Presentation
               on
    “Competency Mapping”
               at
"Concentric Pumps India Pvt Ltd”



                  Presented By:
                       Priyanka Gurav
                       V3027
Contents:
• About concentric pumps India Pvt Ltd
    ▫ Product Overview

• What is competency mapping?
    ▫ Competency mapping-HR tool used in

•   Objectives of study
•   Research Methodology
•   Research Findings
•   Suggestions
•   Conclusion
About Concentric Pumps India Pvt Ltd

• Concentric is a global expert in fluid
  engineering.
• Concentric founded in Birmingham, England
• John S. Barnes Company founded in
  Rockford, USA
• By 2008, Pumps has doubled sales, achieved
  14% operating margins, become global market
  leader and built green-field plants in India and
  China
• August 2011 – David Woolley appointed
  President and CEO of Concentric
Product Overview

• Design and manufacture of oil, water, fuel
  pumps and other components designed to
  improve efficiency in diesel engines from 1.5 to
  over 30 litres capacity.

• Products are divided into two broad categories:
 ▫ Engine Products
 ▫ Hydraulic Products
• Engine Products:

 ▫   Variable Flow Oil Pumps
 ▫   Oil pumps
 ▫   Variable Flow Coolant
 ▫   Coolant Pumps
 ▫   Fuel Transfer Pumps
 ▫   Transmission & Compressor Pumps
 ▫   Varivent
 ▫   Alfdex
• Hydraulic Products:

 ▫   Hydraulic Gear Pumps
 ▫   Hydraulic Gear Motors
 ▫   Hydraulic Fan Drives
 ▫   Hydraulic Power Packs
 ▫   Rotary Flow Dividers/Intensifiers
 ▫   Concentric standard product capabilities offer
     flexibility.
Competency Mapping

• Competency Mapping is a process of
  identifying key competencies of an organization
  and/or a job and incorporating those
  competencies throughout the various processes
  (i.e. Job Evaluation, Training & Recruitment) of
  the organization.
COMPETENCY MAPPING-HR TOOL
USED IN
•   Recruitment /Selection
•   Training/Development
•   Performance Management
•   Career Planning/Development
•   Succession Planning
•   Manpower Planning
•   Human Resource Development
•   Human Resource Planning
•   Human Resource Strategic Planning
Objectives of study

• To identify and describe the factors are critical to
  the functioning of a particular job so that a
  match can be established between the skills
  required to perform a job and actual talent of a
  job holder.

• To identify training and development needs of
  individual.
Research Methodology

• Research Design:
 ▫ An exploratory as well as descriptive research
   design.

• Contact methods:
 ▫ The respondents were contacted directly by the
   Personal Interview.
• Data Collection:

  ▫ Primary data:
     I collected primary data from the Employees.
      The data is collected through Interviews which
      are personally conducted.

  ▫ Secondary Data:
     Company Brochures
     Websites
     Job descriptions Provided
• Sample Description:

 ▫ Sample size: 42
 ▫ Sampling unit: The Employees of Concentric
   Pumps India Pvt Ltd.
 ▫ Method: Analyzed the results by making Format
   of Competency Mapping of questions.
RESEARCH FINDINGS

• Employee in KRIBHCO believe that they are doing the
  job according to their job profile. They finish every work
  assigned to them within the time limit, which shows that
  they are competent, though many of them need guidance
  from their superiors sometimes.

• Few believe that they need training to perform their job
  which is contradicting to their competency level, since
  the type of type of work they were performing at the time
  of their joining and today have changed.

• Many admitted that competency mapping helps them to
  do manpower planning.
Suggestions:
• In this organization competency mapping must be
  regularly done in order to check the competency level of
  the employees.

• Since many of the employees are performing different
  jobs to what they were doing at the time of their joining
  they need training to perform the new work allotted
  them.

