1 Metrolinx overview
go transit, up express, presto
2Metrolinx Overview
• Serve a population of more than seven million across more than 11,000 square
km stretching from Hamilton and Kitchener-Waterloo in the west to Newcastle
and Peterborough in the east, and from Orangeville and Beaverton in the north
to Niagara Falls in the south.
• In operation since 1967, GO now carries more than 70 million passengers a year.
• The PRESTO card is the smart card fare payment system seamlessly connecting 11
transit agencies across the GTHA and Ottawa.
• PRESTO replaces the need for tickets, tokens, passes or cash.
• UP Express connects the country's two busiest transportation hubs: Toronto
Pearson International Airport and Union Station in downtown Toronto, offering a
25-minute journey from end to end, with trains departing every 15 minutes.
Regional transit map – connecting
the region
3 Metrolinx overview
Regional Transportation Plan
4
Vision: The GTHA will have a sustainable
transportation system that is aligned with land use,
and supports healthy and complete communities.
The system will provide safe, convenient and reliable
connections, and support a high quality of life, a
prosperous and competitive economy, and a
protected environment.
31 Priority Actions to Support the 5 Strategies
• Metrolinx published the first regional transportation
plan (RTP) for the Greater Toronto and Hamilton Area
(GTHA) in 2008.
• We are required to review the RTP at least every ten
years, in alignment with Ontario’s Growth Plan for the
Greater Golden Horseshoe.
• The legislative review of initial RTP led to the
development of the 2041 RTP. Key outcomes include:
o Quadrupling the number of people and doubling
the number of jobs within walking distance of
Frequent Rapid Transit
o 27x more kilometres of the Frequent Rapid
Transit
o In addition to the capital costs, successful
implementation will also require operating
funding for transit services, fare integration and
programs for walking and cycling
Metrolinx Overview
Eglinton Station – Renderings
Main Entrance
Future Main
Entrance Site
Future Main
Entrance Interior
Main Entrance Features
 Accessible entrance
 Connections to LRT and TTC Line 1
Subway
Interchange Station Features
 Underground connections to all four
corners of the intersection including the
Yonge-Eglinton Centre and Canada Square
Eglinton Station – Ongoing and Upcoming Works
• Shoring activities (piling, tie-backs, and decking installation) will be ongoing on Eglinton Avenue at
Holly Street until Spring 2019.
• Deep excavation is underway in preparation for the underpinning of the TTC Line 1 Subway box.
– This work includes excavating to the bottom of the future station box (approximately 22 meters at the deepest
point).
– Spoils from the excavation will be extracted and hauled from the existing TTC bus depot site at the southeast
corner of Duplex Avenue and Eglinton Avenue West, and the Salvation Army site at the corner of Eglinton
Avenue East and Cowbell Lane.
– Excavation work has been starting as early as 4:00 a.m. to maintain schedule. Noise mitigation efforts will be
in place while this work gets underway.
The upcoming traffic
configuration (right) will be
in place as early as Spring
2019 and will remain for
the year.
Eglinton Station – Ongoing and Upcoming Works
• Construction of the TTC service building at Berwick Avenue continues with pre-cast concrete
installations:
• The subway will close on the weekends crews are working (1:30am Saturday to 6am Monday) to
safely carry out the work. For full information and confirmed dates on TTC closures, visit:
