PGPM12 Page 1
ASSIGNMENT NO -2
ON
“HUMAN RESOURCE MANAGEMENT”
(PGPM – 12)
SUBMITTED TO:
NATIONAL INSTITUTE OF CONTRUCTION
MANAGEMENT
& RESEARCH (NICMAR) PUNE.
SCHOOL OF DISTANCE EDUCATION (SODE)
By
Mr. abc
(PGDPM)
Reg.no.-abc
PGPM12 Page 2
HUMAN
RESOURCE
MANAGEMENT
PGPM12 Page 3
CONTENTS
SR.NO. DESCRIPTION PAGE NO.
1 ASSIGNMENT. 4
2 UNDERSTANDING THE MAIN PROBLEM. 4
3 REASONS OF VARIOUS PROBLEM 4
4 NEEDS AND THEIR FULFILLMENT AT SITE 5
5 SUGGESTED METHOD FOR HYGIENE
FACTORS
7
6 SUGGESTED METHOD FOR MOTIVATIONAL
FACTORS
7
7 RECOMMENDATION TO MANAGEMENT 8
8 BIBLIOGRAPHY/ READINGS 9
PGPM12 Page 4
ASSIGNMENT:
You are a Project Manager on site where work for 3K.m. long Tunnel has been undertaken.
The site is remote and takes about 2 days travel to nearest town. Supervisors, Technicians
& Skilled Workers are engaged in dangerous / hazardous work. Absenteeism due to
sickness, quarrels, drinking are adding to less output of work and chances of accidents on
site are increasing. Management has urged to do something so that time targets can be
achieved. Discuss how will you tackle the problem and increase the output of the work.
UNDERSTANDINGTHE MAIN PROBLEM:
It is a typical problem faced at construction site located in remote regions. Both workforce
and management slowly become tired with a life of work and no source of entertainment,
social gathering etc. It leads to frustration among people working in remote areas. But the
case presented here has worsened, possibly due to lack of basic infrastructure i.e. proper
housing and healthcare facilities and easy availability of liquor.
Also it is evident that a safety officer is not present at the work site and work force is not
kept motivated by the leadership. As a result the project is losing both quality and time.
MAIN PROBLEMS:
1. Absenteeism Due To Sickness: Lack of Medication, Bad housekeeping and good food
facility at site, Unviability of basic infrastructure like toilets, Hunt, drainage, bad
transportation facilities etc.
2. Absenteeism Due To Quarrels: Lack of Motivation and creating team sprits among staff.
3. Drinking of alcohol: Lack of Discipline at site, Easy Availability of alcohol.
4. Accidents at site: improper training of staff desired work, Lack of Safety Officer ti create
awareness among staff to follow required level of safety during work e.g. Safety shoes,
Helmet, Hand Glows, reflective jackets, Safety belt etc.
5. Motivational problems: to create awareness in staff that different from other staff that’s
why only they got opportunity to work under those circumstances isolated area with
high level of challenges.
REASONS OF VARIOUS PROBLEMS:
Lack of Manpower Management (or) Planning
Un-Hygienic surroundings & Temporary Accommodation
Lack of Medication
Lack of healthy food.
Lack of religious places.
Lack of Discipline at site
Availability of Alcohol
Lack of Safety officer and awareness among staff for following safety norms during work.
Lack of good accommodation for worker and staff.
Lack of basic facility like toilet, shops etc.
Lack of social gathering for creating good environment among staff and worker.
PGPM12 Page 5
Creating team spirit among the staff.
NEEDS AND THEIR FULFILMENTON SITE:-
Lack of Manpower Management (or) Planning
 Prepare a proper schedule of the Project and Assign Resources to each Task i.e. each
Activity, Assigning Resources means Identify manpower required for each Task and
what is the availability of manpower and how much work has been done till date
and how much work is to be done. Identify Type of manpower required i.e. Skilled
(or) unskilled.
 If manpower is in adequate try to get more manpower or Try to use the available
manpower Fully so that maximum amount of work to complete and try to complete
the Urgent woks such that it does not affect our project duration, reschedule the
project and updated schedule to head office and inform them weekly work progress
so that they can help you to overcome the manpower problem (or),
 Try to motivate the available manpower by giving extra benefits if they complete the
project in time. (Or)
 If manpower is very less than required then immediately inform head office so that
they can send some more manpower so that the project can run smoothly.
 Suggestion & Recommendation to Management on Manpower Management
(or) Planning
Understand the project in all respects and get all details of the projects i.e.
o Site condition,
o contract conditions,
o technical specifications,
o construction techniques, and
o time frame.
Working out the labour component in various parameters of the project .by using
constants to workout labour requirement Classifying and categorizing labour
requirement and various jobs by level of skill, responsibility, nature of work etc.
Determine the duration of each job or task at every stage of project.
Estimate the number of manpower required in view of the anticipated of
absenteeism and labour turnover and the stability factor.
After understanding the factors stated above, following principles should be
applied
o Care and skill should be exercised in the selection of employees.
o Introduction to the job should be friendly, skillful and adequate.
