Power BI for Office 365:
Using SharePoint to Deliver Self-Service BI

Presented by: Andy Tegethoff
www.facebook.com/perficient

www.perficient.com

www.twitter.com/perficient
About Perficient

Perficient is a leading information technology consulting firm serving clients throughout
North America.

We help clients implement business-driven technology solutions that integrate business
processes, improve worker productivity, increase customer loyalty and create a more agile
enterprise to better respond to new business opportunities.
2
Perficient Profile

•

Founded in 1997

•

Public, NASDAQ: PRFT

•

2013 revenue ~$375 million

•

Major market locations throughout North America
•
Atlanta, Boston, Charlotte, Chicago, Cincinnati, Cleveland,
Columbus, Dallas, Denver, Detroit, Fairfax, Houston,
Indianapolis, Los Angeles, Minneapolis, New Orleans, New
York City, Northern California, Philadelphia, Southern
California, St. Louis, Toronto and Washington, D.C.

•

Global delivery centers in China, Europe and India

•

>2,000 colleagues

•

Dedicated solution practices

•

~90% repeat business rate

•

Alliance partnerships with major technology vendors

•

Multiple vendor/industry technology and growth awards

3
Our Solutions Expertise

Business Solutions

Technology Solutions

•
•
•
•
•
•
•

•
•
•
•
•
•
•
•
•
•

Business Intelligence
Business Process Management
Customer Experience and CRM
Enterprise Performance Management
Enterprise Resource Planning
Experience Design (XD)
Management Consulting

Business Integration/SOA
Cloud Services
Commerce
Content Management
Custom Application Development
Education
Information Management
Mobile Platforms
Platform Integration
Portal & Social
Our Microsoft Practice
Our Speaker

Andy Tegethoff
Andy is a Microsoft BI architect at Perficient and a senior-level
consultant with more than 14 years of experience exploring,
planning and building cost-effective software and process-oriented
solutions for challenging business problems. A Microsoft Certified
IT Professional (MCITP) for SQL Server BI, his solutions integrate
elements such as data warehousing, dashboards, and broadbased reporting in order to deliver vital, actionable information at
every level of the enterprise.
BI Expertise

A nationwide Microsoft BI practice offering both
• Strategic Engagements
• Strategy assessments
• Program mentoring

• Tactical Engagements
• End-to-end implementations
• Current state evaluations
• Proof of concept projects
Agenda

• Introduction
• Excel 2013 and Self-Service BI
• Power BI on Office 365
• Q&A
Introduction

What is
Power BI?
Power BI is:
A collection of Excel-based
tools and Office 365 SharePoint Online features and services that
enables self-service BI and provides a data collaboration portal
featuring mobile access to analytics
Introduction

Who will use
Power BI?
Any Excel user!
But specifically:

Report
Creators

Data
Stewards

Report
Consumers

(Data Analysts,
Consultants)

(DBAs, IT
Managers/Admins)

(Executives, Managers)

Anyone tasked with gleaning usable information from their data
will find at least some component of Power BI useful.
Introduction

What are the
components of
Power BI?
There are two major elements:
Self-Service BI
with Excel

Power BI with
Office 365

Power Query
Power Pivot
Power View
Power Map

Power BI Sites
Data Management
Power BI for Mobile
Excel Self-Service BI

Excel Self-Service BI includes:
•
•
•
•

Power Query
Power Pivot
Power View
Power Map
Excel Self-Service BI

Power Query
Find and connect data
across a wide variety of
sources – both internal
and external to your
organization

Connect to and consume
Big Data in Excel
• Hadoop (HDFS)
• Azure HDInsight, PDW

Merge/shape data for
further analysis:
• Create custom views
• Perform data
cleansing operations
• “M” – Excel-like
formula language

Manage your queries
(within Power BI), and
share them within your
organization, plus search
for data in-house and/or
in the public domain
Excel Self-Service BI

Power Pivot
Host a significant
analytical database
inside Excel in-memory
using the xVelocity
analytics engine, with no
Admin or Configuration –
and share it via
SharePoint

Access data from
standard a variety of
platforms, and consume
OData to use shared
Power Query queries as
data sources

