The document is a project brief for the construction of a 12AM Cafe at Taylor's University Lakeside Campus in Subang Jaya, Selangor, Malaysia. The project involves constructing a cafe on a 20m x 20m site near academic blocks to provide students a safe place to relax and get food/drinks from 12am-6am. A project management team is assembled consisting of an architect, landscape architect, structural engineer, contractor, and quantity surveyor. Their tasks are outlined. Stakeholders like primary users (students), government authorities, and community groups are identified. The preliminary budget structure and exclusions are mentioned along with reference documents.
Founded in 1995, b+a architecture has primarily been involved in providing architectural services for multifamily and mixed-use projects, adaptive reuse of historic buildings, condominium developments, villa style subdivisions, independent senior and active senior facilities, assisted living and memory care facilities throughout the country and abroad.
In the Kansas City area, we provide architectural services for retail and commercial buildings, church structures, restaurants, night clubs, children's day care, recreational facilities and office design/space planning. We have also become adept at bringing new life to underutilized structures converting them to viable multifamily or condominium projects.
project management, documenting architect This involves the documentation of your Studio Vl Architectural Design Project, to apply the principles learned in
Assignment 1 to your final project. Students from Design Studio lV or V will use their design in Studio lV or V for
the study Your task is to document your own Design Studio Project from the point of view of an Architect, commissioned to
undertake this project.
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAFakhrul Afifi
Conservation works is the most complex method in restoring the element and facade of the old building. Without conservation, the heritage building cannot long last until the expected age.
Training Slides of Construction Supervising Site Engineer - Duties & Responsibilities, discussing the importance of Construction Site.
Some Key-Points:
-The meaning and concept of project management
-The Role of the Project Manager
-The Architect as a Construction Project Manager
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
A BCA can also be a useful and cost-effective device when you are involved about tenant health, comfort and security, or about increasing and regular repair expenses on the service, or issue about rule conformity.
Construction Project Management is an important subject to learn in Civil Engineering.
Significance • As construction involves various activities starting from the design and planning to project completion and quality check, there is a exorbitant need for Management of construction. • Construction Industry plays a crucial role in the economy and development of a nation.
4. Objectives To complete the project in specified time and with allocated budget. To Plan and schedule the work and distribute between various departments. Deployment of personnel in Different tasks. To achieve High quality workmanship. Creating an organisation that works as a team. Using the limited available resources and producing maximum output. Providing safe and satisfactory working conditions for all personnel and workers.
5. Functions: Planning & Scheduling Organizing Staffing Directing Controlling & Co-ordinating
6. Stages of construction Briefing Designing Tendering Construction Commissioning
7. 1) Briefing Stage • This stage consists of framework required for the construction work to take a shape from the ideology of client and feasibility of Project which involves architects, engineers and project manager.
Objectives Developing Alternatives Feasible Solution ? Evaluation of Alternatives Report & Recommendation Technical and non technical Investigations
8. 2) Designing or planning Stage Prepare construction schedule Prepare final cost estimate Prepare Working Drawings and specificati ons Prepare scheme and detailed designs Soil investigations, Topographic investigation, material supply and market surveys etc Carry out Technical Investigations Final adoption of the most suitable summary Finalize Project Summary
Briefing Checklist for Advisers on Construction ProjectsSarah Fox
Each construction project is unique - people, site, project. Getting accurate and complete information at the right time is often difficult for advisers.
This checklist was developed for lawyers to take instructions from clients involved in construction projects but can be used or adapted by any adviser.
For help writing simpler contracts or understanding complex ones, including which terms might trip your company up or even bring it to its knees, email: sarah@500words.co.uk or visit www.500words.co.uk
Founded in 1995, b+a architecture has primarily been involved in providing architectural services for multifamily and mixed-use projects, adaptive reuse of historic buildings, condominium developments, villa style subdivisions, independent senior and active senior facilities, assisted living and memory care facilities throughout the country and abroad.
In the Kansas City area, we provide architectural services for retail and commercial buildings, church structures, restaurants, night clubs, children's day care, recreational facilities and office design/space planning. We have also become adept at bringing new life to underutilized structures converting them to viable multifamily or condominium projects.
project management, documenting architect This involves the documentation of your Studio Vl Architectural Design Project, to apply the principles learned in
Assignment 1 to your final project. Students from Design Studio lV or V will use their design in Studio lV or V for
the study Your task is to document your own Design Studio Project from the point of view of an Architect, commissioned to
undertake this project.
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAFakhrul Afifi
Conservation works is the most complex method in restoring the element and facade of the old building. Without conservation, the heritage building cannot long last until the expected age.
Training Slides of Construction Supervising Site Engineer - Duties & Responsibilities, discussing the importance of Construction Site.
Some Key-Points:
-The meaning and concept of project management
-The Role of the Project Manager
-The Architect as a Construction Project Manager
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
A BCA can also be a useful and cost-effective device when you are involved about tenant health, comfort and security, or about increasing and regular repair expenses on the service, or issue about rule conformity.
Construction Project Management is an important subject to learn in Civil Engineering.
Significance • As construction involves various activities starting from the design and planning to project completion and quality check, there is a exorbitant need for Management of construction. • Construction Industry plays a crucial role in the economy and development of a nation.
4. Objectives To complete the project in specified time and with allocated budget. To Plan and schedule the work and distribute between various departments. Deployment of personnel in Different tasks. To achieve High quality workmanship. Creating an organisation that works as a team. Using the limited available resources and producing maximum output. Providing safe and satisfactory working conditions for all personnel and workers.
5. Functions: Planning & Scheduling Organizing Staffing Directing Controlling & Co-ordinating
6. Stages of construction Briefing Designing Tendering Construction Commissioning
7. 1) Briefing Stage • This stage consists of framework required for the construction work to take a shape from the ideology of client and feasibility of Project which involves architects, engineers and project manager.
Objectives Developing Alternatives Feasible Solution ? Evaluation of Alternatives Report & Recommendation Technical and non technical Investigations
8. 2) Designing or planning Stage Prepare construction schedule Prepare final cost estimate Prepare Working Drawings and specificati ons Prepare scheme and detailed designs Soil investigations, Topographic investigation, material supply and market surveys etc Carry out Technical Investigations Final adoption of the most suitable summary Finalize Project Summary
Briefing Checklist for Advisers on Construction ProjectsSarah Fox
Each construction project is unique - people, site, project. Getting accurate and complete information at the right time is often difficult for advisers.
This checklist was developed for lawyers to take instructions from clients involved in construction projects but can be used or adapted by any adviser.
For help writing simpler contracts or understanding complex ones, including which terms might trip your company up or even bring it to its knees, email: sarah@500words.co.uk or visit www.500words.co.uk
NITIE Center for Student Enterprises .. What it does ! drmandi
NITIE Center for Student Enterprises is Micro Enterprise Incubator for students in NITIE. The center embedded an innovative model of learning where Learning is Practiced with PRODUCTIVE OUTCOMES.. Rarely learning is designed to give PRODUCTIVE outcomes. It is here at NITIE Mumbai this Gandhian model of learning is operationalised..
Taylor's University Lakeside Campus
School of Architecture, Building and Design
Foundation of Natural and Built Environments
April Intake 2013
Elements of Natural and Built Environment
Project REO is a social innovation project that focuses on the services provided by the Office of Student Involvement (OSI) at SCAD. The work shown here is the result of 3 co-creation sessions between our class and the OSI.
<
Project Name
>
<
Date
>
<
Surrey College Library RefsdşflmdsşafnaşsRenovatipon
>
8/6/21
<
Surrey College Library RefsdşflmdsşafnaşsRenovatipon
>
8/6/21
1. PROJECT INFORMATION
Project Name
Project Code
The Surrey College Library Renovation Project
Sur-Ren-Lib/02
Project Sponsor
Project Manager
Surinder Kaur / Chief Librarian
MGMT 640-Team Four
Client Sponsor
Client PM
BC Ministry of Education
Library Board
Prepared By
Prepared On
MGMT 640-Team Four
Surrey College
Authorized By
Authorized On
Dr. Sharzad Khosravi
Surrey Library Renovation
2. PROJECT DESCRIPTION
Throughout the renovation of the first floor of the Surrey College Library, this project offers a unique and contemporary library design in the College Library, which is more enhanced energy-efficient and environment-friendly. It is also presumed to be extra supportive of research, artistic project, and society intercommunication.
3. PROJECT JUSTIFICATION/BUSINESS NEED
With a long history and impressive building, the library is a symbol structure of the college. Notwithstanding, it does not cope with the transformation of information retrieval practices in the current generation. It does not present a welcoming and user-friendly setting anymore because of its incapability of providing adequate computing workstation and multimedia devices and additional socializing features demanded by students and faculty. A philanthropic financial grant of a quarter a million CAD was given to the university library from the Ministry of Education, and the library board decided to use the donation on renovating the 1st floor of the College Library.
4. PROJECT OBJECTIVES
This project aims to develop a library design in the Surrey College Library to please library users’ knowledge retrieval routine in the modernized age. Its overall purpose is to improve productivity and enhance the study method for students and faculty in the current information era.5. PROJECT SUCCESS CRITERIA
· Meet users’ demands of computers and networks
· Encourage group inquiry and collaborative activity
· Plan suits the information retrieving practices of library users in the modernized time
· Boost study and research
· Building is energy-efficient and user-friendly
· Extra natural light is let inside the library.
· Users notice the increased area laptop friendly.
· Users detect the study places extremely useful and competent for group talks.
· Computing workstations are massively utilized by library users, and users determine the computers to run really effectively.
· Users notice the fresh location of reference and reserve spaces quite useful and proper for retrieval and discussion
6. HIGH LEVEL SCOPE
Project Exclusions/Out of Scope
· Relocation, circulation, and reference services related to the collections that are stored originally on the first floor
· The warming, cooling, also air conditioning systems of the library ...
RUNNINGHEADER:COFFEESHOPPROJECT 1
Quintessential’s Coffee Shop 21
MPM344-1501A-01
Project Risk Management
Project Name
Quesadra D. Goodrum
Instructor: Stephen Volz
1/12/2014
Table of Contents
Project Outline 3
Project Description 5
Project Objectives 6
Project Deliverables 6
Project Milestones 6
Risk Management Justification 7
Letter to project sponsor 7
Projective Technical Requirements 8
Project limits and Exclusions 8
Project Sizing 9
Stakeholder Analysis 10
Risk Management Plan Steps 10
Risk Scoring Matrix 10
Top Risks, Actions, and Owners 11
Identified Risk 11
Flow Diagram of steps 12
Final Audit 14
Post Project Review- Customer Review 14
Project Risks Assessment 16
Risk Breakdown Structure 17
Probability Impact Graphs 17
Graph 3 -RBS Categorization 18
Project Risks Responses Strategy 20
Project Risks Responsibility Plan 21
Project Risks Monitoring & Controlling Plan 22
Project Risks WBS & Budget Updates 23
Project Risks Communications Plan 24
References 25
Project Outline
In my initiation paper I introduce the word to Quintessential’s coffee shop. The essence of coffee with the world of technology; it will having both a social and meeting/study environment. This setting will allow residents and other customers to have the option of a quiet area for studying or to conduct a meeting or a social gathering. The project has several main benefits, which includes improving resident’s way of life while within the community, money savings, relaxed environment, and job opportunity. This coffee shop will promote a team cohesive environment, preparing for the training of future employees on the same team attributes promoting success while maintaining a cozy environment.
The tasks involved with construction are as follows:
· Risk Assessment
· Site evaluation
· Building Permits
· Contracting
· Plumbing
· Foundation
· Foundational check/inspection
· Framing
· Insulation
· Electrical/wiring
· Telephone wiring
· Installing Windows
· Code Inspection
· Installing siding exterior
· Installing drywall
· Completion of refrigeration unit
· Completion of Storage unit
· Build bathrooms
· Surface Parking lot
· Landscaping
· Install deliverables
· Building and coding inspection
· Final inspection
· Turn over for decoration
· Completion
Float and Slack are as follows:
· Site Evaluation and Risk Assessment can be ran concurrently
· Refrigeration and storage
· Storage can start at max 4 days later than refrigeration since the two will be ran in parallel to one another
· Phone fax and internet centers
· To compress the scheduled this will be built in parallel to one another
By compressing the scheduled and allowing time for float and slack it enables me to finish the project ahead of time and under projected budget. I made sure to not to allow too much slack for one task as to allow for a faster completion by not consuming all of the float and slack time I had available in the project.
Project Description
In my initiation paper I introduce th.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
At Techbox Square, in Singapore, we're not just creative web designers and developers, we're the driving force behind your brand identity. Contact us today.
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Company Valuation webinar series - Tuesday, 4 June 2024FelixPerez547899
This session provided an update as to the latest valuation data in the UK and then delved into a discussion on the upcoming election and the impacts on valuation. We finished, as always with a Q&A
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
buy old yahoo accounts buy yahoo accountsSusan Laney
As a business owner, I understand the importance of having a strong online presence and leveraging various digital platforms to reach and engage with your target audience. One often overlooked yet highly valuable asset in this regard is the humble Yahoo account. While many may perceive Yahoo as a relic of the past, the truth is that these accounts still hold immense potential for businesses of all sizes.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Project brief
1. PROJECT BRIEF
For the Construction of 12AM Cafe
Taylor's University Lakeside Campus, Subang Jaya, Selangor, Malaysia
Prepared by Taylor's Students
24th June 2013
Revision 1.1
2. Contents
1. Introduction
1.1 Project Description
1.2 Project Background
1.3 Project Objective
1.4 Project Scope
1.5 Success Criteria
2. Specification
2.1 Risk
2.2 Constraints
2.3 Assumptions
2.4 Timescales of the project
3. Project Management Team
3.1 Team Members
3.2 Objective
3.3 Tasks
4. Stakeholders
4.1 Primary Users
4.2 Government and Statutory Authorities
4.3 Other Community and User Groups
5. Budget
5.1 Preliminary Budget Structure
5.2 Exclusions
6. Reference Documents / Sources
4. 1. INTRODUCTION
1.1 PROJECT DESCIRPTION
The project is named :" 12AM Cafe Construction Project", involves the construction of a cafe in
Taylor's University Lakeside Campus, Subang Jaya, Selangor, Malaysia. The land has a total
area of 68,797 square meters and it is owned and managed by Taylor's Education Group Sdn Bhd.
The cafe is built especially for the students who stay up late around 12am to 6am. This cafe
provide students a safe place to have a break while doing their assignments or a place to hang out
in this late night. Food and drinks can be prepared and provided for the students.
The cafe is planned to build inside the university land ,a 20m x 20m site area beside the three
academic blocks. It is a small open space area with green grass and some trees surrounding it.
Selected Site:
VIEW FROM FRONT
Selected Site:
VIEW FROM BACK
6. This site has been a plain green area since 2010 without any construction. We have done some
site analysis and found that this site will be our ideal spot for the cafe for the following reason:
1. Ideal location for students from academic blocks
2. Windy area, hence good ventilation
Selected Site:
VIEW FROM SIDE 1
Selected Site:
VIEW FROM SIDE 2
7. 3. Far from the main road, less sound pollution..
4. Good scenery because near the lake
5. Safe for students as it is within campus area.
6. The site is far from the hostel area hence would not disturb other students in the late night.
The agreement of this project brief is estimated to be signed on 29th July 2013 and the whole
construction is estimated to take about 3 months.
1.2 PROJECT BACKGROUND
Taylor's University Lakeside Campus is a Subang Jaya Lake area on the outskirts of Kuala
Lumpur has had many incarnations—first it was a tin mining field, then an illegal dumpsite,
finally it became a squatter occupied by the homeless.
After a major rehabilitation programme, the site has been transformed into an international
school in 2010—Taylor’s Lakeside Campus now sits on the banks of the lake, wrapped closely
around the water’s edge. The university takes advantage of this natural water body, formed
initially by early mining activities, to formulate its environmental strategies and revitalize it into
a key part of the campus
1.3 PROJECT OBJECTIVES:
Improve in the level of service in Taylor's University
Protect the students' safety in the late night
Provide an ideal spot for the students to relax in the midnight
Shorten the distance for the students to get food or drinks at the cafe instead of the
commercial block.
1.4 PROJECT SCOPE
1.5 SUCCESS CRITERIA
The cafe is built within the estimated time.
The cafe is built within the estimated budget.
The cafe is used fully by students who stay up late and recognize it as a new and ideal
place to get food and drinks.
The cafe is now part of the famous spot for late night activity with relaxing atmosphere
and comfortable ambience.
8. 2. SPECIFICATIONS
2.1 RISK
Funding: In case the funding is not enough, the project will be slowed down, postpone or worst,
abandoned.
Approval: The Authority’s approval will really affect the project, in case the Authority do not
give out an approval for the project, the project cannot be carried out.
Failure to attract or retain top talent: If we cannot find the right talent for the construction,
there might be some problems that will be triggered and it might need to take a longer time that
will trigger more problems in the future, e.g. client will lose their interest in the project.
Injury to workers: In case something like this happens, problems will be triggered, e.g. the cost
of the treatment.
2.2 CONSTRAINTS
Pollution: The remnant of the construction materials will pollute the surroundings of the
construction site, during the construction work. The sound of the construction work will disturb
the activity around the construction site and will distribute to a sound pollution.
Safety: The safety around the construction site will be hard to guarantee, the construction
process and materials might endanger the safety of people passing by near the construction site.
2.3 ASSUMPTIONS
The working hours will be from 12:00am – 6:00am.
The customers will be the students that stayed up late.
The staffs are not from the campus students.
Students who usually go out of the campus area to have supper or to get a short break will
choose to stop by this place.
It will help in our campus facilities improvement.
It will help the students who stayed up late to have a place to have a break.
2.4 TIMESCALE FOR PROJECT
9. 3. PROJECT MANAGEMENT TEAM
3.1 TEAM MEMBERS
Key Members Person-in-charge Company Contact Adress
Architect Mr. Edy Phung
Phone: (+60) 12-253-4128
E-mail: green&bold@gmail.com
G&B Sdn. Bhd. Level 3, JalanHua, No.
777, 47500,
Subang Jaya, Selangor
DarulEhsan,
Malaysia.
Landscape Architect Mr. Peh Ker Neng
Phone: (+60) 14-6170502
E-mail: kernengpeh@gmail.com
MajuTECH Landscape
Architecture Firm
8,jln mutiara emas 5/25,
taman perindustrian
mount austin,81100,
johor bahru, johor
Structural Engineer Miss Lee Jo Yee
Phone: (+60) 16-411-5000
E-mail: JadiEC@gmail.com
JADI Engineering
Consultants Sdn. Bhd.
No. 16, Jalan Scotland,
Taman Lumba Kuda,
Georgetown, Pulau
Pinang
Contractor Mr. Nicolas Wong
Phone: (+60) 14-882-8889
Office No: 086-338889
E-mail: nek4real@hotmail.com
Wong Xiao En Berhad No 51A, Tanjung Batu,
Jalan Tun Husseisn Onn,
97000 Bintulu, Sarawak.
Quantity Surveyor Miss Ling Hui Sim SIM Construction
Berhad
No 3,Jalan Taman
Selekoh, Lahad Datu,
Sabah.
3.2 OBJECTIVES
To completely understand the students' needs and plan, design and build a cafe for
the student.
3.3 TASKS
Architect
Observe construction of 12AM-CAFÉ to ensure that site work will meet the
specifications of construction documents when the construction have completed.
Submit modification of the design of 12AM-CAFÉ during construction to contractor.
Adapt a project to real life site conditions, correct errors and remedy omissions to the
construction documents.
Provide an estimate for the cost work of 12AM-CAFÉ. As cost requirements change,
architect has to update and refine cost estimate and share the information with contractor
and owner.
Architect recommends alternative solution to resolve any variations to original budgets.
Conduct an assessment of the site for the owner
10. Consider the operations and performance of the facilities and make recommendations for
maintenance and improvement.
Landscape Architect
Overseeing the design of a variety of projects, including urban regeneration schemes,
pedestrian schemes, road or retail schemes, and maintaining the character of sites of
natural beauty;
Establishing general landscape requirements with clients;
Conducting preliminary studies of the site (including contours, soil, ecology, buildings,
roads);
Assessing a site's potential to meet the client's specifications;
Carrying out environmental impact assessments;
Seeking and taking into account the views of local residents, potential users, and parties
with a vested interest in the project;
accurately preparing and presenting detailed plans and working drawings, including
applications, construction details and specifications for the project using computer-aided
design (CAD) packages or similar design software;
Presenting proposals to clients, dealing with enquiries and negotiating any amendments
to the final design;
Matching the client's wishes with your knowledge of what will work best;
Contacting and coordinating manufacturers and suppliers;
Putting work out to tender, selecting a contractor and manager (mainly for larger
projects), and leading cross-functional teams;
Making site visits;
Ensuring deadlines are met;
Liaising with other professionals on the project;
Monitoring and checking work on-site (on large projects, landscape managers may do
this type of supervisory work);
Authorising payment once work has been satisfactorily completed;
Attending public inquiries to give evidence if necessary;
Generating new business opportunities.
Structural Engineer
Design structures to withstand stresses & pressures (Do not bend, twist, collapse or
vibrate, remain strong and secure throughout their use.
Choose appropriate materials to meet design specifications
Analysis configurations of the basic structural components of 12AM-CAFÉ
11. Calculate pressure, stress & strains that each component (beam & lintel) will experience
from other parts of the structure due to human use or environmental pressure.
Liaising with architect to agree an safe designs and fit the aesthetic concept of
construction
Considering the strength of various material
Examining structures at risk of collapse and advising how to improve their structure
integrity
Making drawings, specifications and computer models of structures for building
contractors.
Investigating ground conditions and analysising results of site tests
Applying expert knowledge of the forces that act on various structure
Use computers and computer-aided design (CAD) technology for simulation process.
Contractor
To perform and complete a task that is assigned or created
Checking whether the clients are aware of their duties
Cooperate with other working parties
Consult with the workers in good time
Provide workers under their control with relevant information
Ensure the structure is built as per drawings
Lease with consultants, sub-traders and owner to achieve the common goal of work
being completed on time.
Quantity Surveyor
Preparation of Feasibility Studies
Estimating to define project budgets
Analysis of the effect of design changes on the project budget
Cost planning to refine the budget as the design documents develop
Preparation of Bills of Quantities to assist in the tender process
Provision of cost control services during construction
Assessment of the contractor’s progress claims
Assessment of variation and delay claims
Procurement of subcontractors and labour to carry out specialist trade works
Negotiation and settlement of accounts
Monthly forecasting and cost reporting
Monthly negotiation and agreement of payments for works carried out
Determination of the final project cost
12. Preparation of tax depreciation reports for investors and property owners
Expert witness reports to assist in the settlement of building disputes
4. STAKEHOLDERS
These are the stakeholders have so far been identified for the project:
4.1 PRIMARY USERS
13. The students of Taylor's University Lakeside Campus, especially the students from the hostel
and students who stay up late in the educational building block for their assignments, projects or
discussion.
4.2 GOVERNMENT AND STATUTORY AUTHORITIES
4.3 OTHER COMMUNITY AND USER GROUPS
5. BUDGET
5.1 PRELIMINARY BUDGET STRUCTURE
5.2 EXCLUSIONS
14. 6. REFERENCE DOCUMENTS / SOURCES
6.1 WEBSITES
Taylor's University Background:
http://www.futurarc.com/index.cfm/projects-2013/2013-may-jun-taylors-lakeside-campus/
Sample Project Brief:
http://www.hpw.qld.gov.au/SiteCollectionDocuments/CWMFProjectDefinition.pdf
Example of the Timescale of the Project: