Production Part Approval Process
                 PPAP
        ISO TS 16949:2002 Auditor Course
                  Supplement
Course Objectives
• By the end of the course the participant
  should be able identify the following;
  – How to audit PPAP
  · When PPAP submission is required
  · The requirements for part approval
  · Submission levels and the retention
    requirements
  · Definition of requirements
  · Part Submission status

              Robere & Associates (Thailand) Ltd.
                                        2
So what is PPAP?
• PPAP
 – Production Part Approval Process

   “PPAP defines the requirements for
   production part approval, including
   production and bulk materials”



            Robere & Associates (Thailand) Ltd.
                                      3
Applicability
• PPAP applies to all internal and
  external suppliers of;
  – bulk materials
  – production materials
  – production parts
  – service parts



              Robere & Associates (Thailand) Ltd.
                                        4
Foreword to PPAP Third Edition

•   Inclusion of requirements for bulk material
•   Bulk material-specific appendix
•   Industry specific appendix
•   Tire industry specific appendix
•   Cpk/PpK = Initial process studies
•   Clarification



                 Robere & Associates (Thailand) Ltd.
                                           5
PPAP Third edition
Effective date




    February 1, 2000

             Robere & Associates (Thailand) Ltd.
                                       6
Production Part Approval Process

PPAP is a mandatory requirement of
        ISO TS 16949:2002
          Element 7.3.6.3

   so is Supplier PPAP requirements
                  7.3.6.3
           Robere & Associates (Thailand) Ltd.
                                     7
PPAP - When Submission is required

• A full Production Part Approval is always
  required before shipment of the first
  production in the following situations;
  1. A new part or product - something not previously
    supplied before
  2. Correction of discrepancy on a previously
    submitted product
  3. Engineering change on part or product
  4. Other

                Robere & Associates (Thailand) Ltd.
                                          8
Definition of “Other”
    In any of these “other” situations the
       supplier is required to notify the
      customer who may subsequently
      elect to require a submission for
               PPAP approval.



      Driven by design and/or process changes

             Robere & Associates (Thailand) Ltd.
                                       9
Other instances when submission may
be required
  1. An alternate construction method or material is
    now used
  2. When a tool is modified or completely replaced
  3. Refurbishment or re-arrangement of existing
    tooling
     • Refurbishment = the reconstruction or modification of a
       tool or machine to to increase capacity or change its
       existing function
     • Re-arrangement = A deviation from the process
       described in the process flow diagram


                  Robere & Associates (Thailand) Ltd.
                                            10
Other instances when submission may
be required

  4. Transfer of tooling and equipment to a different
    plant/location
  5. Change of subcontractor for parts, non equivalent
    materials or services that affect fit, form, function,
    durability or performance requirements
  6. Tooling inactive for a twelve month period
  7. Product and process changes that affect fit, form,
    function, durability or performance requirements of
    the saleable product

                 Robere & Associates (Thailand) Ltd.
                                           11
Other instances when submission may
be required

  8. Change in the test/inspection method - new
    technique
  9. For bulk materials only

  – New source of raw material with special characteristics from
    new or existing subcontractor
  – Change in product appearance attributes, where there is no
    appearance specification
  – Revised parameters in the same process
  – Change outside of the DFMEA of the approved product


                    Robere & Associates (Thailand) Ltd.
                                              12
PPAP - When Submission is required
       • If there is any question
        concerning the need for
       Production Part Approval -
          contact the customer
                   and
       obtain any agreement in
                writing

           Robere & Associates (Thailand) Ltd.
                                     13
PPAP - Definition of Requirements

• Design records of saleable product
  – These typically include the following;
     • CAD/CAM Math Data
     • Part Drawings
     • Specifications
  – For bulk materials design records may include;
     • raw materials list
     • formulations
     • processing parameters etc..


                  Robere & Associates (Thailand) Ltd.
                                            14
PPAP - Definition of Requirements

• Engineering Change Documents
  – Any documents authorised by a customer’s
    representative that may affect the product
    but has not yet been incorporated in the
    design record or drawing for that product




              Robere & Associates (Thailand) Ltd.
                                        15
PPAP - Definition of Requirements

• Customer Engineering Approval
  – Customer Engineering approval may be
    required for a product or associated
    documentation relating to that product, if
    this is required it will be stated on the
    customer’s drawing or similar.




               Robere & Associates (Thailand) Ltd.
                                         16
PPAP - Definition of Requirements

• Design FMEA
  – If the supplier is design responsible a
    Design FMEA must be developed
  – For bulk materials, a design matrix shall be
    developed prior to developing the Design
    FMEA



              Robere & Associates (Thailand) Ltd.
                                        17
PPAP - Definition of Requirements

• Process flow diagrams
  – A process flow diagram defines the
    sequence of operations utilised to
    manufacture a product
  – Process flow diagrams are mandatory for
    each product - Not Negotiable



             Robere & Associates (Thailand) Ltd.
                                       18
PPAP - Definition of Requirements

• Process FMEA
  – The process flow diagram should be the
    basis of commencing a Process FMEA.
  – Generic FMEA’s are acceptable if there is
    evidence of review and approval that is
    part specific.