o Each employee should be made to feel that his efforts are really appreciated.
PGPM12 Page 6
Administrative setup
Based on the construction programme and various other norms, the administrative set up
is worked out for completion of project.
Un-Hygienic surroundings & Temporary Accommodation
Before Starting of the project Management has to well plan because this project is long
duration so manpower involved will be more it is the one of the preliminary need for the
employees & workers.
Lack of Medication
Management should send a medical team to site and they should stay there till completion
of project. They should be supplied necessary equipments and medical kits so that they can
manage any hazardous situation i.e. any sudden accidents they can handle the situation,
any epidemic occurred they can overcome that situation. By this work will be smoothly
progressed and number of workers absenteeism will be reduced. Worker who is sick will
be taken care by medical team he will be recovered quickly and he can start doing the work
so that manpower problem is solved.
Lack of healthy food:
Place is completely isolated from town so management should take step forward by giving
healthy food to staff and worker with low cost.
Lack of Discipline at site:
Management should setup some rules and regulation regarding work such as:
1. Presenting at work site in good manner.
2. Drinking of alcohol or eating of unhealthy material at site during work is prohibited.
3. Discussion on any sensitive issue like religion etc. is not allowed in group.
Availability of Alcohol:
Good security system should be adopted to find out places where selling of alcoholic
product is being done and with the approval of management strong action shall be taken to
stop such activity
Lack of social gathering for creating good environment among staff and worker.
Absenteeism and Turnover
The Department of Energy study indicated that the absenteeism and turnover are a
relatively minor concern to workmen. Still, they can have a major impact on total project
productivity. High rates of absenteeism are a concern, however, to individuals who had to
carry extra workloads to compensate for missing crewmembers. The low job satisfaction
resulted in high absence from work and high turnover. Thus absenteeism and turnover can
PGPM12 Page 7
be viewed as effects of motivational Activities or demotivation concerns. The cost of
motivational programs is often justified by the reduced absenteeism and turnover.
SUGGESTION METHODS FOR HYGIENE FACTORS:-
Management has to well plan for the temporary shelters in such a way that number of
workers will be involved in the project and how many shelters are required and for
different category of employees will be working at site and different types of shelters
should be constructed with different facility what all materials required for construction
any how much time required to construct it so that all those thing should be completed
before starting of project, Management should built temporary shelters for the workers
who will be working at site because the site is at remote area workers cannot be able to say
at their home and come for work it is the preliminary requirement for the workers so
management has to take extra precautions, A site office also be built with all necessary
requirements, drinking water should be good because most of diseases are spread by water
so it is important step to taken care by management.
SUGGESTION METHODS FOR MOTIVATIONALFACTOR:-
Motivation of Employees in Construction Project
Motivation is the driving force within individuals that drive them physiologically and
psychologically to pursue one or more goals to fulfil their needs or expectations. Motivators
may be intrinsic or extrinsic. An example of an intrinsic motivator is the self-fulfilment of a
worker as a result of performing a task well.
Motivation of labour in Construction Project
Construction labour can be motivated. This is important because dwindling productivity is
a major problem confronting construction today. Productivity has decreased every year for
the past decade, in part because of increasing design complexity, more rigorous federal and
state regulations and socio-economic changes affecting the work force. Our findings
indicate that a highly motivated workforce enhances productivity and project effectiveness.
In construction, the work itself— that is, the building of a structure for all to behold is a key
motivator for all levels of management and the work force.
PGPM12 Page 8
RECOMMENDATIONS TO MANAEGMENT:-
Management always do cost cutting by not providing basic needs to staff and worker,
saving money with less safety equipment, not providing good facility of transportation and
accommodation.
Project manager shall relies to Management due to above points staff are leaving job or not
doing their work with willingness and more time and money are getting involved in
interview of new people and their training and before we make good system of work its
getting brock up due to issues which is very small in compared to companies goal and
target.
PGPM12 Page 9
BIBLIOGRAPHY / READINGS
MANAGEMENT IN ORGANIZATION BY KOONTZ AND ODONEAL, MCGRAW HILL
PUBLICATION

