A literature study on architecture by Ar Eero Saarinen with description of some of his works, i.e., the Gateway Arch, the MIT Chapel, the TWA Terminal, and the Miller House.
A literature study on architecture by Ar Eero Saarinen with description of some of his works, i.e., the Gateway Arch, the MIT Chapel, the TWA Terminal, and the Miller House.
High Rise the most common word in Modern Architecture. Here we made a Report on Vertical Circulation and Services of a High rise. Hope this will help you to Design a High rise.
The Kanchanjunga Apartments, designed by Charles Correa, are a direct response to the present culture, the escalating urbanization, and the climatic conditions for the region. They pay homage to the vernacular architecture that once stood on the site before the development in a number of ways. More on Kanchanjunga Apartments after the break.
This is an indepth presentation on the anthropometrical data of commercial complexes and malls in the field of architecture. It contains analysis, critical review and description of different things related with malls
A final year thesis proposal on PARLIAMENT HOUSE under Architecture of legislature, also known as parliamentary architecture is about creating the spaces for legislation purpose. It is creation of system that creates a system by itself for future.
it is the architecture case study based upon the web info.
it includes introduction, architectural design style, history, floor plans, movements of people and etc.
Data collection - Climate Analysis - Tropical Wet and Dry Climate - Architect...LipikaPandey
CLIMATE ANALYSIS
TROPICAL WET AND DRY CLIMATE
HOT AND HUMID
HOT AND DRY
DESIGN STRATEGIES
ORIENTATION AND POSITIONING
SHADING DEVICES
VENTILATION AND CROSS VENTILATION
PASSIVE COOLING TECHNIQUES
COLOR SCHEME
ENERGY EFFICIENT TECHNIQUES
CONSTRUCTION TECHNIQUES AND MATERIALS TO BE USED - ROOF, WALL, WINDOWS
High Rise the most common word in Modern Architecture. Here we made a Report on Vertical Circulation and Services of a High rise. Hope this will help you to Design a High rise.
The Kanchanjunga Apartments, designed by Charles Correa, are a direct response to the present culture, the escalating urbanization, and the climatic conditions for the region. They pay homage to the vernacular architecture that once stood on the site before the development in a number of ways. More on Kanchanjunga Apartments after the break.
This is an indepth presentation on the anthropometrical data of commercial complexes and malls in the field of architecture. It contains analysis, critical review and description of different things related with malls
A final year thesis proposal on PARLIAMENT HOUSE under Architecture of legislature, also known as parliamentary architecture is about creating the spaces for legislation purpose. It is creation of system that creates a system by itself for future.
it is the architecture case study based upon the web info.
it includes introduction, architectural design style, history, floor plans, movements of people and etc.
Data collection - Climate Analysis - Tropical Wet and Dry Climate - Architect...LipikaPandey
CLIMATE ANALYSIS
TROPICAL WET AND DRY CLIMATE
HOT AND HUMID
HOT AND DRY
DESIGN STRATEGIES
ORIENTATION AND POSITIONING
SHADING DEVICES
VENTILATION AND CROSS VENTILATION
PASSIVE COOLING TECHNIQUES
COLOR SCHEME
ENERGY EFFICIENT TECHNIQUES
CONSTRUCTION TECHNIQUES AND MATERIALS TO BE USED - ROOF, WALL, WINDOWS
Presentation from architectural firm Perkins+Will on the status and progress of the projects for Citizens Tower (formerly known as the Omni Building), located at 1208 14th Street, and the City Hall facilities at 1625 13th Street; and discuss other City facilities.
Construction Specialties 2016 Architectural Wall Louvers- CS provides Architects, a selection of louvers that the aesthetics can be uniquely configured as a one off project Design Feature. Discover How CS can assist in the refinement of your louver design.
CSU Consultants Contract21982 University Lane Orange Beach, ALMargenePurnell14
CSU Consultants Contract
21982 University Lane | Orange Beach, AL 36561
Question
Response
Project Background
(What has the client hired you to do? What basic information do you have on the project?)
