ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
Introduction to Construction Industry
_____________________________________________________________________________________
Final Project
The Project Brief
Name: Tan Yincy & Bryan Teh Qing Da
Student ID: 0318355 & 0318590
Course: Foundation of Natural Build Environment (FNBE)
Intake: FNBE FEB 2014
Subject: Introduction to Construction Industry QSB30105
Lecturers: Pn Hasmanira Moktha and Ms. Ann See Peng
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
Content
1 | Introduction 1
2 | Site Analysis 2 - 3
3 | The Proposed Project 4 - 5
4 | Suggestions 6 - 7
5 | Investigations 8 - 10
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
1 | Introduction
For this final project of Introduction to Construction Industry, students were grouped into a
group of 2 and were required to find a specific land within the campus to initiate a small
construction project. The size of the land could not exceed 30m x 30m.
This report focuses on constructing a new Food & Beverage (Dining area) in Taylors’s
University Lakeside Campus.
1
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
2 | Site Analysis
The Food & Beverage (Dining area) will be built on an existing parking space which is located
directly beside the Boardwalk / Syopz Mall.
2
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
As you can see, it is a very wide land that is able to receive enough sunlight without any
covering, a suitable place for plants. Suitable humidity and very windy, although someday the
temperature will slightly increase, affecting the humidity but that would not be a problem as
ventilation will be used. A green roof is also in consideration.
Besides that, the view of the land is not very appealing because of the uneven land without and
land covers and the lack of plantation but this would be improved throughout the construction of
the project. For the walkability and connectivity, the site is located just beside the Syopz Mall so
it is well connected to the campus and students. Also, it will only require about 5-10 minutes to
arrive.
However, there is only one way to enter the site. (Circulation)
3
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
3 | The Proposed Project
The Food & Beverage (Dining area) will be constructed as a Café on green platform, named
Lake Café.
A space of (25x25)M will be used from the site. That will be the elevated green platform base of
the Café structure. An octagonal glass house structure (Café) of measurements (15x15)M will be
allocated on the center of the green platform.
Reflective pools are suggested all along the green platform as a cooling system to cool down the
surrounding temperature during hot weathers. The whole structure will be overlooking the lake
and refreshing greenery as a short getaway paradise from the concrete jungle and hectic
university life.
The glass house cafe will provide coffee, cakes and pastry, sandwiches and a variety of spaghetti
and snacks.
The walls of the
structure would basically
look almost like this but
bigger in size of course.
Materials for the structure: Glass
(Recycled glass to save costing and
the environment), steel (black) &
wood
4
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
Estimated Timeframe: 8-9 months
Targets: Students of Taylor’s University Lakeside Campus, Staffs of Taylor’s University
Lakeside Campus, Residence and Visitors
More visuals for the roof structure.
5
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
4 | Suggestions
Some suggestions for the
interior design of the Café.
6
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
7
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
5 |Investigations
Requirements in a Project
 Project requirement
 Contract requirement
 Architecture Design Requirement
 Electrical Requirement
 Civil & Structural Design Requirement
Types of Development
 On-site development
Slum upgrading is a way of improving the physical environment and basic services in existing
communities, while preserving their location, character and social structures. Usually upgrading
means that the houses, lanes, roads and open spaces are improved, without changing the layout
or plot sizes.
 On-site reblocking
Reblocking is a more systematic way of improving the infrastructure and physical conditions in
existing communities by making some adjustments to the layout of houses and roads to install
sewers, drains, walkways and roads, but doing so in ways which ensure the continuity of the
8
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
community. Communities can then develop their housing gradually, at their own pace. When
communities opt for reblocking, some houses usually have to be moved and partially or entirely
reconstructed to improve access.
 On-site reconstruction
In this upgrading strategy, existing communities are totally demolished and rebuilt on the same
land, either under a long-term lease or after the people have negotiated to purchase the land. The
new security of land tenure on the already-occupied land often provides community people with
a very strong incentive to invest in their housing, through rebuilding or new construction.
Reconstruction also allows communities on low-lying land to first raise the level of the land
above flood lines before investing in proper housing.
 Land sharing
Land-sharing is a housing and settlement improvement strategy which allows both the land-
owner and the community people living on that land to benefit. After a period of negotiation and
planning, an agreement is reached to “share” the land, where the settlement is divided into two
portions. The community is given, sold or leased one portion (usually the less commercially
attractive part of the site) for reconstructing their housing, and the rest of the land is returned to
the land-owner to develop.
 Nearby or not-so-nearby relocation
The greatest advantage of the relocation strategy is that it usually comes with housing security,
through land use rights, outright ownership or some kind of long-term land lease. Relocation
sites can sometimes be far from existing communities, job opportunities, support structures and
9
ICI | Final Project | Report | The Project Brief
Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University
schools. In these cases, community members who want to keep their old jobs or attend the same
schools must bear the burden of additional traveling time and expense and must adapt themselves
to a new environment.
The Building Plan Approval Process
The approval process will depend on whether you choose to use the Building Control services of
a Local Authority or an Approved Inspector.
If you use an Approved Inspector then you should jointly notify the Local Authority that the
Approved Inspector is carrying out the building control function for the work. This is called the
"Initial Notice".
If you use a Local Authority, the procedures are set out in the Building Regulations. Some of
them relate to pre-site procedures and others relate to procedures once work is underway on site.
On site approval
The Building Control Service will
make statutory and routine
inspections as the work progresses to
ensure compliance with the building
regulations and other allied
legislation.
Pre-site approval
If you choose to use a Local Authority
building control service, there are
three types of application for
approval you can make.
10

More Related Content

Similar to ICI Report

Ici final project
Ici final projectIci final project
Ici final project
kongzc
 
Project
Project Project
Project
chiasueyi
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017
Crosstown TO
 
Project brief
Project brief Project brief
Project brief
PK146
 
ISCN 2019 - Breakouts
ISCN 2019 - BreakoutsISCN 2019 - Breakouts
ISCN 2019 - Breakouts
ISCN_Secretariat
 
Ici final 2
Ici final 2Ici final 2
Ici final 2
Christina Ng Sue Li
 
Ici final project
Ici final projectIci final project
Ici final project
Chong Yu Xuan
 
ICI Report
ICI ReportICI Report
ICI Report
jiahui331
 
Ici proposal
Ici proposalIci proposal
Ici proposal
j3frin30
 
Project brief
Project brief Project brief
Project brief
Haziq1511
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017
Crosstown TO
 
Ici report revised (2)
Ici report revised (2)Ici report revised (2)
Ici report revised (2)
Darren Loong
 
Ici final project (final)
Ici final project (final)Ici final project (final)
Ici final project (final)
Joe Onn Lim
 
ICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefICI Project 3 - The Project Brief
ICI Project 3 - The Project Brief
Ryan Kerry Jy
 
Beech worth montessori school
Beech worth montessori schoolBeech worth montessori school
Beech worth montessori school
Mythili Vinayagam
 
Ici final project
Ici final projectIci final project
Ici final project
温 庄壁
 
ici final project.pdf
ici final project.pdfici final project.pdf
ici final project.pdf
温 庄壁
 
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
Anupama Krishnan
 
ICI final project
ICI final projectICI final project
ICI final project
LY97
 
Ici report
Ici reportIci report
Ici report
Dayana Pak
 

Similar to ICI Report (20)

Ici final project
Ici final projectIci final project
Ici final project
 
Project
Project Project
Project
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017
 
Project brief
Project brief Project brief
Project brief
 
ISCN 2019 - Breakouts
ISCN 2019 - BreakoutsISCN 2019 - Breakouts
ISCN 2019 - Breakouts
 
Ici final 2
Ici final 2Ici final 2
Ici final 2
 
Ici final project
Ici final projectIci final project
Ici final project
 
ICI Report
ICI ReportICI Report
ICI Report
 
Ici proposal
Ici proposalIci proposal
Ici proposal
 
Project brief
Project brief Project brief
Project brief
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017
 
Ici report revised (2)
Ici report revised (2)Ici report revised (2)
Ici report revised (2)
 
Ici final project (final)
Ici final project (final)Ici final project (final)
Ici final project (final)
 
ICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefICI Project 3 - The Project Brief
ICI Project 3 - The Project Brief
 
Beech worth montessori school
Beech worth montessori schoolBeech worth montessori school
Beech worth montessori school
 
Ici final project
Ici final projectIci final project
Ici final project
 
ici final project.pdf
ici final project.pdfici final project.pdf
ici final project.pdf
 
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
 
ICI final project
ICI final projectICI final project
ICI final project
 
Ici report
Ici reportIci report
Ici report
 

More from yincytwincy

Building Science P01
Building Science P01Building Science P01
Building Science P01
yincytwincy
 
Building Science P02
Building Science P02Building Science P02
Building Science P02
yincytwincy
 
Urban comparative essay
Urban comparative essayUrban comparative essay
Urban comparative essay
yincytwincy
 
Urban Theories Synopsis
Urban Theories SynopsisUrban Theories Synopsis
Urban Theories Synopsis
yincytwincy
 
Onsite Journal
Onsite JournalOnsite Journal
Onsite Journal
yincytwincy
 
C&H Journal
C&H JournalC&H Journal
C&H Journal
yincytwincy
 
Business final report 2015
Business final report 2015Business final report 2015
Business final report 2015
yincytwincy
 
Yummy nummies
Yummy nummies Yummy nummies
Yummy nummies
yincytwincy
 
Final English II
Final English IIFinal English II
Final English II
yincytwincy
 
Slides Eng II final 2015
Slides Eng II final 2015Slides Eng II final 2015
Slides Eng II final 2015
yincytwincy
 
English2 inception-vs-interstellar 2015
English2 inception-vs-interstellar 2015English2 inception-vs-interstellar 2015
English2 inception-vs-interstellar 2015
yincytwincy
 
DPJ 03
DPJ 03DPJ 03
DPJ 03
yincytwincy
 
DPJ 01
DPJ 01DPJ 01
DPJ 01
yincytwincy
 
DPJ 02
DPJ 02DPJ 02
DPJ 02
yincytwincy
 
Comic Strips
Comic StripsComic Strips
Comic Strips
yincytwincy
 
Psych Group Report
Psych Group ReportPsych Group Report
Psych Group Report
yincytwincy
 
Psych assigment 01
Psych assigment 01Psych assigment 01
Psych assigment 01
yincytwincy
 
Final rprt
Final rprt Final rprt
Final rprt
yincytwincy
 
English II
English IIEnglish II
English II
yincytwincy
 
English report II
English report IIEnglish report II
English report II
yincytwincy
 

More from yincytwincy (20)

Building Science P01
Building Science P01Building Science P01
Building Science P01
 
Building Science P02
Building Science P02Building Science P02
Building Science P02
 
Urban comparative essay
Urban comparative essayUrban comparative essay
Urban comparative essay
 
Urban Theories Synopsis
Urban Theories SynopsisUrban Theories Synopsis
Urban Theories Synopsis
 
Onsite Journal
Onsite JournalOnsite Journal
Onsite Journal
 
C&H Journal
C&H JournalC&H Journal
C&H Journal
 
Business final report 2015
Business final report 2015Business final report 2015
Business final report 2015
 
Yummy nummies
Yummy nummies Yummy nummies
Yummy nummies
 
Final English II
Final English IIFinal English II
Final English II
 
Slides Eng II final 2015
Slides Eng II final 2015Slides Eng II final 2015
Slides Eng II final 2015
 
English2 inception-vs-interstellar 2015
English2 inception-vs-interstellar 2015English2 inception-vs-interstellar 2015
English2 inception-vs-interstellar 2015
 
DPJ 03
DPJ 03DPJ 03
DPJ 03
 
DPJ 01
DPJ 01DPJ 01
DPJ 01
 
DPJ 02
DPJ 02DPJ 02
DPJ 02
 
Comic Strips
Comic StripsComic Strips
Comic Strips
 
Psych Group Report
Psych Group ReportPsych Group Report
Psych Group Report
 
Psych assigment 01
Psych assigment 01Psych assigment 01
Psych assigment 01
 
Final rprt
Final rprt Final rprt
Final rprt
 
English II
English IIEnglish II
English II
 
English report II
English report IIEnglish report II
English report II
 

Recently uploaded

Learn SQL from basic queries to Advance queries
Learn SQL from basic queries to Advance queriesLearn SQL from basic queries to Advance queries
Learn SQL from basic queries to Advance queries
manishkhaire30
 
一比一原版(牛布毕业证书)牛津布鲁克斯大学毕业证如何办理
一比一原版(牛布毕业证书)牛津布鲁克斯大学毕业证如何办理一比一原版(牛布毕业证书)牛津布鲁克斯大学毕业证如何办理
一比一原版(牛布毕业证书)牛津布鲁克斯大学毕业证如何办理
74nqk8xf
 
Challenges of Nation Building-1.pptx with more important
Challenges of Nation Building-1.pptx with more importantChallenges of Nation Building-1.pptx with more important
Challenges of Nation Building-1.pptx with more important
Sm321
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
aqzctr7x
 
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data LakeViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
Walaa Eldin Moustafa
 
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
zsjl4mimo
 
My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.
rwarrenll
 
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
nuttdpt
 
The Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series DatabaseThe Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series Database
javier ramirez
 
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
74nqk8xf
 
Intelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicineIntelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicine
AndrzejJarynowski
 
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
mzpolocfi
 
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
apvysm8
 
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
Timothy Spann
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
g4dpvqap0
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
dwreak4tg
 
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
g4dpvqap0
 
Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...
Bill641377
 
State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023
kuntobimo2016
 
4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
Social Samosa
 

Recently uploaded (20)

Learn SQL from basic queries to Advance queries
Learn SQL from basic queries to Advance queriesLearn SQL from basic queries to Advance queries
Learn SQL from basic queries to Advance queries
 
一比一原版(牛布毕业证书)牛津布鲁克斯大学毕业证如何办理
一比一原版(牛布毕业证书)牛津布鲁克斯大学毕业证如何办理一比一原版(牛布毕业证书)牛津布鲁克斯大学毕业证如何办理
一比一原版(牛布毕业证书)牛津布鲁克斯大学毕业证如何办理
 
Challenges of Nation Building-1.pptx with more important
Challenges of Nation Building-1.pptx with more importantChallenges of Nation Building-1.pptx with more important
Challenges of Nation Building-1.pptx with more important
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
 
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data LakeViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
 
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
 
My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.
 
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
 
The Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series DatabaseThe Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series Database
 
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
 
Intelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicineIntelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicine
 
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
 
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
 
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证如何办理
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
 
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
 
Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...
 
State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023
 
4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
 

ICI Report

  • 1. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University Introduction to Construction Industry _____________________________________________________________________________________ Final Project The Project Brief Name: Tan Yincy & Bryan Teh Qing Da Student ID: 0318355 & 0318590 Course: Foundation of Natural Build Environment (FNBE) Intake: FNBE FEB 2014 Subject: Introduction to Construction Industry QSB30105 Lecturers: Pn Hasmanira Moktha and Ms. Ann See Peng
  • 2. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University Content 1 | Introduction 1 2 | Site Analysis 2 - 3 3 | The Proposed Project 4 - 5 4 | Suggestions 6 - 7 5 | Investigations 8 - 10
  • 3. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University 1 | Introduction For this final project of Introduction to Construction Industry, students were grouped into a group of 2 and were required to find a specific land within the campus to initiate a small construction project. The size of the land could not exceed 30m x 30m. This report focuses on constructing a new Food & Beverage (Dining area) in Taylors’s University Lakeside Campus. 1
  • 4. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University 2 | Site Analysis The Food & Beverage (Dining area) will be built on an existing parking space which is located directly beside the Boardwalk / Syopz Mall. 2
  • 5. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University As you can see, it is a very wide land that is able to receive enough sunlight without any covering, a suitable place for plants. Suitable humidity and very windy, although someday the temperature will slightly increase, affecting the humidity but that would not be a problem as ventilation will be used. A green roof is also in consideration. Besides that, the view of the land is not very appealing because of the uneven land without and land covers and the lack of plantation but this would be improved throughout the construction of the project. For the walkability and connectivity, the site is located just beside the Syopz Mall so it is well connected to the campus and students. Also, it will only require about 5-10 minutes to arrive. However, there is only one way to enter the site. (Circulation) 3
  • 6. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University 3 | The Proposed Project The Food & Beverage (Dining area) will be constructed as a Café on green platform, named Lake Café. A space of (25x25)M will be used from the site. That will be the elevated green platform base of the Café structure. An octagonal glass house structure (Café) of measurements (15x15)M will be allocated on the center of the green platform. Reflective pools are suggested all along the green platform as a cooling system to cool down the surrounding temperature during hot weathers. The whole structure will be overlooking the lake and refreshing greenery as a short getaway paradise from the concrete jungle and hectic university life. The glass house cafe will provide coffee, cakes and pastry, sandwiches and a variety of spaghetti and snacks. The walls of the structure would basically look almost like this but bigger in size of course. Materials for the structure: Glass (Recycled glass to save costing and the environment), steel (black) & wood 4
  • 7. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University Estimated Timeframe: 8-9 months Targets: Students of Taylor’s University Lakeside Campus, Staffs of Taylor’s University Lakeside Campus, Residence and Visitors More visuals for the roof structure. 5
  • 8. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University 4 | Suggestions Some suggestions for the interior design of the Café. 6
  • 9. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University 7
  • 10. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University 5 |Investigations Requirements in a Project  Project requirement  Contract requirement  Architecture Design Requirement  Electrical Requirement  Civil & Structural Design Requirement Types of Development  On-site development Slum upgrading is a way of improving the physical environment and basic services in existing communities, while preserving their location, character and social structures. Usually upgrading means that the houses, lanes, roads and open spaces are improved, without changing the layout or plot sizes.  On-site reblocking Reblocking is a more systematic way of improving the infrastructure and physical conditions in existing communities by making some adjustments to the layout of houses and roads to install sewers, drains, walkways and roads, but doing so in ways which ensure the continuity of the 8
  • 11. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University community. Communities can then develop their housing gradually, at their own pace. When communities opt for reblocking, some houses usually have to be moved and partially or entirely reconstructed to improve access.  On-site reconstruction In this upgrading strategy, existing communities are totally demolished and rebuilt on the same land, either under a long-term lease or after the people have negotiated to purchase the land. The new security of land tenure on the already-occupied land often provides community people with a very strong incentive to invest in their housing, through rebuilding or new construction. Reconstruction also allows communities on low-lying land to first raise the level of the land above flood lines before investing in proper housing.  Land sharing Land-sharing is a housing and settlement improvement strategy which allows both the land- owner and the community people living on that land to benefit. After a period of negotiation and planning, an agreement is reached to “share” the land, where the settlement is divided into two portions. The community is given, sold or leased one portion (usually the less commercially attractive part of the site) for reconstructing their housing, and the rest of the land is returned to the land-owner to develop.  Nearby or not-so-nearby relocation The greatest advantage of the relocation strategy is that it usually comes with housing security, through land use rights, outright ownership or some kind of long-term land lease. Relocation sites can sometimes be far from existing communities, job opportunities, support structures and 9
  • 12. ICI | Final Project | Report | The Project Brief Tan Yincy (0318355) & Bryan Teh (0318590) |FNBE Feb 2014 | Taylor’s University schools. In these cases, community members who want to keep their old jobs or attend the same schools must bear the burden of additional traveling time and expense and must adapt themselves to a new environment. The Building Plan Approval Process The approval process will depend on whether you choose to use the Building Control services of a Local Authority or an Approved Inspector. If you use an Approved Inspector then you should jointly notify the Local Authority that the Approved Inspector is carrying out the building control function for the work. This is called the "Initial Notice". If you use a Local Authority, the procedures are set out in the Building Regulations. Some of them relate to pre-site procedures and others relate to procedures once work is underway on site. On site approval The Building Control Service will make statutory and routine inspections as the work progresses to ensure compliance with the building regulations and other allied legislation. Pre-site approval If you choose to use a Local Authority building control service, there are three types of application for approval you can make. 10