Built in DAX expression
language has Excel-like
syntax, supporting data
manipulation and
business logic thru
formulas that can
reference any related
table or column

Work with millions of
rows, plus keep larger file
sizes in Power BI
(250MB model size limit,
10MB file size limit)
Excel Self-Service BI

Power View
Create charts and other
visualizations with
filtering, highlighting,
slicing and sorting
• Multiple views
• Solid performance

Interact with data from
various sources –
including Excel itself, a
Power Pivot model, or
SQL Server Analysis
Services (Tabular model
or OLAP Cube)

Power View for
SharePoint creates
RDLX files (related to
Reporting Services);
Power View for Excel
creates sheets that are
part of the Excel
workbook

Power BI sites render
Power View in HTML 5
for cross-browser
compatibility
Excel Self-Service BI

Power Map
3D visualization tool for
mapping, exploring and
interacting with
geospatial and time data

Plot data on Bing maps
and visualize with 3D
columns, bubble/pie
charts, heat maps, and
regions

Discover new insights by
seeing your data in
geographic space and
seeing time-stamped
data change over time

Capture screenshot
"scenes" and build
cinematic, guided
interactive or video
"tours"
Walkthrough - Excel Self-Service BI

Surgical Analytics
Excel Self-Service Walkthrough
• Select and combine data
• Create a local data mart
• Build reports
Walkthrough - Excel Self-Service BI

Select and combine data
•

In our example, we have SQL Server Analysis Services, so we would want to import directly
into Power Pivot, as it can natively connect and consume Analysis Services data
Walkthrough - Excel Self-Service BI

Select and combine data
•

If instead we wanted to bring in weather data, stock market information, Facebook profiles,
or consume a previously created Shared Query, we could use Power Query.
Walkthrough - Excel Self-Service BI

Create a local data mart with Power Pivot
•
•

Once we access and import our data, we can organize tables and relationships and create
hierarchies and formulas. In our example, we simply accept the structure of the source.
Power Pivot’s In-memory xVelocity engine holds millions of rows, but compression keeps
file sizes relatively small.
Walkthrough - Excel Self-Service BI

Create compelling reporting with Power View
• A drag-and-drop development surface that natively understands Power Pivot
enables easy creation of interactive views with animations, data highlighting and
filtering.
Walkthrough - Excel Self-Service BI

Completed Power View report with two views, ready for sharing
Power BI with Office 365

Power BI with Office 365 includes:
• Power BI Sites
• Data Management
• Power BI for Mobile
Power BI with Office 365

Power BI Sites
Analogous to a
PowerPivot Gallery in onpremise SharePoint, but
BETTER! (Allow larger
files, more advanced
browsing)

Power BI Sites is an App
in SharePoint Online, is
available by registration,
and can be applied to
existing SharePoint
Online sites

Workbooks uploaded
must use Data Models to
take advantage of Power
BI features (making
Power Pivot ideal)

Features include:
• Q & A (Natural
Language query)
• Favorite reports
• “My Power BI” page,
with usage analytics
and query
management
Power BI with Office 365

Data Management
Power BI Admin Center
allows IT management of
“gateways” to onpremises data sources,
and is accessible from
O365 Admin or any
Power BI site

Data Management
Gateway client app runs
on machines onpremises, registered to
cloud service

Two scenarios
supported:
• Enable OData Feed
• Enable Cloud Access

Allow users to share
Queries created in Power
Query, or to refresh
online workbooks with
on-premises data
Power BI with Office 365

Power BI for Mobile
Available in the Windows
Store (currently only for
Windows 8, 8.1 devices)

Touch-enhanced
interface great for
tablets. Interact with
Power View by tapping
and sliding instead of
clicking and dragging

Connects to Power BI
site, allows browsing for
Power BI content

Android and iOS users
can interact on the go via
their browsers, since
Power BI Sites will
render contents using
standard HTML 5
Walkthrough - Power BI with Office 365

Surgical Analytics
Power BI Walkthrough
• Upload and enable workbook for
sharing
• Browse workbooks from mobile
Walkthrough - Power BI with Office 365

Upload your workbook to your SharePoint Online team site
• New Document link or Drag and Drop
Walkthrough - Power BI with Office 365

After uploading, enable your workbook in your Power BI Site
• Right-click the workbook and select “Enable”
Walkthrough - Power BI with Office 365

Once enabled, your workbook can be opened and used from Power BI
• A thumbnail will be generated based on the first page
Walkthrough - Power BI with Office 365

Invite specific users to share your new workbook…
Walkthrough - Power BI with Office 365

… and they can access it via the Power BI Mobile app by browsing to the
Power BI site and selecting the workbook
IT Management

Data Management Experience
• My Power BI
• Power BI Admin Center
IT Management of Power BI

Data Management
• The Data Management Experience extends to each user
– The “My Power BI" portal provides access to:
•
•
•

Usage analytics for the queries you've used
Your shared queries from Power Query
Your data sources
IT Management of Power BI

Data Management
• IT can manage access to on-premises data via Power BI Admin
Center
– Data Management Gateway can be used to connect on-premises data sources
•
•

Workbooks created using Corp IT managed resources (i.e. Data Warehouses, Analysis Services
Tabular Models or Cubes) can be refreshed
Queries developed in Power Query can be shared, and are searchable in Excel
Summary

Summary
Microsoft’s Power BI is a compelling collection of BI tools and features for both
desktop and cloud Office users.
•
•

Self-Service BI is possible within the familiar environment of Excel thanks to a suite of
powerful add-in tools.
Power BI Sites for SharePoint Online offers enhanced collaboration features, natural
language query with Q&A, and support for mobile use via the Power BI App.

Desktop Excel 2013 users can already take advantage of the Power BI add-in
tools, which are either already installed or available for free online. Plus,
desktop and Office 365 users can both leverage Power BI Sites with SharePoint
Online at an extremely reasonable price point.

Helpful Links
Getting Started with Power BI - http://bit.ly/1dL4rC2
Power BI Pricing - http://bit.ly/1iGROzZ
SharePoint Online home page - http://bit.ly/1hIX7Lv
Office 365 for Business - http://bit.ly/IFgsl5
Questions?
Connect with Perficient

Preparing for BI in the
Cloud with Windows
Azure
bit.ly/1gnOlWA

bit.ly/1b5Eayq

Power BI for Office 365: Using SharePoint to Deliver Self-Service

  • 1.
    Power BI forOffice 365: Using SharePoint to Deliver Self-Service BI Presented by: Andy Tegethoff www.facebook.com/perficient www.perficient.com www.twitter.com/perficient
  • 2.
    About Perficient Perficient isa leading information technology consulting firm serving clients throughout North America. We help clients implement business-driven technology solutions that integrate business processes, improve worker productivity, increase customer loyalty and create a more agile enterprise to better respond to new business opportunities. 2
  • 3.
    Perficient Profile • Founded in1997 • Public, NASDAQ: PRFT • 2013 revenue ~$375 million • Major market locations throughout North America • Atlanta, Boston, Charlotte, Chicago, Cincinnati, Cleveland, Columbus, Dallas, Denver, Detroit, Fairfax, Houston, Indianapolis, Los Angeles, Minneapolis, New Orleans, New York City, Northern California, Philadelphia, Southern California, St. Louis, Toronto and Washington, D.C. • Global delivery centers in China, Europe and India • >2,000 colleagues • Dedicated solution practices • ~90% repeat business rate • Alliance partnerships with major technology vendors • Multiple vendor/industry technology and growth awards 3
  • 4.
    Our Solutions Expertise BusinessSolutions Technology Solutions • • • • • • • • • • • • • • • • • Business Intelligence Business Process Management Customer Experience and CRM Enterprise Performance Management Enterprise Resource Planning Experience Design (XD) Management Consulting Business Integration/SOA Cloud Services Commerce Content Management Custom Application Development Education Information Management Mobile Platforms Platform Integration Portal & Social
  • 5.
  • 6.
    Our Speaker Andy Tegethoff Andyis a Microsoft BI architect at Perficient and a senior-level consultant with more than 14 years of experience exploring, planning and building cost-effective software and process-oriented solutions for challenging business problems. A Microsoft Certified IT Professional (MCITP) for SQL Server BI, his solutions integrate elements such as data warehousing, dashboards, and broadbased reporting in order to deliver vital, actionable information at every level of the enterprise.
  • 7.
    BI Expertise A nationwideMicrosoft BI practice offering both • Strategic Engagements • Strategy assessments • Program mentoring • Tactical Engagements • End-to-end implementations • Current state evaluations • Proof of concept projects
  • 8.
    Agenda • Introduction • Excel2013 and Self-Service BI • Power BI on Office 365 • Q&A
  • 9.
    Introduction What is Power BI? PowerBI is: A collection of Excel-based tools and Office 365 SharePoint Online features and services that enables self-service BI and provides a data collaboration portal featuring mobile access to analytics
  • 10.
    Introduction Who will use PowerBI? Any Excel user! But specifically: Report Creators Data Stewards Report Consumers (Data Analysts, Consultants) (DBAs, IT Managers/Admins) (Executives, Managers) Anyone tasked with gleaning usable information from their data will find at least some component of Power BI useful.
  • 11.
    Introduction What are the componentsof Power BI? There are two major elements: Self-Service BI with Excel Power BI with Office 365 Power Query Power Pivot Power View Power Map Power BI Sites Data Management Power BI for Mobile
  • 12.
    Excel Self-Service BI ExcelSelf-Service BI includes: • • • • Power Query Power Pivot Power View Power Map
  • 13.
    Excel Self-Service BI PowerQuery Find and connect data across a wide variety of sources – both internal and external to your organization Connect to and consume Big Data in Excel • Hadoop (HDFS) • Azure HDInsight, PDW Merge/shape data for further analysis: • Create custom views • Perform data cleansing operations • “M” – Excel-like formula language Manage your queries (within Power BI), and share them within your organization, plus search for data in-house and/or in the public domain
  • 14.
    Excel Self-Service BI PowerPivot Host a significant analytical database inside Excel in-memory using the xVelocity analytics engine, with no Admin or Configuration – and share it via SharePoint Access data from standard a variety of platforms, and consume OData to use shared Power Query queries as data sources Built in DAX expression language has Excel-like syntax, supporting data manipulation and business logic thru formulas that can reference any related table or column Work with millions of rows, plus keep larger file sizes in Power BI (250MB model size limit, 10MB file size limit)
  • 15.
    Excel Self-Service BI PowerView Create charts and other visualizations with filtering, highlighting, slicing and sorting • Multiple views • Solid performance Interact with data from various sources – including Excel itself, a Power Pivot model, or SQL Server Analysis Services (Tabular model or OLAP Cube) Power View for SharePoint creates RDLX files (related to Reporting Services); Power View for Excel creates sheets that are part of the Excel workbook Power BI sites render Power View in HTML 5 for cross-browser compatibility
  • 16.
    Excel Self-Service BI PowerMap 3D visualization tool for mapping, exploring and interacting with geospatial and time data Plot data on Bing maps and visualize with 3D columns, bubble/pie charts, heat maps, and regions Discover new insights by seeing your data in geographic space and seeing time-stamped data change over time Capture screenshot "scenes" and build cinematic, guided interactive or video "tours"
  • 17.
    Walkthrough - ExcelSelf-Service BI Surgical Analytics Excel Self-Service Walkthrough • Select and combine data • Create a local data mart • Build reports
  • 18.
    Walkthrough - ExcelSelf-Service BI Select and combine data • In our example, we have SQL Server Analysis Services, so we would want to import directly into Power Pivot, as it can natively connect and consume Analysis Services data
  • 19.
    Walkthrough - ExcelSelf-Service BI Select and combine data • If instead we wanted to bring in weather data, stock market information, Facebook profiles, or consume a previously created Shared Query, we could use Power Query.
  • 20.
    Walkthrough - ExcelSelf-Service BI Create a local data mart with Power Pivot • • Once we access and import our data, we can organize tables and relationships and create hierarchies and formulas. In our example, we simply accept the structure of the source. Power Pivot’s In-memory xVelocity engine holds millions of rows, but compression keeps file sizes relatively small.
  • 21.
    Walkthrough - ExcelSelf-Service BI Create compelling reporting with Power View • A drag-and-drop development surface that natively understands Power Pivot enables easy creation of interactive views with animations, data highlighting and filtering.
  • 22.
    Walkthrough - ExcelSelf-Service BI Completed Power View report with two views, ready for sharing
  • 23.
    Power BI withOffice 365 Power BI with Office 365 includes: • Power BI Sites • Data Management • Power BI for Mobile
  • 24.
    Power BI withOffice 365 Power BI Sites Analogous to a PowerPivot Gallery in onpremise SharePoint, but BETTER! (Allow larger files, more advanced browsing) Power BI Sites is an App in SharePoint Online, is available by registration, and can be applied to existing SharePoint Online sites Workbooks uploaded must use Data Models to take advantage of Power BI features (making Power Pivot ideal) Features include: • Q & A (Natural Language query) • Favorite reports • “My Power BI” page, with usage analytics and query management
  • 25.
    Power BI withOffice 365 Data Management Power BI Admin Center allows IT management of “gateways” to onpremises data sources, and is accessible from O365 Admin or any Power BI site Data Management Gateway client app runs on machines onpremises, registered to cloud service Two scenarios supported: • Enable OData Feed • Enable Cloud Access Allow users to share Queries created in Power Query, or to refresh online workbooks with on-premises data
  • 26.
    Power BI withOffice 365 Power BI for Mobile Available in the Windows Store (currently only for Windows 8, 8.1 devices) Touch-enhanced interface great for tablets. Interact with Power View by tapping and sliding instead of clicking and dragging Connects to Power BI site, allows browsing for Power BI content Android and iOS users can interact on the go via their browsers, since Power BI Sites will render contents using standard HTML 5
  • 27.
    Walkthrough - PowerBI with Office 365 Surgical Analytics Power BI Walkthrough • Upload and enable workbook for sharing • Browse workbooks from mobile
  • 28.
    Walkthrough - PowerBI with Office 365 Upload your workbook to your SharePoint Online team site • New Document link or Drag and Drop
  • 29.
    Walkthrough - PowerBI with Office 365 After uploading, enable your workbook in your Power BI Site • Right-click the workbook and select “Enable”
  • 30.
    Walkthrough - PowerBI with Office 365 Once enabled, your workbook can be opened and used from Power BI • A thumbnail will be generated based on the first page
  • 31.
    Walkthrough - PowerBI with Office 365 Invite specific users to share your new workbook…
  • 32.
    Walkthrough - PowerBI with Office 365 … and they can access it via the Power BI Mobile app by browsing to the Power BI site and selecting the workbook
  • 33.
    IT Management Data ManagementExperience • My Power BI • Power BI Admin Center
  • 34.
    IT Management ofPower BI Data Management • The Data Management Experience extends to each user – The “My Power BI" portal provides access to: • • • Usage analytics for the queries you've used Your shared queries from Power Query Your data sources
  • 35.
    IT Management ofPower BI Data Management • IT can manage access to on-premises data via Power BI Admin Center – Data Management Gateway can be used to connect on-premises data sources • • Workbooks created using Corp IT managed resources (i.e. Data Warehouses, Analysis Services Tabular Models or Cubes) can be refreshed Queries developed in Power Query can be shared, and are searchable in Excel
  • 36.
    Summary Summary Microsoft’s Power BIis a compelling collection of BI tools and features for both desktop and cloud Office users. • • Self-Service BI is possible within the familiar environment of Excel thanks to a suite of powerful add-in tools. Power BI Sites for SharePoint Online offers enhanced collaboration features, natural language query with Q&A, and support for mobile use via the Power BI App. Desktop Excel 2013 users can already take advantage of the Power BI add-in tools, which are either already installed or available for free online. Plus, desktop and Office 365 users can both leverage Power BI Sites with SharePoint Online at an extremely reasonable price point. Helpful Links Getting Started with Power BI - http://bit.ly/1dL4rC2 Power BI Pricing - http://bit.ly/1iGROzZ SharePoint Online home page - http://bit.ly/1hIX7Lv Office 365 for Business - http://bit.ly/IFgsl5
  • 37.
  • 38.
    Connect with Perficient Preparingfor BI in the Cloud with Windows Azure bit.ly/1gnOlWA bit.ly/1b5Eayq