              Robere & Associates (Thailand) Ltd.
                                        19
PPAP - Definition of Requirements

• Dimensional results
  – Dimensional results must reference part drawings
    and should include cross sections, tracings and
    sketches as applicable
  – The part number, change level, drawing date and
    supplier’s name must be shown on all
    supplementary documents
  – The supplier shall identify one of the measured
    parts as a Master Sample

                Robere & Associates (Thailand) Ltd.
                                          20
PPAP - Definition of Requirements

• Material & Performance Test Results
  – Material Test results (chemical, physical,
    metallurgical) for all parts/materials
    denoted on the design record
  – Blanket statements of conformance are
   unacceptable
  – All tests on the design record must be
    conducted, not just those you agree with!
               Robere & Associates (Thailand) Ltd.
                                         21
PPAP - Definition of Requirements

• Material Test Results cont..
  – The Material test report must contain;
     • design record change level, date, specification
       level
     • Date of testing
     • Material subcontractors name and supplier
       code if required is they are a customer
       approved subcontractor


                Robere & Associates (Thailand) Ltd.
                                          22
PPAP - Definition of Requirements

• Material & Performance Test Results
  – Performance Test results (functional,
    reliability, etc..) for all parts/materials
    denoted on the design record
  – Blanket statements of conformance are
   unacceptable
  – All tests on the design record must be
    conducted, not just those you agree with!
               Robere & Associates (Thailand) Ltd.
                                         23
PPAP - Definition of Requirements

• Performance Test Results
  – The Performance test report must contain;
    • design record change level, date, specification
      level
    • Any authorised engineering change documents
      not yet incorporated in the design record
    • Date of testing



               Robere & Associates (Thailand) Ltd.
                                         24
PPAP - Definition of Requirements

• Initial Process Studies
  – Initial process capability results are required for
    each special characteristic and must conform to
    customer requirements
  – Unless otherwise specified, default values are:
     • Index value > 1.67 = process meets customer
                     requirements
     • Between 1.33 & 1.67 = acceptable, but may require
                                                 improvement,
       contact
       customer to review
     • Index value < 1.33 = process does not meet customer
                              requirements, contact customer to
                   Robere & review
                               Associates (Thailand) Ltd.
                                                    25
PPAP - Definition of Requirements

• Initial Process Studies cont..
  – If an X bar & R chart is used for the study a
    minimum of 25 subgroups are required containing
    at least 100 readings from consecutive parts.
  – If <100 parts are available contact customer to
    develop a suitable plan.

          Initial Process Studies can only
         be conducted on stable & normal
                     processes
                 Robere & Associates (Thailand) Ltd.
                                           26
PPAP - Definition of Requirements

• Measurement System Analysis Studies
  – For each measurement device,
    Measurement System Studies must be
    conducted.
  – Measurement System Studies include;
    •   Repeatability and Reproducibility Study
    •   Bias study
    •   Linearity study
    •   Stability study

                 Robere & Associates (Thailand) Ltd.
                                           27
PPAP - Definition of Requirements

• Qualified laboratory documentation
  – A qualified laboratory is one that complies to the
    requirements of 4.10.6 of QS 9000 rev 3
  – External laboratories must be accredited to ISO
    Guide 25 or equivalent
  – If an independent lab conducts the testing, the supplier shall submit the
    tests on the labs letterhead or the standard lab report format. The name of
    the lab that completed the tests, date(s) of test(s) and standards used shall
    be indicated.

           Blanket statements of conformance are
                       not acceptable

                        Robere & Associates (Thailand) Ltd.
                                                  28
PPAP - Definition of Requirements

• Control Plan
  – The control plan must include reference to all
    special characteristics that are determined by the
    customer or supplier.
  – Approval of the control plan may be required by
    the customer prior to submission of PPAP
    documents

           Check with the customer

                 Robere & Associates (Thailand) Ltd.
                                           29
PPAP - Definition of Requirements

• Part Submission Warrant
  – A document that is used to indicate the
    reason for submission, the level of
    submission and the submission results
  – This document is signed off by a
    designated official within the company,
    typically the Quality Manager.


              Robere & Associates (Thailand) Ltd.
                                        30
PPAP - Definition of Requirements

• Appearance Approval Report
  – A report which identifies the disposition of
    a product in terms of Appearance
    evaluation and colour evaluation
  – This report must initially be approved by
    the customer’s representative, typically the
    styling department, and then sent in
    conjunction with the Part Submission
    warrant to the customer

              Robere & Associates (Thailand) Ltd.
                                        31
PPAP - Definition of Requirements

• Bulk material requirements checklist
  – The composition of the checklist must be
    agreed with the customer. All specified
    requirements shall be completed unless
    indicated “Not Required” on the checklist




              Robere & Associates (Thailand) Ltd.
                                        32
PPAP - Definition of Requirements

• Sample product {sample production parts}
   – Quantities as requested by the customer




                Robere & Associates (Thailand) Ltd.
                                          33
PPAP - Definition of Requirements

• Master Sample
  – A master sample is a part that has been already
    been verified (refer dimensional results). If this
    part serves as the basis for an acceptance criteria,
    it should be identified as such and identify
    customer approval date together with a reference
    to the design record