More Related Content

What's hot

Webinar- Recruitment Process Outsourcing
Webinar- Recruitment Process OutsourcingWebinar- Recruitment Process Outsourcing
Webinar- Recruitment Process OutsourcingG&A Partners
 
The Importance of an SLA in RPO
The Importance of an SLA in RPOThe Importance of an SLA in RPO
The Importance of an SLA in RPORavi Subramanian
 
Manpower General Presentation Slideshow
Manpower General Presentation SlideshowManpower General Presentation Slideshow
Manpower General Presentation SlideshowGretMathews
 
Humanresourceplanningppt 130605113259-phpapp01
Humanresourceplanningppt 130605113259-phpapp01Humanresourceplanningppt 130605113259-phpapp01
Humanresourceplanningppt 130605113259-phpapp01shreyansoswal3
 
HR Curriculum Vitae – Neeraj Kumar Pandey
HR Curriculum Vitae – Neeraj Kumar PandeyHR Curriculum Vitae – Neeraj Kumar Pandey
HR Curriculum Vitae – Neeraj Kumar PandeyNeeraj Pandey
 
Human Resource Management Strategy Powerpoint Presentation Slides
Human Resource Management Strategy Powerpoint Presentation SlidesHuman Resource Management Strategy Powerpoint Presentation Slides
Human Resource Management Strategy Powerpoint Presentation SlidesSlideTeam
 
Global Trends in RPO and Talent Recruitment 2014
Global Trends in RPO and Talent Recruitment 2014 Global Trends in RPO and Talent Recruitment 2014
Global Trends in RPO and Talent Recruitment 2014 Kelly Services
 
Talent acquisition strategy
Talent acquisition strategyTalent acquisition strategy
Talent acquisition strategySandhya Johnson
 
2010 Manpower Overview
2010 Manpower Overview2010 Manpower Overview
2010 Manpower OverviewManpower
 
Strategic Human Resource Planning PowerPoint Presentation Slides
Strategic Human Resource Planning PowerPoint Presentation Slides Strategic Human Resource Planning PowerPoint Presentation Slides
Strategic Human Resource Planning PowerPoint Presentation Slides SlideTeam
 
HR consultancy Business Plan
HR consultancy Business PlanHR consultancy Business Plan
HR consultancy Business PlanSajjad Hussain
 
Building a Business Case to Support Your RPO Decision
Building a Business Case to Support Your RPO DecisionBuilding a Business Case to Support Your RPO Decision
Building a Business Case to Support Your RPO DecisionHROAssoc
 
ManpowerGroup Academy 2021
ManpowerGroup Academy 2021ManpowerGroup Academy 2021
ManpowerGroup Academy 2021Mohammad Kashif
 
Staffing services
Staffing servicesStaffing services
Staffing servicesV2Soft
 

What's hot (19)

