A PRACTICAL TRANING SEMINAR REPORT
ON
SURATGHAR SUPER THERMAL POWER
STATION, SURATGHAR
BHARTIYA INSTITUTE OF ENGINEERING AND
TECHNOLOGY, SIKAR
SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE
AWARD OF THE DEGREE OF
BACHELOR OF TECHNOLOGY
( ELECTRICAL ENGINEERING)
SUBMITTED BY
RAKESH KUMAR KUMAWAT
ELECTRICAL ENGG (7th
SEM)
ROLL NO. – 7EE39
ENROLLMENT NO. – JNU-jpr/BE/EE/07/043
I
BHARTIYA INSTITUTE OF ENGINEERING AND
TECHNOLOGY, SIKAR
CONDIDATE’S DECLARATION
I hereby certify that the work which is being presented in the report entitled “Suratgarh
Super Thermal Power Station, Suratgarh by Rakesh kumar kumawat in partial
fulfillment of requirements for the award of degree of B.Tech(3rd
year, Electrical Engg)
submitted in the Department of Electrical Engg. at Jaipur National University, Jaipur
is an authentic record of my own carried out during a period from Jun 14, 2010 to July
28, 2010 under the supervision of Naveen Chand Jain.
Signature of the Student
The B.Tech (3rd
year, Electrical Engg) seminar presentation of Rakesh kumar
kumawat has been held on……………………….and accepted.
Signature of the Examiner 1 Signature of the Examiner 2
II
ACKNOWLEDGEMENT
This is my SECOND practical training which has taken at SUPER THERMAL POWER
STATION; SURATGARH.I would like to express my sincere thanks to Mr.N.C.Jain
Who have given his excellent guidance and shared his experience with me using entire
course of this training report.
I would to express my sincere thanks to Mr. Raman Jain(A.En).who has given me
meaningful advice and encourage me a lot during the training.
We are thanks to other staff member which are guided me. Finally I would like to say this
summer training has been a valuable part in my life.
At last but not least I am thankful to HOD of electrical department Mr. Devendra Doda
and all the staff member of “JAIPUR NATIONAL UNIVERSITY,JAIPUR department
of Electrical Engineering.
Rakesh Kumar Kumawat
B.Tech. Final year
Electrical Engg.
III
PREFACE
This is training of 45days my training place was STPS, SURATGARH.STPS means is
super thermal power station generated the electrical energy by thermal / steam energy at
high presser and high voltage.
A thermal power station is a power plant in which the prime mover is steam driven.
Water is heated, turns into steam and spins a steam turbine which drives an electrical
generator or alternator which convert mechanical energy into electrical energy. The basic
three source of energy used for generation of electricity are water, coal and nuclear fuels.
Arrangement of different feeder level and switch yards included information of bus bar
arrangement of different level isolator and growing substation also power transformer
circuit breaker oil, filtration plant, and compression protection control room and place
are level.
IV
PAGE NO.
1 INTRODUCTION 01
1.1 LOCATION 01
1.2 OPRATION PERFORMANCE OF THE PLANT 02
1.3 ENVIRMENTAL PROFILE 02
2 SELECTION OF THERMAL POWER PLANT 03
2.1 PLANT LOCATION 03
2.2 SIZE OF UNIT 03
3 EQUIPMENT ON A THERMAL POWER PLANT 04
3.1 COAL HANDLING PLANT 05
3.1.1 UNLOADING 05
3.1.2 TRANSFER 06
3.1.3 STOKER 06
3.1.4 PURVERIZATION OF COAL 07
3.1.5 ASH DISPOSAL 08
3.2 DRAFT SYSTEM 08
3.3 BOILER 09
3.3.1 FIRE TUBE BOILER 10
3.3.2 WATER TUBE BOILER 11
3.3.3 BOILER DRUME 12
3.4 ASH HANDLING PLANT 13
3.5 TURBINE 14
3.5.1 IMPULSE TURBINE 15
V
3.5.2 IMPULSE REACTION TURBINE 15
3.6 CONDENSER 16
3.7 ECONOMIZER 17
3.8 SUPER HEATER AND REHEATER 18
3.9 DEHEATER 19
3.10 AIR PREHEATER 20
3.11 ALTERNATOR 21
3.12 COOLING TOWER 22
3.13 FEED WATER HEATER 23
3.14 ELECTRO STATIC PRECIPITER 24
3.15 STACK 26
4 CONCLUSION 27
5 REFERANCE 28
PAGE NO.
DIAGRAMS:
1. COAL HANDLING PLANT 05
2. RAILOY 06
3. COAL POLZER 07
4. FORCED DRAF FAN 09
5. FIRE TUBE BOILER 11
VI
6. WATER TUBE BOILER 11
7. BOILER DRUM 12
8. TURBINE 14
9. CONDENSER 16
10. ECONOMIZER 17
11. DEARATOR 19
12. AIR PREAFER 20
13. ALTERNATOR 21
14. COLLING TOWER 22
15. FEED WATER HEATER 23
16. ELECTROSTATC PRECIPITER 25
17. STACK 26
VII
NOTE:
Type of font: Times New Roman
Main heading: 14 “Times New Roman”, Bold, capital latter
Sub heading: 12 “Times New Roman” Bold , small latter
Line spacing: 1.5
Report : 12 “Times New Roman”
VIII
IX
IX

plc scada and networking

  • 1.
    A PRACTICAL TRANINGSEMINAR REPORT ON SURATGHAR SUPER THERMAL POWER STATION, SURATGHAR BHARTIYA INSTITUTE OF ENGINEERING AND TECHNOLOGY, SIKAR SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE AWARD OF THE DEGREE OF BACHELOR OF TECHNOLOGY ( ELECTRICAL ENGINEERING) SUBMITTED BY RAKESH KUMAR KUMAWAT ELECTRICAL ENGG (7th SEM) ROLL NO. – 7EE39 ENROLLMENT NO. – JNU-jpr/BE/EE/07/043 I
  • 2.
    BHARTIYA INSTITUTE OFENGINEERING AND TECHNOLOGY, SIKAR CONDIDATE’S DECLARATION I hereby certify that the work which is being presented in the report entitled “Suratgarh Super Thermal Power Station, Suratgarh by Rakesh kumar kumawat in partial fulfillment of requirements for the award of degree of B.Tech(3rd year, Electrical Engg) submitted in the Department of Electrical Engg. at Jaipur National University, Jaipur is an authentic record of my own carried out during a period from Jun 14, 2010 to July 28, 2010 under the supervision of Naveen Chand Jain. Signature of the Student The B.Tech (3rd year, Electrical Engg) seminar presentation of Rakesh kumar kumawat has been held on……………………….and accepted. Signature of the Examiner 1 Signature of the Examiner 2 II
  • 3.
    ACKNOWLEDGEMENT This is mySECOND practical training which has taken at SUPER THERMAL POWER STATION; SURATGARH.I would like to express my sincere thanks to Mr.N.C.Jain Who have given his excellent guidance and shared his experience with me using entire course of this training report. I would to express my sincere thanks to Mr. Raman Jain(A.En).who has given me meaningful advice and encourage me a lot during the training. We are thanks to other staff member which are guided me. Finally I would like to say this summer training has been a valuable part in my life. At last but not least I am thankful to HOD of electrical department Mr. Devendra Doda and all the staff member of “JAIPUR NATIONAL UNIVERSITY,JAIPUR department of Electrical Engineering. Rakesh Kumar Kumawat B.Tech. Final year Electrical Engg. III
  • 4.
    PREFACE This is trainingof 45days my training place was STPS, SURATGARH.STPS means is super thermal power station generated the electrical energy by thermal / steam energy at high presser and high voltage. A thermal power station is a power plant in which the prime mover is steam driven. Water is heated, turns into steam and spins a steam turbine which drives an electrical generator or alternator which convert mechanical energy into electrical energy. The basic three source of energy used for generation of electricity are water, coal and nuclear fuels. Arrangement of different feeder level and switch yards included information of bus bar arrangement of different level isolator and growing substation also power transformer circuit breaker oil, filtration plant, and compression protection control room and place are level. IV
  • 5.
    PAGE NO. 1 INTRODUCTION01 1.1 LOCATION 01 1.2 OPRATION PERFORMANCE OF THE PLANT 02 1.3 ENVIRMENTAL PROFILE 02 2 SELECTION OF THERMAL POWER PLANT 03 2.1 PLANT LOCATION 03 2.2 SIZE OF UNIT 03 3 EQUIPMENT ON A THERMAL POWER PLANT 04 3.1 COAL HANDLING PLANT 05 3.1.1 UNLOADING 05 3.1.2 TRANSFER 06 3.1.3 STOKER 06 3.1.4 PURVERIZATION OF COAL 07 3.1.5 ASH DISPOSAL 08 3.2 DRAFT SYSTEM 08 3.3 BOILER 09 3.3.1 FIRE TUBE BOILER 10 3.3.2 WATER TUBE BOILER 11 3.3.3 BOILER DRUME 12 3.4 ASH HANDLING PLANT 13 3.5 TURBINE 14 3.5.1 IMPULSE TURBINE 15 V
  • 6.
    3.5.2 IMPULSE REACTIONTURBINE 15 3.6 CONDENSER 16 3.7 ECONOMIZER 17 3.8 SUPER HEATER AND REHEATER 18 3.9 DEHEATER 19 3.10 AIR PREHEATER 20 3.11 ALTERNATOR 21 3.12 COOLING TOWER 22 3.13 FEED WATER HEATER 23 3.14 ELECTRO STATIC PRECIPITER 24 3.15 STACK 26 4 CONCLUSION 27 5 REFERANCE 28 PAGE NO. DIAGRAMS: 1. COAL HANDLING PLANT 05 2. RAILOY 06 3. COAL POLZER 07 4. FORCED DRAF FAN 09 5. FIRE TUBE BOILER 11 VI
  • 7.
    6. WATER TUBEBOILER 11 7. BOILER DRUM 12 8. TURBINE 14 9. CONDENSER 16 10. ECONOMIZER 17 11. DEARATOR 19 12. AIR PREAFER 20 13. ALTERNATOR 21 14. COLLING TOWER 22 15. FEED WATER HEATER 23 16. ELECTROSTATC PRECIPITER 25 17. STACK 26 VII
  • 8.
    NOTE: Type of font:Times New Roman Main heading: 14 “Times New Roman”, Bold, capital latter Sub heading: 12 “Times New Roman” Bold , small latter Line spacing: 1.5 Report : 12 “Times New Roman” VIII
  • 9.
  • 10.