KALISINDH THERMAL POWER PROJECT,
JHALAWAR
CONTENT
• INTRODUCTION OF “KaTPP”
• OVERVIEW OF THE THARMAL POWER
PLANT
• TRANSFORMER
• CONTROL ROOM
INTRODUCTION OF “KTPP”
• Ka.T.P.P is a coal based power plant in rajasthan.
• It is located in Nimoda village,near Kali Sindh river.
• It has two unites each of 600MW capacity.
• TOTAL GENRATION CAPACITY=1200MW.
OVERVIEW
rankine cycle layout
TRANSFORMER
Basic Principle of Transformer
PART OF
TRANSFORME
R
• Transformer is made of
following components:-
• CORE
• WINDING
• TANK
• BUSHING
• AUXILIARY EQUIPMENT
• INSULATING OIL
• COOLING SYSTEM
• Conservator
• Breather
• Explosion vent
TYPES OF TRANSFORMER
In kalisindh, there are various transformers for various purpose.
They are :-
• Generator transformer (GT)
• Unite transformer (UT)
• Unit auxiliary transformer (UAT)
• Unit service transformer (UST)
• Unit station transformer
• Natural grounding transformer(NGT)
INSTRUMENT TRANSFORMERS
• Current transformer (CT)
• Potential transformer (PT)
GENERATOR TRANSFORMER
(GT)
• Output of generator has step up
22KV to 400KV by
generating transformer.
• In Kalisindh power plant 150/
200/ 250MVA,
22.98/22KV, generating
transformers are used.
• There is a transformer of 588
MVA capacity.
• Usally these transformer are
outdoor types
ISOLATED PHASE BUS
UNIT TRANSFORMER (UT)
• Unit transformer are installed to fed supply to HT switchgear
• There are two 80KVA transformer installed near GT.
• Electricity is supplied to BDF, CWP, ID, FD, PA, FANS from Unite
Transformer.
• The unit transformer is used to HT switchgear and it supplies voltage
22/11KV to UTA and different motors in boiler.
• unit transformer is rated for 48/64/80MVA, 22/11.6KVA, 11dyn11yn type
of winding.
• This permit to voltage down up to 11KV it have two radiator.
UNITE SERVICE TRANSFORMER (UST)
• It is also a 66KV/415V
transformers which is used to
supply the auxiliaries connected
to the unit secondary
switchgear bus.
• Step-dwon transformer
UNIT AUXILIARY TRANSFORMER (UAT)
• UAT is connected between
the generator and the
Generator Transformer.
• It is step dwon transformer,
which steps down the voltage
from 16.5KV to 6.9KV .
UNIT STATION TRANSFORMER
• It is a step down transformer, whitch is connected to the station bus.
• It steps down the voltage from 6.6KV to 0.433KV.
CONTROL ROOM PENAL
FAN CONTROL
• Primary Air Fan
• Furnace pressure
• Forced draft fan
• Induced draft fan
TURBINE CONTROL
• Pressure Control
• Load Control
• Speed Control
FUEL CONTROL
• Coal, Oil flow
• Oil pressure
• Flow of Air
STEAM & WATER CONTROL
• Drum level control
• Flow of water & steam
• Pressure of steam and water
• Temp. of steam and water
GENERATOR CONTROL
• Stator Rotor temp.
• For stator cooling
a) H2 pressure
b) H2O pressure
SATATION LOAD IN KATPP
AIR AND FUEL GASS SYSTEM
MILLS OVERVIEW
PA FAN SYSTEM
Presentation transformer and control room thermal power plant jhalawar

More Related Content

Similar to Presentation transformer and control room thermal power plant jhalawar

GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
Utsav Yagnik
 
Internship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationInternship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power station
malikavita731
 
Internship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxInternship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptx
malikavita731
 
Internship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationInternship PPT final ukai thermal power station
Internship PPT final ukai thermal power station
malikavita731
 
Vocational training in ntpc rihandnagar
Vocational training in ntpc rihandnagarVocational training in ntpc rihandnagar
Vocational training in ntpc rihandnagar
NEE260998
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)
Pankaj Rawal
 
National Hydro Power Plant collage PPT 1.pptx
National  Hydro Power Plant  collage PPT  1.pptxNational  Hydro Power Plant  collage PPT  1.pptx
National Hydro Power Plant collage PPT 1.pptx
rupasharma39
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
Jatan Soni
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
Ridwanul Hoque
 
Trainingreport 132 KV
Trainingreport 132 KVTrainingreport 132 KV
Trainingreport 132 KV
Abrar Ahamed
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
Ramendra Dhiman
 
Heavy water plant and there electrical systam
Heavy water plant and there electrical systam Heavy water plant and there electrical systam
Heavy water plant and there electrical systam
mohit Navriya
 
Mppkvv company ltd
Mppkvv company ltdMppkvv company ltd
Mppkvv company ltd
DEEPAK PATEL
 
Htps
HtpsHtps
Htps
VSRAGHU
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
AkshaiSai2
 
Transformers
TransformersTransformers
Transformers
Bhushan Rane
 
Rps plant
Rps plantRps plant
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
Rishabhlko
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
Avdhesh kumar NIET
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
Shishupal03012015
 