                 Robere & Associates (Thailand) Ltd.
                                           34
PPAP - Definition of Requirements

• Master Sample                         cont..
  – A master sample is required for each position of a
    multiple cavity die, mold, tool, pattern or
    production process.
  – If the type of product makes storage difficult, this
    requirement can be waived by the customer, but,
    Obtain Customer Approval in Writing




                 Robere & Associates (Thailand) Ltd.
                                           35
PPAP - Definition of Requirements

• Checking Aids
  – Examples of checking aids are; fixtures, mylars,
    fibreglass splashes, templates etc.. - something
    that is used as a comparative reference
  – Checking aids must reflect the latest engineering
    design level of the product
  – Measurement System studies must be
    conducted on these checking aids


                Robere & Associates (Thailand) Ltd.
                                          36
PPAP - Definition of Requirements

• Records of compliance with customer
  specific requirements
  – Example
    • GM requires two(2) sample parts from level 2
      or 3 suppliers. All sample parts are to be
      labelled with part number, change level and
      supplier name.
    • Ford requires all materials to comply with WSS-
      M99P9999-A1

               Robere & Associates (Thailand) Ltd.
                                         37
PPAP - Submission Levels

 • Submission levels are ranked
              from
             1 to 5,
   the customer will identify the
         submission level.

           Robere & Associates (Thailand) Ltd.
                                     38
PPAP - Submission Levels

             • Level 3
 is the default value if a customer
        has not yet defined a
      submission level for your
              company

           Robere & Associates (Thailand) Ltd.
                                     39
PPAP - Submission Levels

               For
          bulk material
          suppliers the
         default value is
              level 1
           Robere & Associates (Thailand) Ltd.
                                     40
PPAP - Submission Levels

NOTE:
    • Different customers
               may
assign different submission levels


           Robere & Associates (Thailand) Ltd.
                                     41
PPAP - Submission Levels
• The submission levels are:
        Level 1 Warrant only and Appearance Approval
                Report if required
        Level 2 Warrant with product samples and limited
                supporting data
        Level 3 Warrant with product samples and
                complete supporting data
        Level 4 Warrant and other requirements as defined
                by the customer
        Level 5 Warrant with product samples and
                complete supporting data reviewed on-site




                  Robere & Associates (Thailand) Ltd.
                                            42
Submission Levels and Retention Requirements
       Requirement                           Level 1 Level 2 Level 3 Level 4 Level 5
   1   Design records of saleable product      R       S       S       *       R
       :for proprietary components/details     R       R       S       *       R
       : for all other components/details      R       S       R       *       R
    2 Engineering change docs. If any          R       S       S       *       R
    3 Cust Engineering approval, if rqd        R       R       S       *       R
    4 Design FMEA                              R       R       S       *       R
    5 Process flow diagram                     R       R       S       *       R
    6 Process FMEA                             R       R       S       *       R
    7 Dimensional results                      R       S       S       *       R
    8 Matl, performance test results           R       S       S       *       R
    9 Initial process study                    R       R       S       *       R
   10 Measurement Systems Analysis             R       R       S       *       R
   11 Qualified lab. Documentation             R       S       S       *       R
   12 Control Plan                             R       R       S       *       R
   13 Part Submission Warrant (PSW)            S       S       S       S       R
   14 Appearance Approval Report (AAR)         S       S       S       *       R
   15 Bulk Matls. Reqmnts. Checklist           R       R       R       *       R
   16 Sample product                           R       S       S       *       R
   17 Master Sample                            R       R       R       *       R
   18 Checking aids                            R       R       R       *       R
   19 Records of Customer compliance           R       R       S       *       R

       S = Submit to customer & retain copy
       R = Retain on site and make readily available to customer
       * = Retain on site and submit to customer upon request


                               Robere & Associates (Thailand) Ltd.
                                                         43
PPAP - Part Submission Status

• Suppliers will be notified by the
             customer
       as to the disposition
        of the submission


           Robere & Associates (Thailand) Ltd.
                                     44
PPAP - Part Submission Status

            Product is
               NOT
     to be shipped unless
customer approval is received.
Verbal approval is unacceptable
           Robere & Associates (Thailand) Ltd.
                                     45
PPAP - Part Submission Status

• Full Approval
  – This indicates that the part meets all of the
    customer requirements. The supplier may
    then proceed to supply product as
    required.




               Robere & Associates (Thailand) Ltd.
                                         46
PPAP - Part Submission Status

• Interim Approval
  – This indicates that shipment of material may
    proceed for a specified period of time or piece
    quantity.
  – Interim approval is granted when a product does
    not meet all customer requirements but the
    supplier has
     • Clearly defined the root cause and
     • has provided an interim action plan that is approved by
       the customer. Re-submission is required

                  Robere & Associates (Thailand) Ltd.
                                            47
PPAP - Part Submission Status

• Rejected
  – This indicates that the product and/or
    associated documentation does not meet
    customer requirements and therefore
    production quantities are not permitted to
    be shipped until all issues are resolved.