• The trainings should be planned with the involvement of
  the employees as well (not only the team leaders) so that
  there are no low yield trainings being held. This would
  cut down the costs of training further.
CONCLUSION

• Hence, with the given research study conducted
  in this organization, it can be concluded that the
  concept of competency mapping is need to be
  regularly carried out here. Which will help
  organization to build there knowledge pool.
THANK YOU

Presentation on competency mapping

  • 1.
    Presentation on “Competency Mapping” at "Concentric Pumps India Pvt Ltd” Presented By: Priyanka Gurav V3027
  • 2.
    Contents: • About concentricpumps India Pvt Ltd ▫ Product Overview • What is competency mapping? ▫ Competency mapping-HR tool used in • Objectives of study • Research Methodology • Research Findings • Suggestions • Conclusion
  • 3.
    About Concentric PumpsIndia Pvt Ltd • Concentric is a global expert in fluid engineering. • Concentric founded in Birmingham, England • John S. Barnes Company founded in Rockford, USA • By 2008, Pumps has doubled sales, achieved 14% operating margins, become global market leader and built green-field plants in India and China • August 2011 – David Woolley appointed President and CEO of Concentric
  • 4.
    Product Overview • Designand manufacture of oil, water, fuel pumps and other components designed to improve efficiency in diesel engines from 1.5 to over 30 litres capacity. • Products are divided into two broad categories: ▫ Engine Products ▫ Hydraulic Products
  • 5.
    • Engine Products: ▫ Variable Flow Oil Pumps ▫ Oil pumps ▫ Variable Flow Coolant ▫ Coolant Pumps ▫ Fuel Transfer Pumps ▫ Transmission & Compressor Pumps ▫ Varivent ▫ Alfdex
  • 6.
    • Hydraulic Products: ▫ Hydraulic Gear Pumps ▫ Hydraulic Gear Motors ▫ Hydraulic Fan Drives ▫ Hydraulic Power Packs ▫ Rotary Flow Dividers/Intensifiers ▫ Concentric standard product capabilities offer flexibility.
  • 7.
    Competency Mapping • CompetencyMapping is a process of identifying key competencies of an organization and/or a job and incorporating those competencies throughout the various processes (i.e. Job Evaluation, Training & Recruitment) of the organization.
  • 8.
    COMPETENCY MAPPING-HR TOOL USEDIN • Recruitment /Selection • Training/Development • Performance Management • Career Planning/Development • Succession Planning • Manpower Planning • Human Resource Development • Human Resource Planning • Human Resource Strategic Planning
  • 9.
    Objectives of study •To identify and describe the factors are critical to the functioning of a particular job so that a match can be established between the skills required to perform a job and actual talent of a job holder. • To identify training and development needs of individual.
  • 10.
    Research Methodology • ResearchDesign: ▫ An exploratory as well as descriptive research design. • Contact methods: ▫ The respondents were contacted directly by the Personal Interview.
  • 11.
    • Data Collection: ▫ Primary data:  I collected primary data from the Employees. The data is collected through Interviews which are personally conducted. ▫ Secondary Data:  Company Brochures  Websites  Job descriptions Provided
  • 12.
    • Sample Description: ▫ Sample size: 42 ▫ Sampling unit: The Employees of Concentric Pumps India Pvt Ltd. ▫ Method: Analyzed the results by making Format of Competency Mapping of questions.
  • 13.
    RESEARCH FINDINGS • Employeein KRIBHCO believe that they are doing the job according to their job profile. They finish every work assigned to them within the time limit, which shows that they are competent, though many of them need guidance from their superiors sometimes. • Few believe that they need training to perform their job which is contradicting to their competency level, since the type of type of work they were performing at the time of their joining and today have changed. • Many admitted that competency mapping helps them to do manpower planning.
  • 14.
    Suggestions: • In thisorganization competency mapping must be regularly done in order to check the competency level of the employees. • Since many of the employees are performing different jobs to what they were doing at the time of their joining they need training to perform the new work allotted them. • The trainings should be planned with the involvement of the employees as well (not only the team leaders) so that there are no low yield trainings being held. This would cut down the costs of training further.
  • 15.
    CONCLUSION • Hence, withthe given research study conducted in this organization, it can be concluded that the concept of competency mapping is need to be regularly carried out here. Which will help organization to build there knowledge pool.
  • 16.