https://www.ttc.ca/Service_Advisories/Subway_closures/index.jsp
– Work will occur 24 hours a day on Berwick from 7am Friday to 7am Monday.
– Additional weekend subway closures are anticipated throughout 2019.
TTC Service
Building
Rendering
Eglinton Station – Underpinning the TTC Line 1 Subway
• The next major feat at Eglinton Station will be underpinning the TTC’s Line 1 Subway
box, allowing for excavation down to the bottom of the LRT station box (depicted
below).
• With the exception of some weekend closures, the subway will remain in operation
during underpinning, excavation, and station construction.
Rendering of
subway box
underpinning
Eglinton Station – Construction Progress Photos
Deep excavation
underway at the
Salvation Army site
Deep excavation
underway west of
Yonge St
Mt Pleasant Station Renderings
MAIN ENTRANCE SECONDARY ENTRANCE
CONCOURSE PLATFORM
Mt Pleasant Station Update
11
Year What to Expect
2019
• Excavation and roof construction on the south side of
Eglinton Ave
• Construction will move to the north side of Eglinton Ave in
August 2019
• Excavation and roof construction on the north side of
Eglinton Ave
2020
• Eglinton Ave and Mt Pleasant Rd will return to two lanes in
each direction, with some road occupation for truck access
• Deep excavation and station entrance construction
Mt Pleasant Station Staging
12
Mid-March 2019 through July 2019
Mt Pleasant Station Progress Photos
Leaside Station – Renderings
SECONDARY ENTRANCE
MAIN ENTRANCEAERIAL VIEW
ENTRANCE INTERIOR
Leaside Station Update
15
• Wet utilities work, excavation, earth hauling and concrete and material
deliveries will continue on the surface throughout 2019.
• Traffic conditions will change in late March to facilitate works on a large water
main on the NE corner of Bayview and Eglinton.
• In June 2019 traffic conditions will change to support the deep excavation
works.
• Main and Secondary Entrance sites will be the main access points for the deep
excavation underneath Eglinton Avenue.
• Large tower cranes will be installed in both entrances to facilitate deep
excavation works (Summer 2019).
Leaside Station Staging
– March 25 2019 to early June 2019
16
Leaside Station Staging
– June 2019 to late 2019
17
Leaside Station – Renderings
Future Main
Entrance Interior
SECONDARY ENTRANCE
EXCAVATION
WORK BELOW DECKING
TRAFFIC DECK
INSTALLATION
MAIN ENTRANCE
EXCAVATION
Laird Station – Renderings
SECONDARY ENTRANCE
MAIN ENTRANCEAERIAL VIEW
ENTRANCE INTERIOR
Laird Station Update
20
Year What to Expect
2019-2020
• 24 hour mining excavation work will continue to late 2019
• Final lining works are underway in the cavern between the main and
secondary entrances.
• Final lining will begin on other sections of the cavern as mining
excavation is completed. This work will be ongoing to early 2020.
• Waterproofing and concrete works for station foundation, walls,
ceiling and platforms will occur inside of the complete caverns.
• During concrete pour operations, there will be continuous
delivery of concrete to the surface site.
• In late 2019, final lining works will begin in the main and secondary
entrance shafts.
• Architectural works and track & systems installation will begin in 2020
Laird Station Staging
Laird Station Mining Works
22
Cross Cut
Access Adit
Main Entrance
Cavern
Secondary
Entrance
Area being mined underneath Eglinton Ave – from west of Laird Drive to Brentcliffe Road
S
Laird Station Progress Photos
WATERPROOFING &
CAVERN VIEW
PREPARATION FOR
ARCH POUR
CAVERN MINING
EXCAVATION
PREPARATION FOR
ARCH POUR

More Related Content

What's hot

Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
Crosstown TO
 
Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020
Crosstown TO
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Crosstown TO
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021
Crosstown TO
 
Eastern Works Open House - October 24, 2019
Eastern Works Open House  - October 24, 2019Eastern Works Open House  - October 24, 2019
Eastern Works Open House - October 24, 2019
Crosstown TO
 
Fall Open House: Mount Dennis - Caledonia
Fall Open House: Mount Dennis - CaledoniaFall Open House: Mount Dennis - Caledonia
Fall Open House: Mount Dennis - Caledonia
Crosstown TO
 
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - Sept 2019
Pharmacy to Kennedy Construction Liaison Committee Meeting - Sept 2019Pharmacy to Kennedy Construction Liaison Committee Meeting - Sept 2019
Pharmacy to Kennedy Construction Liaison Committee Meeting - Sept 2019
Crosstown TO
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020
Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
Crosstown TO
 
Central West Open House (Cedarvale to Eglinton Stations)
Central West Open House (Cedarvale to Eglinton Stations)Central West Open House (Cedarvale to Eglinton Stations)
Central West Open House (Cedarvale to Eglinton Stations)
Crosstown TO
 
Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021
Crosstown TO
 
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018
Crosstown TO
 
Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018
Crosstown TO
 
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
Crosstown TO
 
Pharmacy kennedy clc meeting -january 29 2019
Pharmacy kennedy clc meeting -january 29 2019Pharmacy kennedy clc meeting -january 29 2019
Pharmacy kennedy clc meeting -january 29 2019
Crosstown TO
 
Spring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to CedarvaleSpring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to Cedarvale
Crosstown TO
 

What's hot (20)

Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - March 2019
 
Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021
 
Eastern Works Open House - October 24, 2019
Eastern Works Open House  - October 24, 2019Eastern Works Open House  - October 24, 2019
Eastern Works Open House - October 24, 2019
 
Fall Open House: Mount Dennis - Caledonia
Fall Open House: Mount Dennis - CaledoniaFall Open House: Mount Dennis - Caledonia
Fall Open House: Mount Dennis - Caledonia
 
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - Sept 2019
Pharmacy to Kennedy Construction Liaison Committee Meeting - Sept 2019Pharmacy to Kennedy Construction Liaison Committee Meeting - Sept 2019
Pharmacy to Kennedy Construction Liaison Committee Meeting - Sept 2019
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
 
Central West Open House (Cedarvale to Eglinton Stations)
Central West Open House (Cedarvale to Eglinton Stations)Central West Open House (Cedarvale to Eglinton Stations)
Central West Open House (Cedarvale to Eglinton Stations)
 
Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021
 
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018
 
Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018
 
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
 
Pharmacy kennedy clc meeting -january 29 2019
Pharmacy kennedy clc meeting -january 29 2019Pharmacy kennedy clc meeting -january 29 2019
Pharmacy kennedy clc meeting -january 29 2019
 
Spring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to CedarvaleSpring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to Cedarvale
 

Similar to Central East Open House Spring 2019

Central West Open House
Central West Open HouseCentral West Open House
Central West Open House
Crosstown TO
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
Crosstown TO
 
Fall18 Open House Western Segment Works
Fall18 Open House   Western Segment WorksFall18 Open House   Western Segment Works
Fall18 Open House Western Segment Works
Crosstown TO
 
Eastern Works Open House
Eastern Works Open House Eastern Works Open House
Eastern Works Open House
Crosstown TO
 
Western works final
Western works final Western works final
Western works final
Crosstown TO
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
Crosstown TO
 
Central West Fall Open House - Oct 28 2019
Central West Fall Open House - Oct 28 2019Central West Fall Open House - Oct 28 2019
Central West Fall Open House - Oct 28 2019
Crosstown TO
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
Crosstown TO
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
Crosstown TO
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
Crosstown TO
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017
Crosstown TO
 
Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017
Crosstown TO
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017
Crosstown TO
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
Crosstown TO
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Crosstown TO
 
Central open house - oct 2019
Central open house - oct 2019Central open house - oct 2019
Central open house - oct 2019
Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
Crosstown TO
 
Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017
Crosstown TO
 
Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018
Crosstown TO
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018
Crosstown TO
 

Similar to Central East Open House Spring 2019 (20)

Central West Open House
Central West Open HouseCentral West Open House
Central West Open House
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
 
Fall18 Open House Western Segment Works
Fall18 Open House   Western Segment WorksFall18 Open House   Western Segment Works
Fall18 Open House Western Segment Works
 
Eastern Works Open House
Eastern Works Open House Eastern Works Open House
Eastern Works Open House
 
Western works final
Western works final Western works final
Western works final
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
Central West Fall Open House - Oct 28 2019
Central West Fall Open House - Oct 28 2019Central West Fall Open House - Oct 28 2019
Central West Fall Open House - Oct 28 2019
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017
 
Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
 
Central open house - oct 2019
Central open house - oct 2019Central open house - oct 2019
Central open house - oct 2019
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
 
Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017
 
Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018
 

More from Crosstown TO

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdf
Crosstown TO
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
Crosstown TO
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023
Crosstown TO
 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdf
Crosstown TO
 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Crosstown TO
 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Crosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
Crosstown TO
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Crosstown TO
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
Crosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
Crosstown TO
 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptx
Crosstown TO
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
Crosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
Crosstown TO
 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Crosstown TO
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Crosstown TO
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Crosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
Crosstown TO
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Crosstown TO
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdf
Crosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
Crosstown TO
 

More from Crosstown TO (20)

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdf
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023
 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdf
 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptx
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptx
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
 

Recently uploaded

TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
Cheong Man Keong
 
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
afsebu
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
Congressional Budget Office
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
narinav14
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
Bharat Mata
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
teeaszt
 
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdfLecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
tshree896
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
Energy for One World
 
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdfGUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
ProexportColombia1
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
zvpwjpty
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
JuanFelipeHerrera4
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
Congressional Budget Office
 
History Of Balochistan amazing .pptx / HOB
History Of Balochistan amazing .pptx      / HOBHistory Of Balochistan amazing .pptx      / HOB
History Of Balochistan amazing .pptx / HOB
uzma baloch
 
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
Scribe
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
JSchaus & Associates
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 

Recently uploaded (20)

TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
 
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
 
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdfLecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
 
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdfGUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
在线制作(umich毕业证书)美国密歇根大学毕业证学位证书原版一模一样
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
 
History Of Balochistan amazing .pptx / HOB
History Of Balochistan amazing .pptx      / HOBHistory Of Balochistan amazing .pptx      / HOB
History Of Balochistan amazing .pptx / HOB
 
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 

Central East Open House Spring 2019

  • 1. Mission We connect our communities Vision Getting you there better, faster and easier Values Play as a team Think forward Serve with passion 1 Metrolinx overview
  • 2. go transit, up express, presto 2Metrolinx Overview • Serve a population of more than seven million across more than 11,000 square km stretching from Hamilton and Kitchener-Waterloo in the west to Newcastle and Peterborough in the east, and from Orangeville and Beaverton in the north to Niagara Falls in the south. • In operation since 1967, GO now carries more than 70 million passengers a year. • The PRESTO card is the smart card fare payment system seamlessly connecting 11 transit agencies across the GTHA and Ottawa. • PRESTO replaces the need for tickets, tokens, passes or cash. • UP Express connects the country's two busiest transportation hubs: Toronto Pearson International Airport and Union Station in downtown Toronto, offering a 25-minute journey from end to end, with trains departing every 15 minutes.
  • 3. Regional transit map – connecting the region 3 Metrolinx overview
  • 4. Regional Transportation Plan 4 Vision: The GTHA will have a sustainable transportation system that is aligned with land use, and supports healthy and complete communities. The system will provide safe, convenient and reliable connections, and support a high quality of life, a prosperous and competitive economy, and a protected environment. 31 Priority Actions to Support the 5 Strategies • Metrolinx published the first regional transportation plan (RTP) for the Greater Toronto and Hamilton Area (GTHA) in 2008. • We are required to review the RTP at least every ten years, in alignment with Ontario’s Growth Plan for the Greater Golden Horseshoe. • The legislative review of initial RTP led to the development of the 2041 RTP. Key outcomes include: o Quadrupling the number of people and doubling the number of jobs within walking distance of Frequent Rapid Transit o 27x more kilometres of the Frequent Rapid Transit o In addition to the capital costs, successful implementation will also require operating funding for transit services, fare integration and programs for walking and cycling Metrolinx Overview
  • 5. Eglinton Station – Renderings Main Entrance Future Main Entrance Site Future Main Entrance Interior Main Entrance Features  Accessible entrance  Connections to LRT and TTC Line 1 Subway Interchange Station Features  Underground connections to all four corners of the intersection including the Yonge-Eglinton Centre and Canada Square
  • 6. Eglinton Station – Ongoing and Upcoming Works • Shoring activities (piling, tie-backs, and decking installation) will be ongoing on Eglinton Avenue at Holly Street until Spring 2019. • Deep excavation is underway in preparation for the underpinning of the TTC Line 1 Subway box. – This work includes excavating to the bottom of the future station box (approximately 22 meters at the deepest point). – Spoils from the excavation will be extracted and hauled from the existing TTC bus depot site at the southeast corner of Duplex Avenue and Eglinton Avenue West, and the Salvation Army site at the corner of Eglinton Avenue East and Cowbell Lane. – Excavation work has been starting as early as 4:00 a.m. to maintain schedule. Noise mitigation efforts will be in place while this work gets underway. The upcoming traffic configuration (right) will be in place as early as Spring 2019 and will remain for the year.
  • 7. Eglinton Station – Ongoing and Upcoming Works • Construction of the TTC service building at Berwick Avenue continues with pre-cast concrete installations: • The subway will close on the weekends crews are working (1:30am Saturday to 6am Monday) to safely carry out the work. For full information and confirmed dates on TTC closures, visit: https://www.ttc.ca/Service_Advisories/Subway_closures/index.jsp – Work will occur 24 hours a day on Berwick from 7am Friday to 7am Monday. – Additional weekend subway closures are anticipated throughout 2019. TTC Service Building Rendering
  • 8. Eglinton Station – Underpinning the TTC Line 1 Subway • The next major feat at Eglinton Station will be underpinning the TTC’s Line 1 Subway box, allowing for excavation down to the bottom of the LRT station box (depicted below). • With the exception of some weekend closures, the subway will remain in operation during underpinning, excavation, and station construction. Rendering of subway box underpinning
  • 9. Eglinton Station – Construction Progress Photos Deep excavation underway at the Salvation Army site Deep excavation underway west of Yonge St
  • 10. Mt Pleasant Station Renderings MAIN ENTRANCE SECONDARY ENTRANCE CONCOURSE PLATFORM
  • 11. Mt Pleasant Station Update 11 Year What to Expect 2019 • Excavation and roof construction on the south side of Eglinton Ave • Construction will move to the north side of Eglinton Ave in August 2019 • Excavation and roof construction on the north side of Eglinton Ave 2020 • Eglinton Ave and Mt Pleasant Rd will return to two lanes in each direction, with some road occupation for truck access • Deep excavation and station entrance construction
  • 12. Mt Pleasant Station Staging 12 Mid-March 2019 through July 2019
  • 13. Mt Pleasant Station Progress Photos
  • 14. Leaside Station – Renderings SECONDARY ENTRANCE MAIN ENTRANCEAERIAL VIEW ENTRANCE INTERIOR
  • 15. Leaside Station Update 15 • Wet utilities work, excavation, earth hauling and concrete and material deliveries will continue on the surface throughout 2019. • Traffic conditions will change in late March to facilitate works on a large water main on the NE corner of Bayview and Eglinton. • In June 2019 traffic conditions will change to support the deep excavation works. • Main and Secondary Entrance sites will be the main access points for the deep excavation underneath Eglinton Avenue. • Large tower cranes will be installed in both entrances to facilitate deep excavation works (Summer 2019).
  • 16. Leaside Station Staging – March 25 2019 to early June 2019 16
  • 17. Leaside Station Staging – June 2019 to late 2019 17
  • 18. Leaside Station – Renderings Future Main Entrance Interior SECONDARY ENTRANCE EXCAVATION WORK BELOW DECKING TRAFFIC DECK INSTALLATION MAIN ENTRANCE EXCAVATION
  • 19. Laird Station – Renderings SECONDARY ENTRANCE MAIN ENTRANCEAERIAL VIEW ENTRANCE INTERIOR
  • 20. Laird Station Update 20 Year What to Expect 2019-2020 • 24 hour mining excavation work will continue to late 2019 • Final lining works are underway in the cavern between the main and secondary entrances. • Final lining will begin on other sections of the cavern as mining excavation is completed. This work will be ongoing to early 2020. • Waterproofing and concrete works for station foundation, walls, ceiling and platforms will occur inside of the complete caverns. • During concrete pour operations, there will be continuous delivery of concrete to the surface site. • In late 2019, final lining works will begin in the main and secondary entrance shafts. • Architectural works and track & systems installation will begin in 2020
  • 22. Laird Station Mining Works 22 Cross Cut Access Adit Main Entrance Cavern Secondary Entrance Area being mined underneath Eglinton Ave – from west of Laird Drive to Brentcliffe Road S
  • 23. Laird Station Progress Photos WATERPROOFING & CAVERN VIEW PREPARATION FOR ARCH POUR CAVERN MINING EXCAVATION PREPARATION FOR ARCH POUR