Project Brief
Lakeview Cafe
2
CONTENT
No. Title Page
Cover page 1
Content 2
1. Introduction
1.1Project Description 3
1.2 Project Objective 4
1.3 Project Benefits 5
2. Stakeholders
2.1 Primary Users 6
2.2 Authorities 6
3. Authorization Approval 7
4. Site Analysis 8
5. Proposed Site Options 9
6. Proposed Concept and Design Brief
6.1 Building Features 10
6.2 Visual Statement 11
6.3 Siting and Orientation Requirements 12
6.4 Spatial Requirement 12
6.5 Services 12
6.6 Building Materials and Finishes 13
6.7 Accessibility 13
7. Budget 14
8. Deadline 15
3
1. Introduction
1.1 Project description
The project involves the construction of a new cafe (Lakeview Cafe) for Taylor’s
University Lakeside Campus. The cafe will be built on the man-made lake at Taylor’s
University campus. The cafe is to be built using one-way glass, meaning that the
exterior will be reflective while the interior walls will be clear and see-through. The cafe
will also include an exterior water feature.
Taylor’s University Lakeside Campus’ man-made lake
4
1.2 Project objective
The main objective is to build a new cafe at Taylor’s University Lakeside Campus.
In doing so, the new cafe needs to be able to respond to the aims of the client and
should be able to embody and deliver the following elements and characteristics:
Experience
o provide a unique dining experience
o floors are made of transparent glass that allows customers to enjoy the unique
experience of dining on a lake
o customers enjoy a spectacular view as the walls can be seen through
o spectacular water feature where water cascades over the outer walls
Environmentally-friendly
o fully utilise the lake without disrupting the natural scenery
o does not cause disturbances to the lake’s natural environment
o priority is given to the ducks, geese, fish and other inhabitants of the lake when
considering the design of the café
o the roof is decorated with real plants to produce a natural green feel
Comfort
o provide comfort while giving a natural feel
o The cafe is built such that it functions mainly on natural lighting and ventilation.
o Real creepers hang down from ceiling beams
5
1.3 Project benefits
Provides a unique new dining experience
Enhances the beauty of the lake
The construction itself will be an architectural masterpiece
Increase publicity of Taylor’s University Lakeside Campus
6
2. Stakeholders
2.1 Primary Users
Staff and students of Taylor’s University Lakeside Campus
2.2 Authorities
Subang Jaya Town Council (MPSJ)
Taylor’s University Faculty Management
7
3. Authorization Approval
No. Procedure Authority Time to complete
1 Submission to Local Authority Subang Jaya Town Council
(MPSJ)
July 2013-November 2013
2 Obtain Development Order Planning Department July 2013-November 2013
3 Obtain Water Approval SYABAS July 2013-November 2013
4 Obtain Hoarding & Signboard
Approval
Subang Jaya Town Council
(MPSJ)
July 2013-November 2013
5 Obtain RORO Bin Approval Subang Jaya Town Council
(MPSJ)
July 2013-November 2013
6 Obtain Landscape Approval Subang Jaya Town Council
(MPSJ)
July 2013-November 2013
7 Obtain Building Plan Approval Subang Jaya Town Council
(MPSJ)
July 2013-November 2013
8
4. Site Analysis
TAYLOR’S
UNIVERSITY
MAN-MADE LAKE
Location of site
for Lakeview
Cafe
9
5. Proposed Site Options
Although, Lakeview Cafe aims to be a cafe that is actually built on the lake, there are a
number of reasons why alternative sites should be considered including the possibility
that the natural scenery could be destroyed by the construction of a cafe on the lake as
well as threats to the lake’s natural flora and fauna.
Accordingly, the Building Committee were charged with the task of identifying whether
there were any other suitable sites in the Taylor’s University Lakeside Campus area that
should be considered for the cafe’s new home.
These were the proposed sites:
Site A (preferred site) - At the far end of the lake, on the lake.
Site B - On the empty land area beside the lake.
Site C - Built above the car park nearest the lake.
Site B and C were proposed because they both provide views of the lake. Thus, they
possess the ability to fulfill the theme of Lakeview Cafe.
10
6. Proposed Concept and Design Brief
6.1 Building Features
No. Item Details Features Requirements
1. Sanitary
Amenities
1 Male
washroom and
1 female
washroom
4 cubicles each 2 sinks and 2 toilets
each.
2. Dining Area Indoor only Tables and
chairs
10 tables and 40 chairs
(4 chairs to a table).