Webinar- Recruitment Process Outsourcing
Webinar- Recruitment Process OutsourcingWebinar- Recruitment Process Outsourcing
Webinar- Recruitment Process Outsourcing
 
The Importance of an SLA in RPO
The Importance of an SLA in RPOThe Importance of an SLA in RPO
The Importance of an SLA in RPO
 
Manpower General Presentation Slideshow
Manpower General Presentation SlideshowManpower General Presentation Slideshow
Manpower General Presentation Slideshow
 
Resume
ResumeResume
Resume
 
Human Resources Planning, Recruitment
Human Resources Planning, RecruitmentHuman Resources Planning, Recruitment
Human Resources Planning, Recruitment
 
Humanresourceplanningppt 130605113259-phpapp01
Humanresourceplanningppt 130605113259-phpapp01Humanresourceplanningppt 130605113259-phpapp01
Humanresourceplanningppt 130605113259-phpapp01
 
HR Curriculum Vitae – Neeraj Kumar Pandey
HR Curriculum Vitae – Neeraj Kumar PandeyHR Curriculum Vitae – Neeraj Kumar Pandey
HR Curriculum Vitae – Neeraj Kumar Pandey
 
Human Resource Management Strategy Powerpoint Presentation Slides
Human Resource Management Strategy Powerpoint Presentation SlidesHuman Resource Management Strategy Powerpoint Presentation Slides
Human Resource Management Strategy Powerpoint Presentation Slides
 
Global Trends in RPO and Talent Recruitment 2014
Global Trends in RPO and Talent Recruitment 2014 Global Trends in RPO and Talent Recruitment 2014
Global Trends in RPO and Talent Recruitment 2014
 
Talent acquisition strategy
Talent acquisition strategyTalent acquisition strategy
Talent acquisition strategy
 
2010 Manpower Overview
2010 Manpower Overview2010 Manpower Overview
2010 Manpower Overview
 
Teamlease RPO
Teamlease RPO Teamlease RPO
Teamlease RPO
 
Strategic Human Resource Planning PowerPoint Presentation Slides
Strategic Human Resource Planning PowerPoint Presentation Slides Strategic Human Resource Planning PowerPoint Presentation Slides
Strategic Human Resource Planning PowerPoint Presentation Slides
 
HR consultancy Business Plan
HR consultancy Business PlanHR consultancy Business Plan
HR consultancy Business Plan
 
Building a Business Case to Support Your RPO Decision
Building a Business Case to Support Your RPO DecisionBuilding a Business Case to Support Your RPO Decision
Building a Business Case to Support Your RPO Decision
 
Tranning & development
Tranning & developmentTranning & development
Tranning & development
 
ManpowerGroup Academy 2021
ManpowerGroup Academy 2021ManpowerGroup Academy 2021
ManpowerGroup Academy 2021
 
Tyra Spears[4]
Tyra Spears[4]Tyra Spears[4]
Tyra Spears[4]
 
Staffing services
Staffing servicesStaffing services
Staffing services
 

Viewers also liked

Pgpm11 principles & practice of managment
Pgpm11 principles & practice of managmentPgpm11 principles & practice of managment
Pgpm11 principles & practice of managmentsakariya88
 
Pgpm13 project procurement and materials
Pgpm13 project procurement and materialsPgpm13 project procurement and materials
Pgpm13 project procurement and materialssakariya88
 
QUANTITY SURVEYING & ESTIMATION- Nicmar
QUANTITY SURVEYING & ESTIMATION- NicmarQUANTITY SURVEYING & ESTIMATION- Nicmar
QUANTITY SURVEYING & ESTIMATION- NicmarMuneesh Methwani
 
Pgpm14 infrastructure development
Pgpm14 infrastructure developmentPgpm14 infrastructure development
Pgpm14 infrastructure developmentsakariya88
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingsooricivil
 
GPPM Certificate with UAE attestation and Arabic Translation
GPPM Certificate with UAE attestation and Arabic TranslationGPPM Certificate with UAE attestation and Arabic Translation
GPPM Certificate with UAE attestation and Arabic Translationsundarbabu ramanathan
 