              Robere & Associates (Thailand) Ltd.
                                        48
Record Retention

• PPAP records shall be retained for;
  – length of time part is active, including service
    requirements
  – plus one year




                 Robere & Associates (Thailand) Ltd.
                                           49
Auditing PPAP
1.   Is the organisation using PPAP rev 3?
2.   How does the organisation identify which level they are?
3.   Is this level consistent with the PPAP they are supplying to
     their customer(s)
4.   Review several PPAPs to ensure all of the applicable 19
     requirements are covered
5.   Review lab documentation and ensure the scope of
     accreditation of the lab is consistent with the
     testing/inspection they are doing for the organisation.
6.   How does the organisation define compliance with customer
     requirements


                     Robere & Associates (Thailand) Ltd.
                                               50
Auditing PPAP
7.  Verify that the date of the PSW is before the initial
    delivery date to the customer for production
    volumes
8. Verify the contents of the PSW, ensure correct
    level, part number, change level etc..
9. How does the organisation deploy PPAP with its
    suppliers?
10. Take a sample of part numbers, obtain the BOM
    and verify that all suppliers have submitted PPAP


                  Robere & Associates (Thailand) Ltd.
                                            51

More Related Content

What's hot

Advanced Product Quality Planning presentation
Advanced Product Quality Planning presentationAdvanced Product Quality Planning presentation
Advanced Product Quality Planning presentation
PRASHANT KSHIRSAGAR
 
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)
Anand Subramaniam
 
Process fmea work_instructions
Process fmea work_instructionsProcess fmea work_instructions
Process fmea work_instructions
CADmantra Technologies
 
Apqp ppt
Apqp pptApqp ppt
Apqp ppt
sbtharan
 
04 ppap training material
04 ppap training material04 ppap training material
04 ppap training material營松 林
 
PPAP Awareness training.pptx
PPAP Awareness training.pptxPPAP Awareness training.pptx
PPAP Awareness training.pptx
Neeraj Pandey
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
bowerj
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
Julian Kalac P.Eng
 
Apqp training presentation
Apqp   training presentationApqp   training presentation
Apqp training presentation
Jitesh Gaurav
 
Ppap training-presentation-150311063239-conversion-gate01
Ppap training-presentation-150311063239-conversion-gate01Ppap training-presentation-150311063239-conversion-gate01
Ppap training-presentation-150311063239-conversion-gate01
BhimKunwar2
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect AnalysisECC International
 
Failure mode and effects analysis
Failure mode  and effects analysisFailure mode  and effects analysis
Failure mode and effects analysis
Andreea Precup
 
APQP Training presentation
APQP Training  presentationAPQP Training  presentation
APQP Training presentation
Qualsys Ltd
 
Ppap training ppt
Ppap training   ppt Ppap training   ppt
Ppap training ppt
Jitesh Gaurav
 
Ppap la
Ppap laPpap la
Ppap la
Paul Robere
 
Process fmea
Process fmea Process fmea
Process fmea
Cardiff City FC
 
APQP
APQP APQP

What's hot (20)

Apqp process flow
Apqp process flowApqp process flow
Apqp process flow
 
APQP
APQPAPQP
APQP
 
Advanced Product Quality Planning presentation
Advanced Product Quality Planning presentationAdvanced Product Quality Planning presentation
Advanced Product Quality Planning presentation
 
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)
 
Process fmea work_instructions
Process fmea work_instructionsProcess fmea work_instructions
Process fmea work_instructions
 
Fmea
FmeaFmea
Fmea
 
Apqp ppt
Apqp pptApqp ppt
Apqp ppt
 
04 ppap training material
04 ppap training material04 ppap training material
04 ppap training material
 
PPAP Awareness training.pptx
PPAP Awareness training.pptxPPAP Awareness training.pptx
PPAP Awareness training.pptx
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
Apqp training presentation
Apqp   training presentationApqp   training presentation
Apqp training presentation
 
Ppap training-presentation-150311063239-conversion-gate01
Ppap training-presentation-150311063239-conversion-gate01Ppap training-presentation-150311063239-conversion-gate01
Ppap training-presentation-150311063239-conversion-gate01
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
Failure mode and effects analysis
Failure mode  and effects analysisFailure mode  and effects analysis
Failure mode and effects analysis
 
APQP Training presentation
APQP Training  presentationAPQP Training  presentation
APQP Training presentation
 
Ppap training ppt
Ppap training   ppt Ppap training   ppt
Ppap training ppt
 
Ppap la
Ppap laPpap la
Ppap la
 
Process fmea
Process fmea Process fmea
Process fmea
 
APQP
APQP APQP
APQP
 

Similar to Ppap la

Training ppt
Training pptTraining ppt
Training ppt
Jitesh Gaurav
 
Saharsh agrawal_km
Saharsh  agrawal_kmSaharsh  agrawal_km
Saharsh agrawal_km
Saharsh Agrawal
 
FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST FACTORY ACCEPTANCE TEST
APQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering productsAPQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering products
INSTITUTE OF ENGINEERING /BKC
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitaeKiran Gp
 
Ralph Daley Resume 11-7-16
Ralph Daley Resume 11-7-16Ralph Daley Resume 11-7-16
Ralph Daley Resume 11-7-16Ralph Daley
 
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
AJAYKUMAR836335
 
PPAP Requirements Training.pptx
PPAP Requirements Training.pptxPPAP Requirements Training.pptx
PPAP Requirements Training.pptx
AjayMakwana38
 
Good Manufacturing Practices by InstantGMP
Good Manufacturing Practices by InstantGMPGood Manufacturing Practices by InstantGMP
Good Manufacturing Practices by InstantGMP
Atlantic Training, LLC.
 
