Project Communications – Tips and Best Practices

Presented by Bill Dow, PMP
© Copyright 2013 – B Dow, B Taylor
Today’s Topics

1. Understanding Project
Communications and Why
Projects Fail Survey(s)
2. Introduction to Project
Communication Planning
3. Top Communication Tools
© Copyright 2013 – B Dow, B Taylor
Bill Dow, PMP
•
•
•
•
•

•

23 years in information technology
21 in Project Management
8 years at Microsoft, over 10 years running large PMOs
Instructor of Project Management, currently teaching at
Bellevue College, and has taught in other Colleges in
British Columbia & Ontario, Canada
Strong passion for Project Management, PMO’s & Project
Management Methodologies.
Author of two Project Management books and several
related project management articles.

Bill Dow, PMP:
Author of “The Tactical Guide
for Building a PMO” and coauthor of “Project Management
Communications Bible”

© Copyright 2013 – B Dow, B Taylor
TOP REASON PROJECT’S FAIL….

© Copyright 2013 – B Dow, B Taylor
Project Communications Introduction

The only way to solve project problems is by
communicating……

There is no other way……
© Copyright 2013 – B Dow, B Taylor
28% of projects that fail, poor
communications is the # 1 reason
28%

Other Reasons for Failure

Project Communications
Failures
72%

That’s 1 out of 4 projects that fail – do so based on poor communications.
Results based on a Jan 2007 poll of 1,007 respondents
© Copyright 2013 – B Dow, B Taylor

(PMI Net July 2007 page 19)
Top 9 Causes for Project Failure
Survey Results

1.

Poor Communication

2.

Insufficient resource planning

3.

Unrealistic schedules

4.

Poor project requirements

9.8%

5.

Lack of stakeholders buy-in

6.7%

6.

Undefined success/closure criteria

5.2%

7.

Unrealistic budgets

4.8%

8.

Insufficient or no risk planning

4.4%

9.

Lack of control/change process

4.3%

Results based on a Jan 2007 poll of 1,007 respondents
© Copyright 2013 – B Dow, B Taylor

28.0%

18%
13.2%

(PMI Net July 2007 page 19)
Other Project Failure Survey's
Center for Project Management Study
 Mistaking half-baked ideas for projects
 Inadequate due diligence – is the project feasible?
 Poor sponsorship
 Under-skilled project managers
 Failing to deploy a robust project management

process
 Not monitoring the vital signs
 Absence of a well managed project portfolio.
© Copyright 2009 – B Dow, B Taylor
Other Project Failure Survey's
Penn State University Study
 Lack of corporate leadership

 Poorly communicated deliverables and goals
 Team-related weaknesses
 Poor project management

 Deviation from schedule or budget
 Notice that there is no mention of technical limits

Research from University of Karlsruhe
 Poor project management
 Uncontrolled “soft factors”
 Absence of change management
© Copyright 2013 – B Dow, B Taylor
Summary
 These 4 survey’s are pretty clear in showing you

that communications is a common theme as why
projects fail. Are you projects any different?

 90% of a project manager’s role is communications

so I can’t stress enough how important it is to be
successful at communicating your project status.

 Ensure you treat communications with high priority

throughout the life of the project.
© Copyright 2013 – B Dow, B Taylor
Introducing Project Communication
Planning
© Copyright 2013 – B Dow, B Taylor
Communication Planning

Who, What, Where, When and How….
© Copyright 2013 – B Dow, B Taylor
Communication Planning Key Concepts!

• Communication planning is going to be one of the most
important aspects of managing your project. Just as important
as any other area!

•Understanding what to communicate and how you will
communicate project information at the beginning of the project is
critical to being successful. No time to go back!