Final day iv pgpm sem iii 2013 enmvio scan
Final day iv pgpm sem iii 2013 enmvio scanFinal day iv pgpm sem iii 2013 enmvio scan
Final day iv pgpm sem iii 2013 enmvio scanAlok Upadhyay
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
Principle and practices of management
Principle and practices of managementPrinciple and practices of management
Principle and practices of managementagarwalcards
 
Operations Management: Production System
Operations Management: Production SystemOperations Management: Production System
Operations Management: Production SystemSarabjeet Singh
 
Industrial disputes act, 1947
Industrial disputes act, 1947Industrial disputes act, 1947
Industrial disputes act, 1947Bibin Ssb
 

Viewers also liked (12)

Pgpm11 principles & practice of managment
Pgpm11 principles & practice of managmentPgpm11 principles & practice of managment
Pgpm11 principles & practice of managment
 
Pgpm13 project procurement and materials
Pgpm13 project procurement and materialsPgpm13 project procurement and materials
Pgpm13 project procurement and materials
 
QUANTITY SURVEYING & ESTIMATION- Nicmar
QUANTITY SURVEYING & ESTIMATION- NicmarQUANTITY SURVEYING & ESTIMATION- Nicmar
QUANTITY SURVEYING & ESTIMATION- Nicmar
 
Pgpm14 infrastructure development
Pgpm14 infrastructure developmentPgpm14 infrastructure development
Pgpm14 infrastructure development
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
GPPM Certificate with UAE attestation and Arabic Translation
GPPM Certificate with UAE attestation and Arabic TranslationGPPM Certificate with UAE attestation and Arabic Translation
GPPM Certificate with UAE attestation and Arabic Translation
 
Final day iv pgpm sem iii 2013 enmvio scan
Final day iv pgpm sem iii 2013 enmvio scanFinal day iv pgpm sem iii 2013 enmvio scan
Final day iv pgpm sem iii 2013 enmvio scan
 
Srinivas Gosula....CV
Srinivas Gosula....CVSrinivas Gosula....CV
Srinivas Gosula....CV
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
Principle and practices of management
Principle and practices of managementPrinciple and practices of management
Principle and practices of management
 
Operations Management: Production System
Operations Management: Production SystemOperations Management: Production System
Operations Management: Production System
 
Industrial disputes act, 1947
Industrial disputes act, 1947Industrial disputes act, 1947
Industrial disputes act, 1947
 

Similar to HRM Assignment on Managing Remote Construction Workforce

execution chapter 2-1.ppt
execution chapter 2-1.pptexecution chapter 2-1.ppt
execution chapter 2-1.pptAbdiqadirOsman
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET Journal
 
Resume Juvena Naidoo
Resume Juvena NaidooResume Juvena Naidoo
Resume Juvena NaidooJuvena Naidoo
 
Michael_Malabanan_Roces
Michael_Malabanan_RocesMichael_Malabanan_Roces
Michael_Malabanan_RocesMICHAEL ROCES
 
Investigating the Effects of Replacing the Project Manager during Project Exe...
Investigating the Effects of Replacing the Project Manager during Project Exe...Investigating the Effects of Replacing the Project Manager during Project Exe...
Investigating the Effects of Replacing the Project Manager during Project Exe...James Dubber
 
Neelam pandey project management issues
Neelam pandey   project management issuesNeelam pandey   project management issues
Neelam pandey project management issuesPMInstituteIndia
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxStanleyChabata1
 
140080714002 paper-2
140080714002 paper-2140080714002 paper-2
140080714002 paper-2pitroda24977
 
CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1Sherrill Moore
 
Project management 02112009
Project management 02112009Project management 02112009
Project management 02112009Manish Chaurasia
 
I need help with my course project.docx
I need help with my course project.docxI need help with my course project.docx
I need help with my course project.docxwrite4
 
I need help with my course project.docx
I need help with my course project.docxI need help with my course project.docx
I need help with my course project.docxbkbk37
 