Vendor Quality_Chander Parkash
Vendor Quality_Chander ParkashVendor Quality_Chander Parkash
Vendor Quality_Chander ParkashChander Parkash
 
Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Richard Metzner
 
Resume - Prasad Patil
Resume - Prasad PatilResume - Prasad Patil
Resume - Prasad PatilPrasad Patil
 

Similar to Ppap la (20)

Training ppt
Training pptTraining ppt
Training ppt
 
Saharsh agrawal_km
Saharsh  agrawal_kmSaharsh  agrawal_km
Saharsh agrawal_km
 
FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST
 
APQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering productsAPQP-PPAP[1].ppt for engineering products
APQP-PPAP[1].ppt for engineering products
 
Apqp la
Apqp laApqp la
Apqp la
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitae
 
Ralph Daley Resume 11-7-16
Ralph Daley Resume 11-7-16Ralph Daley Resume 11-7-16
Ralph Daley Resume 11-7-16
 
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
 
QA ENGINEER new
QA ENGINEER newQA ENGINEER new
QA ENGINEER new
 
PPAP Requirements Training.pptx
PPAP Requirements Training.pptxPPAP Requirements Training.pptx
PPAP Requirements Training.pptx
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Good Manufacturing Practices by InstantGMP
Good Manufacturing Practices by InstantGMPGood Manufacturing Practices by InstantGMP
Good Manufacturing Practices by InstantGMP
 
GMP by InstantGMP
GMP by InstantGMPGMP by InstantGMP
GMP by InstantGMP
 
Vendor Quality_Chander Parkash
Vendor Quality_Chander ParkashVendor Quality_Chander Parkash
Vendor Quality_Chander Parkash
 
Ajay_CV_SQA
Ajay_CV_SQAAjay_CV_SQA
Ajay_CV_SQA
 
Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016
 
Resume - Prasad Patil
Resume - Prasad PatilResume - Prasad Patil
Resume - Prasad Patil
 
Fmea process la
Fmea process laFmea process la
Fmea process la
 
OMPRAKASH_Resume
OMPRAKASH_ResumeOMPRAKASH_Resume
OMPRAKASH_Resume
 

More from Paul Robere

Tpm new
Tpm newTpm new
Tpm new
Paul Robere
 
Tpm basic
Tpm basicTpm basic
Tpm basic
Paul Robere
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
Paul Robere
 
Words to the_wise_0911
Words to the_wise_0911Words to the_wise_0911
Words to the_wise_0911
Paul Robere
 
Quality136 tp 060509
Quality136 tp 060509Quality136 tp 060509
Quality136 tp 060509
Paul Robere
 
Ibi
IbiIbi
Lm
LmLm
Mm
MmMm
Rcm
RcmRcm
Tpm
TpmTpm
Scm v20
Scm v20Scm v20
Scm v20
Paul Robere
 
Kpi 1 day
Kpi 1 dayKpi 1 day
Kpi 1 day
Paul Robere
 
14 epi-e-dn v.1.01(draft)
14 epi-e-dn v.1.01(draft)14 epi-e-dn v.1.01(draft)
14 epi-e-dn v.1.01(draft)
Paul Robere
 
8 qmp
8 qmp8 qmp
7 new qc tools
7 new qc tools7 new qc tools
7 new qc tools
Paul Robere
 
5 s training
5 s training5 s training
5 s training
Paul Robere
 
Hr pts-e-dn-version 2.0
Hr pts-e-dn-version 2.0Hr pts-e-dn-version 2.0
Hr pts-e-dn-version 2.0
Paul Robere
 
Train the trainer
Train the trainerTrain the trainer
Train the trainer
Paul Robere
 
Hr tit-e-dn
Hr tit-e-dnHr tit-e-dn
Hr tit-e-dn
Paul Robere
 
Tqm2
Tqm2Tqm2

More from Paul Robere (20)

Tpm new
Tpm newTpm new
Tpm new
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Words to the_wise_0911
Words to the_wise_0911Words to the_wise_0911
Words to the_wise_0911
 
Quality136 tp 060509
Quality136 tp 060509Quality136 tp 060509
Quality136 tp 060509
 
Ibi
IbiIbi
Ibi
 
Lm
LmLm
Lm
 
Mm
MmMm
Mm
 
Rcm
RcmRcm
Rcm
 
Tpm
TpmTpm
Tpm
 
Scm v20
Scm v20Scm v20
Scm v20
 
Kpi 1 day
Kpi 1 dayKpi 1 day
Kpi 1 day
 
14 epi-e-dn v.1.01(draft)
14 epi-e-dn v.1.01(draft)14 epi-e-dn v.1.01(draft)
14 epi-e-dn v.1.01(draft)
 
8 qmp
8 qmp8 qmp
8 qmp
 
7 new qc tools
7 new qc tools7 new qc tools
7 new qc tools
 
5 s training
5 s training5 s training
5 s training
 
Hr pts-e-dn-version 2.0
Hr pts-e-dn-version 2.0Hr pts-e-dn-version 2.0
Hr pts-e-dn-version 2.0
 
Train the trainer
Train the trainerTrain the trainer
Train the trainer
 
Hr tit-e-dn
Hr tit-e-dnHr tit-e-dn
Hr tit-e-dn
 
Tqm2
Tqm2Tqm2
Tqm2
 

Recently uploaded

Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
Excavator
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Masters European & Gapanese Auto Repair
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
Bertini's German Motors
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
kshamashah95
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
4thzenzstar
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
Excavator
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
Motor Cars International
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Hyundai Motor Group
 
What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
Tanner Motors
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Precious Mvulane CA (SA),RA
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
Dart Auto
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
amvovau
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
European Service Center
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
jennifermiller8137
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
psavhef
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Vic Auto Collision & Repair
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
coc7987515756
 

Recently uploaded (19)

Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
 
What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
 

Ppap la

  • 1. Production Part Approval Process PPAP ISO TS 16949:2002 Auditor Course Supplement
  • 2. Course Objectives • By the end of the course the participant should be able identify the following; – How to audit PPAP · When PPAP submission is required · The requirements for part approval · Submission levels and the retention requirements · Definition of requirements · Part Submission status Robere & Associates (Thailand) Ltd. 2
  • 3. So what is PPAP? • PPAP – Production Part Approval Process “PPAP defines the requirements for production part approval, including production and bulk materials” Robere & Associates (Thailand) Ltd. 3
  • 4. Applicability • PPAP applies to all internal and external suppliers of; – bulk materials – production materials – production parts – service parts Robere & Associates (Thailand) Ltd. 4
  • 5. Foreword to PPAP Third Edition • Inclusion of requirements for bulk material • Bulk material-specific appendix • Industry specific appendix • Tire industry specific appendix • Cpk/PpK = Initial process studies • Clarification Robere & Associates (Thailand) Ltd. 5
  • 6. PPAP Third edition Effective date February 1, 2000 Robere & Associates (Thailand) Ltd. 6
  • 7. Production Part Approval Process PPAP is a mandatory requirement of ISO TS 16949:2002 Element 7.3.6.3 so is Supplier PPAP requirements 7.3.6.3 Robere & Associates (Thailand) Ltd. 7
  • 8. PPAP - When Submission is required • A full Production Part Approval is always required before shipment of the first production in the following situations; 1. A new part or product - something not previously supplied before 2. Correction of discrepancy on a previously submitted product 3. Engineering change on part or product 4. Other Robere & Associates (Thailand) Ltd. 8
  • 9. Definition of “Other” In any of these “other” situations the supplier is required to notify the customer who may subsequently elect to require a submission for PPAP approval. Driven by design and/or process changes Robere & Associates (Thailand) Ltd. 9
  • 10. Other instances when submission may be required 1. An alternate construction method or material is now used 2. When a tool is modified or completely replaced 3. Refurbishment or re-arrangement of existing tooling • Refurbishment = the reconstruction or modification of a tool or machine to to increase capacity or change its existing function • Re-arrangement = A deviation from the process described in the process flow diagram Robere & Associates (Thailand) Ltd. 10
  • 11. Other instances when submission may be required 4. Transfer of tooling and equipment to a different plant/location 5. Change of subcontractor for parts, non equivalent materials or services that affect fit, form, function, durability or performance requirements 6. Tooling inactive for a twelve month period 7. Product and process changes that affect fit, form, function, durability or performance requirements of the saleable product Robere & Associates (Thailand) Ltd. 11
  • 12. Other instances when submission may be required 8. Change in the test/inspection method - new technique 9. For bulk materials only – New source of raw material with special characteristics from new or existing subcontractor – Change in product appearance attributes, where there is no appearance specification – Revised parameters in the same process – Change outside of the DFMEA of the approved product Robere & Associates (Thailand) Ltd. 12
  • 13. PPAP - When Submission is required • If there is any question concerning the need for Production Part Approval - contact the customer and obtain any agreement in writing Robere & Associates (Thailand) Ltd. 13
  • 14. PPAP - Definition of Requirements • Design records of saleable product – These typically include the following; • CAD/CAM Math Data • Part Drawings • Specifications – For bulk materials design records may include; • raw materials list • formulations • processing parameters etc.. Robere & Associates (Thailand) Ltd. 14
  • 15. PPAP - Definition of Requirements • Engineering Change Documents – Any documents authorised by a customer’s representative that may affect the product but has not yet been incorporated in the design record or drawing for that product Robere & Associates (Thailand) Ltd. 15
  • 16. PPAP - Definition of Requirements • Customer Engineering Approval – Customer Engineering approval may be required for a product or associated documentation relating to that product, if this is required it will be stated on the customer’s drawing or similar. Robere & Associates (Thailand) Ltd. 16
  • 17. PPAP - Definition of Requirements • Design FMEA – If the supplier is design responsible a Design FMEA must be developed – For bulk materials, a design matrix shall be developed prior to developing the Design FMEA Robere & Associates (Thailand) Ltd. 17
  • 18. PPAP - Definition of Requirements • Process flow diagrams – A process flow diagram defines the sequence of operations utilised to manufacture a product – Process flow diagrams are mandatory for each product - Not Negotiable Robere & Associates (Thailand) Ltd. 18
  • 19. PPAP - Definition of Requirements • Process FMEA – The process flow diagram should be the basis of commencing a Process FMEA. – Generic FMEA’s are acceptable if there is evidence of review and approval that is part specific. Robere & Associates (Thailand) Ltd. 19
  • 20. PPAP - Definition of Requirements • Dimensional results – Dimensional results must reference part drawings and should include cross sections, tracings and sketches as applicable – The part number, change level, drawing date and supplier’s name must be shown on all supplementary documents – The supplier shall identify one of the measured parts as a Master Sample Robere & Associates (Thailand) Ltd. 20
  • 21. PPAP - Definition of Requirements • Material & Performance Test Results – Material Test results (chemical, physical, metallurgical) for all parts/materials denoted on the design record – Blanket statements of conformance are unacceptable – All tests on the design record must be conducted, not just those you agree with! Robere & Associates (Thailand) Ltd. 21
  • 22. PPAP - Definition of Requirements • Material Test Results cont.. – The Material test report must contain; • design record change level, date, specification level • Date of testing • Material subcontractors name and supplier code if required is they are a customer approved subcontractor Robere & Associates (Thailand) Ltd. 22
  • 23. PPAP - Definition of Requirements • Material & Performance Test Results – Performance Test results (functional, reliability, etc..) for all parts/materials denoted on the design record – Blanket statements of conformance are unacceptable – All tests on the design record must be conducted, not just those you agree with! Robere & Associates (Thailand) Ltd. 23
  • 24. PPAP - Definition of Requirements • Performance Test Results – The Performance test report must contain; • design record change level, date, specification level • Any authorised engineering change documents not yet incorporated in the design record • Date of testing Robere & Associates (Thailand) Ltd. 24
  • 25. PPAP - Definition of Requirements • Initial Process Studies – Initial process capability results are required for each special characteristic and must conform to customer requirements – Unless otherwise specified, default values are: • Index value > 1.67 = process meets customer requirements • Between 1.33 & 1.67 = acceptable, but may require improvement, contact customer to review • Index value < 1.33 = process does not meet customer requirements, contact customer to Robere & review Associates (Thailand) Ltd. 25
  • 26. PPAP - Definition of Requirements • Initial Process Studies cont.. – If an X bar & R chart is used for the study a minimum of 25 subgroups are required containing at least 100 readings from consecutive parts. – If <100 parts are available contact customer to develop a suitable plan. Initial Process Studies can only be conducted on stable & normal processes Robere & Associates (Thailand) Ltd. 26
  • 27. PPAP - Definition of Requirements • Measurement System Analysis Studies – For each measurement device, Measurement System Studies must be conducted. – Measurement System Studies include; • Repeatability and Reproducibility Study • Bias study • Linearity study • Stability study Robere & Associates (Thailand) Ltd. 27
  • 28. PPAP - Definition of Requirements • Qualified laboratory documentation – A qualified laboratory is one that complies to the requirements of 4.10.6 of QS 9000 rev 3 – External laboratories must be accredited to ISO Guide 25 or equivalent – If an independent lab conducts the testing, the supplier shall submit the tests on the labs letterhead or the standard lab report format. The name of the lab that completed the tests, date(s) of test(s) and standards used shall be indicated. Blanket statements of conformance are not acceptable Robere & Associates (Thailand) Ltd. 28
  • 29. PPAP - Definition of Requirements • Control Plan – The control plan must include reference to all special characteristics that are determined by the customer or supplier. – Approval of the control plan may be required by the customer prior to submission of PPAP documents Check with the customer Robere & Associates (Thailand) Ltd. 29
  • 30. PPAP - Definition of Requirements • Part Submission Warrant – A document that is used to indicate the reason for submission, the level of submission and the submission results – This document is signed off by a designated official within the company, typically the Quality Manager. Robere & Associates (Thailand) Ltd. 30
  • 31. PPAP - Definition of Requirements • Appearance Approval Report – A report which identifies the disposition of a product in terms of Appearance evaluation and colour evaluation – This report must initially be approved by the customer’s representative, typically the styling department, and then sent in conjunction with the Part Submission warrant to the customer Robere & Associates (Thailand) Ltd. 31
  • 32. PPAP - Definition of Requirements • Bulk material requirements checklist – The composition of the checklist must be agreed with the customer. All specified requirements shall be completed unless indicated “Not Required” on the checklist Robere & Associates (Thailand) Ltd. 32
  • 33. PPAP - Definition of Requirements • Sample product {sample production parts} – Quantities as requested by the customer Robere & Associates (Thailand) Ltd. 33
  • 34. PPAP - Definition of Requirements • Master Sample – A master sample is a part that has been already been verified (refer dimensional results). If this part serves as the basis for an acceptance criteria, it should be identified as such and identify customer approval date together with a reference to the design record Robere & Associates (Thailand) Ltd. 34
  • 35. PPAP - Definition of Requirements • Master Sample cont.. – A master sample is required for each position of a multiple cavity die, mold, tool, pattern or production process. – If the type of product makes storage difficult, this requirement can be waived by the customer, but, Obtain Customer Approval in Writing Robere & Associates (Thailand) Ltd. 35
  • 36. PPAP - Definition of Requirements • Checking Aids – Examples of checking aids are; fixtures, mylars, fibreglass splashes, templates etc.. - something that is used as a comparative reference – Checking aids must reflect the latest engineering design level of the product – Measurement System studies must be conducted on these checking aids Robere & Associates (Thailand) Ltd. 36
  • 37. PPAP - Definition of Requirements • Records of compliance with customer specific requirements – Example • GM requires two(2) sample parts from level 2 or 3 suppliers. All sample parts are to be labelled with part number, change level and supplier name. • Ford requires all materials to comply with WSS- M99P9999-A1 Robere & Associates (Thailand) Ltd. 37
  • 38. PPAP - Submission Levels • Submission levels are ranked from 1 to 5, the customer will identify the submission level. Robere & Associates (Thailand) Ltd. 38
  • 39. PPAP - Submission Levels • Level 3 is the default value if a customer has not yet defined a submission level for your company Robere & Associates (Thailand) Ltd. 39
  • 40. PPAP - Submission Levels For bulk material suppliers the default value is level 1 Robere & Associates (Thailand) Ltd. 40
  • 41. PPAP - Submission Levels NOTE: • Different customers may assign different submission levels Robere & Associates (Thailand) Ltd. 41
  • 42. PPAP - Submission Levels • The submission levels are: Level 1 Warrant only and Appearance Approval Report if required Level 2 Warrant with product samples and limited supporting data Level 3 Warrant with product samples and complete supporting data Level 4 Warrant and other requirements as defined by the customer Level 5 Warrant with product samples and complete supporting data reviewed on-site Robere & Associates (Thailand) Ltd. 42
  • 43. Submission Levels and Retention Requirements Requirement Level 1 Level 2 Level 3 Level 4 Level 5 1 Design records of saleable product R S S * R :for proprietary components/details R R S * R : for all other components/details R S R * R 2 Engineering change docs. If any R S S * R 3 Cust Engineering approval, if rqd R R S * R 4 Design FMEA R R S * R 5 Process flow diagram R R S * R 6 Process FMEA R R S * R 7 Dimensional results R S S * R 8 Matl, performance test results R S S * R 9 Initial process study R R S * R 10 Measurement Systems Analysis R R S * R 11 Qualified lab. Documentation R S S * R 12 Control Plan R R S * R 13 Part Submission Warrant (PSW) S S S S R 14 Appearance Approval Report (AAR) S S S * R 15 Bulk Matls. Reqmnts. Checklist R R R * R 16 Sample product R S S * R 17 Master Sample R R R * R 18 Checking aids R R R * R 19 Records of Customer compliance R R S * R S = Submit to customer & retain copy R = Retain on site and make readily available to customer * = Retain on site and submit to customer upon request Robere & Associates (Thailand) Ltd. 43
  • 44. PPAP - Part Submission Status • Suppliers will be notified by the customer as to the disposition of the submission Robere & Associates (Thailand) Ltd. 44
  • 45. PPAP - Part Submission Status Product is NOT to be shipped unless customer approval is received. Verbal approval is unacceptable Robere & Associates (Thailand) Ltd. 45
  • 46. PPAP - Part Submission Status • Full Approval – This indicates that the part meets all of the customer requirements. The supplier may then proceed to supply product as required. Robere & Associates (Thailand) Ltd. 46
  • 47. PPAP - Part Submission Status • Interim Approval – This indicates that shipment of material may proceed for a specified period of time or piece quantity. – Interim approval is granted when a product does not meet all customer requirements but the supplier has • Clearly defined the root cause and • has provided an interim action plan that is approved by the customer. Re-submission is required Robere & Associates (Thailand) Ltd. 47
  • 48. PPAP - Part Submission Status • Rejected – This indicates that the product and/or associated documentation does not meet customer requirements and therefore production quantities are not permitted to be shipped until all issues are resolved. Robere & Associates (Thailand) Ltd. 48
  • 49. Record Retention • PPAP records shall be retained for; – length of time part is active, including service requirements – plus one year Robere & Associates (Thailand) Ltd. 49
  • 50. Auditing PPAP 1. Is the organisation using PPAP rev 3? 2. How does the organisation identify which level they are? 3. Is this level consistent with the PPAP they are supplying to their customer(s) 4. Review several PPAPs to ensure all of the applicable 19 requirements are covered 5. Review lab documentation and ensure the scope of accreditation of the lab is consistent with the testing/inspection they are doing for the organisation. 6. How does the organisation define compliance with customer requirements Robere & Associates (Thailand) Ltd. 50
  • 51. Auditing PPAP 7. Verify that the date of the PSW is before the initial delivery date to the customer for production volumes 8. Verify the contents of the PSW, ensure correct level, part number, change level etc.. 9. How does the organisation deploy PPAP with its suppliers? 10. Take a sample of part numbers, obtain the BOM and verify that all suppliers have submitted PPAP Robere & Associates (Thailand) Ltd. 51

Editor's Notes