• Ask your customer how they want their project information
delivered to them at the beginning of the project. Continue to
verify throughout the project that your customers are
getting the status that they really need!
“Every project requires a Communication Plan!”
© Copyright 2013 – B Dow, B Taylor
Communication Planning Tools
1. Circle of Communications Chart (who)
2. Communication Requirements Matrix
(what/who)

3. Role Report Matrix (who/what/when)

4. Project Calendar (what/when)
“Add these tools directly into your Communication Plan!”
© Copyright 2013 – B Dow, B Taylor
Include these tools into every Communication Plan

Table of Contents

Use your existing templates today and add new
sections and include these Communication tools.
© Copyright 2013 – B Dow, B Taylor
Communication Plan Breakdown
Circle of Communications Chart - Software
Development
Manager

• Lead Developer
• Developer

NO
• Analyst #1
• Analyst #2

Requirements
Managers

Project
Manager
Customer

Test Manager

Arch Manager

© Copyright 2013 – B Dow, B Taylor

• Test Analyst #1
• Test Analyst #2

• Architecture Lead
• Designer
Communication Requirements Matrix
Team Member/Tool

Project Manager

Stakeholder
/Customer(Internal)

Updated project information

Team Members

Communicates project
information

Feedback/Issues/Concerns

Team Members

Stakeholder
/Customer(Internal)

Communicates project
status, risks, budget, and
ongoing project information

Project Manager

Project Specific details

Specific project details where
applicable

Note: Best read from left to right and from bottom to top
© Copyright 2013 – B Dow, B Taylor
ROLE REPORT MATRIX
Note: Focus on Timing of Report and who is getting what Report.
People (Who
receive what
Report)

Name

On Demand

CEO/CFO

John Smith

Status & Cost Reports

Owner

Peter Adams

Status & Cost Reports

Stakeholder

Mark Taylor

Stakeholder Report

Risk Manager

Bruce Jones

Risk Report

Media

ABC News

Media Report

© Copyright 2013 – B Dow, B Taylor

Weekly

Monthly

Variance Report

Status Reports

Status Reports

Status Reports
Timeframe/Calendar
•Establishing a Rhythm/Cadence for reporting project
information.

•Such as how often does reports go out?

•How often is information gathered by your team

members? Did you work with your customers to
understand how often they want reports delivered?

Use the Role Report Matrix as your guide to creating
a Project Rhythm Calendar.
© Copyright 2013 – B Dow, B Taylor
Project Calendar
Monday

Wk1

Wk2

Wk3

Prepare Status
Material

Tuesday

Wednesday

Prepare Status
Material

Prepare Status
Material

Team Meeting,
gather
information for
Status Report

Prepare
Monthly
Newsletter

© Copyright 2013 – B Dow, B Taylor

Submit Final
Status Report

Customer
Status Meeting,
Finalize Status
Information

Team Meeting,
gather
information for
Status Report

Friday

Customer
Status Meeting,
Finalize Status
Information

Team Meeting,
gather
information for
Status Report

Thursday

Submit Final
Status Report

Customer
Status Meeting,
Finalize Status
Information

Submit Final
Status Report
Summary
 4 New Communication Planning tools we

believe will help you be successful.

 All of these tools will enhance your

communications and help you drive successful
project from a communication perspective.

 Ensure you add these tools to your

Communications Plan for all your projects.
TOP PROJECT COMMUNICATION TOOLS

© Copyright 2013 – B Dow, B Taylor
Project Communications Tools….

What tools do you use?
© Copyright 2013 – B Dow, B Taylor
ALL COMMUNICATION TOOLS

© Copyright 2013 – B Dow, B Taylor
Knowledge Breakdown Tools Chart

© Copyright 2013 – B Dow, B Taylor
Lifecycle Process Tools Breakdown Chart

© Copyright 2013 – B Dow, B Taylor
Tool Name: Responsibility Matrix
Tool Value: Displays the task the team member is associated with. Some matrixes further identify the level of
authority assigned to a particular role.

© Copyright 2013 – B Dow, B Taylor

Page 304
Tool Name: Work Breakdown Structure
Tool Value: Identify and define all the work on the project. Displays….

© Copyright 2013 – B Dow, B Taylor

Page 151
Tool Name: Project Schedule
Tool Value: Plan of record for the project. It displays where you have been, where you are, and where you are
going.

© Copyright 2013 – B Dow, B Taylor

Page 194
Tool Name: Risk Matrix
Tool Value: Simple and easy-to-read chart to assess risk level
of project. No other…..