Sophie Walker - Portfolio
Sophie Walker - PortfolioSophie Walker - Portfolio
Sophie Walker - PortfolioSophie Walker
 
human resource planning.pptx
human resource planning.pptxhuman resource planning.pptx
human resource planning.pptxarcdf
 
Project management (A Basic Approach)
Project management (A Basic Approach)Project management (A Basic Approach)
Project management (A Basic Approach)Jed Concepcion
 
Human resource planning, Job analysis, Absenteeism and Employee turnover
Human resource planning, Job analysis, Absenteeism and Employee turnoverHuman resource planning, Job analysis, Absenteeism and Employee turnover
Human resource planning, Job analysis, Absenteeism and Employee turnoverSanthanalaxmi Karthikvel
 
case study.pdf
case study.pdfcase study.pdf
case study.pdfHongLc19
 

Similar to HRM Assignment on Managing Remote Construction Workforce (20)

Final Project.pptx
Final Project.pptxFinal Project.pptx
Final Project.pptx
 
execution chapter 2-1.ppt
execution chapter 2-1.pptexecution chapter 2-1.ppt
execution chapter 2-1.ppt
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
 
Planning
PlanningPlanning
Planning
 
Resume Juvena Naidoo
Resume Juvena NaidooResume Juvena Naidoo
Resume Juvena Naidoo
 
Michael_Malabanan_Roces
Michael_Malabanan_RocesMichael_Malabanan_Roces
Michael_Malabanan_Roces
 
Investigating the Effects of Replacing the Project Manager during Project Exe...
Investigating the Effects of Replacing the Project Manager during Project Exe...Investigating the Effects of Replacing the Project Manager during Project Exe...
Investigating the Effects of Replacing the Project Manager during Project Exe...
 
Neelam pandey project management issues
Neelam pandey   project management issuesNeelam pandey   project management issues
Neelam pandey project management issues
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptx
 
140080714002 paper-2
140080714002 paper-2140080714002 paper-2
140080714002 paper-2
 
Updated CV Jan. 2017
Updated CV Jan. 2017Updated CV Jan. 2017
Updated CV Jan. 2017
 
CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1
 
Project management 02112009
Project management 02112009Project management 02112009
Project management 02112009
 
I need help with my course project.docx
I need help with my course project.docxI need help with my course project.docx
I need help with my course project.docx
 
I need help with my course project.docx
I need help with my course project.docxI need help with my course project.docx
I need help with my course project.docx
 
Sophie Walker - Portfolio
Sophie Walker - PortfolioSophie Walker - Portfolio
Sophie Walker - Portfolio
 
human resource planning.pptx
human resource planning.pptxhuman resource planning.pptx
human resource planning.pptx
 
Project management (A Basic Approach)
Project management (A Basic Approach)Project management (A Basic Approach)
Project management (A Basic Approach)
 
Human resource planning, Job analysis, Absenteeism and Employee turnover
Human resource planning, Job analysis, Absenteeism and Employee turnoverHuman resource planning, Job analysis, Absenteeism and Employee turnover
Human resource planning, Job analysis, Absenteeism and Employee turnover
 
case study.pdf
case study.pdfcase study.pdf
case study.pdf
 

Recently uploaded

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 

Recently uploaded (20)

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 

HRM Assignment on Managing Remote Construction Workforce

  • 1. PGPM12 Page 1 ASSIGNMENT NO -2 ON “HUMAN RESOURCE MANAGEMENT” (PGPM – 12) SUBMITTED TO: NATIONAL INSTITUTE OF CONTRUCTION MANAGEMENT & RESEARCH (NICMAR) PUNE. SCHOOL OF DISTANCE EDUCATION (SODE) By Mr. abc (PGDPM) Reg.no.-abc
  • 3. PGPM12 Page 3 CONTENTS SR.NO. DESCRIPTION PAGE NO. 1 ASSIGNMENT. 4 2 UNDERSTANDING THE MAIN PROBLEM. 4 3 REASONS OF VARIOUS PROBLEM 4 4 NEEDS AND THEIR FULFILLMENT AT SITE 5 5 SUGGESTED METHOD FOR HYGIENE FACTORS 7 6 SUGGESTED METHOD FOR MOTIVATIONAL FACTORS 7 7 RECOMMENDATION TO MANAGEMENT 8 8 BIBLIOGRAPHY/ READINGS 9
  • 4. PGPM12 Page 4 ASSIGNMENT: You are a Project Manager on site where work for 3K.m. long Tunnel has been undertaken. The site is remote and takes about 2 days travel to nearest town. Supervisors, Technicians & Skilled Workers are engaged in dangerous / hazardous work. Absenteeism due to sickness, quarrels, drinking are adding to less output of work and chances of accidents on site are increasing. Management has urged to do something so that time targets can be achieved. Discuss how will you tackle the problem and increase the output of the work. UNDERSTANDINGTHE MAIN PROBLEM: It is a typical problem faced at construction site located in remote regions. Both workforce and management slowly become tired with a life of work and no source of entertainment, social gathering etc. It leads to frustration among people working in remote areas. But the case presented here has worsened, possibly due to lack of basic infrastructure i.e. proper housing and healthcare facilities and easy availability of liquor. Also it is evident that a safety officer is not present at the work site and work force is not kept motivated by the leadership. As a result the project is losing both quality and time. MAIN PROBLEMS: 1. Absenteeism Due To Sickness: Lack of Medication, Bad housekeeping and good food facility at site, Unviability of basic infrastructure like toilets, Hunt, drainage, bad transportation facilities etc. 2. Absenteeism Due To Quarrels: Lack of Motivation and creating team sprits among staff. 3. Drinking of alcohol: Lack of Discipline at site, Easy Availability of alcohol. 4. Accidents at site: improper training of staff desired work, Lack of Safety Officer ti create awareness among staff to follow required level of safety during work e.g. Safety shoes, Helmet, Hand Glows, reflective jackets, Safety belt etc. 5. Motivational problems: to create awareness in staff that different from other staff that’s why only they got opportunity to work under those circumstances isolated area with high level of challenges. REASONS OF VARIOUS PROBLEMS: Lack of Manpower Management (or) Planning Un-Hygienic surroundings & Temporary Accommodation Lack of Medication Lack of healthy food. Lack of religious places. Lack of Discipline at site Availability of Alcohol Lack of Safety officer and awareness among staff for following safety norms during work. Lack of good accommodation for worker and staff. Lack of basic facility like toilet, shops etc. Lack of social gathering for creating good environment among staff and worker.
  • 5. PGPM12 Page 5 Creating team spirit among the staff. NEEDS AND THEIR FULFILMENTON SITE:- Lack of Manpower Management (or) Planning  Prepare a proper schedule of the Project and Assign Resources to each Task i.e. each Activity, Assigning Resources means Identify manpower required for each Task and what is the availability of manpower and how much work has been done till date and how much work is to be done. Identify Type of manpower required i.e. Skilled (or) unskilled.  If manpower is in adequate try to get more manpower or Try to use the available manpower Fully so that maximum amount of work to complete and try to complete the Urgent woks such that it does not affect our project duration, reschedule the project and updated schedule to head office and inform them weekly work progress so that they can help you to overcome the manpower problem (or),  Try to motivate the available manpower by giving extra benefits if they complete the project in time. (Or)  If manpower is very less than required then immediately inform head office so that they can send some more manpower so that the project can run smoothly.  Suggestion & Recommendation to Management on Manpower Management (or) Planning Understand the project in all respects and get all details of the projects i.e. o Site condition, o contract conditions, o technical specifications, o construction techniques, and o time frame. Working out the labour component in various parameters of the project .by using constants to workout labour requirement Classifying and categorizing labour requirement and various jobs by level of skill, responsibility, nature of work etc. Determine the duration of each job or task at every stage of project. Estimate the number of manpower required in view of the anticipated of absenteeism and labour turnover and the stability factor. After understanding the factors stated above, following principles should be applied o Care and skill should be exercised in the selection of employees. o Introduction to the job should be friendly, skillful and adequate. o Each employee should be made to feel that his efforts are really appreciated.
  • 6. PGPM12 Page 6 Administrative setup Based on the construction programme and various other norms, the administrative set up is worked out for completion of project. Un-Hygienic surroundings & Temporary Accommodation Before Starting of the project Management has to well plan because this project is long duration so manpower involved will be more it is the one of the preliminary need for the employees & workers. Lack of Medication Management should send a medical team to site and they should stay there till completion of project. They should be supplied necessary equipments and medical kits so that they can manage any hazardous situation i.e. any sudden accidents they can handle the situation, any epidemic occurred they can overcome that situation. By this work will be smoothly progressed and number of workers absenteeism will be reduced. Worker who is sick will be taken care by medical team he will be recovered quickly and he can start doing the work so that manpower problem is solved. Lack of healthy food: Place is completely isolated from town so management should take step forward by giving healthy food to staff and worker with low cost. Lack of Discipline at site: Management should setup some rules and regulation regarding work such as: 1. Presenting at work site in good manner. 2. Drinking of alcohol or eating of unhealthy material at site during work is prohibited. 3. Discussion on any sensitive issue like religion etc. is not allowed in group. Availability of Alcohol: Good security system should be adopted to find out places where selling of alcoholic product is being done and with the approval of management strong action shall be taken to stop such activity Lack of social gathering for creating good environment among staff and worker. Absenteeism and Turnover The Department of Energy study indicated that the absenteeism and turnover are a relatively minor concern to workmen. Still, they can have a major impact on total project productivity. High rates of absenteeism are a concern, however, to individuals who had to carry extra workloads to compensate for missing crewmembers. The low job satisfaction resulted in high absence from work and high turnover. Thus absenteeism and turnover can
  • 7. PGPM12 Page 7 be viewed as effects of motivational Activities or demotivation concerns. The cost of motivational programs is often justified by the reduced absenteeism and turnover. SUGGESTION METHODS FOR HYGIENE FACTORS:- Management has to well plan for the temporary shelters in such a way that number of workers will be involved in the project and how many shelters are required and for different category of employees will be working at site and different types of shelters should be constructed with different facility what all materials required for construction any how much time required to construct it so that all those thing should be completed before starting of project, Management should built temporary shelters for the workers who will be working at site because the site is at remote area workers cannot be able to say at their home and come for work it is the preliminary requirement for the workers so management has to take extra precautions, A site office also be built with all necessary requirements, drinking water should be good because most of diseases are spread by water so it is important step to taken care by management. SUGGESTION METHODS FOR MOTIVATIONALFACTOR:- Motivation of Employees in Construction Project Motivation is the driving force within individuals that drive them physiologically and psychologically to pursue one or more goals to fulfil their needs or expectations. Motivators may be intrinsic or extrinsic. An example of an intrinsic motivator is the self-fulfilment of a worker as a result of performing a task well. Motivation of labour in Construction Project Construction labour can be motivated. This is important because dwindling productivity is a major problem confronting construction today. Productivity has decreased every year for the past decade, in part because of increasing design complexity, more rigorous federal and state regulations and socio-economic changes affecting the work force. Our findings indicate that a highly motivated workforce enhances productivity and project effectiveness. In construction, the work itself— that is, the building of a structure for all to behold is a key motivator for all levels of management and the work force.
  • 8. PGPM12 Page 8 RECOMMENDATIONS TO MANAEGMENT:- Management always do cost cutting by not providing basic needs to staff and worker, saving money with less safety equipment, not providing good facility of transportation and accommodation. Project manager shall relies to Management due to above points staff are leaving job or not doing their work with willingness and more time and money are getting involved in interview of new people and their training and before we make good system of work its getting brock up due to issues which is very small in compared to companies goal and target.
  • 9. PGPM12 Page 9 BIBLIOGRAPHY / READINGS MANAGEMENT IN ORGANIZATION BY KOONTZ AND ODONEAL, MCGRAW HILL PUBLICATION