3. Indoor Lounge Separate from
dining area
Seating and
entertainment
3 couches, 2 pool tables,
1 television set.
4. Outdoor lounge Only drinks are
served.
Tables and
chairs
5 umbrella tables and 15
chairs (3 chairs to a
table)
5. Kitchen Preparation of
all food items.
Storage and
basic kitchen
requirements.
4 stoves, 2 ovens, 2
microwaves,4 sinks
workspace, 2 fridges 10
cabinets and a
ventilation shaft.
6. Drink Station
(non-alcoholic)
Serves drinks
only.
Bar and seats. 4 bar stools.
7. Rubbish/Refuse
area
For garbage
disposal.
Outdoor and
indoor.
5 indoor bins and 3 large
outdoor bins.
8. Cleaner’s store Small store
room.
Located near
bathrooms.
Cleaning equipment and
cleaning chemicals.
11
6.2 Visual Statement
Lakeview Cafe will be developed using the latest environmental and sustainable
considerations.
It is intended that Lakeview Cafe will provide a fully functional facility, which becomes a
hub of activity throughout the year.
Ensuring the cafe is able to deliver its promise of providing a unique experience to
customers will be of primary importance, however, it is also important that the facility
provides a welcoming appearance, which is homey and comfortable.
The building should present an image consistent with the campus environment and
current ecological sustainable development (ESD) principles without dominating the
landscape. It should be:
Low key but distinctive
Be readily identifiable and welcoming
Be constructed of high quality, durable materials
Include principles of ESD design
Maximise the use of the available open site
Seamlessly integrate with the local environment
Minimise the impact of the built environment on its surroundings
Express image and functions of Lakeview Cafe
Repeat, borrow or redefine landscape and building elements from the local
surrounding area
12
6.3 Siting and Orientation Considerations
The building’s siting and orientation should:
Take advantage of the views
Take advantage of natural winds
Encourage passive solar design
Have a clear and identifiable main entry
6.4 Spatial Requirements
It is expected that the cafe will have only one level. The eventual size of the new
building will be driven by a number of factors including:
1. Minimum functional requirements
2. Anticipated growth
3. Site size / location
4. Cost / budget
6.5 Services
It is anticipated the cafe’s building’s services will comprise the following:
1. Mechanical
o Mechanical assisted ventilation
o Air conditioning
o Exhaust to all kitchens and toilet facilities
2. Electrical
o Lighting (general, feature, security, emergency, exit, etc,)
o Power – electrical
o Emergency equipment and systems
o Security access control, CCTV, intercom
o Smoke detectors
3. Communications
o Telephone
o Wireless LAN
4. Hydraulics
o Hot and cold water supply
o Sewerage
o Rainwater harvesting
o Fire protection services
13
6.6 Building Materials and Finishes
All building materials should be carefully selected in respect to:
minimising the need for and duration between maintenance;
minimising the embodied energy required during manufacture and transport to
site;
maximise the use of appropriate recycled materials;
response to site context, landscape and locality;
quality finishes that offer value for money.
6.7 Acessability
Access for those with Disabilities
-In developing Lakeview Cafe, facility that allow for easy access for the disabled will be
taken into account.
14
7. Budget
A range of around RM650, 000 to RM700, 000is considered to be an appropriate total
budget for this project depending on scope and quality of work, fittings and fixtures.
Item Time for funding Cost (RM)
Feasibility Study & Project Planning
(Professional services required –
allowance only)
July 2013-November 2013 5,000
Consultation / Communications
(Professional services required –
allowance only)
July 2013-November 2013 3,500
Fees for Design and Documentation July 2013-November 2013 30,000
Fees for Construction Phase Services July 2013-November 2013 20,000
Construction Costs July 2013-November 2013 450,000
External / Site Works
(Allowance only)
July 2013-November 2013 60,000
Commissioning and Fit out
(Furniture, signage, storage fittings,
etc)
July 2013-November 2013 85,000
Contingencies
(Design and Construction
Contingencies)
July 2013-November 2013 80,000
Total 661,500
15
8. Deadline
The construction of Lakeview Cafe will commence on the 1st
January 2014 and the
expected completion date will be a year from then.