Similar to Presentation transformer and control room thermal power plant jhalawar (20)

GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
Internship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationInternship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power station
 
Internship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxInternship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptx
 
Internship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationInternship PPT final ukai thermal power station
Internship PPT final ukai thermal power station
 
Vocational training in ntpc rihandnagar
Vocational training in ntpc rihandnagarVocational training in ntpc rihandnagar
Vocational training in ntpc rihandnagar
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)
 
National Hydro Power Plant collage PPT 1.pptx
National  Hydro Power Plant  collage PPT  1.pptxNational  Hydro Power Plant  collage PPT  1.pptx
National Hydro Power Plant collage PPT 1.pptx
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
 
Trainingreport 132 KV
Trainingreport 132 KVTrainingreport 132 KV
Trainingreport 132 KV
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
Heavy water plant and there electrical systam
Heavy water plant and there electrical systam Heavy water plant and there electrical systam
Heavy water plant and there electrical systam
 
Mppkvv company ltd
Mppkvv company ltdMppkvv company ltd
Mppkvv company ltd
 
Htps
HtpsHtps
Htps
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
Transformers
TransformersTransformers
Transformers
 
Rps plant
Rps plantRps plant
Rps plant
 
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
 

Recently uploaded

CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
edwin408357
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
Prakhyath Rai
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
Yasser Mahgoub
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
Kamal Acharya
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
mahaffeycheryld
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 

Recently uploaded (20)

CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 

Presentation transformer and control room thermal power plant jhalawar

  • 1. SUBMITTED BY:- VISHAL SEN ELECTRICAL ENGINEERING 7TH SEM(4TH YEAR) 2020------ SUBMITTED TO:- Name of teacher / professor TRAINING SEMINAR OF “KALISINDH POWER PROJECT” GOVERNMENT ENGINEERING COLLEGE, JHALAWAR
  • 3. KALISINDH THERMAL POWER PROJECT, JHALAWAR
  • 4. CONTENT • INTRODUCTION OF “KaTPP” • OVERVIEW OF THE THARMAL POWER PLANT • TRANSFORMER • CONTROL ROOM
  • 5. INTRODUCTION OF “KTPP” • Ka.T.P.P is a coal based power plant in rajasthan. • It is located in Nimoda village,near Kali Sindh river. • It has two unites each of 600MW capacity. • TOTAL GENRATION CAPACITY=1200MW.
  • 9. PART OF TRANSFORME R • Transformer is made of following components:- • CORE • WINDING • TANK • BUSHING • AUXILIARY EQUIPMENT • INSULATING OIL • COOLING SYSTEM • Conservator • Breather • Explosion vent
  • 10. TYPES OF TRANSFORMER In kalisindh, there are various transformers for various purpose. They are :- • Generator transformer (GT) • Unite transformer (UT) • Unit auxiliary transformer (UAT) • Unit service transformer (UST) • Unit station transformer • Natural grounding transformer(NGT) INSTRUMENT TRANSFORMERS • Current transformer (CT) • Potential transformer (PT)
  • 11. GENERATOR TRANSFORMER (GT) • Output of generator has step up 22KV to 400KV by generating transformer. • In Kalisindh power plant 150/ 200/ 250MVA, 22.98/22KV, generating transformers are used. • There is a transformer of 588 MVA capacity. • Usally these transformer are outdoor types
  • 13. UNIT TRANSFORMER (UT) • Unit transformer are installed to fed supply to HT switchgear • There are two 80KVA transformer installed near GT. • Electricity is supplied to BDF, CWP, ID, FD, PA, FANS from Unite Transformer. • The unit transformer is used to HT switchgear and it supplies voltage 22/11KV to UTA and different motors in boiler. • unit transformer is rated for 48/64/80MVA, 22/11.6KVA, 11dyn11yn type of winding. • This permit to voltage down up to 11KV it have two radiator.
  • 14. UNITE SERVICE TRANSFORMER (UST) • It is also a 66KV/415V transformers which is used to supply the auxiliaries connected to the unit secondary switchgear bus. • Step-dwon transformer
  • 15. UNIT AUXILIARY TRANSFORMER (UAT) • UAT is connected between the generator and the Generator Transformer. • It is step dwon transformer, which steps down the voltage from 16.5KV to 6.9KV .
  • 16. UNIT STATION TRANSFORMER • It is a step down transformer, whitch is connected to the station bus. • It steps down the voltage from 6.6KV to 0.433KV.
  • 17.
  • 18. CONTROL ROOM PENAL FAN CONTROL • Primary Air Fan • Furnace pressure • Forced draft fan • Induced draft fan TURBINE CONTROL • Pressure Control • Load Control • Speed Control FUEL CONTROL • Coal, Oil flow • Oil pressure • Flow of Air STEAM & WATER CONTROL • Drum level control • Flow of water & steam • Pressure of steam and water • Temp. of steam and water GENERATOR CONTROL • Stator Rotor temp. • For stator cooling a) H2 pressure b) H2O pressure
  • 19.
  • 21. AIR AND FUEL GASS SYSTEM