© Copyright 2013 – B Dow, B Taylor

Page 421
SUMMARY

• Project Communications is the # 1 factor in
project success or failure

• Project manager must treat project

communications as a high priority when
managing their projects.

• Work with your customers and capture their
project communications needs. Understand
their decision points and adapt your
communications accordingly.

• Understand the various Communication Tools
that you can be using on your project.
© Copyright 2009 – B Dow, B Taylor
Thanks…….

© Copyright 2013 – B Dow, B Taylor
Thanks for your Time!
Bill Dow’s Contact Information:
Http://www.pmotactialguide.com
Email: billdow@pmotacticalguide.com

Social Networks:
Twitter: @billdow
Linkedin: Bill Dow, PMP
Facebook: Bill Dow
Articles @ Projecttimes.com and Projectmanagement.com
Find Both of Bill’s books on Amazon today:
1. “The Tactical Guide for Building a PMO” Published 2012
2. “The Project Management Communications Bible” Published 2008

More Related Content

What's hot

Internship Presentation
Internship PresentationInternship Presentation
Internship PresentationAbRi77
 
Nonverbal Communication for a candidate in an Interview session -Dos & Don'ts
Nonverbal Communication for a candidate in an Interview session -Dos & Don'ts Nonverbal Communication for a candidate in an Interview session -Dos & Don'ts
Nonverbal Communication for a candidate in an Interview session -Dos & Don'ts Peea Basu Chakraborty
 
My Internship Document part1
My Internship Document part1My Internship Document part1
My Internship Document part1Shashi_S_S
 
Final Presentation for Internship
Final Presentation for InternshipFinal Presentation for Internship
Final Presentation for Internshipjnwashburn
 
business communication ,effective business communication Chapter 2
business communication ,effective business communication Chapter 2business communication ,effective business communication Chapter 2
business communication ,effective business communication Chapter 2kamran
 
Job interview slide show
Job interview slide showJob interview slide show
Job interview slide showlmcdonaldbe
 
Winning CVs and Cover Letters
Winning CVs and Cover LettersWinning CVs and Cover Letters
Winning CVs and Cover LettersTahira Majothi
 
Computer science internship report
Computer science internship reportComputer science internship report
Computer science internship reportsurafelteshome3
 
Industrial Report - Ndlovu Kevin Mehluli
Industrial Report - Ndlovu Kevin MehluliIndustrial Report - Ndlovu Kevin Mehluli
Industrial Report - Ndlovu Kevin MehluliKevin Ndlovu
 
INDUSTRIAL ATTACHMENT REPORT BBM_11_11_12 PART 2(1) (1)
INDUSTRIAL ATTACHMENT REPORT BBM_11_11_12 PART 2(1) (1)INDUSTRIAL ATTACHMENT REPORT BBM_11_11_12 PART 2(1) (1)
INDUSTRIAL ATTACHMENT REPORT BBM_11_11_12 PART 2(1) (1)Brian Bor
 
Computer science/ IT Fianl attachment report
Computer science/ IT Fianl attachment reportComputer science/ IT Fianl attachment report
Computer science/ IT Fianl attachment reportPaullaster Okoth
 
Reporting officer performance appraisal
Reporting officer performance appraisalReporting officer performance appraisal
Reporting officer performance appraisalDannyBatca789
 

What's hot (18)

Persuasive message
Persuasive messagePersuasive message
Persuasive message
 
Resume writing
Resume writingResume writing
Resume writing
 
Internship Presentation
Internship PresentationInternship Presentation
Internship Presentation
 
BNI edu slot
BNI edu slot BNI edu slot
BNI edu slot
 
Nonverbal Communication for a candidate in an Interview session -Dos & Don'ts
Nonverbal Communication for a candidate in an Interview session -Dos & Don'ts Nonverbal Communication for a candidate in an Interview session -Dos & Don'ts
Nonverbal Communication for a candidate in an Interview session -Dos & Don'ts
 
My Internship Document part1
My Internship Document part1My Internship Document part1
My Internship Document part1
 
Final Presentation for Internship
Final Presentation for InternshipFinal Presentation for Internship
Final Presentation for Internship
 
BNI Connect Presentation
BNI Connect Presentation BNI Connect Presentation
BNI Connect Presentation
 
business communication ,effective business communication Chapter 2
business communication ,effective business communication Chapter 2business communication ,effective business communication Chapter 2
business communication ,effective business communication Chapter 2
 
Self Introduction
Self IntroductionSelf Introduction
Self Introduction
 
Job interview slide show
Job interview slide showJob interview slide show
Job interview slide show
 
Winning CVs and Cover Letters
Winning CVs and Cover LettersWinning CVs and Cover Letters
Winning CVs and Cover Letters
 
Computer science internship report
Computer science internship reportComputer science internship report
Computer science internship report
 
Industrial Report - Ndlovu Kevin Mehluli
Industrial Report - Ndlovu Kevin MehluliIndustrial Report - Ndlovu Kevin Mehluli
Industrial Report - Ndlovu Kevin Mehluli
 
INDUSTRIAL ATTACHMENT REPORT BBM_11_11_12 PART 2(1) (1)
INDUSTRIAL ATTACHMENT REPORT BBM_11_11_12 PART 2(1) (1)INDUSTRIAL ATTACHMENT REPORT BBM_11_11_12 PART 2(1) (1)
INDUSTRIAL ATTACHMENT REPORT BBM_11_11_12 PART 2(1) (1)
 
Job interview
Job interviewJob interview
Job interview
 
Computer science/ IT Fianl attachment report
Computer science/ IT Fianl attachment reportComputer science/ IT Fianl attachment report
Computer science/ IT Fianl attachment report
 
Reporting officer performance appraisal
Reporting officer performance appraisalReporting officer performance appraisal
Reporting officer performance appraisal
 

Viewers also liked

Project Communications
Project CommunicationsProject Communications
Project Communicationswhaa
 
Outside in from the Inside Out: The Real Work of Becoming Demand Driven
Outside in from the Inside Out: The Real Work of Becoming Demand DrivenOutside in from the Inside Out: The Real Work of Becoming Demand Driven
Outside in from the Inside Out: The Real Work of Becoming Demand DrivenSpinnaker Management Group
 
01 project communications management2013
01 project communications management201301 project communications management2013
01 project communications management2013Mohammad Tawfik
 
Towards a Library of Workflow User Interface Patterns
Towards a Library of Workflow User Interface PatternsTowards a Library of Workflow User Interface Patterns
Towards a Library of Workflow User Interface PatternsJuan Manuel Gonzalez Calleros
 
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg University
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg UniversityJola G.B. Prinsen - Implementing WMS and WCL at Tilburg University
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg Universityjprinsen
 
10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoidMarianna Semenova
 
Challenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSRChallenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSRVSR *
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIsQuang Ngoc
 
Management information system
Management information systemManagement information system
Management information systemSikander Saini
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 

Viewers also liked (12)

Project Communications
Project CommunicationsProject Communications
Project Communications
 
Outside in from the Inside Out: The Real Work of Becoming Demand Driven
Outside in from the Inside Out: The Real Work of Becoming Demand DrivenOutside in from the Inside Out: The Real Work of Becoming Demand Driven
Outside in from the Inside Out: The Real Work of Becoming Demand Driven
 
01 project communications management2013
01 project communications management201301 project communications management2013
01 project communications management2013
 
Towards a Library of Workflow User Interface Patterns
Towards a Library of Workflow User Interface PatternsTowards a Library of Workflow User Interface Patterns
Towards a Library of Workflow User Interface Patterns
 
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg University
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg UniversityJola G.B. Prinsen - Implementing WMS and WCL at Tilburg University
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg University
 
10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid
 
Challenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSRChallenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSR
 
PMP_Project Risk Management
PMP_Project Risk ManagementPMP_Project Risk Management
PMP_Project Risk Management
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 
Management information system
Management information systemManagement information system
Management information system
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 

Similar to Project communications presentations

Improving IT Project Communication
Improving IT Project CommunicationImproving IT Project Communication
Improving IT Project Communicationarshriz
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
Capturing Lessons learned Information - Making your current and future projec...
Capturing Lessons learned Information - Making your current and future projec...Capturing Lessons learned Information - Making your current and future projec...
Capturing Lessons learned Information - Making your current and future projec...Dow Publishing LLC
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxclarebernice
 