More Related Content

What's hot

Toni Nakamura - Interior Design Portfolio
Toni Nakamura - Interior Design PortfolioToni Nakamura - Interior Design Portfolio
Toni Nakamura - Interior Design PortfolioToni Nakamura
 
Port Coogee House and Land Packages Design Guidelines
Port Coogee House and Land Packages Design GuidelinesPort Coogee House and Land Packages Design Guidelines
Port Coogee House and Land Packages Design Guidelines
Port Coogee
 
Veracious Rose Dale Bangalore
Veracious Rose Dale BangaloreVeracious Rose Dale Bangalore
Veracious Rose Dale Bangalore
CommonFloor.com
 
Robert's Architectural Photography
Robert's Architectural PhotographyRobert's Architectural Photography
Robert's Architectural Photography
Robert Downey, PE, LEED® AP, NCEES
 
San francisco public utilities commission headquarters
San francisco public utilities commission headquartersSan francisco public utilities commission headquarters
San francisco public utilities commission headquarters
Rajat Nainwal
 
Sobha marina-one-Call 9811155989 brochure
Sobha marina-one-Call 9811155989 brochureSobha marina-one-Call 9811155989 brochure
Sobha marina-one-Call 9811155989 brochure
SpazeMark
 
DOE Case Study - Warwick SRO
DOE Case Study - Warwick SRODOE Case Study - Warwick SRO
DOE Case Study - Warwick SROPhilip Agee
 
Pisani designs Brighton Interior Design Portfolio
Pisani designs Brighton Interior Design Portfolio Pisani designs Brighton Interior Design Portfolio
Pisani designs Brighton Interior Design Portfolio
Pisani Designs
 
Eductioal campus ppt
Eductioal campus pptEductioal campus ppt
Eductioal campus ppt
Mostafa Elzeni
 
Pedder and Scampton Mini Brochure Domestic 23.03.09
Pedder and Scampton  Mini Brochure Domestic 23.03.09Pedder and Scampton  Mini Brochure Domestic 23.03.09
Pedder and Scampton Mini Brochure Domestic 23.03.09
Gill_Scampton
 
Rohan Kritka Brochure - Zricks.com
Rohan Kritka Brochure - Zricks.comRohan Kritka Brochure - Zricks.com
Rohan Kritka Brochure - Zricks.com
Zricks.com
 
Leed brochure sherryl jacobs
Leed brochure   sherryl jacobsLeed brochure   sherryl jacobs
Leed brochure sherryl jacobs
Sherryl Jacobs
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Ar. M. Senthil [ senthilmani ]
 
Ici final report pdf
Ici final report pdfIci final report pdf
Ici final report pdfsimpsonchin
 

What's hot (19)

Toni Nakamura - Interior Design Portfolio
Toni Nakamura - Interior Design PortfolioToni Nakamura - Interior Design Portfolio
Toni Nakamura - Interior Design Portfolio
 
Portfolio
PortfolioPortfolio
Portfolio
 
Port Coogee House and Land Packages Design Guidelines
Port Coogee House and Land Packages Design GuidelinesPort Coogee House and Land Packages Design Guidelines
Port Coogee House and Land Packages Design Guidelines
 
USGBC LEED sheetNilan042111
USGBC LEED sheetNilan042111USGBC LEED sheetNilan042111
USGBC LEED sheetNilan042111
 
Online Portfolio
Online PortfolioOnline Portfolio
Online Portfolio
 
Veracious Rose Dale Bangalore
Veracious Rose Dale BangaloreVeracious Rose Dale Bangalore
Veracious Rose Dale Bangalore
 
Robert's Architectural Photography
Robert's Architectural PhotographyRobert's Architectural Photography
Robert's Architectural Photography
 
