The project seeks to stabilize excessive & ongoing stream erosion negatively impacting water quality, undermining trees, threatening the riparian corridor, and degrading habitat for aquatic life. Project components include: Install instream structures to direct flow, alleviate erosive forces on stream banks, and provide instream habitat Raise the stream channel bottom to allow water to spread out over the floodplain On a tributary to the main channel, stabilize a headcut & debris jam holding back sediment from channel erosion upstream Control non-native invasive plants Reforest the site with native trees, shrubs, and plants