Chapter 2 Questionsand Answers1. There is a difference between t.docx
Chapter 2 Questionsand Answers1. There is a difference between t.docxChapter 2 Questionsand Answers1. There is a difference between t.docx
Chapter 2 Questionsand Answers1. There is a difference between t.docxwalterl4
 
What are the 6 elements of a project
What are the 6 elements of a projectWhat are the 6 elements of a project
What are the 6 elements of a projectRichardPierce28
 
Major Project Management Challenges and The Way Forward.pptx
Major Project Management Challenges and The Way Forward.pptxMajor Project Management Challenges and The Way Forward.pptx
Major Project Management Challenges and The Way Forward.pptxMd. Masudur Rahman, PMP
 
Strategic Value Presentation 100
Strategic Value Presentation 100Strategic Value Presentation 100
Strategic Value Presentation 100jjhansen5
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfProject Cubicle
 
Project PlanProject ManagementSher.docx
Project PlanProject ManagementSher.docxProject PlanProject ManagementSher.docx
Project PlanProject ManagementSher.docxLynellBull52
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager PrimerTom Cremins
 
Project proposal template 21
Project proposal template 21Project proposal template 21
Project proposal template 21faisalbutt37
 
Project Manual
Project ManualProject Manual
Project ManualJoe Lynn
 
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Nurhazman Abdul Aziz
 
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxRunning head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxcowinhelen
 
WRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxWRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxANDREANIKKAOCHIA
 

Similar to Project communications presentations (20)

Improving IT Project Communication
Improving IT Project CommunicationImproving IT Project Communication
Improving IT Project Communication
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Session 8 gdas pmp study group presentation
Session 8   gdas pmp study group presentationSession 8   gdas pmp study group presentation
Session 8 gdas pmp study group presentation
 
Capturing Lessons learned Information - Making your current and future projec...
Capturing Lessons learned Information - Making your current and future projec...Capturing Lessons learned Information - Making your current and future projec...
Capturing Lessons learned Information - Making your current and future projec...
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docx
 
Chapter 2 Questionsand Answers1. There is a difference between t.docx
Chapter 2 Questionsand Answers1. There is a difference between t.docxChapter 2 Questionsand Answers1. There is a difference between t.docx
Chapter 2 Questionsand Answers1. There is a difference between t.docx
 
What are the 6 elements of a project
What are the 6 elements of a projectWhat are the 6 elements of a project
What are the 6 elements of a project
 
Major Project Management Challenges and The Way Forward.pptx
Major Project Management Challenges and The Way Forward.pptxMajor Project Management Challenges and The Way Forward.pptx
Major Project Management Challenges and The Way Forward.pptx
 
Drupal project management
Drupal project managementDrupal project management
Drupal project management
 
Strategic Value Presentation 100
Strategic Value Presentation 100Strategic Value Presentation 100
Strategic Value Presentation 100
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
 
Project PlanProject ManagementSher.docx
Project PlanProject ManagementSher.docxProject PlanProject ManagementSher.docx
Project PlanProject ManagementSher.docx
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
 
Project proposal template 21
Project proposal template 21Project proposal template 21
Project proposal template 21
 
Project Manual
Project ManualProject Manual
Project Manual
 
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
 
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxRunning head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
 
Planning And Managing The Project
Planning And Managing The ProjectPlanning And Managing The Project
Planning And Managing The Project
 
WRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxWRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptx
 

Recently uploaded

Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 

Recently uploaded (20)

Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 

Project communications presentations

  • 1. Project Communications – Tips and Best Practices Presented by Bill Dow, PMP © Copyright 2013 – B Dow, B Taylor
  • 2. Today’s Topics 1. Understanding Project Communications and Why Projects Fail Survey(s) 2. Introduction to Project Communication Planning 3. Top Communication Tools © Copyright 2013 – B Dow, B Taylor
  • 3. Bill Dow, PMP • • • • • • 23 years in information technology 21 in Project Management 8 years at Microsoft, over 10 years running large PMOs Instructor of Project Management, currently teaching at Bellevue College, and has taught in other Colleges in British Columbia & Ontario, Canada Strong passion for Project Management, PMO’s & Project Management Methodologies. Author of two Project Management books and several related project management articles. Bill Dow, PMP: Author of “The Tactical Guide for Building a PMO” and coauthor of “Project Management Communications Bible” © Copyright 2013 – B Dow, B Taylor
  • 4. TOP REASON PROJECT’S FAIL…. © Copyright 2013 – B Dow, B Taylor
  • 5. Project Communications Introduction The only way to solve project problems is by communicating…… There is no other way…… © Copyright 2013 – B Dow, B Taylor
  • 6. 28% of projects that fail, poor communications is the # 1 reason 28% Other Reasons for Failure Project Communications Failures 72% That’s 1 out of 4 projects that fail – do so based on poor communications. Results based on a Jan 2007 poll of 1,007 respondents © Copyright 2013 – B Dow, B Taylor (PMI Net July 2007 page 19)
  • 7. Top 9 Causes for Project Failure Survey Results 1. Poor Communication 2. Insufficient resource planning 3. Unrealistic schedules 4. Poor project requirements 9.8% 5. Lack of stakeholders buy-in 6.7% 6. Undefined success/closure criteria 5.2% 7. Unrealistic budgets 4.8% 8. Insufficient or no risk planning 4.4% 9. Lack of control/change process 4.3% Results based on a Jan 2007 poll of 1,007 respondents © Copyright 2013 – B Dow, B Taylor 28.0% 18% 13.2% (PMI Net July 2007 page 19)
  • 8. Other Project Failure Survey's Center for Project Management Study  Mistaking half-baked ideas for projects  Inadequate due diligence – is the project feasible?  Poor sponsorship  Under-skilled project managers  Failing to deploy a robust project management process  Not monitoring the vital signs  Absence of a well managed project portfolio. © Copyright 2009 – B Dow, B Taylor
  • 9. Other Project Failure Survey's Penn State University Study  Lack of corporate leadership  Poorly communicated deliverables and goals  Team-related weaknesses  Poor project management  Deviation from schedule or budget  Notice that there is no mention of technical limits Research from University of Karlsruhe  Poor project management  Uncontrolled “soft factors”  Absence of change management © Copyright 2013 – B Dow, B Taylor
  • 10. Summary  These 4 survey’s are pretty clear in showing you that communications is a common theme as why projects fail. Are you projects any different?  90% of a project manager’s role is communications so I can’t stress enough how important it is to be successful at communicating your project status.  Ensure you treat communications with high priority throughout the life of the project. © Copyright 2013 – B Dow, B Taylor
  • 11. Introducing Project Communication Planning © Copyright 2013 – B Dow, B Taylor
  • 12. Communication Planning Who, What, Where, When and How…. © Copyright 2013 – B Dow, B Taylor
  • 13. Communication Planning Key Concepts! • Communication planning is going to be one of the most important aspects of managing your project. Just as important as any other area! •Understanding what to communicate and how you will communicate project information at the beginning of the project is critical to being successful. No time to go back! • Ask your customer how they want their project information delivered to them at the beginning of the project. Continue to verify throughout the project that your customers are getting the status that they really need! “Every project requires a Communication Plan!” © Copyright 2013 – B Dow, B Taylor
  • 14. Communication Planning Tools 1. Circle of Communications Chart (who) 2. Communication Requirements Matrix (what/who) 3. Role Report Matrix (who/what/when) 4. Project Calendar (what/when) “Add these tools directly into your Communication Plan!” © Copyright 2013 – B Dow, B Taylor
  • 15. Include these tools into every Communication Plan Table of Contents Use your existing templates today and add new sections and include these Communication tools. © Copyright 2013 – B Dow, B Taylor
  • 16. Communication Plan Breakdown Circle of Communications Chart - Software Development Manager • Lead Developer • Developer NO • Analyst #1 • Analyst #2 Requirements Managers Project Manager Customer Test Manager Arch Manager © Copyright 2013 – B Dow, B Taylor • Test Analyst #1 • Test Analyst #2 • Architecture Lead • Designer
  • 17. Communication Requirements Matrix Team Member/Tool Project Manager Stakeholder /Customer(Internal) Updated project information Team Members Communicates project information Feedback/Issues/Concerns Team Members Stakeholder /Customer(Internal) Communicates project status, risks, budget, and ongoing project information Project Manager Project Specific details Specific project details where applicable Note: Best read from left to right and from bottom to top © Copyright 2013 – B Dow, B Taylor
  • 18. ROLE REPORT MATRIX Note: Focus on Timing of Report and who is getting what Report. People (Who receive what Report) Name On Demand CEO/CFO John Smith Status & Cost Reports Owner Peter Adams Status & Cost Reports Stakeholder Mark Taylor Stakeholder Report Risk Manager Bruce Jones Risk Report Media ABC News Media Report © Copyright 2013 – B Dow, B Taylor Weekly Monthly Variance Report Status Reports Status Reports Status Reports
  • 19. Timeframe/Calendar •Establishing a Rhythm/Cadence for reporting project information. •Such as how often does reports go out? •How often is information gathered by your team members? Did you work with your customers to understand how often they want reports delivered? Use the Role Report Matrix as your guide to creating a Project Rhythm Calendar. © Copyright 2013 – B Dow, B Taylor
  • 20. Project Calendar Monday Wk1 Wk2 Wk3 Prepare Status Material Tuesday Wednesday Prepare Status Material Prepare Status Material Team Meeting, gather information for Status Report Prepare Monthly Newsletter © Copyright 2013 – B Dow, B Taylor Submit Final Status Report Customer Status Meeting, Finalize Status Information Team Meeting, gather information for Status Report Friday Customer Status Meeting, Finalize Status Information Team Meeting, gather information for Status Report Thursday Submit Final Status Report Customer Status Meeting, Finalize Status Information Submit Final Status Report
  • 21. Summary  4 New Communication Planning tools we believe will help you be successful.  All of these tools will enhance your communications and help you drive successful project from a communication perspective.  Ensure you add these tools to your Communications Plan for all your projects.
  • 22. TOP PROJECT COMMUNICATION TOOLS © Copyright 2013 – B Dow, B Taylor
  • 23. Project Communications Tools…. What tools do you use? © Copyright 2013 – B Dow, B Taylor
  • 24. ALL COMMUNICATION TOOLS © Copyright 2013 – B Dow, B Taylor
  • 25. Knowledge Breakdown Tools Chart © Copyright 2013 – B Dow, B Taylor
  • 26. Lifecycle Process Tools Breakdown Chart © Copyright 2013 – B Dow, B Taylor
  • 27. Tool Name: Responsibility Matrix Tool Value: Displays the task the team member is associated with. Some matrixes further identify the level of authority assigned to a particular role. © Copyright 2013 – B Dow, B Taylor Page 304
  • 28. Tool Name: Work Breakdown Structure Tool Value: Identify and define all the work on the project. Displays…. © Copyright 2013 – B Dow, B Taylor Page 151
  • 29. Tool Name: Project Schedule Tool Value: Plan of record for the project. It displays where you have been, where you are, and where you are going. © Copyright 2013 – B Dow, B Taylor Page 194
  • 30. Tool Name: Risk Matrix Tool Value: Simple and easy-to-read chart to assess risk level of project. No other….. © Copyright 2013 – B Dow, B Taylor Page 421
  • 31. SUMMARY • Project Communications is the # 1 factor in project success or failure • Project manager must treat project communications as a high priority when managing their projects. • Work with your customers and capture their project communications needs. Understand their decision points and adapt your communications accordingly. • Understand the various Communication Tools that you can be using on your project. © Copyright 2009 – B Dow, B Taylor
  • 32. Thanks……. © Copyright 2013 – B Dow, B Taylor
  • 33. Thanks for your Time! Bill Dow’s Contact Information: Http://www.pmotactialguide.com Email: billdow@pmotacticalguide.com Social Networks: Twitter: @billdow Linkedin: Bill Dow, PMP Facebook: Bill Dow Articles @ Projecttimes.com and Projectmanagement.com Find Both of Bill’s books on Amazon today: 1. “The Tactical Guide for Building a PMO” Published 2012 2. “The Project Management Communications Bible” Published 2008