Description of the project
Scope of Work
(Provide a detailed description of what you will do. A bulleted list is a good way to clearly describe to the client your step-by-step procedures.)
A detailed description of the work
1
2
3
4
5
6
7
Cost of Radon Canisters
(Provide a detailed description of the number and cost for each device. Include a separate price for testing cost.)
What Type of Radon Device(s)
Basement
___________
First
___________
# of Radon Devices for Each Floor
Basement
___________
First
___________
Cost per Floor
Cost for Testing
Cost of Asbestos
Test
(Provide a detailed description of the number and cost for each device. Include a separate price for testing cost.)
What Type of Asbestos Device(s)
Basement
___________
First
___________
# of Asbestos Devices for Each Floor
Basement
___________
First
___________
Cost per Floor
Cost for Testing
Cost of Mold Survey Test
(Provide a detailed description of the number and cost for each device. Include a separate price for testing cost.)
What Type of Mold Test(s)
Basement
___________
First
___________
# of Mold Test for Each Floor
Basement
___________
First
___________
Cost per Floor
Cost for Testing
Cost of Lead Paint Test
(Provide a detailed description of the number and cost for each device. Include a separate price for testing cost.)
What Type of Lead Paint Test(s)
Basement
___________
First
___________
# of Lead Paint Test for Each Floor
Basement
___________
First
___________
Cost per Floor
Cost for Testing
Summary of Lead Paint Test
Description of how you test for Lead Paint?
Procedures Followed
1
2
3
4
5
6
7
Cost for Work – Labor to conduct the test
How much will you charge to conduct the investigation?
Description of labor cost
Cost for labor to conduct the investigation
Total Cost for your work
Add Up ALL Cost
Cost of Project
Project Deliverables
What will you provide to the client at the end of the project?
Summarize (from above) what work will provide
1
2
3
4
5
6
7
Project Timetable
Include estimates of when each part of the project will be completed.
Estimate how long it will take to complete work from beginning to end
Summary of Completed Contract
Using the information above, summarize contracts contents into a written summary of what your work will involve – providing specifics about: discovery, types and number of devices used, lead paint test and procedures, estimates of cost, types of labor, project deliverables, timeframe to conduct investigation, and recommendations for mitigation. Your completed contract must be at least three pages in length. At the end of your contract, include an APA-Style references page. You must use at least three academi ...
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOChristina Parmionova
The 2024 World Health Statistics edition reviews more than 50 health-related indicators from the Sustainable Development Goals and WHO’s Thirteenth General Programme of Work. It also highlights the findings from the Global health estimates 2021, notably the impact of the COVID-19 pandemic on life expectancy and healthy life expectancy.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Donate to charity during this holiday seasonSERUDS INDIA
For people who have money and are philanthropic, there are infinite opportunities to gift a needy person or child a Merry Christmas. Even if you are living on a shoestring budget, you will be surprised at how much you can do.
Donate Us
https://serudsindia.org/how-to-donate-to-charity-during-this-holiday-season/
#charityforchildren, #donateforchildren, #donateclothesforchildren, #donatebooksforchildren, #donatetoysforchildren, #sponsorforchildren, #sponsorclothesforchildren, #sponsorbooksforchildren, #sponsortoysforchildren, #seruds, #kurnool
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...OECDregions
Preliminary findings from OECD field visits for the project: Enhancing EU Mining Regional Ecosystems to Support the Green Transition and Secure Mineral Raw Materials Supply.
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
2. OVERVIEW OF PROJECT / TIMELINE
Project Budget $28 Million
2016 Facility Program
$28M and 78,000 SF
October 2, 2017
$27.94 Million and 74,815 SF
Council desires a traditional design theme
November 9, 2017
Present three new conceptual designs for review and direction
Conceptual designs inspired by Melissa, Southlake, & Lewisville, Texas
Design Features
Pitched roof, arches, columns, brick
Gateway sign color scheme
4. CONCEPT 1 - DESIGN CONSIDERATIONS
INSPIRED BY SOUTHLAKE, TX
Exceeds the current budget of $28M
Costly exterior detailing
No exterior window shading
High floor to floor and roof volume
Interior plan must align with façade
design
Interior design needs to match exterior
traditional aesthetic
Covered entry porch
6. CONCEPT 2 – DESIGN CONSIDERATIONS
INSPIRED BY MELISSA, TX
Close to the current budget of
$28M
Simple and less costly exterior
detailing
Overhang to shade exterior
windows
Covered entry porch
Low second floor to roof volume
Façade is modulated and flexible
to interior layout
Interior design aesthetic is flexible
Strong street presence
Integral side balconies with roof
overhang
8. CONCEPT 3 - DESIGN CONSIDERATIONS
INSPIRED BY LEWISVILLE, TX
Exceeds current budget of $28M
Simple exterior detailing
No exterior window shading
Covered entry porch
High floor to floor and roof
volume
Interior design aesthetic is
flexible
Interior plan must align with
façade design
Strong street presence
Large vertical façade openings
9. ASSOCIATED DESIGN AND CONSTRUCTION COST
Modifications to the design will require:
Additional time
Additional funds OR
A reduction in the size of the building
Interior plan / layout must be changed to align with façade design
Minimum of 8 weeks for redesign
Concept 2 offers the least amount of changes needed to the interior layout
Estimated additional construction costs
All three concepts will exceed the programmed budget of $28M
Concept 2 is the closest to the programmed budget
10. NEXT STEPS
Project Schedule
Council’s implementation of their Strategic Plan – construction to begin in FY18
From date of selected design concept, a minimum of 8 weeks for program development
Council Approval / Architectural Advisory Committee Review
Will the Architectural Advisory Committee be reviewing and providing a recommendation to Council?
Architectural Advisory Committee appointments - January 11, 2018
Design Concept Approval
Received November 9th
Begin developing drawings immediately
Council review of final design concepts and programming early 2018
Received after Architectural Advisory Committee review / recommendation
Begin developing drawings early 2018
Council review of final design concepts and programming spring 2018
11. SEEKING DIRECTION
Council approval of one of the
concepts presented
Council direction on the involvement
of the Architectural Advisory
Committee
18. SECURE POINT
SECURE POINT
NEW CURB
CUT
FENCED
MECHANICALYARD
FUTURE
EXPANSION
AREA
PRE-CAST CONCRETE
SECURITY WALL
CHAINLINK FENCE,
TYP. ON NON ROAD
FACING FENCE
PRE-CAST CONCRETE
SECURITY WALL
PROPERTY LINE
& SETBACK
TRUE
NORTH
Graphic Scale: 1 inch = 30 feet
0 30' 60' 90' 120'
CENTRAL PARK
KRENEKTAPRD.
TRASH
38VISITORPARKINGSPACES
110 SECURE STAFF PARKING SPACES
224 SECURED PARKING SPACES
78 PUBLIC PARKING SPACES
317 TOTAL
FUTURE
PARKING
EXPANSION
114 SECURE STAFF PARKING SPACES
ANNEX
BUILDING
40PDVISITOR&
PUBLICPARK
PARKINGSPACES
EXISTING
SIDEWALK
EXISTING
SIDEWALK
CENTRALPARK
133'
262'-6" 268'-6"
47'
ENTRY
PLAZA
MAIN
BUILDING
DARTMOUTH ST.
EXISTING
SIDEWALK
NEW CURB CUT
PRE-CAST CONCRETE
SECURITY WALL
DROP-OFF AND TRUCK
TURN AROUND
24'
24'
440'30'
786'30'
BUILDING
ENTRANCE
162'-11/2"
560'-67/8"
1 1"=30'-0" A2- SITE PLAN- PRESENTATIONOVERALL
OVERALLSITE PLAN - SCHEMATIC
DESIGN
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
19. UP
DN
STAIR
216 SF
(200 SF)
UP
DN
2
3
4
5
MNOPQRS
2A
3A
4A
5A
6A
G
F
E
D
C
A
27'-6"27'-6"27'-6"27'-6"
TRAINING
LARGE
ASSEMBLY
2,331 SF
(2,500 SF)
FORENSIC
EXAMINATION
BAY
564 SF
(550 SF)
MECHANICAL B
340 SF
(0 SF)
CRIME SCENE CRIME SCENE
FORENSIC LAB
484 SF
(160 SF)
COPY
34 SF
(60 S
RECORDS
STORAGE
126 SF
(200 SF)
MECHANICAL A
614 SF
(400 SF)
JANITOR
49 SF
(80 SF)
ACO
WORKSPACE /
REPORT
WRITING
189 SF
(208 SF)
SUPPORT
SERVICES
MANAGER
151 SF
(150 SF)
COPY/COFFEE
98 SF
(100 SF)
INFORMATION
SERVICES
MANAGER
155 SF
(150 SF)
LOBBY MENS
RR
184 SF
(200 SF)
LOBBY
WOMENS RR
184 SF
(200 SF)
INTERVIEW
ROOM
110 SF
(100 SF)
EL EVATOR
INFO/SERVICE
POLICE ASSIST.
73 SF
(64 SF)
TECHNICAL
SERVICES
COORD.
115 SF
(120 SF)
GIS ANALYST
108 SF
(81 SF)
IT SERVER RM
613 SF
(750 SF)
EVENINGSHIFT
LIEUTENANT
156SF
(150SF)
ADMINISTRATIVE
LIEUTENANT
187SF
(150SF)
BRIEFING
ROOM
770 SF
(735 SF)
CRIME SCENE CRIME SCENE FORENSIC
TECHNICIAN SPECIALIST
131 SF
(120 SF)
111 SF
(120 SF)
TECHNICIAN TECHNICIAN
117 SF
(120 SF)
DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT
SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT
85 SF
(81 SF)
NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT
SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT
85 SF
(81 SF)
83 SF
(81 SF)
84 SF
(81 SF)
84 SF
(81 SF)
84 SF
(81 SF)
83 SF
(81 SF)
84 SF
(81 SF)
84 SF
(81 SF)
84 SF
(81 SF)
85 SF
(81 SF)
85 SF
(81 SF)
EVENING SHIFT
CSTEP SERGEANT
94 SF
(81 SF)SERGEANT
91 SF
(81 SF)
EVENING SHIFT
SERGEANT
92 SF
(81 SF)
SERGEANT ADMIN.
SERGEANT
92 SF
(81 SF)
EVENING SHIFT
91 SF
(81 SF)
ADMIN.
SERGEANT
94 SF
(81 SF)
JANITOR
48 SF
(50 SF)
UNISEX
RESTRM
74 SF
(80 SF)
UNISEX
RESTRM
74 SF
(80 SF)
UNISEX
RESTRM RESTRM
75 SF 74 SF
(80 SF)
CHARGING
ROOM
195 SF
(120 SF)
NISEX
(80 SF)
UNISEX
RESTRM
75 SF
(80 SF)
DIGITAL
FORENSICS
102 SF
(100 SF)
POWDER
PROCESSING
148 SF
(0 SF)
ALTERNATE
LIGHT SOURCE
121 SF
(0 SF)
COUNSELING
ROOM
120 SF
(225 SF)
INVENTORY
TECHNICIAN
99 SF
(120 SF)
R/T ARMORY
556 SF
(200 SF)
LOADING
301 SF
(300 SF)
ASSISTANT
BUYER
99 SF
(120 SF)
COPY
72 SF
(60 SF)
COMMUNITY
ENHANCEMENT
SERGEANTS
677 SF
(800 SF)
TRAFFIC
Department Legend
ADMIN
ADMIN SERVICES BUREAU
CIRCULATION
CORE
FIELD OPERATIONS
GENERAL
LOBBY
OPERATION SUPPORT BUREAU
RECORDS
TRAINING
FIRST FLOOR: 40,775 GSF
SECOND FLOOR : 22,815 GSF
MAIN BUILDING: 63,590 GSF
ANNEX: 11,225 GSF
GRAND TOTAL: 74,815 GSF
MENS LOCKERS:
24" X 24": 206
12" X 12": 0
TOTAL: 206
AUGUST 10, 2017
J
3B
H
K
1
L
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 32'-6" 28'-7 5/8"
COMMUNITY/MEDIA
MEETING ROOM
920 SF
(650 SF)
MOTO REPORT
WRITING
520 SF
(800 SF)
BREAK ROOM
Not Enclosed
(800 SF)
VOLUNTEER
STAFF
64 SF
(50 SF)
VOLUNTEER
STAFF
63 SF
(50 SF)
DAY SHIFT NIGHT SHIFT
LIEUTENANT LIEUTENANT LIEUTENANT
166 SF
(150 SF)
166 SF
(150 SF)
DAY SHIFT
165 SF
(150 SF)
PO'S REPORT
WRITING
328 SF
(320 SF)
SPECIAL OP
(TRAFFIC)
LIEUTENANT
165 SF
(150 SF)
SERGEANT WRITER
80 SF
(80 SF)
MOTOR
SERGEANT
81 SF
(81 SF)
PROPERTY
1,277 SF
(450 SF)
INFO/SERVICE
72 SF
(64 SF)
MAIN LOBBY
1,260 SF
(500 SF)
STAIR
218 SF
(200 SF)
TRUE
NORTH
TRAINI
STORAGE
94 SF
(200 SF)
INFORMATION
SERVICES
SUPERVISOR
117 SF
(120 SF)
ACO
SUPERVISOR
121 SF
(120 SF)
117 SF
(120 SF)
SUPERVISOR
165 SF
(150 SF)
CRIME ANALYST CRIME ANALYST
120 SF
(120 SF)
120 SF
(120 SF)
ADMINISTRATIVE
LIEUTENANT
163SF
(150SF)
(2) FIELD
OPERATIONS
POLICE ASST
74 SF
(64 SF)
COMMUNITY
ENHANCEMENT
OFFICER
119 SF
(120 SF)
MAIL B OXES /
C OF FEE BAR
59 SF
(80 SF )
STOR.
64 SF
(0 SF)
ELECTRICAL &
TELE / DATA
225 SF
(100 SF)
RECORD TECH
63 SF
(64 SF)
RECORD TECH
63 SF
(64 SF)
RECORD TECH
RECORD TECH
63 SF
(64 SF)
63 SF
(64 SF)
TRAINING
LOBBY
253 SF
(150 SF)
PATROL
81 SF
(80 SF)
PATROL
WRITER
79 SF
(80 SF)
PATROL
WRITER
80 SF
(80 SF)
CIT RM
108 SF
(0 SF)
RSTRM
72 SF
(0 SF)
RECORD TECH
63 SF
(64 SF)
RECORD TECH
63 SF
(64 SF)
RECORDS
CLOSET
105 SF
(0 SF)
INTERVIEW
ROOM
113 SF
(100 SF)
(2) FIELD
OPERATIONS
POLICE ASST
73 SF
(64 SF)
(2) FIELD
OPERATIONS
POLICE ASST
74 SF
(64 SF)
RECORDS
CLOSET
77 SF
(0 SF)
IDF RM
95 SF
(0 SF)
ANIMAL
CONTROL &
STORAGE
195 SF
(0 SF)
1A
EVIDENCE TECH EVIDENCE
STORAGE
2,261 SF
(900 SF)
EVIDENCE
ROCESSING
101 SF
(0 SF)
EVIDENCELOC.
26SF
(20SF)
EVIDENCE
PROCESSING
AREA
127 SF
(100 SF)
EVIDENCE
56 SF
(63 SF) TECH
56 SF
(63 SF)
EVIDENCE
SUPERVISOR
122 SF
(120 SF)
COLD STORAGE
84 SF
(20 SF)
VAULT
122 SF
(120 SF)
VOLUNTEER
STAFF
61SFSTAFF
57SF
VOLUNTEER
MENS LOCKER
ROOM (206 2x2
LOCKERS)
2,578 SF
(2,080 SF)
MENS RR
211 SF
MENS SHWR
77 SF
MENS RR
191 SF
WOMENS RR
192 SF
CEU STORAGE
368 SF
(800 SF)
CSTEP
STORAGE
362 SF
(0 SF)
SIU STORAGE
367 SF
(300 SF)
TRAINING
STORAGE
241 SF
(200 SF)
TRAINING
STORAGE
95 SF
(200 SF)
WOMENS
LOCKER ROOM
(33 2X2)
516 SF
(68 SF)
WOMENS RR
223 SF
M
A
34
5:
4
1:
1
FIRSTFLOOR
PLAN
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
20. DN
216 SF DN
2
3
4
5
MNOPQRS
K
2A
2A
3A
4A
5A
G
F
E
D
C
A
J
1
L
H
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 32'-6" 28'-7 5/8"
27'-6"27'-6"27'-6"27'-6"
STAIR
(200 SF)
OPEN TO
BELOW
OPEN?
106 SF?
(0 SF)(?)
EL EVATOR
ROOF DECK
PATIO
3B
COMM.
BREAKROOM
203 SF
(200 SF)
RECRUITING /
TRAINING
OFFICER
124 SF
(120 SF)
CIVILIAN
TRAINING
COORDINATOR
124 SF
(120 SF)
COMM.
MANAGER
149 SF
(150 SF)
PUBLIC SAFETY VOLUNTEER
TELECOM
SUPERVISORS
327 SF
(140 SF) RECRUITING /
TRAINING
OFFICER
85 SF
(80 SF)
RECRUITING /
TRAINING
LIEUTENANT
149 SF
(150 SF)
BREAK ROOM
187 SF
(150 SF)
UNISEX
RSTRM
61 SF
(80 SF)
UNISEX
RSTRM
61 SF
(80 SF)
UNISEX
RSTRM
63 SF
(80 SF)
UNISEX
RSTRM
62 SF
(80 SF)
ELECTRICAL
178 SF
(200 SF)
MECHANICAL
393 SF
(400 SF)
ADMIN
CONFERENCE
ROOM
701 SF
(500 SF)
PERSONNEL
FILES
93 SF
(120 SF)
ADMIN IA
LIEUTENANT147 SF
(150 SF)
ADMIN
SECRETARY
117 SF
(120 SF)
BUDGET
ANALYST
125 SF
(120 SF)
ASSIST. CHIEF
OPER.
SUPPORT
BUREAU
194 SF
(200 SF)
(2) VOLUNTEER
COORDINATOR
ASSIST.
184 SF
(240 SF)
IA SERGEANT
147 SF
(120 SF)
OFF DUTY ASSISTANT PIO VOLUNTEER
/ VOL. COORD.
SERGEANT
134 SF
(120 SF)
CHIEF OF
POLICE
254 SF
(300 SF)
ASSISTANT
CHIEF ADMIN
FIELD
OPERATIONS
BUREAU
251 SF
(200 SF)
ASSISTANT
CHIEF ADMIN
SERV. BUREAU
195 SF
(200 SF)
MDF ROOM
159 SF
(100 SF)
CRIME VICTIM
COORDINATOR
131 SF
(165 SF)
(3) CRIMINAL
INVESTIGATIONS
POLICE
ASSISTANTS165 SF
(192 SF)
INVSTGTRS
53SF
(64SF)
2ND FLOOR
LOBBY
631 SF
(0 SF)
CONFERENCE
ROOM
261 SF
(0 SF)
COFFEE/
PANTRY/MAIL
/COPY
53SF
(100SF)
STAFF ASSIST
128 SF
(120 SF)
SIU STORAGE
146 SF
(0 SF)
SECRETARY
109 SF
(120 SF)
VOLUNTEER
57 SF
(50 SF)
TRAINING
ROOM
193 SF
(0 SF)
TRAINING
FILES /COPY
115 SF
(120 SF)
C L OSET
TRAINER
52 SF
(0 SF)
TRAINER
52 SF
(0 SF)
TRAINER
52 SF
(0 SF)
BCKGRND
INVEST.
76 SF
(0 SF)
ACADEMY
COORD.
76 SF
(120 SF)
TRAINEE
52 SF
(0 SF)
TRAINEE
52 SF
(0 SF)
TRAINEE
52 SF
(0 SF)
55 SF
(50 SF)
RECRUITING /
TRAINING
SERGEANT
133 SF
(120 SF)
RECRUITING /
TRAINING
SERGEANT
125 SF
(120 SF)
(2) DETECTIVES
127 SF
(128 SF)
CRIMINAL
INVESTIGATIONS
SERGEANT
151 SF(81 SF)
(2) DETECTIVES
157 SF
(128 SF)
(2) DETECTIVES
127 SF
(128 SF)
(2) DETECTIVES
157 SF
(128 SF)
CRIMINAL
INVESTIGATIONS
SERGEANT
121 SF
(81 SF)
CRIMINAL
INVESTIGATIONS
SERGEANT121 SF
(81 SF)
CRIMINAL
INVESTIGATIONS
LIEUTENANT
153 SF
(150 SF)
CRIMINAL
INVESTIGATIONS
LIEUTENANT
184 SF
(150 SF)
(2) DETECTIVES
157 SF
(128 SF)
(2) DETECTIVES
157 SF
(128 SF)
(2) DETECTIVES
157 SF
(128 SF)
(2) DETECTIVES
157 SF
(128 SF)
(2) DETECTIVES
160 SF
(128 SF)
(2) DETECTIVES
160 SF
(128 SF)
FILES
INTERVIEW
110 SF
(100 SF)
FILES
CRIMINAL
INVESTIGATIONS
WAR ROOM
310 SF
(350 SF)
INTERVIEW
110 SF
(100 SF)
TECH CLOSET
92 SF
(0 SF)
ADMIN
CONF.STOR.
61 SF
(75 SF)
JANITOR
71 SF
(70 SF)
STAFF
123 SF
(120 SF)
CONFSTO.
47SF
(100SF)
ACCREDITATION
MANAGER150 SF
(150 SF)
MABOXES
COFFEEBAR
45SF
(50SF)
PIO /
COORD.
LIEUTENANT
134 SF
(150 SF)
COORD.
Redundant Room
(0 SF)
COMPLIANT /
RESEARCH /
ACRED
ASSISTANT
134 SF
(120 SF)
(2) VOLUNTEER
191 SF
(100 SF)
EL EVATOR
EQU IPMENT
R OOM
40 SF
(50 SF )
Department Legend
ADMIN
ADMIN SERVICES BUREAU
CIRCULATION
CORE
FIELD OPERATIONS
GENERAL
FIRST FLOOR: 40,775 GSF
SECOND FLOOR : 22,815 GSF
MAIN BUILDING: 63,590 GSF
ANNEX: 11,225 GSF
GRAND TOTAL: 74,815 GSF
LOBBY
OPERATION SUPPORT BUREAU
TRAINING AND RECRUITING
MENS LOCKERS:
24" X 24": 206
12" X 12": 0
TOTAL: 206
AUGUST 10, 2017
TRUE
NORTH
IT ROOM
60 SF
(150 SF)
DISPATCH
ROOM
1,694 SF
(1,500 SF)
CONF. ROOM
119 SF
(120 SF)
RECRUITING /
TRAINING
OFFICER
85 SF
(80 SF)
COMM.
RSTRM
76 SF
(80 SF)
FILES AND
STOR. RM
100 SF
(0 SF)
CRIME VICTIM
COORDINATOR
133 SF
(165 SF)
PR IN T
(2)DETECTIVES
209SF
(128SF)
(2) DETECTIVES
154 SF
(128 SF)
COMM.
RSTRM
73 SF
(80 SF)
SIU SECRETARY
210 SF
(120 SF)
INVSTGTRS
53SF
(64SF)
INVSTGTRS
53SF
(64SF)
INVSTGTRS
52SF
(64SF)
INVSTGTRS
53SF
(64SF)
INVSTGTRS
53SF
(64SF)
COMM DOWN
103 SF
(0 SF)
1A
1A
SLOPEDMETALROOF
FLAT TPO
ROOF
FUTURE
240 SF
(150 SF)
M
A
55
5:4
:
SECOND FLOOR
PLAN
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
21. A3
A2
A1
AA AB BB CC DD EE
30'-0"30'-0"
30'-0" 32'-0" 26'-0" 32'-0" 27'-6" 27'-6"
OUTDOOR
EVIDENCE
STORAGE
1,928 SF
(800 SF)
COMMAND
CENTER BAY
964 SF
(960 SF)
HOSTAGE
NEGOTIATIONS
TRAILER BAY
994 SF
(640 SF)
HNT STORAGE
257 SF
(200 SF)
BOMB
TRUCK/TRAILER
BAY
992 SF
(600 SF)
SWAT TEAM
BAY
686 SF
(640 SF)
VEHICLE
MAINTENANCE
BAY
523 SF
(640 SF)
POLICE VAN
BAY
487 SF
(640 SF)
FORENSIC
TRUCK BAY
487 SF
(640 SF)
STORAGE
157 SF
(300 SF)
BOMB
STORAGE
198 SF
(0 SF)
STORAGE
53 SF
(300 SF)
MOTORCYCLE
GARGE
635 SF
WORKOUT
ROOM
1,302 SF
(500 SF)
RESTROOM
64 SF
(100 SF)
STORAGE
119 SF
RESTROOM
64 SF
(100 SF)
TEAM LEADER
RM
102 SF
SPECIAL
OPERATIONS
ROOM
455 SF
8'-0"
6
CIRCULATION
55 SF
ANNEX FLOOR
PLAN
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
29. ALTERNATE FACADE OPTION |AERIALPERSPECTIVE - NORTHEAST
CORNER
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
30. ALTERNATE FACADE OPTION |PERSPECTIVE - KRENEK TAP
VIEW
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
31. ALTERNATE FACADE OPTION |PERSPECTIVE - NORTHFACADE @ TURN
AROUND
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
32. ALTERNATE FACADE OPTION |PERSPECTIVE - CORNER
VIEW
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
33. ALTERNATE FACADE OPTION |PERSPECTIVE - MAINBUILDING
ENTRANCE
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
34. SECURE POINT
PROPERTY LINE
& SETBACK
SECURITY
FENCE/WALL
SECURE POINT
PUBLICPARKING
PUBLIC PARKING
JAIL PARKING
DROP-OFF
SECURE EMPLOYEE PARKING
FENCED
MECHANICAL YARD
FUTURE
EXPANSION
AREA
SECURITY
FENCE/WALL
SECURITY
FENCE/WALL
TRUE
NORTH
60' 90' 120'
Graphic Scale: 1 inch = 30 feet
0 30'
CENTRAL PARK
1 1"=30'-0" A2- SITE PLAN- PRESENTATIONOVERALL
OVERALLSITE PLAN - ORIGINALCONCEPT
DESIGN
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS