This document summarizes a presentation on pile foundations for a pedestrian metro station. It describes the project details including the client, consultant, contractor and engineer. It provides information on the types of piles used (bored piles), their depth, diameter, number and boring completion time. Machinery used for the project including an auger bucket crane and excavator are highlighted. The steps for pile foundation including geotechnical investigation and design are outlined. Details of the boring, cage installation, concrete quantity and filling process are provided. The purpose of using pile foundations to enhance the soil's CBR and strength and to divert loads to stronger strata is stated.