San francisco public utilities commission headquarters
San francisco public utilities commission headquartersSan francisco public utilities commission headquarters
San francisco public utilities commission headquarters
 
Sobha marina-one-Call 9811155989 brochure
Sobha marina-one-Call 9811155989 brochureSobha marina-one-Call 9811155989 brochure
Sobha marina-one-Call 9811155989 brochure
 
DOE Case Study - Warwick SRO
DOE Case Study - Warwick SRODOE Case Study - Warwick SRO
DOE Case Study - Warwick SRO
 
Gabriel Romero, AIA, LEED AP portfolio images
Gabriel Romero, AIA, LEED AP portfolio imagesGabriel Romero, AIA, LEED AP portfolio images
Gabriel Romero, AIA, LEED AP portfolio images
 
Tokyo Joes Chester
Tokyo Joes ChesterTokyo Joes Chester
Tokyo Joes Chester
 
Pisani designs Brighton Interior Design Portfolio
Pisani designs Brighton Interior Design Portfolio Pisani designs Brighton Interior Design Portfolio
Pisani designs Brighton Interior Design Portfolio
 
Eductioal campus ppt
Eductioal campus pptEductioal campus ppt
Eductioal campus ppt
 
Pedder and Scampton Mini Brochure Domestic 23.03.09
Pedder and Scampton  Mini Brochure Domestic 23.03.09Pedder and Scampton  Mini Brochure Domestic 23.03.09
Pedder and Scampton Mini Brochure Domestic 23.03.09
 
Rohan Kritka Brochure - Zricks.com
Rohan Kritka Brochure - Zricks.comRohan Kritka Brochure - Zricks.com
Rohan Kritka Brochure - Zricks.com
 
Leed brochure sherryl jacobs
Leed brochure   sherryl jacobsLeed brochure   sherryl jacobs
Leed brochure sherryl jacobs
 
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use DevelopmentMasters Thesis Report _ Skyscraper _ High rise Mixed use Development
Masters Thesis Report _ Skyscraper _ High rise Mixed use Development
 
Ici final report pdf
Ici final report pdfIci final report pdf
Ici final report pdf
 

Viewers also liked

Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
hlksd
 
Latest psycho final r (2)
Latest psycho final r (2)Latest psycho final r (2)
Latest psycho final r (2)ZIyeeTan
 
Building services-report
Building services-reportBuilding services-report
Building services-report
ZIyeeTan
 
Math Report
Math ReportMath Report
Math ReportZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Unit 2 concrete material 2.7
Unit 2 concrete material 2.7Unit 2 concrete material 2.7
Unit 2 concrete material 2.7
Mara
 
English essay 1 a tools
English essay 1  a toolsEnglish essay 1  a tools
English essay 1 a toolsZIyeeTan
 
Type of concrete
Type of concreteType of concrete
Type of concreteZIyeeTan
 
Estimating letters
Estimating lettersEstimating letters
Estimating letters
ZIyeeTan
 
Unit 1 introduction TO CONSTRUCTION
Unit 1 introduction TO CONSTRUCTIONUnit 1 introduction TO CONSTRUCTION
Unit 1 introduction TO CONSTRUCTION
Mara
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimateimaduddin91
 
Compare esei
Compare eseiCompare esei
Compare eseiZIyeeTan
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
Ong-Art Sanpinit
 

Viewers also liked (20)

Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Latest psycho final r (2)
Latest psycho final r (2)Latest psycho final r (2)
Latest psycho final r (2)
 
Building services-report
Building services-reportBuilding services-report
Building services-report
 
Math Report
Math ReportMath Report
Math Report
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Unit 2 concrete material 2.7
Unit 2 concrete material 2.7Unit 2 concrete material 2.7
Unit 2 concrete material 2.7
 
English essay 1 a tools
English essay 1  a toolsEnglish essay 1  a tools
English essay 1 a tools
 
Type of concrete
Type of concreteType of concrete
Type of concrete
 
Journal 2
Journal 2Journal 2
Journal 2
 
Estimating letters
Estimating lettersEstimating letters
Estimating letters
 
Unit 1 introduction TO CONSTRUCTION
Unit 1 introduction TO CONSTRUCTIONUnit 1 introduction TO CONSTRUCTION
Unit 1 introduction TO CONSTRUCTION
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimate
 
Compare esei
Compare eseiCompare esei
Compare esei
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Construction process
Construction processConstruction process
Construction process
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
 

Similar to Project brief

Ici final project (final)
Ici final project (final)Ici final project (final)
Ici final project (final)Joe Onn Lim
 
ICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefICI Project 3 - The Project Brief
ICI Project 3 - The Project Brief
Ryan Kerry Jy
 
COTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative FutureCOTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative Future
juliekannai
 
Newport Beach Civic Center and Park - Lessons Learned in Sustainability
Newport Beach Civic Center and Park - Lessons Learned in SustainabilityNewport Beach Civic Center and Park - Lessons Learned in Sustainability
Newport Beach Civic Center and Park - Lessons Learned in Sustainability
American Society of Civil Engineers, Orange County Branch
 
Presentation cased study communal centre
Presentation cased study communal centrePresentation cased study communal centre
Presentation cased study communal centreAffif Mazlan
 
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownWalking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownBrian Sipes
 
Project brief
Project briefProject brief
Project briefkerneng
 
Project Management Games and Recreation Documentation Report
Project Management Games and Recreation Documentation ReportProject Management Games and Recreation Documentation Report
Project Management Games and Recreation Documentation Report
KohSungJie
 
338774160-Water-Treatment-Plant-Design-Project.pdf
338774160-Water-Treatment-Plant-Design-Project.pdf338774160-Water-Treatment-Plant-Design-Project.pdf
338774160-Water-Treatment-Plant-Design-Project.pdf
aloknayak47
 
338774160-Water-Treatment-Plant-Design-Project_2.pdf
338774160-Water-Treatment-Plant-Design-Project_2.pdf338774160-Water-Treatment-Plant-Design-Project_2.pdf
338774160-Water-Treatment-Plant-Design-Project_2.pdf
aloknayak47
 
CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project
Ryan Kerry Jy
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
Osama Khadra
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
Osama Khadra
 
LEED Study & Case study of Plummy fashion ltd.
LEED Study & Case study of Plummy fashion ltd.LEED Study & Case study of Plummy fashion ltd.
LEED Study & Case study of Plummy fashion ltd.
Riday Saha
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green Project
Green Project Architects
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate Often
Scott Bowman
 
Mak Pools wit photo
Mak Pools wit photoMak Pools wit photo
Mak Pools wit photoAnanda Kumar
 

Similar to Project brief (20)

Ici final project (final)
Ici final project (final)Ici final project (final)
Ici final project (final)
 
ICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefICI Project 3 - The Project Brief
ICI Project 3 - The Project Brief
 
COTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative FutureCOTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative Future
 
Newport Beach Civic Center and Park - Lessons Learned in Sustainability
Newport Beach Civic Center and Park - Lessons Learned in SustainabilityNewport Beach Civic Center and Park - Lessons Learned in Sustainability
Newport Beach Civic Center and Park - Lessons Learned in Sustainability
 
Presentation cased study communal centre
Presentation cased study communal centrePresentation cased study communal centre
Presentation cased study communal centre
 
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownWalking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
 
Project brief
Project briefProject brief
Project brief
 
Project Management Games and Recreation Documentation Report
Project Management Games and Recreation Documentation ReportProject Management Games and Recreation Documentation Report
Project Management Games and Recreation Documentation Report
 
338774160-Water-Treatment-Plant-Design-Project.pdf
338774160-Water-Treatment-Plant-Design-Project.pdf338774160-Water-Treatment-Plant-Design-Project.pdf
338774160-Water-Treatment-Plant-Design-Project.pdf
 
338774160-Water-Treatment-Plant-Design-Project_2.pdf
338774160-Water-Treatment-Plant-Design-Project_2.pdf338774160-Water-Treatment-Plant-Design-Project_2.pdf
338774160-Water-Treatment-Plant-Design-Project_2.pdf
 
CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project
 
Elements_Winter_2013
Elements_Winter_2013Elements_Winter_2013
Elements_Winter_2013
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
Project brief
Project briefProject brief
Project brief
 
LEED Study & Case study of Plummy fashion ltd.
LEED Study & Case study of Plummy fashion ltd.LEED Study & Case study of Plummy fashion ltd.
LEED Study & Case study of Plummy fashion ltd.
 
F inal ici super project
F inal ici super projectF inal ici super project
F inal ici super project
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green Project
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate Often
 
Mak Pools wit photo
Mak Pools wit photoMak Pools wit photo
Mak Pools wit photo
 

More from ZIyeeTan

Reflective Journal about the module of Rights in Malaysia
Reflective Journal about the module of Rights in Malaysia Reflective Journal about the module of Rights in Malaysia
Reflective Journal about the module of Rights in Malaysia
ZIyeeTan
 
Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)ZIyeeTan
 
Sustainable wastewater treatment
Sustainable wastewater treatmentSustainable wastewater treatment
Sustainable wastewater treatment
ZIyeeTan
 
construction drawings
construction drawingsconstruction drawings
construction drawings
ZIyeeTan
 
Bm final assignment cgc
Bm final assignment   cgcBm final assignment   cgc
Bm final assignment cgcZIyeeTan
 
Paint info
Paint infoPaint info
Paint infoZIyeeTan
 
Personal reflection one
Personal reflection onePersonal reflection one
Personal reflection oneZIyeeTan
 
Account project
Account projectAccount project
Account projectZIyeeTan
 
Research proposal psy 1
Research proposal  psy 1Research proposal  psy 1
Research proposal psy 1ZIyeeTan
 
Psycho Report. Tittle: First Impression on appearance
Psycho Report. Tittle: First Impression on appearance Psycho Report. Tittle: First Impression on appearance
Psycho Report. Tittle: First Impression on appearance ZIyeeTan
 
Company profile
Company profileCompany profile
Company profileZIyeeTan
 
Presentation day
Presentation dayPresentation day
Presentation dayZIyeeTan
 
Elements of natural and built environment 2
Elements of natural and built environment 2Elements of natural and built environment 2
Elements of natural and built environment 2ZIyeeTan
 
Pre writting
Pre  writtingPre  writting
Pre writtingZIyeeTan
 
essay question
essay questionessay question
essay questionZIyeeTan
 

More from ZIyeeTan (18)

Reflective Journal about the module of Rights in Malaysia
Reflective Journal about the module of Rights in Malaysia Reflective Journal about the module of Rights in Malaysia
Reflective Journal about the module of Rights in Malaysia
 
Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)
 
Sustainable wastewater treatment
Sustainable wastewater treatmentSustainable wastewater treatment
Sustainable wastewater treatment
 
construction drawings
construction drawingsconstruction drawings
construction drawings
 
Bm final assignment cgc
Bm final assignment   cgcBm final assignment   cgc
Bm final assignment cgc
 
Paints
PaintsPaints
Paints
 
Paint info
Paint infoPaint info
Paint info
 
Personal reflection one
Personal reflection onePersonal reflection one
Personal reflection one
 
Account project
Account projectAccount project
Account project
 
Research proposal psy 1
Research proposal  psy 1Research proposal  psy 1
Research proposal psy 1
 
Psycho Report. Tittle: First Impression on appearance
Psycho Report. Tittle: First Impression on appearance Psycho Report. Tittle: First Impression on appearance
Psycho Report. Tittle: First Impression on appearance
 
Moral
MoralMoral
Moral
 
Company profile
Company profileCompany profile
Company profile
 
Presentation day
Presentation dayPresentation day
Presentation day
 
model
modelmodel
model
 
Elements of natural and built environment 2
Elements of natural and built environment 2Elements of natural and built environment 2
Elements of natural and built environment 2
 
Pre writting
Pre  writtingPre  writting
Pre writting
 
essay question
essay questionessay question
essay question
 

Recently uploaded

FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
Product School
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 

Recently uploaded (20)

FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 

Project brief

  • 2. 2 CONTENT No. Title Page Cover page 1 Content 2 1. Introduction 1.1Project Description 3 1.2 Project Objective 4 1.3 Project Benefits 5 2. Stakeholders 2.1 Primary Users 6 2.2 Authorities 6 3. Authorization Approval 7 4. Site Analysis 8 5. Proposed Site Options 9 6. Proposed Concept and Design Brief 6.1 Building Features 10 6.2 Visual Statement 11 6.3 Siting and Orientation Requirements 12 6.4 Spatial Requirement 12 6.5 Services 12 6.6 Building Materials and Finishes 13 6.7 Accessibility 13 7. Budget 14 8. Deadline 15
  • 3. 3 1. Introduction 1.1 Project description The project involves the construction of a new cafe (Lakeview Cafe) for Taylor’s University Lakeside Campus. The cafe will be built on the man-made lake at Taylor’s University campus. The cafe is to be built using one-way glass, meaning that the exterior will be reflective while the interior walls will be clear and see-through. The cafe will also include an exterior water feature. Taylor’s University Lakeside Campus’ man-made lake
  • 4. 4 1.2 Project objective The main objective is to build a new cafe at Taylor’s University Lakeside Campus. In doing so, the new cafe needs to be able to respond to the aims of the client and should be able to embody and deliver the following elements and characteristics: Experience o provide a unique dining experience o floors are made of transparent glass that allows customers to enjoy the unique experience of dining on a lake o customers enjoy a spectacular view as the walls can be seen through o spectacular water feature where water cascades over the outer walls Environmentally-friendly o fully utilise the lake without disrupting the natural scenery o does not cause disturbances to the lake’s natural environment o priority is given to the ducks, geese, fish and other inhabitants of the lake when considering the design of the café o the roof is decorated with real plants to produce a natural green feel Comfort o provide comfort while giving a natural feel o The cafe is built such that it functions mainly on natural lighting and ventilation. o Real creepers hang down from ceiling beams
  • 5. 5 1.3 Project benefits Provides a unique new dining experience Enhances the beauty of the lake The construction itself will be an architectural masterpiece Increase publicity of Taylor’s University Lakeside Campus
  • 6. 6 2. Stakeholders 2.1 Primary Users Staff and students of Taylor’s University Lakeside Campus 2.2 Authorities Subang Jaya Town Council (MPSJ) Taylor’s University Faculty Management
  • 7. 7 3. Authorization Approval No. Procedure Authority Time to complete 1 Submission to Local Authority Subang Jaya Town Council (MPSJ) July 2013-November 2013 2 Obtain Development Order Planning Department July 2013-November 2013 3 Obtain Water Approval SYABAS July 2013-November 2013 4 Obtain Hoarding & Signboard Approval Subang Jaya Town Council (MPSJ) July 2013-November 2013 5 Obtain RORO Bin Approval Subang Jaya Town Council (MPSJ) July 2013-November 2013 6 Obtain Landscape Approval Subang Jaya Town Council (MPSJ) July 2013-November 2013 7 Obtain Building Plan Approval Subang Jaya Town Council (MPSJ) July 2013-November 2013
  • 8. 8 4. Site Analysis TAYLOR’S UNIVERSITY MAN-MADE LAKE Location of site for Lakeview Cafe
  • 9. 9 5. Proposed Site Options Although, Lakeview Cafe aims to be a cafe that is actually built on the lake, there are a number of reasons why alternative sites should be considered including the possibility that the natural scenery could be destroyed by the construction of a cafe on the lake as well as threats to the lake’s natural flora and fauna. Accordingly, the Building Committee were charged with the task of identifying whether there were any other suitable sites in the Taylor’s University Lakeside Campus area that should be considered for the cafe’s new home. These were the proposed sites: Site A (preferred site) - At the far end of the lake, on the lake. Site B - On the empty land area beside the lake. Site C - Built above the car park nearest the lake. Site B and C were proposed because they both provide views of the lake. Thus, they possess the ability to fulfill the theme of Lakeview Cafe.
  • 10. 10 6. Proposed Concept and Design Brief 6.1 Building Features No. Item Details Features Requirements 1. Sanitary Amenities 1 Male washroom and 1 female washroom 4 cubicles each 2 sinks and 2 toilets each. 2. Dining Area Indoor only Tables and chairs 10 tables and 40 chairs (4 chairs to a table). 3. Indoor Lounge Separate from dining area Seating and entertainment 3 couches, 2 pool tables, 1 television set. 4. Outdoor lounge Only drinks are served. Tables and chairs 5 umbrella tables and 15 chairs (3 chairs to a table) 5. Kitchen Preparation of all food items. Storage and basic kitchen requirements. 4 stoves, 2 ovens, 2 microwaves,4 sinks workspace, 2 fridges 10 cabinets and a ventilation shaft. 6. Drink Station (non-alcoholic) Serves drinks only. Bar and seats. 4 bar stools. 7. Rubbish/Refuse area For garbage disposal. Outdoor and indoor. 5 indoor bins and 3 large outdoor bins. 8. Cleaner’s store Small store room. Located near bathrooms. Cleaning equipment and cleaning chemicals.
  • 11. 11 6.2 Visual Statement Lakeview Cafe will be developed using the latest environmental and sustainable considerations. It is intended that Lakeview Cafe will provide a fully functional facility, which becomes a hub of activity throughout the year. Ensuring the cafe is able to deliver its promise of providing a unique experience to customers will be of primary importance, however, it is also important that the facility provides a welcoming appearance, which is homey and comfortable. The building should present an image consistent with the campus environment and current ecological sustainable development (ESD) principles without dominating the landscape. It should be: Low key but distinctive Be readily identifiable and welcoming Be constructed of high quality, durable materials Include principles of ESD design Maximise the use of the available open site Seamlessly integrate with the local environment Minimise the impact of the built environment on its surroundings Express image and functions of Lakeview Cafe Repeat, borrow or redefine landscape and building elements from the local surrounding area
  • 12. 12 6.3 Siting and Orientation Considerations The building’s siting and orientation should: Take advantage of the views Take advantage of natural winds Encourage passive solar design Have a clear and identifiable main entry 6.4 Spatial Requirements It is expected that the cafe will have only one level. The eventual size of the new building will be driven by a number of factors including: 1. Minimum functional requirements 2. Anticipated growth 3. Site size / location 4. Cost / budget 6.5 Services It is anticipated the cafe’s building’s services will comprise the following: 1. Mechanical o Mechanical assisted ventilation o Air conditioning o Exhaust to all kitchens and toilet facilities 2. Electrical o Lighting (general, feature, security, emergency, exit, etc,) o Power – electrical o Emergency equipment and systems o Security access control, CCTV, intercom o Smoke detectors 3. Communications o Telephone o Wireless LAN 4. Hydraulics o Hot and cold water supply o Sewerage o Rainwater harvesting o Fire protection services
  • 13. 13 6.6 Building Materials and Finishes All building materials should be carefully selected in respect to: minimising the need for and duration between maintenance; minimising the embodied energy required during manufacture and transport to site; maximise the use of appropriate recycled materials; response to site context, landscape and locality; quality finishes that offer value for money. 6.7 Acessability Access for those with Disabilities -In developing Lakeview Cafe, facility that allow for easy access for the disabled will be taken into account.
  • 14. 14 7. Budget A range of around RM650, 000 to RM700, 000is considered to be an appropriate total budget for this project depending on scope and quality of work, fittings and fixtures. Item Time for funding Cost (RM) Feasibility Study & Project Planning (Professional services required – allowance only) July 2013-November 2013 5,000 Consultation / Communications (Professional services required – allowance only) July 2013-November 2013 3,500 Fees for Design and Documentation July 2013-November 2013 30,000 Fees for Construction Phase Services July 2013-November 2013 20,000 Construction Costs July 2013-November 2013 450,000 External / Site Works (Allowance only) July 2013-November 2013 60,000 Commissioning and Fit out (Furniture, signage, storage fittings, etc) July 2013-November 2013 85,000 Contingencies (Design and Construction Contingencies) July 2013-November 2013 80,000 Total 661,500
  • 15. 15 8. Deadline The construction of Lakeview Cafe will commence on the 1st January 2014 and the expected completion date will be a year from then.