Gantt chart with timelines and expected deliverables for your M and E. Ask participants about their doable deliverables. Do not expect all outputs in one cycle;
  • 12.
    Set program deliverablesfor Year 1, Year 2, etc. Transition for one step at a time. Do not do everything in one setting. _____________________ These outputs indicate that participants have not only gained essential computer literacy skills but are also applying them effectively to enhance the operations and management of their micro cooperatives Presenter 5 Financial Management Seminar Participant: Board, Treasurer, GM, Audit Committee Training Objectives for Financial Management Training for Cooperatives 1. Understand Financial Management Concepts: a. Grasp fundamental financial management concepts, including financial planning, control, and decision-making processes within the cooperative context. 2. Develop Financial Planning Skills: a. Learn to create comprehensive financial plans that align with the cooperative’s goals and objectives, including budgeting, forecasting, and financial projections. 3. Enhance Budgeting Techniques: a. Gain proficiency in developing, managing, and monitoring budgets to ensure efficient allocation of resources and financial stability. 4. Improve Cash Flow Management: a. Understand and apply strategies for effective cash flow management to maintain liquidity and meet the cooperative’s operational needs. 5. Strengthen Financial Analysis and Reporting: a. Acquire skills to analyze financial statements and reports, interpret key financial ratios, and assess the financial performance and position of the cooperative. 6. Optimize Funding and Investment Decisions: a. Learn to evaluate various funding sources, investment opportunities, and capital structure decisions to support the cooperative’s growth and sustainability. 7. Implement Effective Internal Controls: a. Understand the importance of internal controls and learn to design and implement control mechanisms to safeguard assets and ensure accurate financial reporting. 8. Risk Management and Mitigation: a. Identify financial risks facing the cooperative and develop strategies to mitigate these risks through sound financial practices and risk management techniques. 9. Enhance Financial Decision-Making:
  • 13.
    a. Equip participantswith tools and methodologies for making informed financial decisions that contribute to the cooperative’s strategic goals. 10.Promote Compliance and Ethical Practices: a. Gain awareness of legal, regulatory, and ethical requirements in financial management and ensure compliance with relevant standards and practices. 11.Effective Financial Communication: a. Develop skills to communicate financial information clearly and effectively to cooperative members, board members, and other stakeholders. 12.Use of Financial Management Tools and Software: a. Get introduced to financial management tools and software that can enhance efficiency in financial planning, analysis, and reporting. 13.Develop Long-Term Financial Strategies: a. Learn to formulate and implement long-term financial strategies that ensure the cooperative’s sustainability and competitiveness. 14.Participant Feedback and Evaluation: a. Gather feedback from participants on the training program, assess its effectiveness, and identify areas for improvement. 15.Create Action Plans for Implementation: a. Encourage participants to develop action plans detailing how they will apply the financial management skills and knowledge acquired in their cooperatives. Good Points: o With profiling, gap analysis. o Training Implementation o Methodology – with Critiquing ---------------------- These objectives aim to equip cooperative members and managers with the essential financial management skills needed to ensure their organizations' financial health, sustainability, and strategic growth. Recommendations: o State source/s of funds o Include contingency for uncontrollable events (like additional guests) o With partner/s (MOU, MOA) o What about the CETF of the Coop? Presenter 6 Training Objectives for Fundamentals of Cooperatives Based on CDA MC 2025-09
  • 14.
    Understanding Cooperative Principlesand Philosophy 1. Comprehend Cooperative Identity: o Understand the definition, nature, and distinct characteristics of cooperatives, including their values, principles, and philosophy. 2. Grasp the Cooperative Principles: o Learn the seven internationally recognized cooperative principles that guide cooperative organizations: voluntary and open membership, democratic member control, member economic participation, autonomy and independence, education, training and information, cooperation among cooperatives, and concern for community. Legal Framework and Governance 3. Familiarize with the Legal Basis: o Gain knowledge about the Cooperative Development Authority (CDA) regulations, specifically MC 2025-09, and other relevant laws and policies governing cooperatives in the Philippines. 4. Understand Governance Structures: o Learn about the governance structures of cooperatives, including the roles and responsibilities of the general assembly, board of directors, committees, and management. 5. Compliance and Reporting: o Understand the compliance requirements and reporting obligations for cooperatives as mandated by the CDA, including annual reports, audits, and other regulatory submissions. Organizational Management and Development 6. Establish Cooperative Formation and Registration: o Learn the procedures for forming and registering a cooperative, including the preparation of necessary documents and requirements set by the CDA. 7. Develop Strategic Planning Skills: o Gain skills in strategic planning and goal-setting to help cooperatives achieve their mission and objectives effectively. 8. Enhance Member Engagement and Participation: o Understand the importance of member engagement and learn techniques to encourage active participation and commitment from cooperative members. Financial Management and Sustainability 9. Basic Cooperative Financial Management: o Acquire fundamental financial management skills tailored to cooperatives, including budgeting, financial reporting, and resource allocation.
  • 15.
    10.Understand Capital Formationand Allocation: o Learn about capital formation, member contributions, and the allocation of surplus in line with cooperative principles and legal requirements. 11.Promote Economic Sustainability: o Understand strategies to ensure the economic sustainability of cooperatives, including income-generating activities, investment options, and prudent financial management. Education, Training, and Information 12.Implement Education and Training Programs: o Learn the importance of continuous education and training for members, leaders, and staff to enhance their skills, knowledge, and capacity. 13.Utilize Information and Communication Technologies: o Gain awareness of the role of information and communication technologies (ICT) in improving cooperative operations, communication, and member engagement. Social Responsibility and Community Development 14.Promote Social Responsibility: o Understand the cooperative’s role in promoting social responsibility and ethical practices within the community. 15.Engage in Community Development: o Learn about the cooperative’s involvement in community development activities and initiatives that contribute to the welfare and development of the community. 16.Cooperation Among Cooperatives: o Emphasize the importance of cooperation among cooperatives at local, national, and international levels to strengthen the cooperative movement. Evaluation and Continuous Improvement 17.Evaluate Cooperative Performance: o Learn methods for evaluating the performance and impact of cooperatives to identify areas for improvement and ensure continuous development. 18.Adopt Best Practices: o Gain insights into best practices in cooperative management and operations to enhance the efficiency and effectiveness of cooperative activities. These objectives aim to provide a comprehensive understanding of the fundamentals of cooperatives based on CDA MC 2025-09, equipping participants with the knowledge and skills needed to effectively manage and sustain their cooperative organizations. Evaluation Tools for Fundamentals of Cooperatives Based on CDA MC 2025-09
  • 16.
    Pre-Training Assessment 1. BaselineKnowledge Survey: o A survey or quiz administered before the training begins to assess participants' initial understanding of cooperative principles, legal frameworks, governance structures, financial management, and other key areas. During Training Evaluation 2. Interactive Quizzes: o Short quizzes at the end of each module to assess immediate comprehension and retention of the material covered. 3. Group Discussions and Activities: o Facilitate group discussions and activities to encourage peer learning and assess participants' ability to apply concepts in real-world scenarios. 4. Case Studies: o Use case studies relevant to cooperatives to evaluate participants’ analytical and problem-solving skills. 5. Practical Exercises: o Hands-on exercises, such as drafting strategic plans or preparing financial statements, to assess practical application of the skills learned. Post-Training Evaluation 6. Post-Training Knowledge Assessment: o A comprehensive test similar to the pre-training assessment to measure the improvement in participants' knowledge and understanding after the training. 7. Participant Feedback Survey: o A survey to collect participants’ feedback on the training content, delivery, and overall experience. This helps in evaluating the training’s effectiveness and areas for improvement. 8. Action Plan Development: o Have participants develop action plans on how they will apply the knowledge and skills gained in their cooperatives. Review and evaluate these action plans for feasibility and relevance. Long-Term Evaluation 9. Follow-Up Surveys and Interviews: o Conduct follow-up surveys and interviews a few months after the training to assess how participants are applying their new knowledge and skills in their cooperative roles. 10.Performance Metrics:
  • 17.
    o Track keyperformance indicators (KPIs) within the cooperatives, such as membership growth, financial performance, compliance with CDA regulations, and member engagement, to evaluate the training’s long-term impact. 11.Observation and Reporting: o Trainers or cooperative leaders observe and report on participants' implementation of best practices and improved processes within their cooperatives. 12.Peer Reviews: o Organize peer review sessions where participants can share their experiences and provide feedback on each other’s implementation of the training concepts. 13.Case Study Follow-Up: o Revisit initial case studies or introduce new ones to assess ongoing problem-solving abilities and the application of cooperative principles in new scenarios. 14.Documentation Review: o Review documentation and records maintained by participants’ cooperatives, such as meeting minutes, financial statements, and strategic plans, to ensure adherence to training principles. Evaluation Reporting 15.Evaluation Report: o Compile a comprehensive evaluation report summarizing the findings from various evaluation tools, highlighting areas of success and areas needing improvement. This report can guide future training programs and ongoing support initiatives. By using these evaluation tools, trainers can effectively measure the impact of the Fundamentals of Cooperatives training based on CDA MC 2025-09, ensuring that participants gain the necessary knowledge and skills to strengthen their cooperative organizations. Note: This is just advisory. Your actions should be based on the circumstances in the cooperative, the culture of the organization, fund consideration, and available and capacity of human resources. Suggestion: Provide materials for your participants for them to re-read and guide them in doing their duties and obligations Presenter 7. Training on Policy Formulation Room for Improvement o Glancing at the audience
  • 18.
    o Try tohave eye contact with audience o There must be critiquing of your workshop output Training Outcome for Policy Formulation for Cooperatives Objective: Equip participants with the knowledge, skills, and tools necessary to effectively formulate, analyze, and implement policies that enhance the growth and sustainability of cooperatives. Learning Outcomes: 1. Understanding Policy Frameworks: o Knowledge: Participants will understand the fundamental principles and frameworks that underpin policy formulation for cooperatives. o Skills: Ability to critically analyze existing policy frameworks and identify their strengths and weaknesses. o Attitude: Develop an appreciation for the role of effective policy in the success of cooperatives. 2. Policy Analysis and Research: o Knowledge: Participants will gain knowledge of various research methodologies used in policy analysis. o Skills: Ability to conduct comprehensive policy research, including data collection, analysis, and interpretation. o Attitude: Foster a culture of evidence-based policy-making within cooperative organizations. 3. Stakeholder Engagement: o Knowledge: Understand the importance of engaging stakeholders in the policy formulation process. o Skills: Develop skills in stakeholder analysis, communication, and consensus-building. o Attitude: Cultivate an inclusive approach to policy development that considers the perspectives of all relevant stakeholders. 4. Drafting and Formulating Policies: o Knowledge: Learn the components and structure of effective policy documents. o Skills: Ability to draft clear, concise, and actionable policy documents tailored to the needs of cooperatives. o Attitude: Emphasize the importance of clarity, precision, and feasibility in policy drafting. 5. Policy Implementation and Evaluation: o Knowledge: Understand the processes involved in the implementation and evaluation of policies. o Skills: Develop strategies for effective policy implementation and mechanisms for monitoring and evaluation. o Attitude: Promote a results-oriented approach to policy implementation and continuous improvement.
  • 19.
    6. Ethics andGovernance: o Knowledge: Learn about the ethical considerations and governance issues related to policy formulation for cooperatives. o Skills: Ability to integrate ethical principles and good governance practices into policy development. o Attitude: Encourage a commitment to ethical behavior and transparency in policy-making processes. Assessment Methods:  Case studies and policy analysis reports.  Group projects on drafting policy documents.  Role-playing exercises for stakeholder engagement.  Quizzes and exams to test theoretical knowledge.  Practical assignments on policy implementation plans. Resources:  Academic articles and textbooks on policy formulation.  Case studies of successful cooperative policies.  Access to policy research databases.  Workshops and seminars with policy experts and practitioners. By the end of this training, participants should be able to design and implement policies that effectively address the unique challenges and opportunities faced by cooperatives, contributing to their long-term sustainability and impact. Note: choose learning outcomes based on the feasibility and applicability to cooperatives Presenter 8. Credit Management Room for Improvement: o Use case analysis in your methodology o In your rationale, kindly mention the result of gap analysis conducted as the basis for the conduct credit management Training Outcome for Policy Formulation for Cooperatives Objective: Equip participants with the knowledge, skills, and tools necessary to effectively formulate, analyze, and implement policies that enhance the growth and sustainability of cooperatives. Learning Outcomes: 1. Understanding Policy Frameworks:
  • 20.
    o Knowledge: Participantswill understand the fundamental principles and frameworks that underpin policy formulation for cooperatives. o Skills: Ability to critically analyze existing policy frameworks and identify their strengths and weaknesses. o Attitude: Develop an appreciation for the role of effective policy in the success of cooperatives. 2. Policy Analysis and Research: o Knowledge: Participants will gain knowledge of various research methodologies used in policy analysis. o Skills: Ability to conduct comprehensive policy research, including data collection, analysis, and interpretation. o Attitude: Foster a culture of evidence-based policy-making within cooperative organizations. 3. Stakeholder Engagement: o Knowledge: Understand the importance of engaging stakeholders in the policy formulation process. o Skills: Develop skills in stakeholder analysis, communication, and consensus-building. o Attitude: Cultivate an inclusive approach to policy development that considers the perspectives of all relevant stakeholders. 4. Drafting and Formulating Policies: o Knowledge: Learn the components and structure of effective policy documents. o Skills: Ability to draft clear, concise, and actionable policy documents tailored to the needs of cooperatives. o Attitude: Emphasize the importance of clarity, precision, and feasibility in policy drafting. 5. Policy Implementation and Evaluation: o Knowledge: Understand the processes involved in the implementation and evaluation of policies. o Skills: Develop strategies for effective policy implementation and mechanisms for monitoring and evaluation. o Attitude: Promote a results-oriented approach to policy implementation and continuous improvement. 6. Ethics and Governance: o Knowledge: Learn about the ethical considerations and governance issues related to policy formulation for cooperatives. o Skills: Ability to integrate ethical principles and good governance practices into policy development. o Attitude: Encourage a commitment to ethical behavior and transparency in policy-making processes. Assessment Methods:  Case studies and policy analysis reports.  Group projects on drafting policy documents.
  • 21.
     Role-playing exercisesfor stakeholder engagement.  Quizzes and exams to test theoretical knowledge.  Practical assignments on policy implementation plans. Resources:  Academic articles and textbooks on policy formulation.  Case studies of successful cooperative policies.  Access to policy research databases.  Workshops and seminars with policy experts and practitioners. By the end of this training, participants should be able to design and implement policies that effectively address the unique challenges and opportunities faced by cooperatives, contributing to their long-term sustainability and impact. Training Outcome for Credit Management for Cooperatives Objective: Equip participants with the knowledge, skills, and tools necessary to effectively manage credit within cooperatives, ensuring financial stability and growth. Learning Outcomes: 1. Understanding Credit Management Principles: o Knowledge: Participants will understand the fundamental principles and concepts of credit management in the context of cooperatives. o Skills: Ability to apply these principles to real-world situations within cooperatives. o Attitude: Develop an appreciation for the importance of effective credit management in maintaining financial health. 2. Credit Risk Assessment: o Knowledge: Gain knowledge of methods and techniques for assessing credit risk. o Skills: Ability to conduct thorough credit risk assessments, including analyzing financial statements and credit histories. o Attitude: Foster a cautious and diligent approach to evaluating creditworthiness. 3. Credit Policy Development: o Knowledge: Understand the components and importance of a comprehensive credit policy. o Skills: Ability to develop and implement credit policies that align with the cooperative’s objectives and risk tolerance. o Attitude: Promote the adoption of clear and fair credit policies. 4. Credit Approval and Disbursement: o Knowledge: Learn the procedures for credit approval and disbursement within cooperatives.
  • 22.
    o Skills: Abilityto manage the credit approval process efficiently and ensure timely disbursement of funds. o Attitude: Emphasize the importance of due diligence and accuracy in the credit approval process. 5. Credit Monitoring and Collection: o Knowledge: Understand the processes involved in monitoring credit and managing collections. o Skills: Develop strategies for effective credit monitoring and timely collection of outstanding debts. o Attitude: Encourage a proactive approach to credit monitoring and a firm but fair approach to collections. 6. Financial Analysis and Reporting: o Knowledge: Learn techniques for financial analysis and reporting related to credit management. o Skills: Ability to generate and interpret financial reports to inform credit decisions and policy adjustments. o Attitude: Promote transparency and accuracy in financial reporting. 7. Legal and Ethical Considerations: o Knowledge: Understand the legal and ethical considerations in credit management. o Skills: Ability to navigate legal requirements and integrate ethical practices into credit management processes. o Attitude: Encourage adherence to legal standards and ethical principles in all credit management activities. Assessment Methods:  Case studies and credit risk assessment reports.  Group projects on developing credit policies.  Role-playing exercises for credit approval and collection scenarios.  Quizzes and exams to test theoretical knowledge.  Practical assignments on financial analysis and reporting. Resources:  Academic articles and textbooks on credit management.  Case studies of successful credit management practices in cooperatives.  Access to financial analysis software and credit assessment tools.  Workshops and seminars with credit management experts and practitioners. By the end of this training, participants should be able to effectively manage credit within cooperatives, contributing to their financial stability and sustainable growth. Note: choose learning outcomes based on the feasibility and applicability to cooperatives
  • 23.
    Presenter 9 GenderAwareness Training for Masaganang Baroro MPC Good point: o With TNA o Generated data o Analysis of the data generated o Basis for Training Design o Output action planning basis for implementation. Use MC 2017-04 for your M & E o MC 2017 -04 Tools assessing Progress in gender equality o Creative PowerPoint presentation with animation Rationale Sequence: UN SDG, PDP, TNA and legal basis Training Outcomes for Gender Awareness Training Objective: Equip participants with the knowledge, skills, and attitudes necessary to understand and address gender issues, promoting gender equality and inclusivity in their personal and professional lives. Learning Outcomes: 1. Understanding Gender Concepts and Terminology: o Knowledge: Participants will understand key gender concepts, terminology, and the distinction between sex and gender. o Skills: Ability to accurately use and explain gender-related terminology. o Attitude: Develop an appreciation for the complexity and diversity of gender identities. 2. Recognizing Gender Stereotypes and Bias: o Knowledge: Learn about common gender stereotypes and biases and their impact on individuals and society. o Skills: Ability to identify and challenge gender stereotypes and biases in various contexts. o Attitude: Foster a critical mindset towards stereotypes and a commitment to reducing bias. 3. Exploring Gender Equality and Equity: o Knowledge: Understand the principles of gender equality and equity NOTE: Study what learning outcomes are doable and applicable to coops Presenter 10 Factors in Preparing the Right and Environment Conducive for Learning Good Points o With eye contact with his audience
  • 24.
    o Creative andinnovative presentation o With brief articulation per slide o Condensed presentation within the prescribed timeframe o Conducted survey as the basis for his training proposal Below is the listing of what to consider, however, the budget has a bearing on your training proposal. 1. Physical Environment: o Comfortable Seating: Ensure that chairs and desks are ergonomic to maintain comfort during long periods of study. o Lighting: Adequate lighting, preferably natural light, helps reduce eye strain and increases alertness. o Temperature Control: Maintain a comfortable room temperature to ensure students are neither too hot nor too cold. o Cleanliness and Organization: A clean, well-organized space minimizes distractions and promotes focus. o Accessibility: Ensure that the learning space is accessible to all students, including those with disabilities. 2. Technological Resources: o Up-to-date Technology: Provide access to modern technology, such as computers, projectors, and internet access. o Technical Support: Ensure that technical support is readily available to address any issues quickly. o Software and Tools: Provide necessary software and tools relevant to the learning material. 3. Learning Materials and Resources: o Diverse Materials: Use a variety of learning materials, such as textbooks, multimedia, and online resources, to cater to different learning styles. o Availability: Ensure that all necessary materials are readily available and easy to access. 4. Psychological Environment: o Supportive Atmosphere: Foster an atmosphere of mutual respect and support where students feel safe to express their ideas and ask questions. o Positive Reinforcement: Use positive reinforcement to encourage participation and effort. o Mindfulness and Well-being: Incorporate practices that promote mental well-being, such as mindfulness exercises or stress management techniques. 5. Instructional Strategies: o Active Learning: Implement teaching methods that involve active participation, such as group discussions, hands-on activities, and problem- solving tasks. o Feedback: Provide timely and constructive feedback to help students understand their progress and areas for improvement.
  • 25.
    o Differentiated Instruction:Tailor teaching methods to meet the diverse needs of students, taking into account different learning styles and abilities. 6. Cultural and Social Considerations: o Inclusive Environment: Promote an inclusive environment that respects and values diversity. o Cultural Sensitivity: Be aware of and sensitive to the cultural backgrounds and perspectives of all students. o Collaboration and Interaction: Encourage collaborative learning and peer interactions to build a sense of community and shared learning. 7. Engagement and Motivation: o Relevant Content: Ensure that the learning material is relevant and engaging to the students’ interests and future goals. o Goal Setting: Help students set achievable goals and track their progress. o Autonomy: Provide opportunities for students to make choices about their learning to increase their sense of ownership and motivation. 8. Teacher Preparedness: o Professional Development: Ensure that teachers are well-trained and up-to-date with the latest educational practices and technologies. o Preparation and Planning: Teachers should thoroughly plan lessons and be prepared to adapt to the needs of the students. o Communication Skills: Effective communication is crucial for delivering content clearly and engaging students. By addressing these factors, you can create an environment that is conducive to learning, fostering both academic success and personal growth Presenter 11 Technical Support in Records Management Good Points o With confidence o Clear presentation o With audience impact o Creative presentation o Methodology – role play, exercise, skills demonstration For information and further study, consider short term plan (annual) , mid range (3 years) and long term plans (5 years) Effective technical support in records management is crucial for maintaining accurate, secure, and accessible records. Here are some insights into the types of technical support that can be provided: 1. Software and System Support:
  • 26.
     Electronic RecordsManagement Systems (ERMS): Provide support for software that organizes, stores, and retrieves electronic records.  Document Management Systems (DMS): Assist with systems that manage document creation, storage, and control throughout their lifecycle.  Database Management: Ensure databases are maintained for efficient storage, retrieval, and manipulation of records. 2. Data Security and Privacy:  Access Control: Implement and manage user permissions to ensure that only authorized personnel can access certain records.  Encryption: Use encryption to protect sensitive data both in transit and at rest.  Backup and Recovery: Regularly back up records and provide support for data recovery in case of data loss or system failures. 3. Compliance and Legal Support:  Regulatory Compliance: Ensure that records management practices comply with relevant laws and regulations, such as data protection laws and industry- specific standards.  Audit Trails: Maintain audit trails to track who accessed or modified records and when these actions occurred. 4. Technical Training and Education:  User Training: Provide training sessions and materials for staff to effectively use records management systems.  Ongoing Support: Offer continuous support and refresher courses to keep staff updated on new features and best practices. 5. System Integration and Automation:  Integration with Other Systems: Ensure that records management systems integrate smoothly with other enterprise systems like ERP, CRM, and HR systems.  Automation: Implement automated workflows for record creation, approval, archiving, and deletion to improve efficiency and reduce manual errors. 6. Technical Documentation and Resources:  User Manuals and Guides: Provide comprehensive manuals and guides to help users navigate the records management system.  FAQs and Help Desks: Maintain a knowledge base with frequently asked questions and provide help desk support for immediate assistance. 7. Data Migration and Conversion:
  • 27.
     Migration Support:Assist with the migration of records from legacy systems to new records management systems.  Data Conversion: Provide support for converting records into different formats as needed for compatibility or compliance. 8. Monitoring and Maintenance:  System Monitoring: Continuously monitor the records management systems for performance issues, security breaches, and other potential problems.  Regular Maintenance: Schedule regular maintenance tasks to ensure systems are running smoothly and updates are applied. 9. Custom Development and Enhancement:  Customization: Develop custom features or modifications to the records management system to meet specific organizational needs.  System Enhancements: Provide support for adding new functionalities and improving existing ones based on user feedback and technological advancements. 10. Support for Physical Records Management:  Digitization: Provide technical support for scanning and converting physical records into digital formats.  Barcode and RFID Systems: Implement and maintain systems for tracking physical records using barcodes or RFID tags. 11. Disaster Recovery Planning:  Disaster Recovery Plans: Develop and support disaster recovery plans to ensure that records are protected and can be restored in the event of a disaster.  Offsite Storage: Provide solutions for offsite storage of backups to safeguard against local disasters. By providing comprehensive technical support in these areas, organizations can ensure that their records management processes are efficient, secure, and compliant with all relevant standards and regulations. Presenter 12 Cooperative Management and Governance Room for Improvement o Endeavor to get your audience participation o Set eye contact with them Recommendation:
  • 28.
    o Be guidedby CDA MA 2015 on the revised guidelines for mandatory training Possible training outcomes and learning outcomes where applicable and relevant Insights on Cooperative Governance and Management 1. Collaborative Decision-Making: o Inclusivity: Involves multiple stakeholders, ensuring that diverse perspectives contribute to more comprehensive and effective decisions. o Shared Power: Power is distributed among participants, promoting democratic principles and collective ownership of decisions. 2. Transparency and Accountability: o Open Processes: Actions and decisions are transparent, building trust among stakeholders and reducing the potential for corruption. o Clear Accountability: Mechanisms are in place to hold individuals and groups accountable, ensuring responsibility for actions taken. 3. Capacity Building: o Skill Development: Enhances the abilities of stakeholders to participate effectively in governance and management processes. o Resource Allocation: Ensures that resources are allocated efficiently and equitably to support collaborative efforts. 4. Conflict Resolution: o Mediation and Negotiation: Establishes processes for resolving conflicts amicably, promoting a culture of cooperation and mutual respect. o Consensus Building: Encourages finding common ground and reaching agreements that satisfy all parties involved. 5. Sustainable Practices: o Long-term Focus: Emphasizes sustainable development and practices that consider the long-term impact on communities and the environment. o Ethical Considerations: Promotes ethical behavior and decisions that align with the values and principles of cooperative governance. Learning Outcomes for Cooperative Governance and Management 1. Understanding Collaborative Frameworks: o Students will be able to explain the principles and practices of cooperative governance and management. o Students will understand the roles and responsibilities of various stakeholders in collaborative decision-making processes. 2. Developing Transparent and Accountable Systems: o Students will design governance structures that ensure transparency and accountability. o Students will implement mechanisms to monitor and evaluate the effectiveness of governance processes. 3. Enhancing Stakeholder Capacities:
  • 29.
    o Students willdevelop programs to build the capacity of stakeholders to engage in cooperative governance. o Students will allocate resources effectively to support stakeholder participation and collaboration. 4. Facilitating Conflict Resolution: o Students will apply mediation and negotiation techniques to resolve conflicts within governance structures. o Students will develop strategies to build consensus and foster a cooperative environment. 5. Promoting Sustainable and Ethical Practices: o Particioants will integrate sustainable practices into governance and management processes. o Participants will adhere to ethical principles in decision-making and governance activities. By achieving these learning outcomes, students will be well-equipped to contribute to and lead in environments that prioritize cooperative governance and management, ensuring that diverse perspectives are valued and that decisions are made transparently and responsibly Presenter 13 Credit Management and Delinquency Control Good points o Nice PowerPoint presentation with animation o Creative o Slides not crowded with words, ideal font size Please refer to presenter no 8 for your training outcome and learning outcomes Presenter 14 Policy Formulation on Loom Weaving under VLFFEP Suggestions o Conduct write-shop to get ideas o Critiquing of policy formulate Policy formulation for projects like woom weaving involves several key considerations. Here’s a structured approach to developing effective policies for such projects: 1. Understand the Project Context  Project Goals: Define what the project aims to achieve. Is it to preserve traditional weaving techniques, boost local economies, or promote sustainable practices?  Stakeholders: Identify who will be affected by or involved in the project. This might include artisans, local communities, government agencies, NGOs, and potential consumers.
  • 30.
    2. Needs Assessment Current State: Assess the current state of woom weaving, including techniques, materials used, and existing infrastructure.  Challenges and Opportunities: Identify key challenges (e.g., skill gaps, market access) and opportunities (e.g., tourism, export potential). 3. Policy Objectives  Support and Incentives: Develop objectives that provide support to weavers and incentivize quality production. This could include financial aid, training programs, or marketing support.  Sustainability: Ensure that the policy promotes sustainable practices in both the environment and the economy. 4. Regulatory Framework  Standards and Quality Control: Establish standards for quality and safety to ensure that products meet certain criteria and are competitive in the market.  Intellectual Property: Consider protections for traditional designs and techniques to prevent exploitation and ensure fair recognition for artisans. 5. Implementation Strategies  Training and Capacity Building: Design training programs to enhance skills and knowledge among artisans.  Infrastructure Development: Invest in necessary infrastructure, such as weaving centers or supply chains for materials.  Marketing and Promotion: Develop strategies for promoting woom weaving products, including branding and market access. 6. Monitoring and Evaluation  Metrics: Establish metrics to measure the success of the policy, such as increased income for weavers, higher quality products, or expanded market reach.  Feedback Mechanisms: Create channels for feedback from stakeholders to continuously improve the policy and address emerging issues. 7. Integration with Broader Policies  Cultural Preservation: Align with broader cultural preservation policies to ensure that the project supports and enhances traditional practices.  Economic Development: Integrate with economic development policies to maximize the economic benefits of the project.
  • 31.
    8. Community Engagement Involvement: Engage the local community in the policy development process to ensure it meets their needs and gains their support.  Awareness: Raise awareness about the value of woom weaving and the benefits of the policy to foster broader community and stakeholder engagement. By focusing on these areas, you can create a comprehensive and effective policy for supporting and developing projects like woom weaving. Presenter 15 Training on the Submission of Required Reports (E CoopRIS and CAIS) Room for Improvement o Rationale condense to 2-3 paragraphs, cite legal basis Recommendations o Request CDA to assist the cooperatives in updating their information using the Electronic Cooperative Registration Information System (E-CoopRIS), for those who have not accessed it yet, and to be able to proceed to the encoding and submitting their mandatory reports for the issuance of Certificate of Compliance (COC). o CDA also creates awareness for the cooperatives that the Offline Mode is available to help coops with difficulties in network connection in their areas. o The workshop will focus on orientations on both the online and offline modes, hands-on applications including accessing, account creation for the online mode, downloading for the offline mode, encoding, and submission of the reports. o Presenter 16 Credit Management and Delinquency Control Good Points o Nice presentation o Clear voice with modulation o Condensed presentation Room for improvement o No eye contact with audience o Budget no contingency fund for uncontrollable events Please refer to presenter no 8 for your training outcome and learning outcomes Presenter 17 Parliamentary Procedures
  • 32.
    Good Points o Withgood voice, with modulation o Can relate with his audience Training on parliamentary procedures for conducting meetings, especially within cooperatives, is crucial for ensuring meetings are efficient, democratic, and productive. Here's a breakdown of the training outcomes and learning outcomes for such a program: Training Outcomes 1. Enhanced Understanding of Parliamentary Procedure o Participants will have a solid grasp of the rules and principles of parliamentary procedure, including Robert's Rules of Order or other relevant procedural guides. o They will understand the purpose and benefits of parliamentary procedure in fostering orderly and fair meetings. 2. Improved Meeting Management Skills o Participants will be able to effectively chair meetings, manage discussions, and maintain order. o They will develop skills in setting agendas, managing time, and ensuring all members have an opportunity to contribute. 3. Increased Ability to Facilitate Participation o Participants will be adept at encouraging and managing member participation, ensuring that all voices are heard and considered. o They will understand how to handle disruptions and disagreements constructively. 4. Enhanced Decision-Making Processes o Participants will be able to guide the group through decision-making processes, including making motions, debating, and voting. o They will learn how to document decisions and actions accurately. 5. Effective Conflict Resolution o Participants will acquire skills in resolving conflicts and managing contentious issues in a meeting context. o They will be prepared to address and mediate conflicts in a way that respects all members and adheres to procedural norms. Learning Outcomes 1. Knowledge of Key Parliamentary Concepts o Participants will be able to define and explain key parliamentary terms and concepts, such as motions, amendments, quorum, and voting procedures. o They will understand the roles and responsibilities of different meeting participants (e.g., chair, secretary, members). 2. Application of Parliamentary Rules
  • 33.
    o Participants willdemonstrate the ability to apply parliamentary rules to various meeting scenarios, including making and seconding motions, conducting debates, and handling procedural issues. o They will be able to draft and use meeting agendas and minutes effectively. 3. Practical Skills in Conducting Meetings o Participants will practice and refine their skills in chairing and participating in meetings, including managing discussion flows and enforcing rules. o They will learn to use parliamentary tools and techniques to enhance meeting efficiency and effectiveness. 4. Understanding of Cooperative Dynamics o Participants will gain insight into the specific dynamics and governance structures of cooperatives and how parliamentary procedure can support cooperative principles. o They will learn to adapt parliamentary procedures to fit the cooperative context and address unique challenges. 5. Ability to Implement Best Practices o Participants will be able to identify and implement best practices for conducting effective and inclusive meetings. o They will learn how to evaluate and improve meeting processes and outcomes based on feedback and observations. Evaluation and Assessment To ensure that training outcomes and learning outcomes are achieved, consider including the following assessment methods:  Quizzes and Tests: To evaluate knowledge of parliamentary procedures and concepts.  Role-Playing Exercises: To practice conducting meetings and applying parliamentary rules in simulated scenarios.  Case Studies: To analyze real-world examples and discuss how parliamentary procedures can be applied or adapted.  Feedback Surveys: To gather feedback from participants on the effectiveness of the training and identify areas for improvement. By focusing on these outcomes and assessments, the training program can help cooperatives conduct their meetings more effectively and ensure that democratic processes and member participation are upheld. NOTE: Adopt what is practical, doables, and applicable to the circumstances surrounding the cooperative Presenter 18 Leadership and Personality Development Room for Improvement
  • 34.
    o Include theimportance of Leadership and Personality Development o Discuss what are leadership projects o Focus on the two thematic themes in your training proposal Effectiveness in leadership roles and their overall personal growth. Here’s a structured approach to defining training outcomes and learning outcomes for such a program: Training Outcomes 1. Enhanced Leadership Skills o Participants will develop the ability to lead and inspire teams effectively, making strategic decisions and setting clear, achievable goals. o They will gain skills in communication, motivation, and delegation to enhance team performance and cohesion. 2. Improved Self-Awareness and Emotional Intelligence o Participants will increase their self-awareness and understand how their behaviors, emotions, and decisions impact themselves and others. o They will improve their emotional intelligence, including empathy, self- regulation, and social skills. 3. Strengthened Problem-Solving and Decision-Making Abilities o Participants will enhance their problem-solving skills, learning to approach complex issues with critical thinking and creativity. o They will become more adept at making informed decisions and managing risks effectively. 4. Increased Confidence and Assertiveness o Participants will develop greater self-confidence and assertiveness in their leadership roles and personal interactions. o They will learn to express their ideas clearly and assertively while respecting others' opinions. 5. Effective Conflict Resolution and Team Management o Participants will acquire skills in managing and resolving conflicts within teams constructively. o They will learn techniques for building and maintaining effective team dynamics and addressing issues that arise. Learning Outcomes 1. Understanding of Leadership Theories and Styles o Participants will be able to identify and explain various leadership theories (e.g., transformational, transactional) and styles (e.g., democratic, autocratic). o They will understand how to apply different leadership approaches depending on the situation and team needs. 2. Application of Leadership Skills
  • 35.
    o Participants willdemonstrate the ability to apply leadership skills in practical scenarios, including setting goals, motivating team members, and making strategic decisions. o They will be able to create and execute action plans to address leadership challenges. 3. Development of Self-Awareness and Emotional Intelligence o Participants will show an increased awareness of their own personality traits, strengths, and areas for improvement. o They will be able to use emotional intelligence skills to manage their own emotions and effectively interact with others. 4. Enhanced Communication and Interpersonal Skills o Participants will demonstrate effective communication skills, including active listening, clear articulation of ideas, and constructive feedback. o They will develop interpersonal skills to build relationships, influence others, and navigate social dynamics. 5. Effective Problem-Solving and Decision-Making o Participants will apply problem-solving frameworks and decision-making techniques to real-world challenges. o They will be able to evaluate options, anticipate potential outcomes, and make decisions that align with organizational goals. 6. Conflict Resolution and Team Building o Participants will demonstrate skills in resolving conflicts through negotiation and mediation techniques. o They will be able to build and sustain high-performing teams by fostering a collaborative and supportive environment. Evaluation and Assessment To measure the effectiveness of the training and the achievement of learning outcomes, consider the following assessment methods:  Self-Assessments and Reflection: Encourage participants to assess their own leadership styles and personality traits, and reflect on their development over the course of the training.  Behavioral Observations: Observe participants during role-playing exercises, group discussions, and practical tasks to evaluate their application of leadership skills and personality development.  Feedback from Peers and Mentors: Collect feedback from peers, subordinates, and mentors to gain insights into the participants’ leadership effectiveness and personal growth.  Performance Metrics: Use specific performance metrics, such as team productivity, conflict resolution effectiveness, and decision-making quality, to assess improvements.  Action Plans and Follow-Up: Have participants create and implement action plans for personal and professional development, and conduct follow-up sessions to review progress and adjust strategies as needed.
  • 36.
    By focusing onthese training and learning outcomes, you can help participants develop the skills and attributes necessary for effective leadership and personal growth Presenter 19: Training on Basic Literacy, Digital Communication and Collaboration Tools Good Points: o Nice PowerPoint presentation Suggestions o Hands–on with specific output. No output no certificate o Intro to Google products Training on basic literacy, digital communication, and collaboration tools is crucial for ensuring that participants are equipped to thrive in today’s digitally driven environment. Here's a structured overview of the training outcomes and learning outcomes for such a program: Training Outcomes 1. Improved Basic Literacy Skills o Participants will gain proficiency in reading, writing, and basic arithmetic, which are essential for everyday tasks and further learning. o They will develop the ability to understand and create simple documents, follow written instructions, and perform basic calculations. 2. Enhanced Digital Communication Skills o Participants will learn to use various digital communication tools effectively, including email, instant messaging, and video conferencing platforms. o They will develop skills in crafting clear, concise, and professional digital messages and using digital platforms to engage with others. 3. Effective Use of Collaboration Tools o Participants will become adept at using collaboration tools such as shared documents, project management software, and online workspaces. o They will learn to collaborate efficiently with others, manage and track tasks, and contribute to team projects using these tools. 4. Increased Confidence in Digital Environments o Participants will build confidence in navigating and using digital platforms and tools for various personal and professional purposes. o They will develop a proactive approach to learning and adapting to new technologies as they emerge. 5. Enhanced Problem-Solving and Critical Thinking o Participants will develop skills in problem-solving and critical thinking by using digital tools to analyze information, collaborate on solutions, and make informed decisions.
  • 37.
    o They willlearn to troubleshoot common issues related to digital communication and collaboration tools. Learning Outcomes 1. Basic Literacy Proficiency o Reading: Participants will demonstrate the ability to read and comprehend simple texts, including instructions, narratives, and informational materials. o Writing: Participants will be able to write clear and coherent sentences, paragraphs, and basic documents, including emails and memos. o Arithmetic: Participants will apply basic arithmetic operations (addition, subtraction, multiplication, division) to solve everyday problems. 2. Effective Digital Communication o Email Communication: Participants will compose and send professional emails, including using proper etiquette, formatting, and attachments. o Messaging Platforms: Participants will effectively use instant messaging and chat platforms for real-time communication, including managing conversations and group chats. o Video Conferencing: Participants will use video conferencing tools to schedule and conduct meetings, share screens, and interact with remote participants. 3. Proficiency in Collaboration Tools o Document Sharing: Participants will use tools like Google Drive or Dropbox to share, edit, and manage documents collaboratively. o Project Management: Participants will use project management software (e.g., Asana, Trello) to create, assign, and track tasks and deadlines. o Online Workspaces: Participants will navigate and utilize online workspaces (e.g., Microsoft Teams, Slack) for team communication, file sharing, and project coordination. 4. Navigating Digital Platforms o Tool Familiarity: Participants will be familiar with the basic functions of commonly used digital tools and platforms, including troubleshooting common issues. o Adaptability: Participants will demonstrate the ability to quickly learn and adapt to new digital tools and technologies as needed. 5. Application of Digital Skills o Problem-Solving: Participants will use digital tools to address and solve real-world problems, such as managing a project or coordinating with a team. o Critical Thinking: Participants will analyze information, evaluate options, and make informed decisions using digital resources and tools. Evaluation and Assessment To measure the effectiveness of the training and ensure learning outcomes are achieved, consider the following assessment methods:
  • 38.
     Pre- andPost-Training Assessments: Conduct assessments before and after the training to measure improvements in basic literacy, digital communication, and collaboration skills.  Practical Exercises: Use practical exercises and simulations to evaluate participants’ ability to apply digital tools and communication skills in real-world scenarios.  Assignments and Projects: Assign tasks and projects that require participants to use digital tools and collaboration platforms, and assess their performance and outcomes.  Feedback Surveys: Collect feedback from participants on their confidence and proficiency with digital tools and communication skills before and after the training.  Peer and Self-Assessment: Incorporate peer and self-assessment to gauge participants’ understanding and application of digital communication and collaboration tools. By focusing on these training and learning outcomes, you can help participants build the essential skills needed for effective digital communication and collaboration, while also enhancing their basic literacy and problem-solving abilities. Presenter 20 Strategic Development Planning Workshop Room improvement o Not looking at her audience o Soft voice Recommendation o SP presentation o V-M-G and values are initial drafts from participants. The outputs should be presented to the members for further consultation/enhancement. A Strategic Development Planning Workshop for cooperatives focuses on equipping participants with the knowledge and skills to create and implement effective strategic plans that drive the growth and success of their cooperative. Here’s a detailed outline of the training outcomes and learning outcomes for such a workshop: Training Outcomes 1. Enhanced Strategic Planning Skills o Participants will be able to develop comprehensive strategic plans that align with their cooperative’s mission, vision, and goals.
  • 39.
    o They willgain skills in conducting SWOT (Strengths, Weaknesses, Opportunities, Threats) analyses and using other strategic planning tools effectively. 2. Improved Understanding of Cooperative Dynamics o Participants will understand the unique characteristics and challenges of cooperatives and how to address them through strategic planning. o They will learn how to align strategic plans with cooperative principles and values. 3. Strengthened Ability to Set and Achieve Goals o Participants will develop skills in setting SMART (Specific, Measurable, Achievable, Relevant, Time-bound) goals and objectives. o They will learn to create actionable plans and milestones to track progress and achieve strategic goals. 4. Increased Capacity for Strategic Decision-Making o Participants will improve their decision-making abilities by analyzing data, forecasting trends, and evaluating strategic options. o They will gain skills in prioritizing initiatives and allocating resources effectively. 5. Enhanced Collaboration and Communication o Participants will develop skills in collaborating with stakeholders, communicating strategic plans, and engaging members in the planning process. o They will learn to build consensus and manage conflicts related to strategic decisions. Learning Outcomes 1. Understanding Strategic Planning Concepts o Strategic Planning: Participants will be able to explain the fundamental concepts of strategic planning, including its purpose, benefits, and key components. o SWOT Analysis: Participants will understand how to conduct and interpret a SWOT analysis to inform strategic decision-making. 2. Development of Strategic Plans o Mission and Vision Statements: Participants will learn to articulate and refine their cooperative’s mission and vision statements to guide strategic planning. o Goal Setting: Participants will be able to define SMART goals and objectives that align with the cooperative’s strategic direction. 3. Application of Strategic Tools and Techniques o Strategic Frameworks: Participants will demonstrate the ability to use strategic frameworks (e.g., PESTEL analysis, Porter’s Five Forces) to assess the external environment and inform strategy. o Action Planning: Participants will create detailed action plans that outline steps, timelines, responsibilities, and resources required to achieve strategic goals.
  • 40.
    4. Effective StrategicDecision-Making o Data Analysis: Participants will be able to analyze and interpret data relevant to strategic planning, including market trends, financial performance, and member feedback. o Scenario Planning: Participants will learn to use scenario planning techniques to anticipate future challenges and opportunities. 5. Implementation and Evaluation o Implementation Strategies: Participants will develop strategies for implementing their strategic plans, including resource allocation, timeline management, and stakeholder engagement. o Monitoring and Evaluation: Participants will understand how to set up monitoring and evaluation systems to track progress, measure success, and make adjustments as needed. 6. Enhanced Stakeholder Engagement o Communication: Participants will learn effective communication techniques to present strategic plans to stakeholders and members. o Collaboration: Participants will develop strategies for engaging members in the planning process and building consensus around strategic initiatives. Evaluation and Assessment To assess the effectiveness of the workshop and the achievement of learning outcomes, consider using the following methods:  Pre- and Post-Workshop Surveys: Assess participants’ knowledge and skills before and after the workshop to measure improvements.  Case Studies and Simulations: Use case studies and simulations to evaluate participants’ ability to apply strategic planning concepts and tools in practical scenarios.  Action Plan Development: Have participants develop and present a draft strategic plan or action plan for their cooperative, and provide feedback on its comprehensiveness and feasibility.  Group Discussions and Role Plays: Facilitate group discussions and role- playing exercises to assess participants’ collaboration and decision-making skills.  Feedback and Reflections: Collect feedback from participants on the workshop’s content, delivery, and applicability, and encourage reflections on their learning experiences and future applications. By focusing on these training and learning outcomes, the workshop can help cooperatives develop effective strategic plans, enhance their strategic decision-making, and improve their overall organizational performance Presenter 21 Policy Development Room for Improvement
  • 41.
    o Soft voice.More volume to emphasize your point o Improve your audience impact o Workshop outputs need critiquing o Review of old policies for their relevance to the present situation then revised to be responsive to the present situation Policy development consists of phases. Formulating, implementing, and reviewing policies for cooperatives involves a structured approach to ensure that policies are effective, relevant, and aligned with the cooperative’s goals and values. Here’s a detailed overview of each phase: 1. Policy Formulation a. Identify Needs and Objectives:  Assess Needs: Determine the specific needs of the cooperative that require policy development. This could include areas such as governance, financial management, membership, or operational procedures.  Set Objectives: Define the goals the policy aims to achieve. Ensure they align with the cooperative’s mission, vision, and strategic plan. b. Research and Analysis:  Benchmarking: Research best practices and policies from other cooperatives or organizations in similar sectors.  Legal and Regulatory Compliance: Ensure the policy complies with relevant laws, regulations, and cooperative principles.  Stakeholder Input: Engage with members, board members, and other stakeholders to gather input and perspectives. c. Drafting the Policy:  Clear Language: Write the policy in clear, concise, and understandable language.  Structure: Include key components such as purpose, scope, definitions, responsibilities, procedures, and enforcement.  Alignment: Ensure the policy aligns with existing policies and procedures to avoid conflicts. d. Review and Approval:  Internal Review: Have the draft policy reviewed by key stakeholders and experts for feedback and revisions.  Approval Process: Submit the policy draft to the cooperative’s board or governing body for approval.
  • 42.
     Communication: Communicatethe new policy to all members and stakeholders, explaining its purpose and implications. 2. Policy Implementation a. Develop an Implementation Plan:  Action Steps: Outline the steps required to implement the policy, including timelines, resources, and responsibilities.  Training: Provide training and resources to members and staff to ensure they understand and can comply with the new policy. b. Assign Responsibilities:  Roles: Designate individuals or teams responsible for implementing different aspects of the policy.  Support: Provide support and resources to those responsible for enforcing and adhering to the policy. c. Integrate with Operations:  Procedures: Update or create procedures to align with the new policy. Ensure they are integrated into daily operations.  Monitoring: Set up monitoring mechanisms to track the implementation process and identify any issues. d. Communication and Support:  Information Dissemination: Clearly communicate the policy details and its impact to all members and staff.  Support Systems: Establish support systems for addressing questions, concerns, or issues related to the policy. 3. Policy Review a. Regular Monitoring:  Performance Metrics: Define and track performance metrics to assess the effectiveness of the policy.  Feedback Mechanisms: Collect feedback from members and stakeholders on the policy’s impact and effectiveness. b. Review and Evaluation:  Periodic Review: Schedule regular reviews of the policy (e.g., annually or biannually) to ensure it remains relevant and effective.
  • 43.
     Evaluation Criteria:Evaluate the policy based on its ability to meet objectives, compliance with regulations, and overall impact. c. Revise and Update:  Identify Changes: Based on the review, identify areas for improvement or necessary changes to the policy.  Update Policy: Revise the policy as needed and follow the same process for review and approval as in the formulation phase. d. Document and Communicate Changes:  Documentation: Document any changes or updates to the policy.  Communication: Inform all members and stakeholders of the changes and provide updated versions of the policy. Key Considerations:  Inclusivity: Ensure that the policy development process is inclusive and considers the diverse needs and perspectives of all stakeholders.  Compliance: Stay up-to-date with changes in laws and regulations that may affect the policy.  Transparency: Maintain transparency throughout the policy formulation, implementation, and review processes to build trust and ensure buy-in from members.  Flexibility: Be prepared to adapt policies as the cooperative evolves and external conditions change. By following these guidelines, cooperatives can develop, implement, and review policies effectively, ensuring they support the cooperative’s objectives and contribute to its overall success. Presenter 21 Skills Training on Cassava Processing Good points o Good voice Rationale Benefits that can be derived from the training Room for improvement o Use of printed materials for lecturer presentation in case no power o Make sure to have confirmation from the targeted participants
  • 44.
    Skills training oncassava processing is essential for enhancing the efficiency and quality of cassava-based products. This type of training typically covers various aspects of cassava processing, including production, handling, and product development. Here’s a detailed outline of the training outcomes and learning outcomes for such a program: Training Outcomes 1. Enhanced Processing Skills o Participants will gain practical skills in various methods of cassava processing, including peeling, grating, drying, and milling. o They will learn to operate and maintain processing equipment effectively. 2. Improved Quality and Safety Standards o Participants will understand and implement quality control and safety standards in cassava processing to ensure high-quality products. o They will learn best practices for handling and storing cassava to minimize contamination and spoilage. 3. Increased Product Knowledge o Participants will be able to produce a range of cassava-based products, such as flour, chips, and fermented products. o They will understand the nutritional and economic benefits of different cassava products. 4. Enhanced Economic Viability o Participants will develop skills to improve the economic viability of cassava processing, including cost management, pricing strategies, and market analysis. o They will learn to identify and capitalize on market opportunities for cassava products. 5. Strengthened Problem-Solving and Innovation o Participants will enhance their problem-solving skills to address common challenges in cassava processing. o They will be encouraged to innovate and develop new products or processes based on market needs and technological advancements. Learning Outcomes 1. Understanding Cassava Processing Techniques o Basic Processing: Participants will be able to explain and perform basic cassava processing techniques, including peeling, washing, grating, and milling. o Advanced Techniques: Participants will learn advanced processing techniques such as fermentation, baking, and producing high-value products like cassava flour and starch. 2. Application of Quality Control Measures o Quality Standards: Participants will understand and apply quality control measures to ensure the consistency and safety of processed cassava products.
  • 45.
    o Safety Protocols:Participants will implement food safety protocols to prevent contamination and ensure compliance with relevant health regulations. 3. Product Development and Innovation o Product Variety: Participants will develop and produce various cassava- based products, including snacks, flour, and beverages. o Market Trends: Participants will learn to assess market trends and consumer preferences to guide product development and innovation. 4. Economic and Financial Management o Cost Analysis: Participants will perform cost analysis and budgeting for cassava processing to ensure economic sustainability. o Pricing and Marketing: Participants will develop pricing strategies and marketing plans to effectively promote and sell cassava products. 5. Practical Application and Troubleshooting o Hands-On Skills: Participants will gain hands-on experience in operating processing equipment and handling cassava. o Problem-Solving: Participants will demonstrate the ability to troubleshoot common issues in the processing chain, such as equipment malfunctions or product quality problems. 6. Sustainability and Environmental Impact o Sustainable Practices: Participants will learn about sustainable practices in cassava processing, including waste management and resource conservation. o Environmental Impact: Participants will understand the environmental impact of cassava processing and ways to mitigate it. Evaluation and Assessment To measure the effectiveness of the training and ensure the learning outcomes are achieved, consider the following assessment methods:  Practical Demonstrations: Evaluate participants’ ability to perform processing tasks and operate equipment through hands-on demonstrations and practical exercises.  Product Quality Assessment: Assess the quality of cassava products produced by participants, including texture, taste, and appearance.  Knowledge Tests: Use quizzes or tests to evaluate participants’ understanding of processing techniques, quality control, and market strategies.  Feedback Surveys: Collect feedback from participants on the training’s content, delivery, and applicability, and gather suggestions for improvement.  Project Assignments: Have participants complete projects, such as developing a new cassava product or creating a business plan for a cassava processing venture, and assess their performance.
  • 46.
    By focusing onthese training and learning outcomes, participants can acquire the skills and knowledge needed to enhance their cassava processing operations, improve product quality, and achieve economic success. NOTE, Conserve what is doable and applicable training and learning outcomes for your cooperative. Presenter 23: Governance and Management of Cooperatives Room for Improvement o What is the output per module o Who is responsible in the preparation of modules? o Use of simple case study as part of the methodology Recommendation: o Be guided by CDA MA 2015 on the revised guidelines for mandatory training o Refer to Presenter No. 12 Presenter 24 Strengthening the Conduct Mediation and Conciliation Through Barangay Agrarian Reform Committee Room for improvement o Soft voice. More volume when you want to emphasize your point and get the attention of your audience o Identify possible opportunities to strengthen the conduct of mediation and conciliation through surveys, Focus Group Discussions, and benchmarking with other Barangay Agrarian Reform Committee Alternative Solution o Activate the Med Com of the cooperative for internal disputes /issues Training on strengthening mediation and conciliation through Barangay Agrarian Reform Committees (BARCs) aims to enhance the effectiveness of these committees in resolving agrarian disputes and promoting peaceful community relations. This type of training is essential for improving conflict resolution skills and ensuring fair and effective processes in agrarian reform contexts. Here’s an outline of the training outcomes and learning outcomes for such a program: Training Outcomes 1. Enhanced Mediation and Conciliation Skills o Participants will develop advanced skills in mediation and conciliation to effectively handle disputes related to agrarian reform.
  • 47.
    o They willlearn techniques to facilitate dialogue, build consensus, and reach fair agreements among conflicting parties. 2. Improved Understanding of Legal and Policy Frameworks o Participants will gain a thorough understanding of the legal and policy frameworks governing agrarian reform and the role of BARCs in the mediation process. o They will learn to navigate and apply relevant laws and regulations in resolving disputes. 3. Strengthened Conflict Resolution Capabilities o Participants will enhance their ability to identify, analyze, and address the root causes of agrarian disputes. o They will develop strategies to manage conflicts constructively and prevent escalation. 4. Increased Capacity for Community Engagement o Participants will improve their skills in engaging with community members and stakeholders, fostering trust and collaboration. o They will learn to communicate effectively and sensitively with diverse groups involved in agrarian reform issues. 5. Enhanced Procedural and Administrative Skills o Participants will acquire skills in managing the procedural and administrative aspects of mediation and conciliation processes. o They will learn to document and report on mediation outcomes and follow up on agreements effectively. Learning Outcomes 1. Understanding Mediation and Conciliation Processes o Concepts and Techniques: Participants will be able to explain key concepts and techniques of mediation and conciliation, including active listening, negotiation, and conflict resolution strategies. o Process Stages: Participants will understand the stages of the mediation and conciliation process, from initiation to agreement implementation. 2. Application of Legal and Policy Knowledge o Legal Framework: Participants will demonstrate knowledge of the legal and policy frameworks relevant to agrarian reform and BARC functions. o Policy Implementation: Participants will be able to apply legal and policy guidelines effectively in mediation and conciliation scenarios. 3. Conflict Identification and Analysis o Root Cause Analysis: Participants will be able to identify and analyze the root causes of agrarian disputes and assess their impact on the community. o Resolution Strategies: Participants will develop and implement strategies to address the underlying issues and achieve fair and sustainable resolutions. 4. Effective Communication and Engagement
  • 48.
    o Dialogue Facilitation:Participants will practice facilitating constructive dialogues between conflicting parties, ensuring all voices are heard and respected. o Community Interaction: Participants will improve their ability to engage with community members and stakeholders in a manner that fosters trust and cooperation. 5. Procedural and Administrative Management o Documentation: Participants will learn to document mediation and conciliation processes, including recording agreements, tracking progress, and preparing reports. o Follow-Up: Participants will develop skills for monitoring the implementation of agreements and addressing any issues that arise post- resolution. 6. Ethical and Professional Conduct o Ethics: Participants will understand the ethical standards and professional conduct expected in mediation and conciliation roles. o Impartiality: Participants will demonstrate the ability to remain impartial and ensure fairness throughout the mediation process. Evaluation and Assessment To assess the effectiveness of the training and the achievement of learning outcomes, consider using the following methods:  Role-Playing Exercises: Use role-playing scenarios to evaluate participants’ mediation and conciliation skills in simulated agrarian disputes.  Case Studies: Analyze real-world case studies to assess participants’ understanding of legal frameworks, conflict resolution strategies, and community engagement.  Knowledge Tests: Conduct quizzes or tests to measure participants’ knowledge of mediation techniques, legal guidelines, and procedural management.  Feedback and Reflection: Collect feedback from participants on the training’s content and delivery, and encourage reflections on their learning experiences and applications.  Performance Reviews: Observe participants’ performance in handling actual mediation cases or mock scenarios, and provide constructive feedback on their skills and approaches. By focusing on these training and learning outcomes, the program can help strengthen the capabilities of BARCs in effectively mediating and conciliating agrarian disputes, ultimately contributing to more equitable and peaceful agrarian reform processes. Presenter 25 Cooperative Governance and Management Room for improvement
  • 49.
    o Don’t skipRationale o State the expected outputs of your training Recommendation: o Be guided by CDA MA 2015 on the revised guidelines for mandatory training o Refer to Presenter No. 12 Presenter 26 Pre Membership Education Program Good Points o Good voice for lecturing o With a sense of humor o Use of vernacular Point of Order: PMES is a training conducted by the Education and Training Committee or designated personnel. It is not the responsibility of a DAR trainer or facilitator to conduct PMES. Remember Principles on autonomous and independence. Recommendations for ETC o Assist would-be members in filling up forms such as subscription forms, applications for membership o Get a receipt of their contribution o Assist in getting BIR TIN o Discuss the duties and responsibilities of membership The Pre-Membership Education Program (PMEP) for cooperatives is designed to educate prospective members about the principles, values, and operations of cooperatives before they join. This program ensures that new members are well- informed and prepared to contribute effectively to the cooperative’s success. Here’s an outline of the training outcomes and learning outcomes for such a program: Training Outcomes 1. Enhanced Understanding of Cooperative Principles and Values o Participants will gain a thorough understanding of the fundamental principles and values of cooperatives, including democracy, equality, and mutual assistance. o They will appreciate how these principles guide the cooperative’s operations and decision-making processes. 2. Improved Knowledge of Cooperative Structure and Governance o Participants will learn about the structure of cooperatives, including the roles and responsibilities of the board of directors, management, and members.
  • 50.
    o They willunderstand the governance processes and decision-making mechanisms within the cooperative. 3. Increased Awareness of Member Rights and Responsibilities o Participants will be aware of their rights and responsibilities as cooperative members, including voting rights, financial obligations, and participation in meetings and activities. o They will understand the importance of active involvement in the cooperative to contribute to its success. 4. Strengthened Understanding of Cooperative Operations and Services o Participants will gain insight into the cooperative’s operations, including how services and products are delivered and managed. o They will learn about the cooperative’s business model, financial management, and service offerings. 5. Enhanced Readiness for Active Membership o Participants will be prepared to engage actively in the cooperative, including attending meetings, participating in committees, and fulfilling their membership obligations. o They will develop the skills needed to contribute effectively to the cooperative’s activities and goals. Learning Outcomes 1. Understanding Cooperative Principles and Values o Cooperative Principles: Participants will be able to explain the seven cooperative principles (e.g., voluntary and open membership, democratic member control, member economic participation). o Core Values: Participants will understand core cooperative values such as self-help, self-responsibility, democracy, equality, equity, and solidarity. 2. Knowledge of Cooperative Structure and Governance o Organizational Structure: Participants will be able to describe the organizational structure of the cooperative, including the roles of the board of directors, management, and members. o Governance Mechanisms: Participants will understand the governance mechanisms, such as elections, annual meetings, and decision-making processes. 3. Awareness of Member Rights and Responsibilities o Member Rights: Participants will know their rights as cooperative members, including the right to vote, stand for election, and access information. o Member Responsibilities: Participants will understand their responsibilities, such as paying dues, attending meetings, and participating in cooperative activities. 4. Understanding Cooperative Operations and Services o Operations: Participants will be familiar with the cooperative’s operational procedures, including how services are provided and managed.
  • 51.
    o Financial Management:Participants will learn about the cooperative’s financial structure, including how funds are raised and allocated. 5. Preparation for Active Membership o Engagement: Participants will demonstrate an understanding of how to engage in cooperative activities, including attending meetings, volunteering, and participating in committees. o Contribution: Participants will be prepared to contribute to the cooperative’s success by fulfilling their roles and responsibilities effectively. Evaluation and Assessment To assess the effectiveness of the PMEP and ensure learning outcomes are achieved, consider the following methods:  Knowledge Tests: Use quizzes or tests to evaluate participants’ understanding of cooperative principles, structure, and member rights and responsibilities.  Case Studies and Scenarios: Analyze case studies or scenarios to assess participants’ ability to apply their knowledge in practical situations related to cooperative operations and governance.  Role-Playing Exercises: Use role-playing to simulate cooperative meetings or decision-making processes and assess participants’ readiness for active membership.  Feedback Surveys: Collect feedback from participants on the program’s content, delivery, and applicability, and gather suggestions for improvement.  Participation Assessment: Evaluate participants’ engagement and involvement in program activities and discussions to gauge their preparedness for active membership. By focusing on these training and learning outcomes, the PMEP can effectively prepare prospective members to understand and engage with the cooperative, contributing to its overall success and sustainability. Presenter 27: Boosting Agricultural Productivity With Civil Engineering Solutions for Cooperatives Suggestions o Survey or Focal group discussions to gather data on Civil Engineering Solutions for Cooperatives o identify simple infra projects feasible for their needs such as Maintenance/repair of irrigation, Water impounding, Rain water harvesting, etc. o On your raining methodology, show a local picture of infra that is suited for your targeted beneficiaries
  • 52.
    Training on boostingagricultural productivity with civil engineering solutions for cooperatives focuses on integrating civil engineering techniques and technologies to enhance agricultural practices. This type of training aims to improve agricultural productivity through infrastructure development, water management, and land optimization. Here’s an outline of the training outcomes and learning outcomes for such a program: Training Outcomes 1. Enhanced Understanding of Civil Engineering Applications in Agriculture o Participants will gain knowledge of how civil engineering solutions can be applied to agricultural settings, including irrigation systems, soil erosion control, and infrastructure development. o They will learn to integrate civil engineering practices into agricultural projects to improve productivity. 2. Improved Infrastructure Planning and Management Skills o Participants will develop skills in planning, designing, and managing agricultural infrastructure projects, such as farm roads, storage facilities, and irrigation systems. o They will learn to assess and address infrastructure needs to support agricultural activities. 3. Increased Proficiency in Water Management Techniques o Participants will acquire skills in designing and implementing effective water management systems, including irrigation and drainage solutions, to optimize water use in agriculture. o They will understand how to manage water resources to enhance crop yield and sustainability. 4. Strengthened Land Optimization and Erosion Control Skills o Participants will learn techniques for land optimization and soil conservation to prevent erosion and improve land productivity. o They will develop strategies for effective land use planning and management. 5. Enhanced Capacity for Implementing Engineering Solutions o Participants will gain hands-on experience in applying civil engineering solutions to real-world agricultural challenges. o They will learn to evaluate the effectiveness of engineering solutions and make necessary adjustments. Learning Outcomes 1. Understanding Civil Engineering Concepts for Agriculture o Engineering Principles: Participants will be able to explain key civil engineering principles and their relevance to agricultural productivity. o Application Areas: Participants will understand various areas where civil engineering can be applied in agriculture, such as irrigation, drainage, and infrastructure development.
  • 53.
    2. Planning andDesigning Agricultural Infrastructure o Infrastructure Needs: Participants will identify infrastructure needs for agricultural projects, including roads, storage facilities, and irrigation systems. o Design Skills: Participants will be able to plan and design agricultural infrastructure that meets the needs of the cooperative and enhances productivity. 3. Water Management Techniques o Irrigation Systems: Participants will design and implement efficient irrigation systems, including surface, drip, and sprinkler irrigation. o Drainage Solutions: Participants will learn to design and manage drainage systems to prevent waterlogging and erosion. 4. Land Optimization and Soil Conservation o Erosion Control: Participants will understand and apply techniques for controlling soil erosion, such as terracing, contour plowing, and use of cover crops. o Land Use Planning: Participants will be able to plan and manage land use to optimize productivity and prevent degradation. 5. Implementation and Evaluation of Engineering Solutions o Hands-On Experience: Participants will gain practical experience in implementing civil engineering solutions in agricultural settings. o Effectiveness Evaluation: Participants will learn to assess the effectiveness of engineering solutions and make improvements as needed. Evaluation and Assessment To assess the effectiveness of the training and ensure that learning outcomes are achieved, consider the following methods:  Practical Exercises: Conduct hands-on exercises where participants design and implement civil engineering solutions for agricultural projects.  Case Studies: Use case studies to evaluate participants’ ability to apply engineering principles to real-world agricultural challenges.  Knowledge Tests: Administer quizzes or tests to measure participants’ understanding of civil engineering concepts, infrastructure planning, and water management techniques.  Project Assignments: Have participants complete projects, such as designing an irrigation system or planning infrastructure for a cooperative farm, and assess their performance.  Feedback Surveys: Collect feedback from participants on the training’s content, delivery, and applicability, and gather suggestions for improvement. By focusing on these training and learning outcomes, the program can help cooperatives enhance their agricultural productivity through effective civil engineering solutions, improving infrastructure, water management, and land optimization.
  • 54.
    Presenter 28 CooperativeGovernance and Management Course Good Points o Good motivator to engage participants o Can relate to her audience o Use of FGD in gathering initial data o With articulation per slide o Methodologies suggested like case study, role playing Recommendations o Every five years or earlier, officers need to have a refresher course to enhance their knowledge and skills o Redirection of the training course based on present circumstances (Upskilling and reskilling of the duties and responsibilities of the Officers/staff/members) o Review of GM Performance – What went right? And what went wrong? o Find a solution to improve the governance and management of the cooperative o Conduct SWOT Analysis o Always be guided by the universal principles and practices of the cooperative Recommendation: o Be guided by CDA MA 2015 on the revised guidelines for mandatory training o Refer to presenter no,12 for more details NOTE: Possible training outcomes and learning outcomes where applicable and relevant Presenter 29 Records Management for Financial Transactions Good Points o Good voice o Good pronunciation o Room for Improvement o Rationale at least 2-3 paragraphs o Coverage of the mentoring and coaching sessions Training on records management for financial transactions focuses on equipping participants with the skills and knowledge to effectively manage and maintain accurate records of financial activities. This training is crucial for ensuring financial integrity, compliance, and efficient operation of financial systems. Here’s a detailed outline of the training outcomes and learning outcomes for such a program:
  • 55.
    Training Outcomes 1. EnhancedSkills in Financial Records Management o Participants will develop advanced skills in managing and organizing financial records, including documentation, storage, and retrieval. o They will learn best practices for maintaining accurate and comprehensive financial records. 2. Improved Understanding of Compliance and Regulatory Requirements o Participants will gain a thorough understanding of compliance requirements related to financial records, including relevant laws, regulations, and standards. o They will be able to apply these requirements to ensure that financial records are managed in accordance with legal and regulatory frameworks. 3. Increased Proficiency in Using Records Management Systems o Participants will become proficient in using records management systems and software for tracking and managing financial transactions. o They will learn to implement and utilize digital tools for efficient records management. 4. Strengthened Ability to Ensure Data Accuracy and Integrity o Participants will learn techniques to ensure the accuracy and integrity of financial records, including error detection and correction methods. o They will develop skills to safeguard financial data from unauthorized access and tampering. 5. Enhanced Capacity for Audits and Financial Reporting o Participants will acquire skills to prepare for audits and generate accurate financial reports based on well-maintained records. o They will learn to organize and present financial data in a manner that supports transparency and accountability. Learning Outcomes 1. Understanding Records Management Principles o Fundamentals: Participants will be able to explain the fundamental principles of records management, including the importance of documentation, storage, and retrieval. o Best Practices: Participants will understand best practices for maintaining financial records, including regular updates and proper categorization. 2. Compliance and Regulatory Knowledge o Legal Requirements: Participants will be able to identify and understand the legal and regulatory requirements related to financial records management. o Application: Participants will demonstrate the ability to apply these requirements to ensure compliance in their financial record-keeping practices. 3. Proficiency in Records Management Systems
  • 56.
    o Software Usage:Participants will be proficient in using records management systems and software for tracking financial transactions. o System Implementation: Participants will learn how to implement and utilize digital tools to streamline records management processes. 4. Ensuring Accuracy and Integrity of Financial Records o Data Accuracy: Participants will learn techniques to ensure the accuracy of financial records, including methods for detecting and correcting errors. o Data Security: Participants will understand and apply measures to safeguard financial data from unauthorized access and ensure its integrity. 5. Preparation for Audits and Reporting o Audit Readiness: Participants will develop skills to prepare financial records for audits, including organizing and presenting data in an audit- friendly manner. o Financial Reporting: Participants will learn to generate and present financial reports that reflect accurate and comprehensive data. Evaluation and Assessment To assess the effectiveness of the training and ensure the achievement of learning outcomes, consider the following methods:  Practical Exercises: Conduct hands-on exercises where participants manage financial records, use records management systems, and prepare financial reports.  Case Studies: Use case studies to evaluate participants’ ability to apply records management principles and compliance requirements in real-world scenarios.  Knowledge Tests: Administer quizzes or tests to measure participants’ understanding of records management principles, compliance requirements, and system usage.  Project Assignments: Have participants complete projects, such as creating a records management plan or preparing for an audit, and assess their performance.  Feedback Surveys: Collect feedback from participants on the training’s content, delivery, and applicability, and gather suggestions for improvement. By focusing on these training and learning outcomes, the program can help participants effectively manage financial records, ensuring accuracy, compliance, and efficiency in financial transactions. Presenter 30 Basic Computer Literacy of Lingsat Saranay Cooperative Good Points o Training was based on the TNA conducted o Nice PowerPoint presentation Recommendations
  • 57.
    o Make sureyou have desks tops or laptops for your exercises o Stable internet connectivity o Please refer to Presenter 19: Training on Basic Literacy, Digital Communication and Collaboration Tools Presenter 31 Basic Coop Course Room for Improvement o Establish eye contact with your audience o Change title to fundamental of Cooperatives in compliance with MC 2004 -01, MC 2021 -04, MC 2020-28, MC 2015-09 o Increase the use of fonts that is readable to all Good Point o Added miscellaneous expenses in the proposed budget Areas for Improvement o Evaluation method o Follow up o Refer to Presenter 6 Training Objectives for Fundamentals of Cooperatives Based on CDA MC 2025-09 for more details Presenter 32 Basic Accounting for Non-Accountants Good points o Good PowerPoint presentation o Creative and innovative o Study the use of font color – dark background use white. light background use black o With articulation with e payment like Gcash, e BIR o She specialized on the Training Proposed o Refer to Presenter 2 got more details Presenter 33 Governance and Management of cooperatives Good Points o With eye contact with audience o Pleasing personality o Use story telling o Rationale based on TNA with legal basis
  • 58.
    o She realizedthat the copp has leveled/transformed to another status thus the officers, and staff need retooling, upskilling and reskilling to match their present circumstances o Refer to Presenter 12 Presenter 34 Policy Development Good Points o Good voice o TNA integrated in the rationale o Use of participatory approach o Frevisit old policies and revised according to the present circumstances on the cooperative Recommendations o Prior to the conduct of the training, advise board to review past policies formulated to assess its relevance and effectiveness vis-à-vis performance and culture of the organization o Get inputs fro officers/staff/ key members for their inputs in the revision o You may conduct benchmarking with same category cooperative to learn from their practices Training on policy development for cooperatives aims to equip participants with the skills and knowledge necessary to create effective policies that guide cooperative operations and decision-making. Here’s an outline of the training outcomes and learning outcomes for such a program: Training Outcomes 1. Enhanced Policy Development Skills o Participants will develop the ability to formulate, draft, and implement policies that address the needs and goals of the cooperative. o They will learn to use structured approaches to policy development, including research, stakeholder consultation, and impact assessment. 2. Improved Understanding of Cooperative Governance and Compliance o Participants will gain a thorough understanding of the principles of cooperative governance and the legal and regulatory requirements for policy development. o They will learn to ensure that policies are compliant with relevant laws and regulations. 3. Increased Proficiency in Stakeholder Engagement
  • 59.
    o Participants willlearn to engage effectively with stakeholders, including members, board members, and external partners, to gather input and build support for policies. o They will develop skills in facilitating discussions and addressing concerns during the policy development process. 4. Strengthened Ability to Evaluate and Monitor Policies o Participants will acquire skills to evaluate the effectiveness of policies and monitor their implementation. o They will learn to adjust and refine policies based on feedback and performance data. 5. Enhanced Capacity for Policy Communication and Training o Participants will learn to communicate policies clearly and effectively to all stakeholders. o They will develop skills to train others in understanding and implementing policies. Learning Outcomes 1. Understanding Policy Development Process o Policy Formulation: Participants will be able to explain the process of policy formulation, including the steps involved in drafting and reviewing policies. o Research and Analysis: Participants will understand how to conduct research and analyze information to inform policy development. 2. Knowledge of Cooperative Governance and Compliance o Governance Principles: Participants will be able to describe the principles of cooperative governance and their impact on policy development. o Legal Requirements: Participants will understand the legal and regulatory requirements for policy development and ensure policies are compliant. 3. Proficiency in Stakeholder Engagement o Engagement Techniques: Participants will demonstrate techniques for engaging stakeholders, including conducting consultations and facilitating discussions. o Feedback Integration: Participants will learn to integrate stakeholder feedback into policy development. 4. Evaluation and Monitoring of Policies o Policy Evaluation: Participants will be able to assess the effectiveness of policies through evaluation techniques and performance metrics.
  • 60.
    o Monitoring: Participantswill understand how to monitor policy implementation and make necessary adjustments based on feedback and data. 5. Effective Communication and Training o Policy Communication: Participants will be able to communicate policies clearly and effectively to members and stakeholders. o Training Others: Participants will develop skills to train others on policy understanding and implementation. Evaluation and Assessment To assess the effectiveness of the training and ensure the achievement of learning outcomes, consider the following methods:  Practical Exercises: Conduct exercises where participants draft and review sample policies, incorporating stakeholder feedback and compliance requirements.  Case Studies: Use case studies to evaluate participants’ ability to apply policy development principles and address real-world scenarios.  Knowledge Tests: Administer quizzes or tests to measure participants’ understanding of policy development processes, governance principles, and compliance requirements.  Project Assignments: Have participants complete projects, such as developing a policy proposal or creating a policy implementation plan, and assess their performance.  Feedback Surveys: Collect feedback from participants on the training’s content, delivery, and applicability, and gather suggestions for improvement. By focusing on these training and learning outcomes, the program can help participants effectively develop and implement policies that support the success and governance of cooperatives. Presenter 35 Orientation on SPLIT Policy guidelines and Other Related Issuances for DAR Implementers Room for Improvement o Increase volume of your voice. It soft o Rationale condensed to 2-3 paragraphs Presenter 36 Basic Accounting for Non-Accountants Good Points o Creative and innovative Presentation
  • 61.
    o With TNA Recommendations oM & E Presenter 37 Credit Risk and Delinquency Control Good point o Training implementation Recommendations o Do not use red font preferred font color is black or blue. You may use red to emphasize your point o Discuss fully what is PBD lawyering and how it can impact the credit risk and delinquency control of the cooperative o Discuss coverage of mentoring and coaching o Include Mediation and conciliation committee in your selection of participants o Include KPI in your Action Plan, including metrics Presenter 38 Gender and Development Seminar Recommendation o Use CDA MCs re GAD Organization, o Create GAD Committee to oversee the GAD Plan o Use CDA MC 2017 -04 tool to assess Progress in gender Equality o Action Plan to implement MCs o Provide Miscellaneous expense for uncontrollable events Presenter 39 Training Workshop on Gender Analysis and GA Tools Good Points o Creative presentation Recommendations o Rationale 2-3 paragraghs o Use CDA MC 2017 -04 tool to assess Progress in gender Equality o Discuss your outputs (plans and Programs) to address gender mainstreaming in the DAR Presenter 40 Digital Literacy Training Room for Improvement o Use TNA as the basis for your training proposal
  • 62.
    o Individual hands-onactivity to get a certificate of attendance or participation Presenter 41 Training on Records Management Good Points o Creative with good presentation o Provision of sample records Recommendations o Officers and staff should be included in the proposed training o Provide contingency expenses to cover uncontrollable events o Output will be an action plan with timelines and deliverables so that it would be easy for you top monitor progress in managing their records o State sources of funds to cover the training expenses Presenter 42 Risk Management Seminar Good points o With good voice Recommendations o Gather data to come up with a risk registry o Measure the severity of the risk and occurrence o Consult Officers/Staff about possible intervention measures to reduce or eliminate risk o Monitor reduction risk and occurrence o If its increasing despite intervention, change your strategies if found ineffective o Risk interventions should be funded Presenter 43 Conduct of training on Technical Assistance on Credit Availment of Micro Cooperatives Good point o With TNA o Nice presentation - colorful o With list of agencies providing financial assistance Recommendations o Study further possible sources of funds o Ask funders to discuss requirements for availment o Evaluation methods o Follow Up
  • 63.
    Presenter 44 FinancialLiteracy Training Good Point o With minimal articulation Recommendations o Invite resource person from cooperatives (University of Experience) with a good track record on financial literacy o Or a resource person from DTI A financial literacy seminar for cooperatives focuses on equipping members with essential financial knowledge and skills to manage their personal and cooperative finances effectively. This training aims to enhance financial decision-making, improve financial management practices, and support the overall financial health of the cooperative. Here’s an outline of the training outcomes and learning outcomes for such a seminar: Training Outcomes 1. Enhanced Understanding of Financial Concepts o Participants will gain a comprehensive understanding of fundamental financial concepts and terminology. o They will learn the importance of financial literacy for personal and cooperative financial health. 2. Improved Personal Financial Management Skills o Participants will develop skills in budgeting, saving, and managing personal debt. o They will learn strategies for financial planning and goal setting. 3. Increased Proficiency in Cooperative Financial Management o Participants will gain knowledge in managing cooperative finances, including budgeting, financial reporting, and cash flow management. o They will learn to interpret financial statements and make informed financial decisions for the cooperative. 4. Strengthened Ability to Evaluate Financial Products and Services o Participants will learn to evaluate different financial products and services, such as loans, insurance, and investment options. o They will understand how to select appropriate financial products that meet their personal and cooperative needs. 5. Enhanced Capacity for Financial Decision-Making o Participants will develop critical thinking skills to analyze financial information and make sound financial decisions. o They will learn to assess the financial risks and benefits associated with various financial options. Learning Outcomes
  • 64.
    1. Understanding FinancialConcepts o Basic Concepts: Participants will be able to explain fundamental financial concepts, including income, expenses, savings, investments, and debt. o Financial Literacy Importance: Participants will understand the significance of financial literacy for achieving personal financial goals and ensuring cooperative sustainability. 2. Personal Financial Management o Budgeting: Participants will learn to create and manage personal budgets to track income and expenses. o Saving and Debt Management: Participants will understand the importance of saving and strategies for managing and reducing personal debt. 3. Cooperative Financial Management o Financial Reporting: Participants will learn to read and interpret financial statements, such as income statements, balance sheets, and cash flow statements. o Budgeting and Cash Flow: Participants will be able to develop and manage budgets for the cooperative and understand cash flow management. 4. Evaluating Financial Products o Product Comparison: Participants will learn to compare different financial products and services, including loans, insurance policies, and investment opportunities. o Appropriate Selection: Participants will understand how to choose financial products that align with their financial goals and the cooperative’s needs. 5. Financial Decision-Making o Analyzing Financial Information: Participants will develop skills to analyze financial data and assess the implications of financial decisions. o Risk Assessment: Participants will learn to evaluate the risks and benefits of different financial options and make informed decisions. Evaluation and Assessment To assess the effectiveness of the training and ensure the achievement of learning outcomes, consider the following methods:  Practical Exercises: Conduct exercises where participants create personal and cooperative budgets, interpret financial statements, and evaluate financial products.  Case Studies: Use case studies to evaluate participants’ ability to apply financial concepts and decision-making skills in real-world scenarios.  Knowledge Tests: Administer quizzes or tests to measure participants’ understanding of financial concepts, personal financial management, and cooperative financial management.
  • 65.
     Role-Playing: Userole-playing scenarios to assess participants’ skills in discussing financial options, making decisions, and presenting financial plans.  Feedback Surveys: Collect feedback from participants on the seminar’s content, delivery, and applicability, and gather suggestions for improvement. By focusing on these training and learning outcomes, the financial literacy seminar can help cooperative members manage their finances more effectively, make informed financial decisions, and contribute to the financial stability and growth of their cooperative. Presenter 45 Computer Literacy for Beginners Good point o Good training content o Learning outcomes were mentioned Recommendation o Use TNA as the basis for your training proposal although trending is also accepted provide you have the data o Choose a venue with strong internet connectivity with competent IT staff to assist o Who will prepare for the module to be distributed to participants o Introduce other Google products especially google sheet o Participants should bring their laptops for the hands-on activity o All participants must complete exercises before they can receive their certificate of attendance or participation o Please refer to previous presenters with the same training proposal Presenter 46 Governance and Management of Cooperatives Recommendation o State the category of coops in compliance to the conduct of mandatory/optional trainings o Include in the rationale the legal basis and result of your TNA analysis o Provide miscellaneous expenses in your budget to cover uncontrollable events o State sources of funds including sharing if funding will come from outside of the coops o Please refer to previous presenters with the same training proposal Presenter 47 Effective Cooperative Management and Entrepreneurship Recommendations o Determine topics for coop management and topics for entrepreneurship
  • 66.
    o As youhave two themes in your training proposal Training in Cooperative Management and Entrepreneurship aims to equip participants with the knowledge and skills necessary to manage cooperatives effectively and foster entrepreneurial thinking. This training helps enhance the overall performance, sustainability, and growth potential of cooperatives. Here’s an outline of the training outcomes and learning outcomes for such a program: Training Outcomes 1. Enhanced Understanding of Cooperative Principles and Practices o Participants will gain comprehensive knowledge of cooperative principles, values, and practices. o They will learn the roles and responsibilities of cooperative members and leaders. 2. Improved Cooperative Management Skills o Participants will develop skills in strategic planning, governance, and operational management. o They will learn techniques for effective decision-making, conflict resolution, and member engagement. 3. Increased Knowledge of Financial Management for Cooperatives o Participants will gain proficiency in financial planning, budgeting, and financial reporting for cooperatives. o They will understand how to manage cooperative finances, including revenue generation, expense control, and financial sustainability. 4. Strengthened Entrepreneurial Skills o Participants will develop entrepreneurial skills, including opportunity identification, innovation, and risk management. o They will learn to create and implement business plans that support cooperative growth and diversification. 5. Enhanced Capacity for Marketing and Business Development o Participants will learn strategies for marketing cooperative products and services. o They will develop skills in customer relationship management, sales, and business development. Learning Outcomes 1. Understanding Cooperative Principles and Practices o Cooperative Principles: Participants will be able to explain the seven cooperative principles and their importance in cooperative management. o Roles and Responsibilities: Participants will understand the roles and responsibilities of cooperative members, leaders, and managers. 2. Cooperative Management Skills o Strategic Planning: Participants will learn to develop and implement strategic plans that align with cooperative goals and objectives.
  • 67.
    o Governance andOperations: Participants will be able to establish effective governance structures and manage day-to-day operations efficiently. o Decision-Making and Conflict Resolution: Participants will understand decision-making processes and conflict resolution techniques to ensure smooth cooperative functioning. 3. Financial Management for Cooperatives o Financial Planning and Budgeting: Participants will learn to create financial plans and budgets that support cooperative sustainability and growth. o Financial Reporting: Participants will be able to prepare and interpret financial statements, including income statements, balance sheets, and cash flow statements. o Revenue and Expense Management: Participants will understand how to manage cooperative finances, focusing on revenue generation and expense control. 4. Entrepreneurial Skills o Opportunity Identification: Participants will learn to identify and evaluate new business opportunities for the cooperative. o Innovation and Risk Management: Participants will develop skills in fostering innovation and managing risks associated with entrepreneurial activities. o Business Planning: Participants will be able to create comprehensive business plans that outline strategies for growth and diversification. 5. Marketing and Business Development o Marketing Strategies: Participants will learn to develop and implement marketing strategies that promote cooperative products and services. o Customer Relationship Management: Participants will understand the importance of building and maintaining strong customer relationships. o Sales and Business Development: Participants will develop skills in sales techniques and business development to expand the cooperative’s market presence. Evaluation and Assessment To assess the effectiveness of the training and ensure the achievement of learning outcomes, consider the following methods:  Practical Exercises: Conduct exercises where participants develop strategic plans, financial budgets, business plans, and marketing strategies.  Case Studies: Use case studies to evaluate participants’ ability to apply cooperative management and entrepreneurial concepts in real-world scenarios.  Knowledge Tests: Administer quizzes or tests to measure participants’ understanding of cooperative principles, financial management, and entrepreneurial skills.
  • 68.
     Role-Playing: Userole-playing scenarios to assess participants’ skills in decision-making, conflict resolution, customer engagement, and sales techniques.  Feedback Surveys: Collect feedback from participants on the training’s content, delivery, and applicability, and gather suggestions for improvement. By focusing on these training and learning outcomes, the Cooperative Management and Entrepreneurship program can help cooperative members and leaders enhance their management capabilities, foster entrepreneurial thinking, and drive the cooperative’s success and growth. Presenter 48 Parliamentary Procedures Room for improvement o Rationale 2-3 paragraphs will suffice o Who will prepare for the modules o State sources of funds and counterparts (sharing schemes) o MOU for fund sharing Please refer to previous presenters with the same training proposal Presenter 49 Conflict Management Good points o Creative presentation o Font use readable to all participants o Good voice o With elaboration on age and gender and its relationship to conflict management Recommendations o Categorize conflicts if major and minor. o Categorize if urgent or not, this way you can make your decision on what to prioritized based on urgency and capacity of your MC Committee o Empower Mediation and Conciliation Committee to resolve conflicts within the cooperatives o Come up with a policy with procedures after a series conduct of consultations Training on Conflict Management for cooperatives is essential to ensure smooth operations, enhance cooperation among members, and foster a positive working environment. Effective conflict management can lead to better decision-making, increased productivity, and a more harmonious cooperative. Here’s an outline of the training outcomes and learning outcomes for a conflict management program: Training Outcomes
  • 69.
    1. Enhanced Understandingof Conflict Dynamics o Participants will gain a comprehensive understanding of the nature, types, and causes of conflicts within cooperatives. o They will learn the impact of unresolved conflicts on cooperative operations and member relationships. 2. Improved Conflict Resolution Skills o Participants will develop skills in identifying, addressing, and resolving conflicts effectively. o They will learn various conflict resolution techniques and strategies suitable for different types of conflicts. 3. Increased Ability to Foster a Positive Cooperative Culture o Participants will learn to create an environment that promotes open communication, mutual respect, and collaboration. o They will understand how to implement practices that prevent conflicts and encourage cooperative problem-solving. 4. Strengthened Communication Skills o Participants will enhance their communication skills, including active listening, empathy, and assertiveness. o They will learn to facilitate constructive dialogues and mediate disputes among members. 5. Enhanced Capacity for Developing Conflict Management Policies o Participants will gain knowledge in formulating and implementing conflict management policies and procedures. o They will learn to establish systems for reporting, addressing, and resolving conflicts within the cooperative. Learning Outcomes 1. Understanding Conflict Dynamics o Nature of Conflict: Participants will be able to explain the nature and dynamics of conflicts, including their types and causes. o Impact of Conflict: Participants will understand the negative impact of unresolved conflicts on cooperative effectiveness and member relationships. 2. Conflict Resolution Skills o Identifying Conflicts: Participants will learn to recognize early signs of conflicts and understand their underlying causes. o Resolution Techniques: Participants will be able to apply various conflict resolution techniques, such as negotiation, mediation, and arbitration, to resolve disputes. 3. Fostering a Positive Cooperative Culture o Open Communication: Participants will learn to promote open communication and transparency within the cooperative. o Preventive Measures: Participants will understand how to implement preventive measures that reduce the likelihood of conflicts. 4. Communication Skills
  • 70.
    o Active Listening:Participants will develop active listening skills to understand different perspectives and emotions during conflicts. o Empathy and Assertiveness: Participants will learn to communicate empathetically and assertively to address conflicts without escalating them. o Facilitating Dialogue: Participants will be able to facilitate constructive dialogues and mediate disputes to reach mutually acceptable solutions. 5. Conflict Management Policies o Policy Development: Participants will learn to develop conflict management policies and procedures tailored to the cooperative’s needs. o Implementation and Monitoring: Participants will understand how to implement these policies effectively and monitor their impact on conflict resolution. Evaluation and Assessment To assess the effectiveness of the training and ensure the achievement of learning outcomes, consider the following methods:  Practical Exercises: Conduct exercises where participants identify conflicts, apply resolution techniques, and practice communication skills in simulated scenarios.  Case Studies: Use case studies to evaluate participants’ ability to analyze conflicts, understand their dynamics, and apply appropriate resolution strategies.  Knowledge Tests: Administer quizzes or tests to measure participants’ understanding of conflict dynamics, resolution techniques, and communication skills.  Role-Playing: Use role-playing scenarios to assess participants’ skills in mediating disputes, facilitating dialogues, and implementing conflict management policies.  Feedback Surveys: Collect feedback from participants on the training’s content, delivery, and applicability, and gather suggestions for improvement. By focusing on these training and learning outcomes, the Conflict Management training program can help cooperative members and leaders effectively manage conflicts, foster a positive cooperative culture, and enhance overall cooperative performance. Resources: o RA 9520 o CDA MCs and advisories o Chatgpt